HomeMy WebLinkAboutMS 2021-0002; JUNIPER BEACH HOMES; HYDROLOGY STUDY FOR GRADING PERMIT/PARCEL MAP, JUNIPER HOMES - 295 JUNIPER AVENUE; 2021-11-01
HYDROLOGY STUDY
FOR
GRADING PERMIT / PARCEL MAP
JUNIPER HOMES - 295 JUNIPER AVENUE
MS 2021-0002 / CDP 2021-0007 / PUD 2021-0002 / SDP 2021-0004
DWG 533-7A
CITY OF CARLSBAD, CA
PREPARED FOR:
RREG INVESTMENTS SERIES, LLC SERIES I039
5315 AVENIDA ENCINAS, SUITE 200
CARLSBAD, CA 92008
PREPARED BY:
PASCO LARET SUITER & ASSOCIATES, INC.
535 N. HIGHWAY 101, SUITE A
SOLANA BEACH, CA 92075
PH: (858) 259-8212
Prepared: August 2021
Revised: November 2021
__________________________________________________
Bryan Knapp, PE #86542 DATE
11-12-21
TABLE OF CONTENTS
SECTION
Executive Summary 1.0
Introduction 1.1
Existing Conditions 1.2
Proposed Project 1.3
Conclusions 1.4
References 1.5
Methodology 2.0
Introduction 2.1
County of San Diego Criteria 2.2
Runoff Coefficient Determination 2.3
Hydrology & Hydraulic Model Output 3.0
Pre-Developed Hydrologic Calculations (100-Year Event) 3.1
Post-Developed Hydrologic Calculations (100-Year Event) 3.2
Pre-Developed vs. Post-Developed Peak Flows (100-Year Event) 3.3
Detention Analysis 3.4
Appendix 4.0
Isopluvial Maps
Intensity Duration Design Charts
Runoff Coefficients
Hydrologic Soil Group - USDA Web Soil Survey
Pre-Development Hydrology Node Map
Post-Development Hydrology Node Map
PLSA 3459-01
Page 1 of 13
1.0 EXECUTIVE SUMMARY
1.1 Introduction
This Hydrology Study for the proposed development at 295 Juniper Avenue, known as
Juniper Homes, has been prepared to analyze the hydrologic and hydraulic characteristics
of the existing and proposed project site. This report intends to present both the
methodology and the calculations used for determining the runoff from the project site in
both the pre-developed (existing) conditions and the post-developed (proposed)
conditions produced by the 100-year, 6-hour storm.
1.2 Existing Conditions
The subject property is located along Juniper Avenue, northeast of the intersection of
Juniper Avenue and Garfield Street, in the City of Carlsbad. The site is bound by a
combination of existing single-family and multi-family developments to the west, south,
and east, as well as Juniper Avenue, a public road, to the north. The existing site consists
of a single-family residence, driveway, walkways, landscaping, open space consisting of
mostly dirt, and miscellaneous improvements typical of this type of development. The
project site is located in the Agua Hedionda Hydrologic Area, and, more specifically, the
Los Monos Hydrologic Sub-Area (904.31) of the Carlsbad watershed.
The subject property has an approximate area of 0.251 acres and is approximately 54%
impervious in the existing condition. Per the Web Soil Survey application available
through the United States Department of Agriculture, the basin is generally categorized to
have type B hydrologic soils. Based on the existing impervious area and land use type, a
pre-development weighted runoff coefficient of 0.60 was calculated for the subject
property using the methodology described in section 3.1.2 of the San Diego County
Hydrology Manual and the formula provided therein.
The existing site can be categorized into one (1) major drainage basin, with one (1)
primary discharge location leaving the property. Drainage basin EX-1 consists of the
entirety of the project site and primarily drains from the southeast corner of the property
to the northwest, discharging to the Juniper Avenue right-of-way by surface and sheet
flow methods. Once in the Juniper Avenue right-of-way, runoff leaving the site travels
northwest approximately 45 feet toward an existing storm drain inlet. The storm drain
inlet is on the north side of Juniper Avenue, which is a superelevated road sloping to the
north. Surface flow enters the storm drain inlet ultimately are conveyed south to outlet in
the Agua Hedionda Lagoon prior to entering the Pacific Ocean.
Using the Rational Method Procedure outlined in the San Diego County Hydrology
Manual, a peak flow rate and time of concentration was calculated for the 100-year, 6-
hour storm event for the onsite drainage basin. Table 1 below summarizes the results of
the Rational Method calculations.
PLSA 3459-01
Page 2 of 13
EXISTING DRAINAGE FLOWS
DRAINAGE
AREA
DRAINAGE
AREA
(ACRES)
Q100
(CFS)
I100
(IN/HR)
EX-1 0.251 1.00 6.59
Table 1. Existing Condition Peak Drainage Flow Rates
Refer to pre-development hydrology calculations included in Section 3.1 of this report for
a detailed analysis of the existing drainage basin, as well as a pre-development hydrology
node map included in the appendix of this report for pre-development drainage basin
delineation and discharge locations.
1.3 Proposed Project
The proposed project includes the demolition of all existing onsite improvements and the
construction of four (4) new condominium units. The project proposes a driveway to
provide vehicular access to the proposed garages consisting of pervious pavers. Two
private onsite parking stalls interior to the site are also shown for site residents. There are
two proposed pad elevations for the 4 proposed structures. The northern structures are to
be built on a graded 56.9 pad elevation, and the southern structures are to be built on a
graded 57.2 pad elevation. Site grading, drainage and utility improvements typical of this
type of multi-family residential development will also be constructed as can be seen on
the precise Grading Plan prepared by Pasco, Laret, Suiter & Associates under separate
cover.
The subject property is approximately 42% impervious in the proposed condition. Based
on the proposed impervious area and land use type, a post-development weighted runoff
coefficient of 0.52 was calculated for the subject property using the methodology
described in section 3.1.2 of the San Diego County Hydrology Manual and the formula
provided therein. The proposed site consists of one (1) major drainage basin, with one
(1) primary discharge location from the southwest corner of the property similar to the
existing condition. Drainage basin PR-1 consists of the entirety of the site and will
continue to convey runoff generally from a high point in the southeast corner of the site
to the Juniper Avenue right-of-way by means of surface flow and a storm drain
conveyance system. Runoff from the northeast side yard will enter a trash capture BMP
and will then be routed west to the inlet at the end of the concrete ribbon gutter. A
concrete ribbon gutter located at the center of the pervious paver driveway will also serve
to capture and convey drainage to the proposed trash capture BMP inlet and then will be
routed the final trash capture BMP inlet in the northwest front yard. All runoff will leave
the site through a modified D-25 sidewalk underdrain connected to the inlet in the
northwest side yard.
PLSA 3459-01
Page 3 of 13
Using the Rational Method Procedure outlined in the San Diego County Hydrology
Manual, a peak flow rate and time of concentration were calculated for the 100-year, 6-
hour storm event for the onsite drainage basin. Table 2 below summarizes the results of
the Rational Method calculations in the post-developed condition.
PROPOSED DRAINAGE FLOWS
DRAINAGE
AREA
DRAINAGE
AREA
(ACRES)
Q100
(CFS)
I100
(IN/HR)
PR-1 0.251 0.86 6.59
Table 2. Proposed Condition Peak Drainage Flow Rates
Refer to post-development hydrology calculations included in Section 3.2 of this report
for a detailed analysis of the proposed drainage basin, as well as a post-development
hydrology node map included in the appendix of this report for post-development
drainage basin delineation and discharge locations.
In an effort to comply with the City of Carlsbad storm water standards, the proposed site
has incorporated LID design techniques to optimize the site layout. Runoff from
proposed roofs and new or removed and replaced hardscape areas will be directed to
landscaped areas or pervious pavers to disperse drainage to pervious surfaces. The
landscaped areas will assist to remove sediment and particulate-bound pollutants from
storm water. In addition, the storage layers of the pervious pavers will help to mitigate
peak runoff by providing detention volume as well as slightly increasing the site’s overall
time of concentration. Refer to Section 3.4 of the report for a static detention analysis
showing that the increase in overall volume generated by the slight increase in hardscape
is accounted for in the gravel storage layer of the pervious pavers.
1.4 Conclusions
Based upon the analysis included in this report, there is a decrease of ~0.14 cfs in peak
runoff as a result of the proposed development due to the 1,339 square feet of decreased
hardscape in the proposed condition as compared the existing site. Similar to the existing
condition, the project will discharge to the northwest and onto the Juniper Avenue right-
of-way. Thus, water will not be diverted away from existing drainage patterns, and the
runoff produced by the proposed development will not have an adverse effect on the
downstream watershed. Although there is no increase is storm water volume, the
inherent detention characteristics and storage volume provided in the gravel layers of the
pervious pavers will assist to detain and mitigate peak runoff to pre-project conditions.
Additionally, the proposed project will be exempt from hydromodification compliance
requirements as it does not qualify as a Priority Development Project as defined in the
Regional Municipal Separate Storm Sewer System (MS4) Permit and the San Diego
County Model BMP Design Manual.
PLSA 3459-01
Page 4 of 13
1.5 References
“San Diego County Hydrology Manual”, revised June 2003, County of San Diego,
Department of Public Works, Flood Control Section.
“San Diego County Hydraulic Design Manual”, revised September 2014, County of San
Diego, Department of Public Works, Flood Control Section
“City of Carlsbad Engineering Standards, Volume 5: Carlsbad BMP Design Manual
(Post Construction Treatment BMPs)”, revised February 2016
“Low Impact Development Handbook – Stormwater Management Strategies”, revised
July 2014, County of San Diego, Department of Public Works
Soil Survey Staff, Natural Resources Conservation Service, United States Department of
Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov.
Accessed September 2, 2020
PLSA 3459-01
Page 5 of 13
2.0 METHODOLOGY
2.1 Introduction
The hydrologic model used to perform the hydrologic analysis presented in this report
utilizes the Rational Method (RM) equation, Q=CIA. The RM formula estimates the
peak rate of runoff based on the variables of area, runoff coefficient, and rainfall
intensity. The rainfall intensity (I) is equal to:
I = 7.44 x P6 x D-0.645
Where:
I = Intensity (in/hr)
P6 = 6-hour precipitation (inches)
D = duration (minutes – use Tc)
Using the Time of Concentration (Tc), which is the time required for a given element of
water that originates at the most remote point of the basin being analyzed to reach the
point at which the runoff from the basin is being analyzed. The RM equation determines
the storm water runoff rate (Q) for a given basin in terms of flow (typically in cubic feet
per second (cfs) but sometimes as gallons per minute (gpm)). The RM equation is as
follows:
Q = CIA
Where:
Q = flow (in cfs)
C = runoff coefficient, ratio of rainfall that produces storm water
runoff (runoff vs. infiltration/evaporation/absorption/etc)
I = average rainfall intensity for a duration equal to the Tc for the
area, in inches per hour.
A = drainage area contributing to the basin in acres.
The RM equation assumes that the storm event being analyzed delivers precipitation to
the entire basin uniformly, and therefore the peak discharge rate will occur when a
raindrop that falls at the most remote portion of the basin arrives at the point of analysis.
The RM also assumes that the fraction of rainfall that becomes runoff or the runoff
coefficient C is not affected by the storm intensity, I, or the precipitation zone number.
PLSA 3459-01
Page 6 of 13
2.2 County of San Diego Criteria
As defined by the County Hydrology Manual dated June 2003, the rational method is the
preferred equation for determining the hydrologic characteristics of basins up to
approximately one square mile in size. The County of San Diego has developed its own
tables, nomographs, and methodologies for analyzing storm water runoff for areas within
the county. The County has also developed precipitation isopluvial contour maps that
show even lines of rainfall anticipated from a given storm event (i.e. 100-year, 6-hour
storm).
One of the variables of the RM equation is the runoff coefficient, C. The runoff
coefficient is dependent only upon land use and soil type and the County of San Diego
has developed a table of Runoff Coefficients for Urban Areas to be applied to basin
located within the County of San Diego. The table categorizes the land use, the
associated development density (dwelling units per acre) and the percentage of
impervious area. Each of the categories listed has an associated runoff coefficient, C, for
each soil type class.
The County has also illustrated in detail the methodology for determining the time of
concentration, in particular the initial time of concentration. The County has adopted the
Federal Aviation Agency’s (FAA) overland time of flow equation. This equation
essentially limits the flow path length for the initial time of concentration to lengths under
100 feet, and is dependent on land use and slope. The time of concentration minimum is
5 minutes for purposes of calculating rainfall intensity per the County of San Diego
Hydrology Manual requirements.
2.3 Runoff Coefficient Determination
As stated in section 2.2, the runoff coefficient is dependent only upon land use and soil
type and the County of San Diego has developed a table of Runoff Coefficients for Urban
Areas to be applied to basin located within the County of San Diego. The table, included
in the Appendix of this report, categorizes the land use, the associated development
density (dwelling units per acre) and the percentage of impervious area.
For this study, a weighted runoff coefficient was used for both the pre-project and post-
developed site in accordance with the equation provided in Section 3.1.2 of the County of
San Diego Hydrology Manual. The weighted runoff coefficient is a function of the total
impervious and pervious surface areas in the existing and proposed conditions.
PLSA 3459-01
Page 7 of 13
3.0 HYDROLOGY MODEL OUTPUT
3.1 Pre-Developed Hydrologic Model Output (100-Year Event)
Pre-Development:
Q = CIA *Rational Method Equation
P100 = 2.5 *100-Year, 6-Hour Rainfall Precipitation
Basin EX-1
Total Area = 10,941 sf ➔ 0.251 Acres
Impervious Area = 5,919 sf ➔ 0.136 Acres
Pervious Area = 5,022 sf ➔ 0.115 Acres
Cn, Weighted Runoff Coefficient
- 0.25, Cn value for natural ground, Type B soils
* Per San Diego Hydrology Design Manual (SDHDM) Section 3.1.2
- 0.9, C value for developed / impervious surface
* Per SDHDM Section 3.1.2
Cn = 0.9 x 5,919 sf + 0.25 x 5,022 sf = 0.60
10,941 sf
Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM
I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation
I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr
Q100 = 0.60 x 6.59 in/hr x 0.251 Ac = 1.00 cfs
PLSA 3459-01
Page 8 of 13
3.2 Post-Developed Hydrologic Model Output (100-Year Event)
Post-Development (without considering HMP/BMP treatment):
Q = CIA *Rational Method Equation
P100 = 2.5 *100-Year, 6-Hour Rainfall Precipitation
Basin PR-1 (Total Site)
Total Area = 10,941 sf ➔ 0.251 Acres
Impervious Area = 4,580 sf ➔ 0.105 Acres
Pervious Area = 6,361 sf ➔ 0.146 Acres
Cn, Weighted Runoff Coefficient
- 0.25, Cn value for natural ground, Type B soils
* Per San Diego Hydrology Design Manual (SDHDM) Section 3.1.2
- 0.9, C value for developed / impervious surface
* Per SDHDM Section 3.1.2
Cn = 0.9 x 4,580 sf + 0.25 x 6,361 sf = 0.52
10,941 sf
Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM
I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation
I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr
Q100 = 0.52 x 6.59 in/hr x 0.251 Ac = 0.86 cfs
PLSA 3459-01
Page 9 of 13
Basin PR-1.1 (Flow at NW corner outlet)
Total area = 2,015 sf ➔ 0.046 Acres
Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM
I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation
I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr
Q100 = 0.52 x 6.59 in/hr x 0.047 Ac = 0.2 cfs
Basin PR-1.2 (Flow at NE corner outlet)
Total area = 2,115 sf ➔ 0.049 Acres
Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM
I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation
I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr
Q100 = 0.52 x 6.59 in/hr x 0.049 Ac = 0.2 cfs
Basin PR-1.3 (Flow at NW outlet)
Total area = 6,689 sf ➔ 0.154 Acres
Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM
I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation
I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr
Q100 = 0.52 x 6.59 in/hr x 0.154 Ac = 0.5 cfs
3.2.1 Capacity Check for modified D-25 PVC Sidewalk Underdrain
CD-25 = 1.10 cfs** *Capacity of 3” X 1’ drainage channel sloped at 2%
QPR1.1 = 0.2 cfs *Peak flow from basin PR-1.1
QPR1.2 = 0.2 cfs *Peak flow from basin PR-1.2
QPR1.3 = 0.5 cfs *Peak flow from basin PR-1.2
PLSA 3459-01
Page 10 of 13
Capacity check for modified D-24 3” x 1’ drainage channel sloped at 2% onto Juniper
Avenue for basins PR-1.1, PR-1.2, and PR-1.3.
CD-25 - QPR1 - QPR2- QPR3 = 1.10 – 0.2 – 0.2 -0.5 = +0.2 cfs
3” X 1’ drainage channel sidewalk under drain pipes sloped at 2% will sufficiently
handle the 100-year storm peak flow rates for PR-1.1 and PR-1.2
**See Appendix for capacity calculations for 3” X 1’ drainage channel sloped at 2%
3.3 Pre-Developed vs. Post-Developed Peak Flows (100-Year Event)
Total Pre-Development (Total Discharge Leaving Site)
Basin EX-1 Q100 = 1.00 cfs
*Discharging from the site at the northwest corner to Juniper Avenue
Total Q100 = 1.00 cfs
Total Post-Development (Total Discharge Leaving Site)
Basin PR-1 Q100 = 0.86 cfs
*Discharging from the site at the northwest corner to Juniper Avenue
Total Q100 = 0.86 cfs
Pre-Development vs. Post-Development (Discharge Leaving Site):
Pre-Development Post-Development Delta
Q100 = 1.00 cfs Q100 = 0.86 cfs 0.14 cfs decrease
3.4 Detention Analysis
The 100-year, 6-hour storm event detention analysis was performed in accordance with
Chapter 6 of the San Diego County Hydrology Manual (SDCHM). The results of the
analysis provide a static detention requirement by comparing the total volume produced
by the 100-year, 6-hour storm in the existing and post-project conditions. The total
PLSA 3459-01
Page 11 of 13
volume can be calculated after producing a hydrograph for each event (pre- and post-
developed) with the results of the Rational Method analysis. Calculations and results of
this analysis can be shown below.
The proposed pervious pavement driveway provides mitigation of the 100-year, 6-hour
storm event peak flow rate. Underneath the paver units and bedding layer is a 6-inch
gravel storage layer that provides sufficient detention volume to offset the increase in
total volume generated in the proposed condition due to the increase in overall hardscape.
See sections 3.4.1 and 3.4.2 below for the results of these calculations.
3.4.1 Static (No Routing) Detention Calculation
Pre-Development: 100-Year Event (Basin EX-1)
Volume = C*P6*A *Equation 6-1 of SDCHM
Volume = 0.60 * (2.5 in * 1 ft / 12 in) * (10,941 SF) = 1,368 CF
Post-Development: 100-Year Event (Basin PR-1)
Volume = C*P6*A *Equation 6-1 of SDCHM
Volume = 0.52 * (2.5 in * 1 ft / 12 in) * (10,941 SF) = 1,185 CF
Required Detention Volume = Total Post-Development – Total Pre-Development
= Basin PR-1 – Basin EX-1
= 1,185 CF – 1,368 CF = -183 CF*
*The proposed project produces less storm water volume that volume produced by the
existing conditions. This is primarily due to the decrease in proposed impervious area
and the implementation of pervious pavers.
3.4.2 Pervious Pavement Drive Aisle – Storage
Detention Volume Provided = Driveway Area x 6” Gravel Layer x 40% Voids
= 2,295 SF * (6 in * 1 ft / 12 in) * 0.40
= 459 CF
PLSA 3459-01
Page 12 of 13
459 CF of storage in gravel layers under pervious paver driveway.
**As stated previously, the potential storage of storm water is not required but provided
in the site design, by pervious pavers, for improved runoff mitigation.
PLSA 3459-01
Page 13 of 13
4.0 APPENDIX
San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient “C” Soil TypeNRCS Elements County Elements % IMPER. A B C D Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.200.250.300.35Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6
Hydrologic Soil Group—San Diego County Area, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/29/2021
Page 1 of 436680173668026366803536680443668053366806236680713668080366808936680173668026366803536680443668053366806236680713668080467866467875467884467893467902467911467920
467866 467875 467884 467893 467902 467911 467920
33° 9' 3'' N 117° 20' 40'' W33° 9' 3'' N117° 20' 38'' W33° 9' 1'' N
117° 20' 40'' W33° 9' 1'' N
117° 20' 38'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84
0 15 30 60 90
Feet
0 5 10 20 30
Meters
Map Scale: 1:357 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: San Diego County Area, California
Survey Area Data: Version 15, May 27, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jan 24, 2020—Feb
12, 2020
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—San Diego County Area, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/29/2021
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
MlC Marina loamy coarse
sand, 2 to 9 percent
slopes
B 0.3 100.0%
Totals for Area of Interest 0.3 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—San Diego County Area, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/29/2021
Page 3 of 4
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—San Diego County Area, California
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/29/2021
Page 4 of 4
XX
EXISTING 1 STORY BUILDINGEXISTING 1 STORY BUILDING13"TD16"TC12"TDXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
OE
OE
OE
OE
OEOEOEOEOEOEOEE E E
GW
OEOEOEOEOEOEX X X X X X X
XXXXXXXXXXXXXXXXX57575757575656
565655555555
545454EXISTING 1 STORY BUILDINGSSSSSSSSSSSSSSSSSSSSSSSCMU WALLCMU WALLASPHALTCONC.CONC.CONC.CONC.CONC.CONC.CONC.CONC.CONC.CONC.CONC.CONC.CONCRETE/PAVER COURTYARDBLOCK WALL
6' HIGH WOOD FENCE
CAR PORT
6' HIGH WOOD FENCE6' HIGH WOOD FENCE
6' HIGH VINYL FENCECMU WALLBLOCK WALL
4' HIGH CHAIN LINK FENCE STORAGEDIRT/GRAVELPARKING53.7654.7254.9355.1153.8455.5455.6655.8055.9456.2956.1855.7556.0954.6256.8256.8056.2956.2356.7557.0657.2057.1354.3753.3953.3953.1953.1857.4257.4256.7756.3957.2957.3857.0957.2157.1357.0857.0157.5857.0857.0457.7356.8956.6654.5055.1455.8455.9955.8356.3955.4555.1556.0456.2556.4956.4856.6056.5555.0956.7457.0556.9053.5055.4155.4054.8955.6355.1155.0755.5255.2856.0955.7157.09TW=59.14TW=59.16TW=59.20TW=60.03TW=56.82TW=56.96TW=57.23TW=57.67TW=58.70TW=58.52TW=58.28TW=58.24TW=57.73TW=57.70TW=57.81TW=59.55FF=58.25FF=57.66FF=58.36FF=56.97RF=67.6RF=68.1XXXXWALL/SIDINGWALL/CORRUGATED METAL SIDING
N 34°01'13" W 124.95'
N 34°00'55" W 125.00'N 56°00'25" E87.54'N 55°58'43" E87.55'JUNIPER AVENODE EX-100
(57.6 EG)
NODE EX-101(57.6 EG)
Q100=1.00 CFS
(57.5 EG)(56.9 FG)
(55.6 FG)
(55.4 EG)
(57.0 TW)
(56.5 TW@EG)(56.4 BW@EG)
(57.25 TW)(57.1 TW@EG)
(56.7 BW@EG)
(57.0 EG)
(57.1 EG)
(57.5 EG)
(57.4 EG)
(57.3 EG)
(57.2 EG)
(57.1 EG)
(56.1 EG)
(56.1 EG)
(55.5 EG)
(54.4 EG)
(54.1 EG)
(55.2 EG)
(55.7 EG)
(56.4 EG)
(53.6 FS)
(54.3 FS)
(55.6 FS)
30'
17' 13'
BASIN EX-1
AREA = 10,941 SF
(0.251 AC)
Cn = 0.60
5 10 15
GRAPHIC SCALE 1" = 5'
05
LEGEND
PROPERTY BOUNDARY
CENTERLINE OF ROAD
ADJACENT PROPERTY LINE
PUBLIC RIGHT-OF-WAY
BASIN BOUNDARY
FLOW LINE
IMPERVIOUS AREA
EXISTING HYDROLOGY EXIHIBT
295 JUNIPER AVE
CARLSBAD, CA 92008
BASIN EX-1 - AREA CALCULATIONS
TOTAL SITE AREA 10,941 SF (0.251 AC)
BASIN EX-1 TOTAL AREA 10,941 SF (0.251 AC)
BASIN EX-1 IMPERVIOUS AREA 5,919 SF (0.136 AC)BASIN EX-1 PERVIOUS AREA 5,022 SF (0.115 AC)
% IMPERVIOUS 54%
Cn 0.60
TIME OF CONCENTRATION 5.0 MINUTES (PER SDCHM)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Mar 17 2022
<Name>
Circular
Diameter (ft) = 0.50
Invert Elev (ft) = 100.00
Slope (%) = 1.00
N-Value = 0.013
Calculations
Compute by: Known Depth
Known Depth (ft) = 0.50
Highlighted
Depth (ft) = 0.50
Q (cfs) = 0.561
Area (sqft) = 0.20
Velocity (ft/s) = 2.86
Wetted Perim (ft) = 1.57
Crit Depth, Yc (ft) = 0.39
Top Width (ft) = 0.00
EGL (ft) = 0.63
0 1
Elev (ft)Section
99.75
100.00
100.25
100.50
100.75
101.00
Reach (ft)
6" PVC @ 1%
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Mar 17 2022
<Name>
Circular
Diameter (ft) = 0.50
Invert Elev (ft) = 100.00
Slope (%) = 2.00
N-Value = 0.013
Calculations
Compute by: Known Depth
Known Depth (ft) = 0.50
Highlighted
Depth (ft) = 0.50
Q (cfs) = 0.793
Area (sqft) = 0.20
Velocity (ft/s) = 4.04
Wetted Perim (ft) = 1.57
Crit Depth, Yc (ft) = 0.45
Top Width (ft) = 0.00
EGL (ft) = 0.75
0 1
Elev (ft)Section
99.75
100.00
100.25
100.50
100.75
101.00
Reach (ft)
6" PVC @ 2%
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Thursday, Mar 17 2022
<Name>
Rectangular
Bottom Width (ft) = 1.00
Total Depth (ft) = 0.25
Invert Elev (ft) = 100.00
Slope (%) = 2.00
N-Value = 0.015
Calculations
Compute by: Known Depth
Known Depth (ft) = 0.25
Highlighted
Depth (ft) = 0.25
Q (cfs) = 1.060
Area (sqft) = 0.25
Velocity (ft/s) = 4.24
Wetted Perim (ft) = 1.50
Crit Depth, Yc (ft) = 0.25
Top Width (ft) = 1.00
EGL (ft) = 0.53
0 .25 .5 .75 1 1.25 1.5
Elev (ft)Depth (ft)Section
99.75 -0.25
100.00 0.00
100.25 0.25
100.50 0.50
100.75 0.75
101.00 1.00
Reach (ft)
Modified D-25 capacity @ 2.0 %