HomeMy WebLinkAbout2715 CIRCULO SANTIAGO; ; CBCA2020-0029; PermitPERMIT REPORT ( City of Carlsbad Commercial Associated Permit Print Date: 04/28/2022 Job Address: 2715 CIRCULO SANTIAGO, CARLSBAD, CA 92008-6830 Permit Type: BLDG-Associated Permit Commercial Parcel#: 1672504400 Valuation: $58,000.00 Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Project Title: Work Class: Repair Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: PC2020-0019 Plan Check#: Permit No: CBCA2020-0029 Status: Closed -Finaled Applied: 08/25/2020 Issued: 10/06/2020 Finaled Close Out: 04/28/2022 Inspector: Final Inspection: TAlva 08/27/2021 Description: THE RESERVE APARTMENTS: VOLUNATRY SEISMIC RETROFIT AT TUCK UNDER PARKING -BLDG #5 (6 OF 10) FEE BUILDING PLAN CHECK FEE (BLDG) BUILDING PERMIT FEE ($2000+) Property Owner: DP CARLSBAD MAGNI FICA INVESTORS LP DP AIRPORT HOSPITAL WAY INVESTORS LP C/0 DECRON PROPERTIES CORP 6222 WILSHIRE BLVD, # UNIT 400 LOS ANGELES, CA 90048 581473 GREEN BUILDING STATE STANDARDS FEE Total Fees: $728. 73 Total Payments To Date: $728.73 Balance Due: 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov AMOUNT $284.29 $441.44 $3.00 $0.00 PERMIT INSPECTION HISTORY for (CBCA2020-0029) Permit Type: BLDG-Associated Permit Commerc Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Issue Date: 10/06/2020 Subdivision: PARCEL MAP NO 13126 Status: Scheduled Date 03/10/2021 08/27/2021 Closed -Finaled Expiration Date: 09/07/2021 IVR Number: 28250 Address: 2715 CIRCULO SANTIAGO CARLSBAD, CA 92008-6830 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS March 2, 2021: No building deficiencies 1. Structural engineer's sheet S4.01 detail #3 and detail #2-S3.01, structural reinforcement steel moment frame column/beam connections, for soft story three level apartment buildings with carports below, structural modifications-approved . 2. OK to cover with stucco lath paper and rib metal -approved. February 5, 2021 No building deficiencies 1. Structural engineer's sheet S4.01 detail #1 and #2, structural reinforcement for soft story structural modifications-approved. BLDG-85 T-Bar, Ceiling 151705-2021 Failed Tony Alvarado Grids, Overhead Checklist Item COMMENTS BLDG-Building Deficiency March 2, 2021 (cancel). 03/10/2021 BLDG-17 Interior Lath/Drywall Checklist Item 152438-2021 COMMENTS Passed Paul Burnette BLDG-Building Deficiency 08/27/2021 BLDG-Final Inspection Checklist Item BLDG-Structural Final 165313-2021 COMMENTS August 27, 2021: Passed No building deficiencies Tony Alvarado 1. Structural reinforcement To existing apartment complex units, soft story design with carport parking below units. 2. seismic structural reinforcement and modifications to existing garage moment frame carports, Per structural engineer's plans and detail specifications-approved. Reinspection Inspection Passed Yes Yes Reinspection Incomplete Passed No Complete Passed Yes Complete Passed Yes Thursday, April 28, 2022 Page 4 of 4 PERMIT INSPECTION HISTORY for (CBCA2020-0029) Permit Type: BLDG-Associated Permit Com mere Application Date: 08/25/2020 Owner: DP CARLSBAD MAGNIFICA INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Issue Date: 10/06/2020 Subdivision: PARCEL MAP NO 13126 Status: Scheduled Date 0211212021 0212212021 03/02/2021 Closed -Finaled Expiration Date: 09/07/2021 IVR Number: 28250 Address: 2715 CIRCULO SANTIAGO CARLSBAD, CA 92008-6830 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item BLDG-Building Deficiency COMMENTS February 5, 2021 No building deficiencies 1. Structural engineer's sheet S4.01 detail #1 and #2, structural reinforcement for soft story structural modifications-approved. 02/12/2021 BLDG-17 Interior Lath/Drywall 150406-2021 Passed Tony Alvarado Checklist Item COMMENTS BLDG-Building Deficiency 0212212021 BLDG-12 Steel/Bond Beam 151055-2021 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS February 22, 2021: (virtual inspection). 1. No building deficiencies. 2. Seismic retrofitting, grade beam foundation, reinforcement steel rebar, steel Column footings, Per engineers plans detail specifications-approved. 3. Verified structural engineers, structural obseivation certification form letter, certifying steel reinforcement placement, size, and type, for grade beams, buildings #5, #6, and #7-approved. 4. Deputy/special inspectors report verified, for field steel beam welds, and grade beam steel reinforcement rebar-approved. 03/0212021 BLDG-14 151896-2021 Passed Tony Alvarado Frame/Steel/Bolting/We lding (Decks) Passed Yes Complete Passed No Complete Passed Yes Complete Thursday, April 28, 2022 Page 3 of 4 PERMIT INSPECTION HISTORY for (CBCA2020-0029) Permit Type: BLDG-Associated Permit Commerc Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA INVESTORS LP D P AIRPORT HOSPITAL WAY INVESTORS LP C/O DECRON PROPERTIES CORP Work Class: Repair Status: Closed -Finaled Issue Date: 10/06/2020 Expiration Date: 09/07/2021 IVR Number: 28250 Subdivision: PARCEL MAP NO 13126 Address: 2715 CIRCULO SANTIAGO CARLSBAD, CA 92008-6830 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 02/0412021 02/04/2021 02/05/2021 02/05/2021 Thursday, April 28, 2022 Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency COMMENTS January 14, 2021: 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase-1, approved for (3) -garage pads spread footings, reinforcement steel, with isolated moment-frame, grade beam and pad spread footings-approved (only). 2. Enlarged existing spread footings and new spread footings at garage areas, for new moment steel frame design-per structural engineers detail sheet S3.01 and revised structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase-1 concrete footings at garage areas-(only). January 11, 2021: 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase 1 2. Enlarge existing spread footings and new spread footings at garage areas, for new moment steel frame design -per structural sheet S3.01 and revise structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase 1 concrete footings at garage areas-(only). BLDG-85 T-Bar, Ceiling 149804-2021 Failed Tim Kersch Grids, Overhead Checklist Item COMMENTS BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers BLDG-14 149912-2021 Partial Pass Tony Alvarado Frame/Steel/BoltingfWe lding (Decks) Passed Yes Yes Reinspection Incomplete Passed No No No No No Reinspection Incomplete Page 2 of 4 Building Permit Inspection History Finaled {Cityof Carlsbad PERMIT INSPECTION HISTORY for (CBCA2020-0029) Permit Type: BLDG-Associated Permit Commerc Work Class: Repair Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date 01/11/2021 01/11/2021 BLDG-11 Foundation/Ftg/Piers (Rebar) Checklist Item Application Date: 08/25/2020 Owner: D P CARLSBAD MAGNIFICA Issue Date: 10/06/2020 Expiration Date: 09/07/2021 IVR Number: 28250 Inspection No. Inspection Status 147964-2021 Partial Pass COMMENTS INVESTORS LP DP AIRPORT HOSPITAL WAY INVESTORS LP C/0 DECRON PROPERTIES CORP Subdivision: PARCEL MAP NO 13126 Address: 2715 CIRCULO SANTIAGO CARLSBAD, CA 92008-6830 Primary Inspector Reinspection Inspection Tony Alvarado Reinspection Incomplete Passed BLDG-Building Deficiency January 11, 2021: Yes 01/1412021 01/14/2021 BLDG-11 Thursday, April 28, 2022 Foundation/Ftg/Piers (Rebar) 1. Seismic retrofit buildings #5, #6, #7, First concrete footing phase 1 2. Enlarge existing spread footings and new spread footings at garage areas, for new moment steel frame design -per structural sheet S3.01 and revise structural engineer stamp/signed details. 3. Required deputy inspectors report to be verified. 4. OK to pour phase 1 concrete footings at garage areas-(only). 148405-2021 Partial Pass Tony Alvarado Reinspection Incomplete Page 1 of4