Loading...
HomeMy WebLinkAboutPRE 2021-0002; BAKER PARCEL; Preliminary Review (PRE)~ Cicyof Carlsl:iad PRELIMINARY REVIEW REQUEST FORM co•oP41a1,, e,we,m,11t · Planning Division 1635 Faraday Avenue (760) 602-4610 P-14 REC EH/ED www.carlsbadca.gov PROJECT NAME: BAKER PARCEL Assessor's Parcel Number(s}: 215-070--43 & 215·070-45 PLANl\lll\JG D!VlSIOf~ Desalptlon of proposal (add attachment If necessary): Subdividing e,cisting lots to allow for single family homes, along with proposed access/utility easements, and improvements. See attached for proposed lot configurations and list of preliminary review questions. Would you Wee to orally present your proposal to your assJ&ned staff planner/en&ineer? Yes Please list the staff members you have previously spoken to regarding this project. Please state "N/ A" If not. N/A FOCUS AREA(S): Ii) Site Design [!] Land Use O Architecture {!] Zoning Interpretations [!] Englneerll'\B Standards O Other TELEPHONE: EMAIL ADDRESS: f,{ I CERTIFY THAT I AM THE LEGAL OWNER ANO THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. •owner's signature Indicates permlsslon to conduct a prellmlnary review for a development proposal. CITY USE ONLY Project Numbr. D TELEPHON EMAILAD I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT All THE ABOVE INFORMATION IS TRUE ANO CORRECT TO THE BEST OF MV KNOWLEDGE. ~/2c>Zl DATE .,..,., ___ _ fPASCO LARE & ASSOCIATES CIVIL FNGINEERING + LAND PLANNING + LAND SURVFVING February 10, 2021 City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 RE: BAKER PROPERTY (APN 215-070-43 & 215-070-45) PRELIMINARY DESIGN REVIEW Project Description: Parcel 1 -APN 215-070-45 (North Lot) Gross Area: 2.01 AC Zoning: R-1 General Plan: R-4 Zoning District: L-C PLSA 3496 Parcel 1 proposes a development of 9 market rate single family homes, along with an access road and improvements. An alternative proposed design for Parcel 1 includes 13 single family homes, which takes advantage of the Density Bonus with low-income housing. Density Bonus Calculation: • Based on R-4 Land Use Designation (4 du/ac), utilizing 4 units on 2.01 Gross/Net acres*: 8.04 units, rounded up to 9 units. o *assumes there are no deductions for slopes greater than 40% or "Land upon which other significant environmental features as determined by the environmental review process for a project are located" • 1/9 = 11 % Very Low Income affordable 1 Very Low Income affordable unit required • 35%* Density Bonus: 9 units x 0.35 = 3.15, rounded up to 4 bonus units o per CMC 12.86.04 Table B • Total of 13 units (12 market-rate and 1 very-low income) Parcel 3 -APN 215-070-43 (South Lot) Gross Area: 2.62 AC Zoning: R-1 General Plan: R-4 Zoning District: L-C FEB 1 ! 2021 CIT Ot-GAKLSbAD 1::'.___~~~'.1\'.2 ~'\ .~'.2.~ Parcel 3 proposes a development of 5 market rate single family homes, along with dedicating a portion of the parcel to public right-of-way. An exploratory design proposes an additional 2 single family homes on the lot adjacent (APN 215-070-23) and includes the dedicated right-of-way along existing access easements. PASCO LAREY SUITER 0 & ASSOCIATES CIVIi FNGINtFRING + 11\NO Pl ANNING t-I AND SURVFYING February 10, 2021 PLSA 3496 Density Calculation: • Based on R-4 Land Use Designation (4 du/ac), utilizing 4 units on 2.62 acres: 10.48 units, rounded up to 11 units allow • 5 units on Parcel 3 are proposed. The remaining area is proposed to be dedicated as biological open space. Questions for staff: Planning: 1. 13 lot density bonus project would require waivers. Confirm the reduction/modification to the following development standards would be categorized as waivers: lot depth, lot width, lot area, FAR, lot coverage, and setbacks. 2. Confirm that a waiver could be used to create a private road for access instead of a public road. 3. Confirm staff would support the quitclaim of easements [2], [3]. & [4] as shown on the exhibit. 4. Can easement [1] be replotted or quitclaimed once pad grades are set? 5. Confirm base density and density bonus calculations methods are acceptable to staff. (applicant understands a site specific slope analysis and additional environmental documentation will be require to determine exact density) 6. Will the City require a Phase I Environmental Assessment as part of the application? 7. Will a biological survey be required for this project? 8. Will a noise study be required for this project? 9. Will a traffic study or traffic improvements be required for this project? Currently, Poinsettia/Brigantine intersection does not have a traffic signal. Engineering: 10. What are the required improvements, dedications, or easements along Poinsettia, Brigantine, and Triton? 11. Parcel 1 : What is the minimum distance required between the Brigantine/Poinsettia intersection and the new proposed private road access road approach? 12. Parcel 1: Does the access road need to have a specific intersection angle with Brigantine Drive? 7% max departure from 90 degrees? 13. Parcel 1: Confirm cul-de-sac minimum radius is 36-ft to curb. 14. Parcel 3: Given the fact that the knuckle was initially designed without the 20-ft dedication of Lot 6, does the new proposed dedication alter the knuckle design or requirements? i.e. can the knuckle be shifted further east to align with road to the south. 15. Parcel 3: Will the project be required to provide a turnaround or cul-de-sac at the terminus of the access road? Utilities: 16. Parcel 1: Is it acceptable to tap water main off 8" stub near Brigantine/Poinsettia that feeds to fire hydrant service? Or do we need to pull water service from Regatta/Brigantine intersection? 17. Parcel 3: Is it acceptable to tap water main off Triton for continuation? Appears to be 8" main. ,,-. PASCO LARETSUITER ~ & ASSOC I ATES CIVIL ENGINEERING+ LAND PLANNING+ LAND SURVEYING February 10, 2021 PLSA 3496 Environmental: 18. Removal of some coastal sage scrub will be likely be required to develop this land. Is there a land bank that we can buy into for mitigation? Is there a land bank planed for the near future? 19. If no coastal sage land bank is available, how can we mitigate the removal of vegetation? 20. For vegetation calculations can we consider the multiple parcels as one project if submitted as such? 21. What other environmental constraints would be present on this site? Zoning: 22. We understand these property's have been selected for a possible "up-zoning" in the proposed Carlsbad Housing Element, described as site 13, parcels 2, 3 & 4. If the up-zoning is adopted with the new housing element and the how long will the up-zone take? 23. While the City is processing the up-zoning will we be able to concurrently process a project utilizing the new zoning and density at our own risk? If so, when would staff consider accepting such a submittal? 24. Can we choose to not up-zone one of the properties if we decide? TY R LAWSON, P.E., Associate Principal PASCO LARET SUITER & ASSOCIATES 858-259-8212 X 113 tlawson@plsaengineering.com LETTER OF TRANSMITTAL PASCO LARET SUITER -~ & ASSOCIATES CIVll LNGINl:ERING ; LAND PLANNING+ LAND SURVEYING 53S N Coast Highway IOI Ste A Solana Beach, CA 92075 ph 858.259.8212 I fx 858.259.4812 I plsaengincering.com To: City of Carlsbad -PLANNING 1635 Faraday Ave. Carlsbad, CA 92008 Copies Date No. 1 2-11-2021 - 1 2-11-2021 - 1 2-11-2021 - Transmittal (this sheet) Preliminary Review Application List of questions/discussion items DATE: FEB 11, 2021 PLSA JOB NO: 3496 ATTN: C/0 CARLSBAD PLANNING RE: BAKER PRELIMINARY REVIEW APN 215-070-43 & 215-070-45 PRELIMINARY REVIEW TRANSMITTAL Description 4 2-11-2021 -Preliminary Lot Configurations for project development These are transmitted: 0 For your approval □ For your use Remarks: □ As requested □ For your signature Please email invoice for intake to cblood@plsaengineering.com Chase Blood, P.E. Senior Project Engineer FEB 11 2021