Loading...
HomeMy WebLinkAbout2735 CIRCULO SANTIAGO; ; CBCA2020-0024; PermitPERMIT REPORT (city of Carlsbad Commercial Associated Permit Print Date: 04/28/2022 Job Address: 2735 CIRCULO SANTIAGO, CARLSBAD, CA 92008-6882 Permit Type: BLDG-Associated Permit Commercial Work Class: Repair Parcel#: 1672504400 Track#: Valuation: $58,000.00 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Bathrooms: Project Title: Construction Type: Orig. Plan Check#: PC2020-0019 Plan Check#: Permit No: CBCA2020-0024 Status: Closed -Finaled Applied: 08/25/2020 Issued: 10/06/2020 Fina led Close Out: 04/28/2022 Inspector: Final Inspection: TAlva 08/27/2021 Description: THE RESERVE APARTMENTS: VOLUNATRY SEISMIC RETROFIT AT TUCK UNDER PARKING-BLDG #7 (1 OF 10) FEE Property Owner: DP CARLSBAD MAGNIFICA INVESTORS LP DP AIRPORT HOSPITAL WAY INVESTORS LP C/0 DECRON PROPERTIES CORP 6222 WILSHIRE BLVD, # UNIT 400 LOS ANGELES, CA 90048 SB1473 GREEN BUILDING STATE STANDARDS FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Total Fees: $444.44 Total Payments To Date: $444.44 Balance Due: 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov AMOUNT $3.00 $441.44 $0.00 $0.00 PERMIT INSPECTION HISTORY for (CBCA2020-0024) Permit Type: BLDG-Associated Permit Commerc Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Issue Date: 10/06/2020 Subdivision: PARCEL MAP NO 13126 Status: Scheduled Date 03/10/2021 08/27/2021 Closed -Finaled Expiration Date: 09/07/2021 IVR Number: 28245 Address: 2735 CIRCULO SANTIAGO CARLSBAD, CA 92008-6882 Actual Inspection Type Start Date Checklist Item Inspection No. COMMENTS Inspection Status Primary Inspector BLDG-Building Deficiency February 5, 2021 No building deficiencies BLDG-Building Deficiency 1. Structural engineer's sheet S4.01 detail #1 and #2, structural reinforcement for soft story structural modifications-approved. March 2, 2021: No building deficiencies 1. Structural engineer's sheet S4.01 detail #3 and detail #2-S3.01, structural reinforcement steel moment frame column/beam connections, for soft story three level apartment buildings with carports below, structural modifications-approved. 2. OK to cover with stucco lath paper and rib metal -approved. BLDG-85 T-Bar, Ceiling 151707-2021 Cancelled Tony Alvarado Grids, Overhead 03/10/2021 BLDG-17 Interior Lath/Drywall Checklist Item 152436-2021 Passed Paul Burnette COMMENTS BLDG-Building Deficiency 08/27/2021 BLDG-Final Inspection Checklist Item BLDG-Structural Final 165311-2021 COMMENTS August 27, 2021: Passed No building deficiencies Tony Alvarado 1 . Structural reinforcement To existing apartment complex units, soft story design with carport parking below units. 2. seismic structural reinforcement and modifications to existing garage moment frame carports, Per structural engineer's plans and detail specifications-approved. Reinspection Inspection Passed Yes Yes Reinspection Incomplete Complete Passed Yes Complete Passed Yes Thursday, April 28, 2022 Page 4 of 4 PERMIT INSPECTION HISTORY for (CBCA2020-0024) Permit Type: BLDG-Associated Permit Commerc Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Status: Closed -Finaled Issue Date: 10/06/2020 Subdivision: PARCEL MAP NO 13126 Expiration Date: 09/07/2021 IVR Number: 28245 Address: 2735 CIRCULO SANTIAGO CARLSBAD, CA 92008-6882 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 02/12/2021 02/22/2021 03/02/2021 Checklist Item BLDG-Building Deficiency COMMENTS February 5, 2021 No building deficiencies 1. Structural engineer's sheet S4.01 detail #1 and #2, structural reinforcement for soft story structural modifications-approved. 02/12/2021 BLDG-17 Interior Lath/Drywall 150404-2021 Passed Tony Alvarado Checklist Item COMMENTS BLDG-Building Deficiency 02/22/2021 BLDG-12 Steel/Bond Beam 151058-2021 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS February 22, 2021: (virtual inspection). 1. No building deficiencies. 2. Seismic retrofitting, grade beam foundation, reinforcement steel rebar, steel Column footings, Per engineers plans detail specifications-approved. 3. Verified structural engineers, structural observation certification form letter, certifying steel reinforcement placement, size, and type, for grade beams, buildings #5, "/16, and #?-approved. 4. Deputy/special inspectors report verified, for field steel beam welds, and grade beam steel reinforcement rebar-approved. 03/02/2021 BLDG-14 151897-2021 Passed Tony Alvarado Frame/Steel/Bolting/We !ding (Decks) Thursday, April 28, 2022 Passed Yes Complete Passed No Complete Passed No Complete Page 3 of 4 PERMIT INSPECTION HISTORY for (CBCA2020-0024) Permit Type: BLDG-Associated Permit Commerc Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA INVESTORS LP DP AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Issue Date: 10/06/2020 Subdivision: PARCEL MAP NO 13126 Address: 2735 CIRCULO SANTIAGO CARLSBAD, CA 92008-6882 Status: Scheduled Date 02/04/2021 02/05/2021 Closed -Finaled Expiration Date: 09/07/2021 IVR Number: 28245 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector 02/04/2021 02/05/2021 Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS January 14, 2021: 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase-1, approved for (3) -garage pads spread footings, reinforcement steel, with isolated moment-frame, grade beam and pad spread footings-approved (only). 2. Enlarged existing spread footings and new spread footings at garage areas, for new moment steel frame design-per structural engineers detail sheet S3.01 and revised structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase-1 concrete footings at garage areas-(only). January 11, 2021: 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase 1 2. Enlarge existing spread footings and new spread footings at garage areas, for new moment steel frame design -per structural sheet S3.01 and revise structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase 1 concrete footings at garage areas-(only). BLOG-85 T-Bar, Ceiling 149809-2021 Failed Tim Kersch Grids, Overhead Checklist Item COMMENTS BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers BLDG-14 149914-2021 Partial Pass Tony Alvarado Frame/Steel/Bolting/We lding (Decks) Thursday, April 28, 2022 Reinspection Inspection Passed Yes Yes Re inspection Incomplete Passed No No No No No Re inspection Incomplete Page 2 of 4 Building Permit Inspection History Finaled (city of Carlsbad PERMIT INSPECTION HISTORY for {CBCA2020-0024) Permit Type: BLDG-Associated Permit Commerc Work Class: Repair Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date 01/11/2021 01/11/2021 BLDG-11 Foundation/Ftg/Piers (Rebar) Checklist Item Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA Issue Date: 10/06/2020 Expiration Date: 09/07/2021 IVR Number: 28245 Inspection No. Inspection Status 147966-2021 Partial Pass COMMENTS INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/0 DECRON PROPERTIES CORP Subdivision: PARCEL MAP NO 13126 Address: 2735 CIRCULO SANTIAGO CARLSBAD, CA 92008-6882 Primary Inspector Reinspection Inspection Tony Alvarado Reinspection Incomplete Passed BLDG-Building Deficiency January 11, 2021: Yes 01/14/2021 01/14/2021 BLDG-11 Thursday, April 28, 2022 Foundation/Ftg/Piers (Rebar) 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase 1 2. Enlarge existing spread footings and new spread footings at garage areas, for new moment steel frame design -per structural sheet S3.01 and revise structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase 1 concrete footings at garage areas-(only). 148404-2021 Passed Tony Alvarado Complete Page 1 of4