Loading...
HomeMy WebLinkAbout2021-12-30; Clean Energy Alliance JPA; Resolution 2021-017DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE RESOLUTION NO. 2021-017 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CLEAN ENERGY ALLIANCE AMENDING RESOLUTION NO. 2021-007, SETTING RATES FOR CLEAN ENERGY ALLIANCE WHEREAS, the Clean Energy Alliance (CEA) is a joint powers agency formed on November 4, 2019, under the Joint Exercise of Power Act, California Government Code section 6500 et seq., among the Cities of Carlsbad, Solana Beach and Del Mar created by the cities of Carlsbad, Del Mar, and Solana Beach; and WHEREAS, Section 4.6 of the Joint Powers Authority (JPA) Agreement establishes the specific responsibility of the CEA Board of Directors to adopt retail rates for power; and WHEREAS, Section 6.5 of the JPA Agreement states CEA's power supply base product will be greater than or equal to 50% qualified renewable resources and the Board shall establish other product offerings; and WHEREAS, CEA established initial rates through adoption of Resolution 2021-007; and WHEREAS, the CEA Board desires to amend Resolution No. 2021-007 and set rates to ensure revenues sufficient to cover costs and comparability with San Diego Gas & Electric rates. NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the Clean Energy Alliance, as follows: Section 1. The Board of Directors of the Clean Energy Alliance hereby approves CEA Rates as detailed in Exhibit A. 1 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A The foregoing Resolution was approved and adopted this 30th day of December 2021, by the following vote: AYES: Druker, Inscoe, Musgrove, Bhat-Patel, Becker NOES: None ABSENT: None APPROVED : Kri sti Becker, Chair ATTEST: ~ DocuSlgned by: ~£.-~ 087CF7B87878476 ... Sheila Cobian, Interim Board Secretary 2 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE PROPOSED RATES EFFECTIVE JANUARY 1, 2022 Exhibit A The rates below reflect Clean Energy Alliance's (CEA) generation rate, and do not include San Diego Gas & Electric (SDG&E) delivery charge, General Municipal Surcharge (GMS), or the Power Charge Indifference Adjustment (Exit Fees) on SDG&E's CCA-CRS rate tariff. Information for these charges can be found at www.sdge.com. SDG&E to SDG&E Rate Mapping The table below maps SDG&E rates to CEA rates SDG&E RATE CEA RATE RESIDENTIAL Schedule DR-LI and Medical Baseline Customers DR-LI-MB DR-TOU, DR-TOU-CARE, DR-TOU-MB DR-TOU DR-SES, DR-SES-CARE, DR-SES-MB DR-SES EV-TOU EV-TOU EV-TOU-2, EV-TOU-2-CARE, EV-TOU-2-MB EV-TOU-2 EV-TOU-5, EV-TOU-5-CARE, EV-TOU-5-MB EV-TOU-5 TOU-DR-1, TOU-DR-1-CARE, TOU-DR-1-MB TOU-DR-1 TOU-DR-2, TOU-DR-CARE, TOU -DR-2-MB TOU-DR-2 TOU-DR, TOU-DR-CARE, TOU-DR-MB TOU-DR DR-SES (Grandfathered) G-DR-SES EV-TOU (Grandfathered) G-EV-TOU EV-TOU-2, EV-TOU-2-CARE, EV-TOU-2-MB (Grandfathered) G-EV-TOU-2 TOU-DR, TOU-DR-CARE, TOU-DR-MB (Grandfathered) G-TOU-DR COMMERCIAL/INDUSTRIAL TOU-A TOU-A-S TOU-A TOU-A-P TOU-A-LI, TOU-A-2-LI, TOU-M -LI E-LI-TOU AL-TOU-LI, DG-R-LI E-LI-NR TOU-A-2 -Secondary TOU-A-2-S TOU-A-2 -Primary TOU-A-2-P TOU-A-3 -Secondary TOU-A-3-S TOU-A-3 -Primary TOU-A-3-P TOU-M TOU-M A-TC A-TC OL-TOU OL-TOU AL-TOU -Secondary AL-TOU-S AL-TOU -Primary AL-TOU-P AL-TOU -Transmission AL-TOU-T AL-TOU-2 -Secondary AL-TOU-2-S AL-TOU-2 -Primary AL-TOU-2-P DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A SDG&E RATE AL-TOU-2 -Transmission DG-R -Secondary DG-R -Primary DG-T -Transmission A6-TOU -Primary A6-TOU -Transmission TOU-M (Grandfathered) OL-TOU (Grandfathered) TOU-A (Grandfathered) -Secondary TOU-A (Grandfathered) -Primary AL-TOU (Grandfathered) -Secondary AL-TOU (Grandfathered) -Primary AL-TOU (Grandfathered) -Transmission DG-R (Grandfathered) -Secondary -DG-R (Grandfathered) -Primary DG-R (Grandfathered) -Transmission A6-TOU (Grandfathered) -Primary A6-TOU (Grandfathered) -Transmission PUMPING/AGRICULTURE TOU-PA<20kW -Secondary TOU-PA<20kW -Primary TOU-PA-2>=20kW-Secondary TOU-PA-2>=20kW-Primary TOU-PA-3<20kW -Secondary TOU-PA-3<20kW -Primary TOU-PA-3>=20kW -Secondary TOU-PA-3>=20kW-Primary PA-T-1 -Secondary PA-T-1 -Primary PA-T-1 -Transmission PA-T-1 (Grandfathered) -Secondary PA-T-1 (Grandfathered) -Primary PA-T-1 (Grandfathered) -Transmission TOU-PA<20kW (Grandfathered) -Secondary TOU-PA<20kW (Grandfathered) -Primary TOU-PA>=20kW (Grandfathered) -Secondary TOU-PA>=20kW (Grandfathered) -Primary LIGHTING LS-1, LS-2, LS-3, OL-1, DWL and LS-2 DS Ol-2 LS-2 AD CEA Proposed Rate Schedule Effective January 1, 2022 CEA RATE AL-TOU-2-T DG-R-S DG-R-P DG-R-T A6-TOU-P A6-TOU-T G-TOU-M G-OL-TOU G-TOU-A-S G-TOU-A-P G-AL-TOU-S G-AL-TOU-P G-Al-TOU-T G-DG-R-S G-DG-R-P G-DG-R-T G-A6-TOU-P G-A6-TOU-T TOU-PA-S TOU-PA-P TOU-PA-2-S TOU-PA-2-P TOU-PA-3-S<20kW TOU-PA-3-P<20kW TOU-PA-3-S>=20kW TOU-PA-3-P>=20kW PA-T-1-S PA-T-1-P PA-T-1-T G-PA-T-1-S G-PA-T-1-P G-PA-T-1-T G-TOU-PA-S G-TOU-PA-P G-TOU-PA-2-S G-TOU-PA-2-P LS OL-2 LS-2-AD 2 DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A TIME-OF-USE PERIODS Weekdays Summer June 1-October 31 On-Peak 4pm-9pm Off-Peak 6am-4pm; 9pm -midnight Super Off-Peak Midnight-6am Weekends Summer June 1 -October 31 On-Peak 4pm-9pm Off-Peak 2pm -4pm; 9pm -midnight Super Off-Peak Midnight-2pm GRANDFATHERED TIME-OF-USE PERIODS On-Peak Semi-Peak Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 Summer June 1-October 31 llam-6pm Monday through Friday, excluding Holidays 6am-llam and 6pm- 10pm Monday through Friday, excluding Holidays 10pm-6am weekdays, and all hours weekends and Holidays Winter November 1 -May 31 4pm-9pm 6am -4pm Excluding 10am-2pm in March & April; 9pm -midnight Midnight-6am 10am -2pm in March & April Winter November 1 -May 31 4pm-9pm 2pm-4pm 9pm -midnight Midnight-2pm Winter November 1 -May 31 N/A 6am-6pm weekdays, and all hours on weekends and Holidays 6pm-6am weekdays, and all hours on weekends and Holidays 3 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE RATES CEA RATE TIME-OF-USE PERIOD RESIDENTIAL DR All DR-LI-MB All E-LI-TOU All E-LI-NR All DR-SES On-Peak DR-SES Off-Peak DR-SES Super Off-Peak G-DR-SES (Grandfathered) On-Peak G-DR-SES (Grandfathered) Semi-Peak G-DR-SES (Grandfathered) Off-Peak EV-TOU On-Peak EV-TOU Off-Peak EV-TOU Super Off-Peak G-EV-TOU (Grandfathered) ' On-Peak G-EV-TOU (Grandfathered) Off-Peak G-EV-TOU (Grandfathered) I Super Off-Peak EV-TOU-2 On-Peak -EV-TOU-2 Off-Peak EV-TOU-2 Super Off-Peak G-EV-TOU-2 1 On-Peak (Grandfathered) I G-EV-TOU-2 Off-Peak (Grandfathered) G-EV-TOU-2 Super Off-Peak (Grandfathered) EV-TOU-5 On-Peak EV-TOU-5 Off-Peak EV-TOU-5 Super Off-Pea k TOU-DR-1 On-Peak TOU-DR-1 Off-Peak TOU-DR-1 Super Off-Peak TOU-DR-2 On-Peak TOU-DR-2 I Off-Peak TOU-DR On-Peak TOU-DR Off-Peak TOU-DR Super Off-Peak G-TOU-DR I On-Peak (Grandfathered) CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1 -October 31 November 1-May 31 Per kWh Per kWh $.15057 $.06334 $.15057 $.06334 $.06169 $.04128 $.07444 $.05044 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.38344 $.38342 $.10447 $.10839 $.09277 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.33252 $.08824 $.31188 $.07982 $.06908 $.06781 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.32796 $.08404 $.28762 $.08305 $.06908 I $.06781 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.35487 $.07591 $.09513 $.06428 $.03510 $.05138 $.35487 $.07591 $.07238 $.05859 $.22978 $.06194 $.16515 $.05188 $.10116 $.04072 $.27379 $.07114 4 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A (Grandfathered) G-TOU-DR Off-Peak (Grandfathered) COMMERCIAL/INDUSTRIAL TOU-A-S On-Peak TOU-A-S Off-Peak G-TOU-A-S On-Peak (Grandfathered) G-TOU-A-S Semi-Peak (Grandfathered) G-TOU-A-S I Off-Peak (Grandfathered) TOU-A-P On-Peak TOU-A-P Off-Peak G-TOU-A-P On-Peak (Grandfathered) G-TOU-A-P Semi-Peak (Grandfathered) G-TOU-A-P Off-Peak (Grandfathered) TOU-A-2-S On-Peak TOU-A-2-S Off-Peak TOU-A-2-S Super Off-Peak TOU-A-2-P On-Peak TOU-A-2-P Off-Peak TOU-A-2-P Super Off-Peak TOU-A-3-S On-Peak TOU-A-3-S Off-Peak TOU-A-3-S Super Off-Peak TOU-A-3-P On-Peak TOU-A-3-P Off-Peak TOU-A-3-P Super Off-Peak A-TC All TOU-M On-Peak TOU-M Off-Peak TOU-M Super Off-Peak G-TOU-M (Grandfathered) , On-Peak G-TOU-M (Grandfathered) Semi-Peak G-TOU-M (Grandfathered) Off-Peak OL-TOU On-Peak OL-TOU Off-Peak OL-TOU Super Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 $.2316 l $.04728 $.23526 $.07037 $.11725 $.05365 $.24815 $.07349 $.13522 $.05896 $.04828 $.04976 $.23397 $.06993 $.11655 $.05336 $.24672 $.07302 $.13439 $.05859 $.04791 $.04952 $.31111 $.06836 $.10460 $.05796 $.04627 $.04630 $.30949 $.06794 $.10398 $.05762 $.00000 $.04608 $.23897 $.06837 $.13756 $.05797 $.04589 $.04631 $.23771 $.06795 $.13678 $.05763 $.04556 $.04609 $.05799 $.05799 $.31458 $.06857 $.10539 I $.05814 $.04739 $.04647 $20156 $.07815 $.19549 $.06291 $.05705 $.05329 $.40751 $.08527 $.13429 $.07280 $.05778 $.05897 5 DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD G-OL-TOU On-Peak (Grandfathered) G-OL-TOU Semi-Peak ( Grandfathered) G-OL-TOU Off-Peak ( Grandfathered) AL-TOU-S DEMAND On-Peak AL-TOU-S On-Peak AL-TOU-S Off-Peak AL-TOU-S Super Off-Peak G-AL-TOU-S DEMAND On-Peak ( Grandfathered) G-AL-TOU-S On-Peak (Grandfathered) G-AL-TOU-S Semi-Peak (Grandfathered) G-AL-TOU-S Off-Peak (Grandfathered) AL-TOU-P DEMAND On-Peak AL-TOU-P On-Peak AL-TOU-P Off-Peak AL-TOU-P Super Off-Peak G-AL-TOU-P DEMAND On-Peak ( Grandfathered) G-AL-TOU-P On-Peak (Grandfathered) G-AL-TOU-P Semi-Peak ( Grandfathered) G-AL-TOU-P Off-Peak ( Grandfathered) AL-TOU-T DEMAND On-Peak AL-TOU-T On-Peak AL-TOU-T Off-Peak AL-TOU-T Super Off-Peak G-AL-TOU-T DEMAND On-Peak ( Grandfathered I 1--'- G-AL-TOU-T , On-Peak I (Grandfathered) G-AL-TOU-T Semi-Peak ( Grandfathered) G-AL-TOU-T Off-Peak (Grandfathered) I AL-TOU-2-S DEMAND On-Peak CEA Proposed Rate Schedule Effect ive January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1 -May 31 Per kWh Per kWh $.26036 $.09291 $.24216 $.07508 $.07489 I $.06422 I $13.25 $0 I $.13677 $.11279 $.11000 $.09720 $.07845 $.07991 $7.55 $0 $.12995 I $.12572 $.12212 $.10294 $.09183 I $.08907 I $13.19 $0 $.13599 I $.11214 $.10937 $.09670 $.07809 $.07957 $7.50 $0 s .12913 I $.12500 $.12142 $.10237 $.09140 $.08868 $12.62 $0 $.12904 $.10634 $.10362 $.09166 $.07390 $.07533 $7.17 $0 s.12221 I $.11853 $.11517 $.09704 $.08665 $.08406 I $23.17 $0 6 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD AL-TOU-2-S On-Peak AL-TOU-2-S Off-Peak AL-TOU-2-S Super Off-Peak AL-TOU-2-P DEMAND On-Peak AL-TOU-2-P On-Peak AL-TOU-2-P Off-Peak AL-TOU-2-P Super Off-Peak AL-TOU-2-T DEMAND On-Peak AL-TOU-2-T On-Peak AL-TOU-2-T Off-Peak AL-TOU-2-T Super Off-Peak DG-R-S On-Peak DG-R-S Off-Peak DG-R-S Super Off-Peak G-DG-R-S (Grandfathered) , On-Peak G-DG-R-S (Grandfathered) Semi-Peak G-DG-R-S (Grandfathered) Off-Peak DG-R-P On-Peak DG-R-P Off-Peak DG-R-P Super Off-Peak G-DG-R-P (Grandfathered) On-Peak G-DG-R-P (Grandfathered) Semi-Peak G-DG-R-P (Grandfathered) ' Off-Peak DG-R-T On-Peak DG-R-T Off-Peak ,__ DG-R-T Super Off-Peak G-DG-R-T (Grandfathered) 1 On-Peak G-DG-R-T (Grandfathered) Semi-Peak G-DG-R-T (Grandfathered) Off-Peak AG-TOU-P DEMAND On-Peak A6-TOU-P On-Peak AG-TOU-P Off-Peak AG-TOU-P Super Off-Peak G-AG-TOU-P DEMAND All (Grandfathered) G-A6-TOU-P On-Peak (Grandfathered) G-AG-TOU-P Semi-Peak (Grandfathered) G-A6-TOU-P Off-Peak (Grandfathered) I AG-TOU-T DEMAND On-Peak A6-TOU-T I On-Peak CEA Proposed Rate Schedule Effective January 1, 2022 S!JMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $.12251 $.09990 $.09816 $.08577 $.06876 $.07009 ---$23.06 $0 $.12179 $.09932 $.09758 $.08530 $.06844 $.06977 $22.07 $0 $.11546 $.09406 $.09233 $.08074 $.06463 $.06592 $.40619 $.08533 $.19946 $.07284 $.12199 $.05898 $.26901 $.09783 $.25370 $.06144 $.11735 $.06792 $.40555 $.08482 $.19873 I $.07243 $.12171 $.05870 $26833 $.09723 $.25303 $.07878 I $.11697 $.06759 $.39991 $.08016 $.19210 $.06839 $.11836 $.05530 $.26264 $.09196 $.24739 $.07443 $.11273 $.06383 $13.19 $0 $.13599 $.11214 $.10937 $.09670 $.07809 $.07957 $7.50 $0 $.12913 $.12500 $.12142 $.10237 $.09140 I $.08868 $12.62 $0 $.12904 $.10634 7 DocuSign Envelope ID: 93838166-FAFE-46C8-AF56-8C06000CCB3A CEA RATE TIME-OF-USE PERIOD A6-TOU-T Super Off-Peak G-A6-TOU-T DEMAND All (Grandfathered) G-A6-TOU-T On-Peak (Grandfathered) G-A6-TOU-T Semi-Peak (Grandfathered) G-A6-TOU-T Off-Peak (Grandfathered) PUMPING & AGRICULTURE TOU-PA-S 1 On-Peak TOU-PA-S Off-Peak G-TOU-PA-S On-Peak (Grandfathered) G-TOU-PA-S Semi-Peak (Grandfathered) G-TOU-PA-S Off-Peak (Grandfathered) TOU-PA-P On-Peak TOU-PA-P Off-Peak G-TOU-PA-P On-Peak (Grandfathered) G-TOU-PA-P Semi-Peak (Grandfathered) G-TOU-PA-P Off-Peak (Grandfathered) TOU-PA-2-S DEMAND On-Peak TOU-PA-2-S On-Peak TOU-PA-2-S Off-Peak TOU-PA-2-S Super Off-Peak G-TOU-PA-2-S 1 On-Peak DEMAND (Grandfathered! G-TOU-PA-2-S On-Peak (Grandfathered) G-TOU-PA-2-S Semi-Peak (Grandfathered) G-TOU-PA-2-S Off-Peak (Grandfathered) TOU-PA-2-P DEMAND On-Peak TOU-PA-2-P On-Peak TOU-PA-2-P , Off-Peak TOU-PA-2-P Super Off-Peak G-TOU-PA-2-P On-Peak DEMAND (Grandfathered) CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $,07390 I $.07533 $7.17 $0 $.12227 I $.11853 $.11517 $.09704 $.08665 $.08406 -- $.18316 I $.05676 $.09261 $.04238 $.23006 $.05934 $.09791 $.04752 $.04508 $.04033 $.18215 $.05641 $,09205 I $.04215 $.22875 $.05896 $.09729 I $.04723 $.04474 $.04013 $9.51 $0 $.07965 $.06916 $.06283 $.05922 $.04727 $.04821 $1.06 $0 j $.18038 $.07927 $.09868 $.06446 $.03689 $.05544 $9.47 $0 $.07919 $.06876 $.06244 $.05890 $.04695 $.04799 $1.05 $0 8 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A (Grandfathered) G-TOU-PA-2-P Semi-Peak Grandfathered) G-TOU-PA-2-P Off-Peak (Grandfathered) TOU-PA-3-S<20kW On-Peak TOU-PA-3-S<20kW Off-Peak TOU-PA-3-S<20kW Super Off-Peak TOU-PA-3-P<20kW On-Peak TOU-PA-3-P<20kW Off-Peak TOU-PA-3-P<20kW Super Off-Peak TOU-PA-3-S>=20kW On-Peak DEMAND TOU-PA-3-S>=20kW On-Peak TOU-PA-3-S>=20kW Off-Peak TOU-PA-3-S>=20kW Super Off-Peak TOU-PA-3-P>=20kW I On-Peak DEMAND TOU-PA-3-P>=20kW On-Peak TOU-PA-3-P>=20kW Off-Peak TOU-PA-3-P>=20kW Super Off-Peak PA-T-1-S DEMAND On-Peak PA-T-1-S On-Peak PA-T-1-S Off-Peak PA-T-1-S Super Off-Peak G-PA-T-1-S DEMAND On-Peak (Grandfathered) PA-T-1-S (Grandfathered) On-Peak PA-T-1-S (Grandfathered) Semi-Peak PA-T-1-S (Grandfathered) Off-Peak PA-T-1-P DEMAND On-Peak PA-T-1-P On-Peak PA-T-1-P Off-Peak PA-T-1-P Super Off-Peak G-PA-T-1-P DEMAND On-Peak (Grandfathered) PA-T-1-P (Grandfathered) On-Peak PA-T-1-P (Grandfathered) Semi-Peak PA-T-1-P (Grandfathered) Off-Peak PA-T-1-T DEMAND On-Peak PA-T-1-T On-Peak PA-T-1-T Off-Peak PA-T-1-T Super Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 $.09806 1 $.06408 $.03659 $.05519 $.21362 $.05536 $.10095 $.04697 $.04084 $.03768 $.21250 $.05501 $.10037 $.04670 $.04055 $.03749 $2.25 $0 $.13779 $.06973 $.10706 $.05974 $.03172 $.04864 $2.24 $0 $.13705 $.06932 $.10645 $.05940 $.03148 $.04842 $5.29 $0 $.09057 $.07941 $.07202 $.06831 $.05497 $.05602 $2.57 $0 $.08463 $.08854 $.07965 $.07233 $.06442 $.06247 $5.27 $0 $.09005 $.07896 $.07160 $.06796 $.05472 $.05578 $2.56 $0 $.08408 $.08801 $.07919 $.07193 $.06412 $.06218 $5.04 $0 $.08537 $.07482 $.06774 $.06438 $.05174 $.05275 9 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD G-PA-T-1-T DEMAND On-Peak (Grandfathered) PA-T-1-T (Grandfathered) On-Peak PA-T-1-T (Grandfathered) Semi-Peak PA-T-1-T (Grandfathered) Off-Peak LIGHTING LS All OL-2 All LS-2-AD On-Peak LS-2-AD Off-Peak LS-2-AD Super Off-Peak PREMIUM POWER SUPPLY PRODUCTS Clean Impact Plus Premium -75% Carbon Free Green Impact Premium -100% Renewable ------NET ENERGY METERING Personal Impact -Net Surplus Compensation CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $2.45 I $0 s.07951 I $.08341 $.07501 $.06814 $.06074 I $.05891 s .06747 I $.05338 $.07911 $.06420 s.24009 I $.07247 $.14046 $.06225 s.o5o39 I $.05080 s.00100 I $.00100 $.00750 I $.00750 $.06 $.06 10