May 25, 2022
Kirk Moeller
2888 Loker Ave. E.
Suite 220
Carlsbad, CA 92010
3rd CYCLE REVIEW COMMENTS
~ s: ft,(,/~
8FILE COPY ~
CCityof
Carlsbad
VIA EMAIL AND MAIL
3060 STATE ST. RESTAURANT-SDP 2022-0002/CDP 2022-0003 (DEV2021-0052)-LETTER OF INCOMPLETENESS
Dear Kirk Moeller:
The Community Development Department ("CD") has reviewed your application for a Minor Site Development
Plan/Coastal Development Permit and is providing you with the attached package of information as a guide for
further processing your application.
A. PROJECT DESCRIPTION
Below is the project description that staff has generated from the information provided in the application
package. Please review this project description and verify with staff that the project description is correct:
The project is the conversion of an approximately 6,000-square-foot site containing two
existing structures, 863 square feet and 310 square feet, to facilitate a restaurant use. The
project would create three onsite parking spaces accessed from a rear alley, with the
remainder of required parking provided through parking in-lieu fees. The project site is
located at 3060 State Street and is comprised of Assessor Parcel Numbers (APN) 203-297-05-
00.
B. PROJECT ISSUES/CORRECTIONS
Project applications are not only reviewed by CD, which includes the divisions of planning, building and
engineering, but they are routed to other city departments such as the Carlsbad Fire Department,
Community Services Department, Public Works/Environmental Management, and Water District for their
review to ensure compliance with the relevant codes and regulations they are charged with enforcing.
This letter is intended to include a comprehensive -list of the project issues/comments and corrections
required by all commenting departments. Please note that the issue(s) discussed in this letter were
identified based upon information presently available to the city and are subject to change upon submittal
of further clarifying information and/or studies.
For ease of reference, the comments/corrections made by each department/division are provided as
attachments to this letter with the appropriate contact name and number/email should you require further
clarification (see Comment Letter Attachment Matrix at the conclusion on this letter). As the project
manager, please include me in any email exchanges or correspondences involving your project so I'm
kept informed and aware of any changes/agreements, and to ensure that submittals are being accepted
pursuant to established department guidelines.
Community Development Department
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
f""'!>l . • M;'': : ,.~'? ,If: .. 4\ I'? ~ " . ; ... ,~iey
· .. C} '-.J . ;• ' ... J
SOP 2022-0002/CDP 2022-0003 (DEV2021-0052) -3060 STATE ST. RESTAURANT
May 25, 2022 .
Pa e 2
City review comments/corrections identify: 1) the mm,mum submittal requirements (i.e. the forms,
drawings, and documents} that must be submitted to deem your application complete; and/or 2) other
issues regarding the project's conformance with the General Plan, municipal or zoning code, or other
federal, state, or local requirements. While some items are not required to deem the application complete,
they are necessary to review your application for consistency with applicable standards and requirements
and will need to be addressed or corrected before final action can be made on the project. The
comments/corrections in the attachments will let you know whether corrections are needed to
"complete the application" or required in order to "address and issue of concern."
Please note that the comments in this letter do not address structural or project construction requirements
(i.e., building and fire code compliance) as those are typically assessed as part of building permit review,
which does not get initiated until discretionary approvals are secure. Any comments/corrections received
by the Building Division and/or Carlsbad Fire Department largely address code requirements that affect site
design and/or use.
C. GUARANTEED SECOND OPINION AND PROJECT ISSUE RESOLUTION PROCESS
CD is dedicated to meeting customer service needs and offers a Guaranteed Second Opinion. If you have
disagreements with any of the comments or code interpretations in this letter, please feel free to contact
the project staff directly to resolve. If you are still unable to resolve the issue to a mutual satisfaction, we
strongly encourage you to elevate the matter to the division manager. If we are still unable to resolve the
disagreement, pursuant to Information Bulletin CD-10, I encourage you to have the matter discussed at a
Project Issue Resolution meeting, which is a venue where project issues/concerns can be presented and
considered by the Department Director. For more information about the PIR process, CD -10 is available on
the department's website.
D. ESTIMATED DECISION DATE
An estimate for when your permit application will be considered by the decision-making authority has been
generated for your project and is included in Attachment B. The estimated hearing/decision date for this
project is October 2022.
Please note that the estimated decision date is based on certain assumptions detailed in the attachment
and could be more or less than the estimate provided. If the schedule assumptions prove to be incorrect,
the estimate will be revised. In addition, if the Planning Commission Agenda is full for the previously
estimated date the application will be scheduled for the next available meeting.
Please also note that this schedule covers the discretionary permit ONLY. If approved, the project will still
require building permits to construct, enlarge, alter, repair, move, improve, remove, conve~, or demolish
a building or structure. Additional plan approvals and permits may be required such as grading plans,
improvement plans, final/parcel maps and landscape construction plans. Conditions of approval for your
project will list the plan approvals and permits that are required. A permit must be obtained following
discretionary permit approval, but prior to construction and prior to occupancy.
J
SOP 2022-0002/CDP 2022-0003 (DEV2021-0052)-3060 STATE ST. RESTAURANT
May 25, 2022
Pa e 3
E. DETERMINATION OF COMPLETENESS
The following determinations are for filing purposes and do not signify whether the project will be approved
or denied. However, the required information is needed for staff to fairly and completely assess the
proposed project.
a. Completeness Determination -California Government Code §65943
CD staff has completed its initial review of your application and cannot find it complete pursuant
to Section 65943 of the Government Code at this time. Please review the attached package of
information which will detail how to further process your application. When all required materials
are submitted, the city has 30 days to make a determination of completeness. If the application is
determined to be complete, processing for a decision on the application will be initiated. In
addition, please note that you have six months from the date the application was initially filed,
January 12, 2022, to either resubmit the application or submit the required information. Failure to
resubmit the application or submit the materials necessary to determine your application complete
shall be deemed to constitute withdrawal of the application. If an application is withdrawn or
deemed withdrawn, a new application must be submitted.
b. Completeness Determination -California Environmental Quality Act (CEQA)
CD staff has completed the review of your Environmental Impact Assessment (EIA) Information
Form for the subject project and believe your project may be exempt from further environmental
analysis pursuant to Section 15303 of CEQA. This exemption is for construction or conversion of
small structures. Submittal of other environmentally related information is not required at this
time.
F. SUBMITTAL REQUIREMENTS
Unless other agreements have been made with City staff, you must submit all of the following items
concurrently and by the submittal date listed below in order to maintain the processing schedule for your
application. The submittal must be made to the CD Counter at 1635 Faraday Avenue and must include the
following items:
a. A COPY OF THIS LETTER. The requested information will not be accepted unless accompanied by
this letter.
b. SUBMIT A LETTER ADDRESSING HOW YOU HAVE ADDRESSED EACH COMMENT/CORRECTION
MADE IN THE ATTACHMENTS. This letter must explain in detail (e.g. description of the revision and
location of changes in submitted documents) how every unresolved item has been addressed in
the resubmittal package.
c. SUBMIT ADDITIONAL/CORRECTED INFORMATION. The following information and/or document(s)
with the requested number of copies as specified.
SOP 2022-0002/CDP 2022-0003 (DEV2021-0052)-3060 STATEST. RESTAURANT
May 25, 2022
Pa e4
# of Submittal Information/Document Copies Form
City's Comment Letter 2 HC
Applicant Response Letter Addressing 2 HC/PDF Corrections/Comments
Revised Plan Sets 2 HC/PDF
Revised SWQMP 1 HC/PDF
Local Mobility Analysis 2 HC/PDF
Admin.
Purposes
Only
PLNG/LDE
PLNG/LDE
PLNG/LDE
LOE
PLNG/LDE
*Please contact me in advance if you wish to submit other documents not specifically listed
above.
G. SUBMITTAL DUE DATE
To maintain adequate progress and be consistent with the estimated schedule, all the information
requested in this letter must be submitted by June 25, 2022. If you are unable to submit the requested
information by the above date, please contact me via phone or email. Notification must be submitted in
writing and be signed and dated by the project applicant. The notification must include a revised submittal
· date and a brief rationale for the extension.
CD's goal is to help facilitate the efficient and timely processing of each application. If you have any questions
regarding this letter or other aspects of your project, please contact me at 442-339-2611 or via email at
kyle.vanleeuwen@carlsbadca.gov.
Sincerely,
~~ 11 (lit, Lee«f#elf,
KYLE VAN LEEUWEN
Associate Planner
KVL:mh
cc: JVK FMK Venture I, LLC, 2737 Vista del Rio, Fallbrook, CA 92028
Nichole Fine, Project Engineer
File Copy/Data Entry
Attachments: A -Comments
B -Processing Project Schedule
C -LOE Redline Plans
D -LOE Redline SWQMP
SDP 2022-0002/CDP 2022-0003 (DEV2021-0052) -3060 STATE ST. RESTAURANT
May 25, 2022
Pa e 5
ATTACHMENT A
COMMENTS
Please contact me should you have any questions or need clarification on how to resolve any of the items listed
below. Also, if it would be helpful, we would be happy to preview the format of a resubmittal to confirm that it
provides the information that we need.
SECTION 1. LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION
The following section identifies the minimum submittal requirements (i.e. the forms, drawings, and documents)
that must be submitted to continue the processing of your application.
Engineering Division Comments
1. The net ADT associated with this project is greater than 110, therefore the project will be subject to
preparing a local mobility analysis per the City of Carlsbad Transportation Impact Analysis Guidelines. Prior
to acceptance or review of a transportation impact analysis, a scoping agreement is required to be approved
by city staff. Please contact Nick Gorman at Nick.Gorman@carlsbadca.gov for further assistance regarding
transportation impact analysis requirements.
SECTION 2. ISSUES OF CONCERN
The following section identifies issues of concern regarding the project's conformance with the General Plan,
municipal or zoning code, or other federal, state, or local requirements. These items are not required to deem the
application complete but are necessary to review your application for consistency with applicable standards and
requirements. Please note that the comments below do not address structural or project construction
requirements as those are typically associated with the building permits, which are not submitted for review until
after the discretionary approvals are secure.
Planning Comments
1. Please revise the Climate Action Plan Consistency Checklist (form P-30) to include the rear building as new
construction and update the checklist accordingly. If revised form is not provided, conditions of approval
for the project will include CAP requirements.
Engineering Comments
1. Remove all clouds and deltas on the final site development plan.
2. Project plans show a restroom at Building B, delineate and annotate a water lateral on the site plans.
3. On sheet Cl.0, show the finish grade spot elevations outside of each building. Ensure site grading shown
provides positive drainage away from structures in accordance with CBC1804.4.
4. In the Trash Capture Storm Water Quality Management Plan, update E-34 Form to include Building B.
SDP 2022-0002/CDP 2022-0003 (DEV2021-0052)-3060 STATE ST. RESTAURANT
May 25, 2022
Pa e 6
5. Delineate and annotate the trash capture device to be utilized on the exhibit provided in the Trash Capture
Storm Water Quality Management Plan. Ensure that the minimum size depicted for the trash capture
device in the specifications can be utilized with the sizes and depths depicted on the grading plan sheet
CLO.
For questions and clarification on Engineering comments please contact Nichole Fine at
nichole.fine@carlsbadca.gov
Landscape Review Comments
Further Landscape Concept Plan submittals are not required. The following notes represent minor items that can
be worked out at the time of Construction Drawings.
Numbers below are referenced on the red line plans where appropriate for ease in locating the area of the
comment concern.
1. This project may qualify for the option of only satisfying the requirements of "Appendix D Prescriptive
Compliance Option" (PCO) of the Landscape Manual. If the project is less than 2500 square feet of landscape
area, then it would qualify. The actual square footage is not yet clear. The final design has not yet been
determined. To qualify for PCO review, the project (a non-residential project in this case) must have 100%
Low water use planting. The current plan, as proposed, has a mix of Low and Moderate planting. ft is
recommended that the project proceed under the standard City review process at least until the final design
is determined. 2nd Review: This item is to be determined based on final project design.
2. A copy of the color/hatched Recycled Water Use Plan showing where recycled water, graywater and potable
water are proposed to be used for irrigation has been provided with this submittal. This plan will be
forwarded to Carlsbad Municipal Water District (CMWD) for review. Any comments will be returned to the
Applicant. The plan, therefore, will not be returned to the Applicant at this time. 2nd Review: Comments
were received from CMWD that the project may be designed for only potable water irrigation. Recycled
water design is not required.
3. Please check the square foot numbers in the Hydrozone Legend. These are inconsistent with the numbers
included in the ETWU calculation and the worksheet. 2nd Review: The water use calculations (MAWA and
ETWU) are not included on the plans. Due to the nature of the project and the ongoing design
development, water calculations can be finalized with future Construction Drawings.
For questions and clarification on Engineering comments please contact Bruce Dugmore, Contract Landscape
Architect, at bd@dugmoredesignstudio.com.
DISCRETIONARY PERMIT PROCESSING SCHEDULE
Project Name:
Project Number:
Permit Category (Service Level):
Staff Completing Schedule:
Decision-Making Body:
Application Submittal Date:
Date Schedule Produced/Revised:
3060 State St Restaurant
SOP 2022-0002/CDP 2022-0003
5 -CEQA Exemption
Kyle Van Leeuwen
CITY PLANNER
1/12/2022
5/24/2022
CITY reviews project application; completes 1st Cycle Review Letter
APPLICANT Submits Responses/Corrections to 1st Cycle Review Letter
CITY Reviews Submittal/Prepares 2nd Cycle Review Letter
APPLICANT Submits Responses/Corrections to 2nd Cycle Review Letter
CITY Reviews Submittal/Prepares 3rd (Final) Cycle Review Letter 2
APPLICANT Submits Responses/Corrections to 3rd Cycle Review Letter
CITY Reviews Submittal/Prepares 4th (Final) Cycle Review Letter 2
APPLICANT submits final draft documents (i.e., final draft plans/documents/studies)
CITY finalizes project documentation (e.g., findings, conditions) 3
ESTIMATED DECISION DATE (reflected in month and year) 4
PROJECT SCHEDULE ASSUMPTIONS FOOTNOTES
30 2/11/2022
26 3/9/2022
30 4/8/2022
18 4/26/2022
30 5/26/2022
30 6/25/2022
30 7/25/2022
14 8/8/2022
60 10/7/2022
14 October-22
* Project description remains consistent throughout process
* The project qualifies for a CEQA exemption .
1 Dates that fall on a holiday or weekend have a target completion date the first business day after the holiday/Sunday
2 Assumes that remianing issues are minor and can be addressed as part of final draft documents submittal
* Task can be eliminated if earlier draft documents are adequate. 3 CITY will provide APPLICANT with draft approval letter and conditions for review
* Major project issues can be resolved by the 2nd Cycle Review 4 Actual decision date shall occur no later than two weeks following completion task above.
Note: Because the Applicant creates the-Project and the City receives and reviews this work, the City can nearly always process its side ohhe Project review timeline faster than the applicant.
An Applicant may move faster or slower; the City's review times will remain the same. Quality projects that are responsive to City review comments move faster through the review process.
Therefore, the Applicant has control over its side of the Project review timeline, and ultimately the estimated decision date timeline.