Loading...
HomeMy WebLinkAbout2022-06-14; City Council; Resolution 2022-138RESOLUTION NO. 2022-138 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE EXHIBIT 10 WHEREAS, the City Council of the City of Carlsbad, California has the authority to establish fees for city services; and WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for city services; and WHEREAS, the City Council has determined the cost of providing general and development­ related services; and WHEREAS, the City Council believes it is necessary for the City Manager to have the authority to adjust the parks and recreation and library and arts program and classes fees from time to time to remain competitive and within the market pricing for like programs and classes; and WHEREAS, the City Council finds it necessary to recover the costs for city services; and WHEREAS, the City Council has held the necessary public hearing and allowed for public comment on the establishment said fees. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That the changes to the Master Fee Schedule as shown in Attachment A are adopted. 3.The City Council authorizes the City Manager or a designee to set parks and recreation and library and cultural arts program, rental, and class fees that are included in the Community Services Guide. The fees shall not exceed the fully burdened, including direct and indirect, costs of providing the program, rental, and class but shall be no less (except in the case of introductory, discount or promotional pricing) than the lowest fee charged for like kind programs or classes in similarly benchmarked Southern California cities. 4.The City Council authorizes the City Manager or a designee to change vehicle and traffic violation fees at the time, and by the same amount, as the state changes its portion of the fine. Any changes to these fees will be made to the current Master Fee Schedule. June 14, 2022 Item #7 Page 195 of 454 5.This resolution shall become effective on Sept. 1, 2022; not sooner than 60 days after adoption in accordance with California Government Code Section 66017 for development-related service fees and development impact fees. 6.Per the contract with Republic Services, changes to the recycling and trash fees as shown in Attachment A shall become effective on July 1, 2022. PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the City Council of the City of Carlsbad, the Board of Directors of the Carlsbad Municipal Water District, the Board of Directors of the Carlsbad Public Financing Authority, the City of Carlsbad Community Development Commission, and the City Council of the City of Carlsbad as Successor Agency to the Carlsbad Redevelopment Agency held on the 14th day of June, 2022, by the following vote, to wit: AYES: NAYS: ABSENT: Blackburn, Bhat-Patel, Acosta, Norby. None. Hall. +v"FAVIOLA MEDINA, City Clerk Services Manager (SEAL) June 14, 2022 Item #7 Page 196 of 454 Proposed Master Fee Schedule Changes FY 2022-23 All Fees Within, except Trash Collection Rates, Effective Sept. 1, 2022 Trash Collection Rates Effective July 1, 2022 Attachment A June 14, 2022 Item #7 Page 197 of 454 Proposed Master Fee Schedule FY 2022-23 Contents Section 1 – General City Service Fees, Deposits, Rates, Penalties and Fines Miscellaneous Fees and Returned Checks ....................................................................................... 4 Deposits and Securities .................................................................................................................... 5 Special Events and Safety Training Center ....................................................................................... 6 Ambulance and Street Light Energizing ........................................................................................... 7 City Clerk Fees .................................................................................................................................. 8 Library Fees ...................................................................................................................................... 9 Fire (Fire Extinguishing and Alarm Systems) .................................................................................. 10 Fire (Development Applications, Plan Review, and Inspection) .................................................... 11 Fire (Fire and Life Safety Inspections and Fire Code Permits) ....................................................... 12 Police Department Fees ................................................................................................................. 15 Administrative and Vehicle, Traffic, and Parking Penalties ........................................................... 16 Trash Collection Rates .................................................................................................................... 17 Utility Account and Service Fees .................................................................................................... 25 Utility Meter Installation and Connection ..................................................................................... 27 Utility (San Diego County Water Authority) .................................................................................. 29 Section 2 – Development Related Fees Planning Department Fees ............................................................................................................ 31 Engineering Department Fees ....................................................................................................... 36 Building (New Construction, Additions and Major Remodels) ...................................................... 41 Building (Minor/Miscellaneous Residential & Commercial Improvements) ................................. 46 Building (Plumbing, Mechanical, and Electrical) ............................................................................ 50 Building (Simple Single or Combination Permits List) .................................................................... 52 Section 3 – Development Impact Fees Bridge and Thoroughfare District 2 Map ....................................................................................... 54 Local Facilities Management Zones Map ....................................................................................... 55 Park in Lieu Fees, Park Districts Map ............................................................................................. 56 Planned Local Drainage Fee Areas and Map .................................................................................. 57 Sewer Benefit Area and Connection Fees Map ............................................................................. 59 Affordable Housing, Habitat Mitigation, and Traffic ..................................................................... 61 June 14, 2022 Item #7 Page 198 of 454 Section 1 General City Service Fees, Deposits, Rates, Penalties and Fines June 14, 2022 Item #7 Page 199 of 454 Fee Name Fee Type Notes Fee/Deposit Miscellaneous Fees Administrative Fee for 1915 Act Bond Call - 1% of principal being repaid (All Assessment Districts using 1915 Act Bonds)each [1] $50 min/$500 max Business License - additional CA fee each [4],[6]4.00$ Business License - master list of active business licenses each [2]33.00$ Business License - monthly list of new licenses each [2]6.00$ Cable Channel Administration Fee per hour [3]94.00$ Electric Vehicle Charging Fee per kWh [1]0.35$ GIS - digital data delivery, production of new documents, reproduction of existing documents, and technical services per hour [1] Actual Cost Hearing Disposition Services for Parking Citations - Personal Hearings each [1] Actual Cost Hearing Disposition Services for Parking Citations - Written Review each [1] Actual Cost City Publications each [1] Copy Charge Community Facilities District Annexation - City Labor (Plus actual consultants costs)each [2]1,620.00$ Returned Check Fee First Returned Check each [5]25.00$ Each Additional Check each [5]35.00$ [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per 2021 - Cost of Service Study and Fee Schedule Update. [4] Set per CA Government Code 4467 [5] Set per CA Civil Code 1719 [6] Business license tax, set per Carlsbad Municipal Code 5.08.010, is separate from these fees. June 14, 2022 Item #7 Page 200 of 454 Fee Name Fee Type Notes Fee/Deposit Deposits and Securities Grading and Erosion Control Grading Security (with approved plans)deposit [1],[2] Based on Grading Cost Estimate Grading Cash Deposit deposit [1],[2] Up to 10% of total grading security Development/Subdivision Improvements Faithful Performance Security deposit [1],[2] Based on Improvement Cost Estimate Labor and Materials Security deposit [1],[2] 50% of Faithful Performance Security Monumentation Security deposit [1],[2] Based on Total Cost of Monumentation [Notes] [1] Set per City policy [2]Per CA Government Code 53079, 1% shall be deducted from any interest due. The city may require a security be provided to ensure work related to a project is completed in accordance with the Carlsbad Municipal Code and development agreements executed with the city. This information is to help understand the standard structure of how these deposits and securities are calculated. The security amounts are calculated using final city-approved cost estimates, not initial or draft estimates during plan check. June 14, 2022 Item #7 Page 201 of 454 Fee Name Fee Type Notes Fee/Deposit Special Events Fees Special Event Application - Minor - 2 or less intersections (fee + services rendered)each [1],[3]144.00$ Special Event Application - Major - 3 or more intersections (fee + services rendered) each [1],[2]432.00$ Special Event Application - Third party Vendor Fee per day [1],[2]97.00$ Special Event City Services - Staff Time per hour [1] Actual Cost Safety Training Center Facility Fees One Shooting Range full day [1]1,263.00$ One Shooting Range 1/2 day [1]632.00$ Two Shooting Ranges full day [1]1,419.00$ Two Shooting Ranges 1/2 day [1]742.00$ Classroom full day [1]600.00$ Classroom 1/2 day [1]343.00$ Confined Space Prop full day [1]664.00$ Confined Space Prop 1/2 day [1]332.00$ Grinder full day [1]476.00$ Grinder 1/2 day [1]277.00$ Grinder/Commercial Prop (No Fire Ops)full day [1]687.00$ Grinder/Commercial Prop (No Fire Ops)1/2 day [1]343.00$ Grinder/Residential Prop (No Fire Ops)full day [1]687.00$ Grinder/Residential Prop (No Fire Ops)1/2 day [1]343.00$ PriSim (Training Simulator)full day [1]500.00$ PriSim (Training Simulator)1/2 day [1]250.00$ Pump Draft Pit full day [1]400.00$ Pump Draft Pit 1/2 day [1]200.00$ Streetscape full day [1]167.00$ Streetscape 1/2 day [1]122.00$ Special Events Recovery - Hourly hourly [1]55.00$ Shooting Range - Hourly hourly [1]128.00$ Shooting Range Hazardous Waste Disposal Fees each [1],[3]217.00$ [Notes] [1] Set per City policy [2] Carlsbad Municipal Code 8.17 defines and outlines Special Events which may require a permitting. [3] Fee charged as determined by staff Full details on how to apply for a Special Event Application can be referenced in the Special Event Reference Handbook available on the City of Carlsbad website. The below fees are listed for reference only and may not be representative of the entirety of a Special Event Application cost. A valid, unexpired City of Carlsbad Business License is required for all special event applicants. Carlsbad Municipal Code Section 8.17.070 CMC requires an applicant to pay a non-refundable fee to allow third party vendors to participate under the applicant’s business License. June 14, 2022 Item #7 Page 202 of 454 Fee Name Fee Type Notes Fee/Deposit Ambulance Fees Assessment/Non-Transport with medication given. No charge for assessment if no medication given and non-transport. per [1]224.00$ Advanced Life Support 1 - Resident and Non-Resident - plus Level I or Level II supplies and medications per [1]1,286.00$ Advanced Life Support 2 - Non-Resident - plus Level II supplies and medications per [1]1,510.00$ Advanced Life Support 2 - Resident - plus Level II supplies and medications per [1]1,399.00$ Basic Life Support - Resident and Non-Resident per [1]1,050.00$ Mileage Charge mile [1]25.00$ Oxygen Charge per [1]84.00$ Street Light Energizing Fees 40 watts each [2]90.00$ 45 watts each [2]98.00$ 70 watts each [2]136.00$ 85 watts each [2]160.00$ 100 watts each [2]183.00$ 150 watts each [2]260.00$ 200 watts each [2]338.00$ 250 watts each [2]416.00$ [Notes] [1] Set per City policy [2]Street Light Energizing Fees are the cost for energizing each street light for eighteen months, and include a $30.00 charge per light for connecting the light to an SDG&E service point. June 14, 2022 Item #7 Page 203 of 454 Fee Name Fee Type Notes Fee/Deposit City Clerk Fees Blueprinting of Standard Size each [1]5.00$ Appeals to City Council each [2]115.00$ Candidate Filing Fee each [3]25.00$ Notice of Intention to Circulate Initiative Petition each [4]200.00$ Subpoena Fees Deposition Subpoena per day [5]275.00$ Records Subpoena - research per hour [6]15.00$ Copy Fees Copies & Printing - Black & White each [1]0.10$ Copies & Printing - Color each [1]0.10$ CD Copy each [1] Actual Cost DVD Copy each [1] Actual Cost USB Drive Copy each [1] Actual Cost FPPC Fees Campaign Statements per page [7]0.10$ Conflict of Interest Statement per page [7]0.10$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]115.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 1.12.010 [4] Set per CA Elections Code 9202 [5] Set per CA Government Code 68096.1(b) [6] Set per CA Evidence Code 1563(b)(1) [7] Set per CA Government Code 81008 June 14, 2022 Item #7 Page 204 of 454 Fee Name Fee Type Notes Fee/Deposit Library Fees Copies & Printing - Black & White each [1]0.20$ Copies & Printing - Color each [1]1.00$ Account Collection Fee per item [1]10.00$ Hold Request Non-Pickup Fee per item [2]1.00$ Borrowing - Audio/Visual Equipment, per item per day [1]5.00$ Card Replacement per card [2]2.00$ Carlsbad History Collection Photo Fee per request [1] Actual Cost Inter Loan per request [2]6.00$ Lost/Damaged Item Processing fee per item [2]6.00$ Lost/Damaged Item per item [1]List Price Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]12.00$ [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update June 14, 2022 Item #7 Page 205 of 454 Fee Name Fee Type Notes Fee/Deposit Fire Extinguishing and Alarm Systems New Sprinkler System ESFR Fire Sprinkler System (Initial system)each [2]1,017.00$ Each additional System each [2]281.00$ Per Additional Inspection each [2]121.00$ ESFR Fire Sprinkler System with In-Rack Sprinklers each [2]1,177.00$ Each additional System each [2]281.00$ Per Additional Inspection each [2]121.00$ Fire Pump (first pump)each [2]936.00$ Each Additional pump each [2]321.00$ NFPA 13 System < 100 heads each [2]735.00$ Per Additional Inspection each [2]121.00$ Per Additional Plan Type each [2]160.00$ NFPA 13 System > 100 heads (includes one riser)each [2]1,017.00$ Each Additional Riser each [2]281.00$ Per Additional Inspection each [2]121.00$ Per Additional Plan Type each [2]160.00$ NFPA 13R System 3-16 units (per building)each [2]1,017.00$ Per Additional Inspection (per building)each [2]160.00$ Per Additional Plan Type each [2]160.00$ NFPA 13D Single Family System (Plan Review Per Initial or Single Plan Type)each [2]292.00$ Per Additional Plan Type each [2]160.00$ NFPA 13D Single Family System (Inspection Per Building)each [2]148.00$ Underground Piping with up to 4 Hydrants/Risers each [2]895.00$ Underground Piping with 5 or more Hydrants/Risers each [2],[3]1,180.00$ Tenant Improvement Sprinkler System NFPA 13 or 13R System 6 heads or less each [2]148.00$ NFPA 13 or 13R System 7 - 100 heads each [2]654.00$ Per Additional Inspection each [2]160.00$ Per Additional Plan Type each [2]160.00$ NFPA 13 or 13R System > 100 heads each [2]774.00$ Per Additional Inspection each [2]160.00$ Per Additional Plan Type each [2]160.00$ Other Extinguishing Systems Gas Systems (Med Gas, Industrial Gas, LPG)each [2]493.00$ Hood & Duct Extinguishing System each [2]493.00$ Each additional System each [2]241.00$ Pre-Action System with Alarm each [2]654.00$ Refrigeration Systems < 500 lbs.each [2]855.00$ Refrigeration Systems > 500 lbs.each [2]1,458.00$ Special Equipment (Ovens, Dust, Battery)each [2]493.00$ Special Extinguishing System each [2]694.00$ Spray Booths each [2]493.00$ Alarm Systems June 14, 2022 Item #7 Page 206 of 454 Fee Name Fee Type Notes Fee/Deposit New Alarm System each [2]1,499.00$ Per Additional Inspection each [2]160.00$ Per Additional Plan Type each [2]160.00$ Sprinkler Monitoring each [2]453.00$ Per Additional Inspection each [2]160.00$ Per Additional Plan Type each [2]160.00$ Tenant Improvement Fire Alarm System each [2]735.00$ Per Additional Inspection each [2]160.00$ Per Additional Plan Type each [2]160.00$ Development Applications, Plan Review and Inspection Building Construction Plan (Architectural Review) A-1 Occupancies - New each [2]1,407.00$ A-1 Occupancies - Tenant Improvements each [2]1,076.00$ A-2 & A-3 Occupancies - New each [2]965.00$ A-2 & A-3 Occupancies - Tenant Improvements each [2]744.00$ A-4 & A-5 Occupancies - New each [2]1,407.00$ A-4 & A-5 Occupancies - Tenant Improvements each [2]1,076.00$ E Occupancies - New each [2]1,407.00$ E Occupancies - Tenant Improvements each [2]1,076.00$ E Occupancies (Daycare only) each [2]563.00$ F Occupancies - New each [2]965.00$ F Occupancies - Tenant Improvements each [2]744.00$ H Occupancies (not including Chem Class) - New each [2]965.00$ H Occupancies (not including Chem Class) - Tenant Improvements each [2]744.00$ I Occupancies - New each [2]965.00$ I Occupancies - Tenant Improvements each [2]744.00$ L Occupancies - New each [2]563.00$ L Occupancies - Tenant Improvements each [2]443.00$ R-1 & R-2 Occupancies <50 units New flat [2]1,407.00$ R-1 & R-2 Occupancies ≥50 units New flat [2]1,739.00$ R-3 Townhomes New each [2]965.00$ R Occupancies All - Tenant Improvements each [2]744.00$ S Occupancies < 50,000 sq. ft. New flat [2]563.00$ S Occupancies < 50,000 sq. ft. - Tenant Improvements flat [2]443.00$ S Occupancies ≥ 50,000 sq. ft. New flat [2]1,046.00$ S Occupancies ≥ 50,000 sq. ft. - Tenant Improvements flat [2]803.00$ Plan Review and Inspection Hazardous Materials Storage Chem Class <10 Chemicals flat [2]574.00$ Chem Class 10- 25 Chemicals flat [2]895.00$ Chem Class 26 - 100 Chemicals flat [2]1,297.00$ Chem Class >100 Chemicals flat [2]1,700.00$ Fire Department Access & Fire Lanes flat [2]292.00$ June 14, 2022 Item #7 Page 207 of 454 Fee Name Fee Type Notes Fee/Deposit High Piled Storage flat [2]895.00$ High Rise Structure greater than 55 feet 402.00$ Per Additional Floor flat [2]321.00$ Storage Tanks Aboveground Storage Tanks (First tank)each [2]855.00$ Underground Storage Tanks (First tank)each [2]774.00$ Each Additional Tank each [2]121.00$ Vegetation Fuel Modification Custom Home flat [2]574.00$ Tract <75 Homes flat [2]1,057.00$ Tract ≥75 Homes flat [2]1,539.00$ Smoke Control - Rationale Analysis & Plan Review 1,620.00$ Other Fire Fees Aerial Fireworks Display Major each [2]1,528.00$ Minor each [2]884.00$ Plan Review Processing Fee each [2]27.00$ Per Hour - Overtime hourly [2]174.00$ Per Hour - Regular Office Hours hourly [2]160.00$ Hourly Services for: Alternate Methods and Materials Review, Time and Materials Review, Project Meetings, etc. First Hour each [2]188.00$ Each Additional Hour hourly [2]160.00$ Plan Resubmittal (3rd and Subsequent Submittal, per hour)hourly [2]160.00$ Reinspection (Per inspection)each [2]228.00$ Tent Permit (Not associated with special events) Single tent each [2]241.00$ 2-5 tents flat [2]482.00$ 6 or more tents flat [2]644.00$ Weed Abatement Administrative Fee 321.00$ Fire Nuisance Alarm - 1st response in 12 month period each [1]-$ Fire Nuisance Alarm - 2nd response in 12 month period each [1]96.00$ Fire Nuisance Alarm - 3rd response in 12 month period each [1]191.00$ Fire Nuisance Alarm - each additional response thereafter each [1]375.00$ Fire Nuisance Alarm - each billing each [1]13.00$ Special Events Application Processing flat [2],[6]160.00$ Special Events - Fire Prevention/Operations Support Prior To/During Event each [2],[6] Actual Cost Fire & Life Safety Inspections and Fire Code Permits Fire Inspections for the following Occupancies: Care Facility for more than 6 ambulatory & non-ambulatory clients each [2],[4]174.00$ Hospitals, Nursing homes, Mental hospitals, Detoxification and Surgery Centers each [2],[4]335.00$ June 14, 2022 Item #7 Page 208 of 454 Fee Name Fee Type Notes Fee/Deposit Commercial Care Facility (i.e. Child, Drug & Alcohol, Juvenile, & etc.)each [2],[4]174.00$ Pre-Inspection Residential Care Facility (i.e. Single Family Residences)each [2],[4]174.00$ High Rise Facility > 75 ft. (per floor of building)each [2],[4]174.00$ State Mandated School Inspection - Public or Private School [2],[4] Pre-School each [2],[4]402.00$ Elementary/Middle School each [2],[4]644.00$ High School each [2],[4]965.00$ State Mandated Hotel and Motel Inspection 1-5 Buildings per property flat [2],[4]563.00$ 6-10 Buildings per property flat [2],[4]965.00$ 11 or more buildings per property flat [2],[4]1,206.00$ State Mandated Apartment Inspection 3-10 units per building flat [2],[4]201.00$ 11-40 units per building flat [2],[4]241.00$ Greater than 40 units per building flat [2],[4]322.00$ Fire Code Permits - Initial Permit Tier 1 each [2],[5]174.00$ Tier 2 each [2],[5]335.00$ Tier 3 each [2],[5]496.00$ Fire Code Permits - Annual Renewal Permit Tier 1 each [2],[5]94.00$ Tier 2 each [2],[5]174.00$ Tier 3 each [2],[5]255.00$ Assembly < 300 people flat [2]174.00$ > 300 people flat [2]335.00$ All Other Occupancies Annual Inspections Tier 1 - 5,000 sq. ft. or less flat [2]134.00$ Tier 2 - 5,001 to 20,000 sq. ft.flat [2]214.00$ Tier 3 - 20,001 and greater flat [2]335.00$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]160.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Additional Reinspection fees shall apply for phased inspection projects at the discretion of the Fire Marshall [4] All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspection shall be charged an additional rate per inspection. June 14, 2022 Item #7 Page 209 of 454 Fee Name Fee Type Notes Fee/Deposit [5] [6]Additional fees for Standby of fire personnel and equipment during event will apply. Tier 1 – Candles – Open Flame; Cryogens; Dry Cleaning; Liquefied Petroleum Gas (LPG); Motor Vehicle Fuel Dispensing; Industrial Ovens; Hot Works; Welding Tier 2 – Aerosol; Aviation Facility; Waste Handling; Carnival/Fair; Combustible Materials Storage; Compressed Gas; Dust Producing Operations; Flammable Liquids – Storage; Combustible Liquids – Storage; Flammable/Combustible Liquids – Tanks; Flammable/Combustible Liquids – AST/UST Removal; Fruit Ripening; Hazardous Materials; Magnesium Work; Repair Garage; Tire Storage; Explosives-Model Rockets June 14, 2022 Item #7 Page 210 of 454 Fee Name Fee Type Notes Fee/Deposit Police Fees Audio / Photos on Disk each [2]40.00$ Burglary Alarm Registration Fee each [2]26.00$ False Alarm Response - Second Occurrence each [2]36.00$ False Alarm Response - Additional Occurrence each [2]67.00$ Excess False Alarm Panic Response - Robbery each [3]100.00$ Excess False Alarm Panic Response - Burglary each [3]100.00$ Copy Investigation Record each [2]55.00$ Dispatch Records Searches per query [2]20.00$ Entertainment License each [2]280.00$ Fingerprinting processing Fee each [2],[5]24.00$ Fix-It Ticket - moving violation each [2],[6]19.00$ Fix-It Ticket - parking/registration violation each [2],[6]12.00$ Handicap Placard Violation Waiver Processing Fee each [2],[7]26.00$ Photograph Copy - Subpoena or Records requests that require retrieval in QueTel evidence program.each [2]19.00$ Police/Fire - Emergency Response DUI Traffic Collision (max $12,000 per incident)each [1] Actual Cost Production of body worn camera videos. Staff time per hour of production and redaction of videos.each [1] Actual Cost Report Copy Fee (Free to Victim)each [2]12.00$ Rental of Conference rooms to Safety Personnel each [2]210.00$ Storage/Impounded Vehicle Administrative Charge each [2]145.00$ Administrative Fee - DUI each [1]22.00$ Massage license permit (plus fingerprint processing fee)each [4]146.00$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]80.00$ [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per City of Carlsbad Municipal Code 8.50.080 [E] [4] Set per City of Carlsbad Municipal Code 5.16.070 [5] Plus actual cost from processing agency [6] Requires proof of correction [7] Waived with proof of correction June 14, 2022 Item #7 Page 211 of 454 Fee Name Fee Type Notes Fee/Deposit Administrative Citation Penalties 1st Violation of a City Ordinance each [2]100.00$ 2nd Violation of a City Ordinance each [2]200.00$ 3rd Violation of a City Ordinance each [2]500.00$ Subsequent violation of same ordinance within one year each [2]500.00$ Vehicle, Traffic, and Parking Civil Penalties CA Vehicle Code Parking Violation, if not specified by separate fee amount (rounded)each [3]48.00$ CA VC 22500(i) Bus Zone each [3]263.00$ CA VC 22500(l) Curb Cut/Disabled Access each [3]343.00$ CA VC 22507.8 (a)-(c) Disabled Parking Space/Access Area/Loading Area each [3]343.00$ CA VC 22522 Sidewalk Access Ramp (3 ft. away)each [3]343.00$ CA VC 22526 (a)(b) Block Intersection/Gridlock each [3]63.00$ CA Vehicle Code Violation for Equipment, if not specified by separate fee amount (rounded)each [3]38.00$ CA VC 4000(a) Expired Registration each [3]63.00$ CA VC 26100C Tinted Covers on Headlights each [3]48.00$ CA VC 28071 Passenger Car Bumpers Required each [3]88.00$ Carlsbad Municipal Code Parking Violations, if violation not established by the CA Vehicle Code Parking Violation or CA Vehicle Code Equipment Violation. each [1]50.00$ [Notes] [1] Set per City policy [2] Set per City of Carlsbad Resolution 2001-167 and limit set per CA Government Code Section 36900 [B] [3] Set per City Policy to the San Diego County Sheriff's Department Parking Fee Violation Table. June 14, 2022 Item #7 Page 212 of 454 Fee Name Fee Type Notes Fee/Deposit Trash Collection Rates (Stormwater fee included) Residential Services 3-Cart (64 or 96 gallon cart)[1]28.02$ 3-Cart Low Generator (35 gallon cart)[1]25.54$ Back Yard Service Fee (added to curbside rate)[1]35.26$ Additional Solid Waste Cart [1]3.05$ Additional Recycled Materials Cart (4+)[1]3.05$ Additional Organics Cart (4+)[1]3.05$ Commercial Services Commercial Solid Waste - 64 or 96 Gallon Cart One pick-up per week [1]27.94$ Two pick-ups per week [1]55.90$ Three pick-ups per week [1]83.84$ Four pick-ups per week [1]108.27$ Five pick-ups per week [1]132.80$ Six pick-ups per week [1]157.31$ Extra pick-up per week [1]13.16$ Commercial 96 Gallon Cart - Recycling and Organics Included One pick-up per week [1]58.61$ Two pick-ups per week [1]103.60$ Three pick-ups per week [1]148.54$ Four pick-up per week [1]191.82$ Five pick-ups per week [1]235.29$ Six pick-ups per week [1]278.71$ Multi-Family: Set of Solid Waste, Recycling, and Organics (per unit)[1]12.77$ Commercial Solid Waste Yard Bins 1-yard bin - one pick-up per week [1]73.64$ 1-yard bin - two pick-ups per week [1]125.08$ 1-yard bin - three pick-ups per week [1]176.71$ 1-yard bin - four pick-ups per week [1]228.18$ 1-yard bin - five pick-ups per week [1]279.90$ 1-yard bin - six pick-ups per week [1]331.56$ 1-yard bin - extra pick-up [1]35.42$ 2-yard bin - one pick-up per week [1]100.03$ 2-yard bin - two pick-ups per week [1]176.04$ 2-yard bin - three pick-ups per week [1]252.09$ 2-yard bin - four pick-ups per week [1]328.01$ 2-yard bin - five pick-ups per week [1]404.09$ 2-yard bin - six pick-ups per week [1]480.12$ 2-yard bin - extra pick-up [1]48.11$ 3-yard bin - one pick-up per week [1]135.89$ June 14, 2022 Item #7 Page 213 of 454 Fee Name Fee Type Notes Fee/Deposit 3-yard bin - two pick-ups per week [1]247.77$ 3-yard bin - three pick-ups per week [1]359.63$ 3-yard bin - four pick-ups per week [1]480.12$ 3-yard bin - five pick-ups per week [1]583.36$ 3-yard bin - six pick-ups per week [1]695.26$ 3-yard bin - extra pick-up [1]64.57$ 4-yard bin - one pick-up per week [1]181.22$ 4-yard bin - two pick-ups per week [1]338.41$ 4-yard bin - three pick-ups per week [1]495.67$ 4-yard bin - four pick-ups per week [1]652.86$ 4-yard bin - five pick-ups per week [1]810.07$ 4-yard bin - six pick-ups per week [1]967.29$ 4-yard bin - extra pick-up [1]77.25$ 5-yard bin - one pick-up per week [1]226.57$ 5-yard bin - two pick-ups per week [1]429.15$ 5-yard bin - three pick-ups per week [1]631.69$ 5-yard bin - four pick-ups per week [1]810.07$ 5-yard bin - five pick-ups per week [1]1,036.82$ 5-yard bin - six pick-ups per week [1]1,239.40$ 5-yard bin - extra pick-up [1]89.90$ 6-yard bin - one pick-up per week [1]247.77$ 6-yard bin - two pick-ups per week [1]480.12$ 6-yard bin - three pick-ups per week [1]695.26$ 6-yard bin - four pick-ups per week [1]967.29$ 6-yard bin - five pick-ups per week [1]1,239.40$ 6-yard bin - six pick-ups per week [1]1,588.05$ 6-yard bin - extra pick-up [1]112.39$ Commercial Split Bins (includes 2 locks )[1] One pick-up per week [1]109.74$ Two pick-ups per week [1]200.29$ Three pick-ups per week [1]290.82$ Four pick-ups per week [1]381.35$ Five pick-ups per week [1]471.88$ Six pick-ups per week [1]562.43$ Commercial Bin Compactor - Solid Waste 3-yard bin - one pick-up per week [1]190.49$ 3-yard bin - two pick-ups per week [1]356.71$ 3-yard bin - three pick-ups per week [1]522.93$ 3-yard bin - four pick-ups per week [1]689.14$ 3-yard bin - five pick-ups per week [1]855.37$ 3-yard bin - six picks-up per week [1]1,021.63$ 3-yard bin - extra pick-up [1]77.47$ 4-yard bin - one pick-up per week [1]314.57$ June 14, 2022 Item #7 Page 214 of 454 Fee Name Fee Type Notes Fee/Deposit 4-yard bin - two pick-ups per week [1]602.70$ 4-yard bin - three pick-ups per week [1]891.27$ 4-yard bin - four pick-ups per week [1]1,179.78$ 4-yard bin - five pick-ups per week [1]1,468.39$ 4-yard bin - six picks-up per week [1]1,757.05$ 4-yard bin - extra pick-up [1]127.93$ 6-yard bin - one pick-up per week [1]491.72$ 6-yard bin - two pick-ups per week [1]969.21$ 6-yard bin - three pick-ups per week [1]1,447.56$ 6-yard bin - four pick-ups per week [1]1,926.40$ 6-yard bin - five pick-ups per week [1]2,405.46$ 6-yard bin - six picks-up per week [1]2,884.62$ 6-yard bin - extra pick-up [1]199.96$ Commercial Recycling 32 gal cart - one pick-up per week [1]20.43$ 32 gal cart - two pick-ups per week [1]40.87$ 32 gal cart - three pick-ups per week [1]61.30$ 32 gal cart - four pick-ups per week [1]79.15$ 32 gal cart - five pick-ups per week [1]97.09$ 32 gal cart - six pick-ups per week [1]115.01$ 64 or 96 gal cart - one pick-up per week [1]22.36$ 64 or 96 gal cart - two pick-ups per week [1]44.72$ 64 or 96 gal cart - three pick-ups per week [1]67.07$ 64 or 96 gal cart - four pick-ups per week [1]86.62$ 64 or 96 gal cart - five pick-ups per week [1]106.24$ 64 or 96 gal cart - six pick-ups per week [1]125.85$ 64 or 96 gal cart - extra pick-up [1]10.53$ 1-yard bin - one pick-up per week [1]58.91$ 1-yard bin - two pick-ups per week [1]100.06$ 1-yard bin - three pick-ups per week [1]141.37$ 1-yard bin - four pick-ups per week [1]182.54$ 1-yard bin - five pick-ups per week [1]223.92$ 1-yard bin - six pick-ups per week [1]265.25$ 1-yard bin - extra pick-up [1]28.33$ 2-yard bin - one pick-up per week [1]80.03$ 2-yard bin - two pick-ups per week [1]140.83$ 2-yard bin - three pick-ups per week [1]201.67$ 2-yard bin - four pick-ups per week [1]262.40$ 2-yard bin - five pick-ups per week [1]323.27$ 2-yard bin - six pick-ups per week [1]384.10$ 2-yard bin - extra pick-up [1]38.49$ 3-yard bin - one pick-up per week [1]108.71$ 3-yard bin - two pick-ups per week [1]198.22$ June 14, 2022 Item #7 Page 215 of 454 Fee Name Fee Type Notes Fee/Deposit 3-yard bin - three pick-ups per week [1]287.71$ 3-yard bin - four pick-ups per week [1]384.10$ 3-yard bin - five pick-ups per week [1]466.69$ 3-yard bin - six pick-ups per week [1]556.20$ 3-yard bin - seven pick-ups per week [1]648.13$ 3-yard bin - extra pick-up [1]51.65$ 4-yard bin - one pick-up per week [1]144.97$ 4-yard bin - two pick-ups per week [1]270.73$ 4-yard bin - three pick-ups per week [1]396.53$ 4-yard bin - four pick-ups per week [1]522.29$ 4-yard bin - five pick-ups per week [1]648.06$ 4-yard bin - six pick-ups per week [1]773.83$ 4-yard bin - seven pick-ups per week [1]899.72$ 4-yard bin - extra pick-up [1]61.80$ 5-yard bin - one pick-up per week [1]181.25$ 5-yard bin - two pick-ups per week [1]343.32$ 5-yard bin - three pick-ups per week [1]505.35$ 5-yard bin - four pick-ups per week [1]648.06$ 5-yard bin - five pick-ups per week [1]829.45$ 5-yard bin - six pick-ups per week [1]991.52$ 5-yard bin - extra pick-up [1]71.92$ 6-yard bin - one pick-up per week [1]198.22$ 6-yard bin - two pick-ups per week [1]384.10$ 6-yard bin - three pick-ups per week [1]556.20$ 6-yard bin - four pick-ups per week [1]773.83$ 6-yard bin - five pick-ups per week [1]991.52$ 6-yard bin - six pick-ups per week [1]1,270.44$ 6-yard bin - extra pick-up [1]89.92$ Commercial Bin Compactor - Recycling 3-yard bin - one pick-up per week [1]152.39$ 3-yard bin - two pick-ups per week [1]285.37$ 3-yard bin - three pick-ups per week [1]418.35$ 3-yard bin - four pick-ups per week [1]551.31$ 3-yard bin - five pick-ups per week [1]684.30$ 3-yard bin - six picks-up per week [1]817.30$ 3-yard bin - extra pick-up [1]61.97$ 4-yard bin - one pick-up per week [1]251.66$ 4-yard bin - two pick-ups per week [1]482.16$ 4-yard bin - three pick-ups per week [1]713.01$ 4-yard bin - four pick-ups per week [1]943.82$ 4-yard bin - five pick-ups per week [1]1,174.72$ 4-yard bin - six picks-up per week [1]1,405.64$ 4-yard bin - extra pick-up [1]102.34$ June 14, 2022 Item #7 Page 216 of 454 Fee Name Fee Type Notes Fee/Deposit 6-yard bin - one pick-up per week [1]393.38$ 6-yard bin - two pick-ups per week [1]775.37$ 6-yard bin - three pick-ups per week [1]1,158.04$ 6-yard bin - four pick-ups per week [1]1,541.12$ 6-yard bin - five pick-ups per week [1]1,924.37$ 6-yard bin - six picks-up per week [1]2,307.70$ 6-yard bin - extra pick-up [1]159.97$ Commercial Organics Recycling 32 gal cart - one pick-up per week [1]20.43$ 32 gal cart - two pick-ups per week [1]40.87$ 32 gal cart - three pick-ups per week [1]61.30$ 32 gal cart - four pick-ups per week [1]79.15$ 32 gal cart - five pick-ups per week [1]97.09$ 32 gal cart - six pick-ups per week [1]115.01$ 64 or 96 gal cart - one pick-up per week [1]22.36$ 64 or 96 gal cart - two pick-ups per week [1]44.72$ 64 or 96 gal cart - three pick-ups per week [1]67.07$ 64 or 96 gal cart - four pick-ups per week [1]86.62$ 64 or 96 gal cart - five pick-ups per week [1]106.24$ 64 or 96 gal cart - six pick-ups per week [1]125.85$ 64 or 96 gal cart - extra pick-up [1]10.53$ 1-yard bin - one pick-up per week [1]58.91$ 1-yard bin - two pick-ups per week [1]100.06$ 1-yard bin - three pick-ups per week [1]141.37$ 1-yard bin - four pick-ups per week [1]182.54$ 1-yard bin - five pick-ups per week [1]223.92$ 1-yard bin - six pick-ups per week [1]265.25$ 1-yard bin - extra pick-up [1]28.33$ 1.5-yard bin - one pick-up per week [1]69.47$ 1.5-yard bin - two pick-ups per week [1]120.45$ 1.5-yard bin - three pick-ups per week [1]171.52$ 1.5-yard bin - four pick-ups per week [1]222.47$ 1.5-yard bin - five pick-ups per week [1]273.60$ 1.5-yard bin - six pick-ups per week [1]324.67$ 1.5-yard bin - extra pick-up [1]33.41$ 2-yard bin - one pick-up per week [1]80.03$ 2-yard bin - two pick-ups per week [1]140.83$ 2-yard bin - three pick-ups per week [1]201.67$ 2-yard bin - four pick-ups per week [1]262.40$ 2-yard bin - five pick-ups per week [1]323.27$ 2-yard bin - six pick-ups per week [1]384.10$ 2-yard bin - extra pick-up [1]38.49$ 3-yard bin - one pick-up per week [1]108.71$ June 14, 2022 Item #7 Page 217 of 454 Fee Name Fee Type Notes Fee/Deposit 3-yard bin - two pick-ups per week [1]198.22$ 3-yard bin - three pick-ups per week [1]287.71$ 3-yard bin - four pick-ups per week [1]384.10$ 3-yard bin - five pick-ups per week [1]466.69$ 3-yard bin - six pick-ups per week [1]556.20$ 3-yard bin - extra pick-up [1]51.65$ 4-yard bin - one pick-up per week [1]144.97$ 4-yard bin - two pick-ups per week [1]270.73$ 4-yard bin - three pick-ups per week [1]396.53$ 4-yard bin - four pick-ups per week [1]522.29$ 4-yard bin - five pick-ups per week [1]648.06$ 4-yard bin - six pick-ups per week [1]773.83$ 4-yard bin - extra pick-up [1]61.80$ Commercial Bin Compactor - Organics Recycling 3-yard bin - one pick-up per week [1]152.39$ 3-yard bin - two pick-ups per week [1]285.37$ 3-yard bin - three pick-ups per week [1]418.35$ 3-yard bin - four pick-ups per week [1]551.31$ 3-yard bin - five pick-ups per week [1]684.30$ 3-yard bin - six picks-up per week [1]817.30$ 3-yard bin - extra pick-up [1]61.97$ 4-yard bin - one pick-up per week [1]251.66$ 4-yard bin - two pick-ups per week [1]482.16$ 4-yard bin - three pick-ups per week [1]713.01$ 4-yard bin - four pick-ups per week [1]943.82$ 4-yard bin - five pick-ups per week [1]1,174.72$ 4-yard bin - six picks-up per week [1]1,405.64$ 4-yard bin - extra pick-up [1]102.34$ 6-yard bin - one pick-up per week [1]393.38$ 6-yard bin - two pick-ups per week [1]775.37$ 6-yard bin - three pick-ups per week [1]1,158.04$ 6-yard bin - four pick-ups per week [1]1,541.12$ 6-yard bin - five pick-ups per week [1]1,924.37$ 6-yard bin - six picks-up per week [1]2,307.70$ 6-yard bin - extra pick-up [1]159.97$ Special Haul Bin Rate 3-yard bin - one pick-up per week [1]166.12$ 3-yard bin - two pick-ups per week [1]259.62$ 3-yard bin - three pick-ups per week [1]353.11$ 3-yard bin - four pick-ups per week [1]446.61$ 3-yard bin - five pick-ups per week [1]540.12$ 3-yard bin - six pick-ups per week [1]633.62$ 3-yard bin - extra pick-up [1]54.24$ June 14, 2022 Item #7 Page 218 of 454 Fee Name Fee Type Notes Fee/Deposit Construction and Demolition Recycling Special Haul Bin (no Storm Water Fees) 1 week or less [1]117.32$ 2-yard temporary C&D Recycling Bin [1]136.79$ 3-yard temporary C&D Recycling Bin [1]139.03$ 4-yard temporary C&D Recycling Bin [1]151.10$ 6-yard temporary C&D Recycling Bin [1]156.09$ Other Fees and Charges Bin Exchange [1]75.92$ Bin Lock Set Up Fee [1]47.45$ Locking Fee [1]18.04$ Overloaded Bins [1]65.37$ Bin paint charge fee - allowed 1 per year. After first paint within one year, there will be a charge per paint request.[1]130.67$ Bin Relocation (first 25 feet free)9.02$ Special haul bin delivery [1]52.33$ Certified burial at Miramar plus special handling fee charged by Miramar [1]409.62$ Commercial Return to Service Fee - The return to service fee for two or more calls in a one-month period by a bin [1]84.19$ Copy Fee - The charge for copies requested by customers [1]1.79$ Delivery of extra cart [1]14.66$ Late Fee - There will be a minimum fee on any delinquent account - $3 minimum charge [1]4.51$ Bulky Item - Exceeding 5 per pick up - First item [1]53.30$ Bulky Item - Exceeding 5 per pick up - each addl item [1]13.66$ Per Bulky Item - first item [1]53.30$ Per Bulky Item - each additional item [1]13.66$ Bulky Item requiring 2 people to handle [1]76.54$ Contamination Fee - to recover costs for separating solid waste placed in a recycling or green waste container or for arranging a special, unscheduled collection due to contamination. [1]67.96$ Scout service per bin per service [1]61.49$ Residential Return to Service Fee - The return to service fee for two or more calls in a one-month period by a residential customer [1]42.81$ Restart Fee - The fee for restarting commercial service when a permanent account has been terminated for non-payment.[1]25.68$ Roll off Service Single and Multi-Family Resident Bulky Item Pick-Ups - 5 items maximum per pick up Commercial Bulky Item Pick-Ups June 14, 2022 Item #7 Page 219 of 454 Fee Name Fee Type Notes Fee/Deposit Service Fee - Roll off service [1]278.87$ Disposal Fee per Ton (pass through)[1]51.05$ Recycling Processing Fee per Ton (pass through)[1]35.51$ Organics Processing Fee per Ton (pass through)[1]77.87$ C&D Processing Fee per Ton (pass through)[1]73.28$ Contaminated Load (per occurrence)[1]278.87$ Roll off - Demurrage Per Day Charge [1]5.94$ Delivery [1]71.77$ Delivery Demo (includes signage) [1]75.87$ Relocation Charge onsite [1]56.07$ Relocation Charge offsite [1]79.99$ Wash Out Receiver Boxes [1]64.15$ Dead Run charge [1]96.15$ Standby charge after 5 minutes [1]2.54$ [Notes] [1] Set per contract by Republic Services June 14, 2022 Item #7 Page 220 of 454 Fee Name Fee Type Notes Fee/Deposit Utility Account and Service Fees Water Account Fees Discontinuation of Service - Non-Payment (Shut-off)each [2]48.00$ Service Reconnection (Non-Payment) - Same Day / Non-Business hours (After Hours Turn-On)each [2],[3]216.00$ Continuity of Service each [2]9.00$ Electronic Notice (in lieu of door hanger)each [2]3.00$ Door Hanger Notice each [2]20.00$ New Account Set Up (Admin)each [2]40.00$ Service Reconnection for Non-Payment (Next Day) Business Hours (Next Scheduled Day Turn-On)each [2],[3]100.00$ New Account Service Connection - (Same Day) Business Hours (Same Day Turn-On)each [2]136.00$ Water Services Fees Utility Standards and Specifications each [1] Actual Cost Potable Water Meter - Construction Meter Deposit deposit [1]900.00$ Potable Water Meter - Construction Meter Installation each [2]232.00$ Potable Water Meter - Construction Meter Relocation each [2]103.00$ Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet (cost for each)each [2]6.00$ Potable Backflow Preventer Annual Testing - 1st Notice each, per month [1]3.00$ Potable Backflow Preventer Annual Testing - 2nd Notice per month [1]20.00$ Potable Backflow Preventer Annual Testing - 3rd Notice per month [1]50.00$ Potable Water Shutdown Fee each [1]867.00$ Recycled Water Fees Recycled Backflow Preventer Annual Testing - 2nd Notice per month [2]13.00$ Recycled Backflow Preventer Annual Testing - 3rd Notice per month [2]39.00$ Cross-Connection Inspection - County Department of Environmental Health (CDEH)each [2] Actual Cost Recycled Backflow Preventer Annual Testing - 1st Notice each, per month [2]3.00$ Cross-Connection Reinspection each [2] Actual Cost Recycled Water Meter - Construction Meter Deposit deposit [1]900.00$ Recycled Water Meter - Construction Meter Installation each [2]232.00$ Recycled Water Meter - Construction Meter Relocation each [2]103.00$ E28 Recycled Water Shutdown - Actual Cost each [2]867.00$ Wastewater Fees Fats, Oils, and Grease (FOG) Fee each [1]151.00$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]163.00$ June 14, 2022 Item #7 Page 221 of 454 Fee Name Fee Type Notes Fee/Deposit [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Set per CA Health and Safety Code 1169149(a)(1) June 14, 2022 Item #7 Page 222 of 454 Fee Name Fee Type Notes Fee/Deposit Utility Meter Installation Fees Potable Water (meter size, inches) 5/8" Ultrasonic per [1]399.00$ Fire Protection – 5/8" Ultrasonic per [1]399.00$ 3/4” Ultrasonic per [1]395.00$ 1” Ultrasonic per [1]506.00$ 1-1/2” Ultrasonic per [1]614.00$ 1-1/2” Turbo per [1]745.00$ 2” Ultrasonic per [1]873.00$ 2” Turbo per [1]918.00$ 3" Ultrasonic per [1] Actual Cost 4" Ultrasonic per [1] Actual Cost 6” Ultrasonic per [1] Actual Cost 8” Ultrasonic per [1] Actual Cost 10” Ultrasonic per [1] Actual Cost 12” Ultrasonic per [1] Actual Cost Recycled Water (meter size, inches) 5/8" Ultrasonic per [1]399.00$ Fire Protection – 5/8" Ultrasonic per [1]399.00$ 3/4” Ultrasonic per [1]395.00$ 1” Ultrasonic per [1]506.00$ 1-1/2” Turbo per [1]745.00$ 2” Turbo per [1]918.00$ 3" Ultrasonic per [1] Actual Cost 4" Ultrasonic per [1] Actual Cost 6” Ultrasonic per [1] Actual Cost 8” Ultrasonic per [1] Actual Cost 10” Ultrasonic per [1] Actual Cost 12” Ultrasonic per [1] Actual Cost Utility Potable and Recycled Water Connection Fees (meter size, inches) Ultrasonic 5/8” each [1]4,870.00$ 3/4”each [1]6,943.00$ 1”each [1]10,958.00$ 1-1/2”each [1]20,699.00$ The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are in addition to the Potable & Recycled Water Connection Fees and SDCWA Fee. These fees are in addition to the Meter Installation Fees and SDCWA Fees. June 14, 2022 Item #7 Page 223 of 454 Fee Name Fee Type Notes Fee/Deposit 2”each [1]31,172.00$ 3”each [1]52,737.00$ 4”each [1]82,036.00$ 6”each [1] 152,352.00$ 8”each [1] 180,069.00$ Turbo (All Irrigation Meters) 1-1/2”each [1]24,300.00$ 2”each [1]38,963.00$ 3”each [1]82,036.00$ 4”each [1] 234,389.00$ 6”each [1] 468,769.00$ 8”each [1] 656,502.00$ [Notes] [1] Set per City policy June 14, 2022 Item #7 Page 224 of 454 Fee Name Fee Type Notes Fee/Deposit San Diego County Water Authority (SDCWA) Fees SDCWA System Capacity Charge (meter size, inches) Fire Protection per [1] Based on size of meter 5/8" Displacement per [1]5,328.00$ 3/4” Displacement per [1]5,328.00$ 1” Displacement per [1]8,525.00$ 1-1/2” Displacement per [1]15,984.00$ 1-1/2” Turbo per [1]15,984.00$ 2” Displacement per [1]27,706.00$ 2” Turbo per [1]27,706.00$ 3” per [1]51,149.00$ 4” per [1]87,379.00$ 6”per [1] 159,840.00$ 8”per [1] 277,056.00$ 10”per [1] 415,584.00$ 12”per [1] 703,296.00$ Water Treatment Capacity Charge (meter size, inches) Fire Protection per [1] Based on size of meter 5/8" Displacement per [1]149.00$ 3/4” Displacement per [1]149.00$ 1” Displacement per [1]238.00$ 1-1/2” Displacement per [1]447.00$ 1-1/2” Turbo per [1]447.00$ 2” Displacement per [1]775.00$ 2” Turbo per [1]775.00$ 3” per [1]1,430.00$ 4” per [1]2,443.00$ 6”per [1]4,470.00$ 8”per [1]7,748.00$ 10”per [1]11,622.00$ 12”per [1]19,668.00$ [Notes] [1] The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter necessary to meet the water use requirements, not the actual meter size of 1”. These fees are set by San Diego County Water Authority, effective January 1, 2022, and are in addition to the Meter Installation Fees and Potable and Reclaimed Connection Fees. June 14, 2022 Item #7 Page 225 of 454 Section 2 Development Related Service Fees June 14, 2022 Item #7 Page 226 of 454 Fee Name Fee Type Notes Fee/Deposit Planning Department Fees Agricultural Mitigation Fee per net converted acre [1] $ 10,000.00 Amendments and Revisions to Approved Projects flat [1] 50% of Current Application Fee Appeals to Planning Commision / City Council [2]847.00$ Building Plan Review Minor Projects, per permit each [3]98.00$ Major Projects, per permit each [4]295.00$ Coastal Development Permit (CDP) 2 - 4 unit or lot subdivision and SFD w/ bluff (per unit or lot, whichever is greater)per unit/lot [2]2,831.00$ 5 or more units or lot subdivision per permit [2]4,610.00$ Emergency flat [2]573.00$ Exemption flat [2]316.00$ Minor Permit flat [2]1,111.00$ Non-Residential + 10 cents per square foot flat [2]1,255.00$ Single Family Lot flat [2]1,398.00$ Conditional Use Permit (CUP) Within Biological Habitat Preserve flat [2]1,096.00$ Minor flat [2]975.00$ Regular flat [2]5,821.00$ Daycare Permit (7 - 14 Children)flat [2]272.00$ Environmental Impact Assessment (EIA) Initial Study - NEGATIVE DECLARATION flat [2]2,243.00$ Initial Study - MITIGATED NEG DEC flat [2]1,234.00$ Environmental Impact Report (EIR) Addendum First 20 hours of project planner base fee (flat) [2]3,261.00$ >20 hours of project planner per hour [2]106.00$ Focused/Supplemental (requiring a public hearing) First 120 hours of project planner and 20 hours of project engineer base fee (flat) [2]16,471.00$ >120 project planner hours and >20 project engineer hours per hour [2]244.00$ FULL EIR First 180 hours of project planner and 40 hours of project engineer base fee (flat) [2]25,259.00$ >180 project planner hours and >40 project engineer hours per hour [2]244.00$ June 14, 2022 Item #7 Page 227 of 454 Fee Name Fee Type Notes Fee/Deposit Fish & Game Fee Environmental Impact Report (EIR)flat [5] $ 3,589.25 Environmental Document pursuant to a Certified Regulatory Program (CRP)flat [5] $ 1,253.25 Negative Declaration (ND) /Mitigated Negative Declaration (MND)flat [5] $ 2,598.00 Extensions to projects in process flat [1] 25% of current fee General Plan Amendment deposit [2]5,541.00$ Habitat Management Plan (HMP) Amendment to Plan Document - Major - first 60 hours of project planner base fee (flat) [2]6,939.00$ >60 hours of project planner per hour [2]106.00$ Amendment to Plan Document - Minor flat [2]4,186.00$ Permit - Major -first 40 hours of project planner base fee (flat) [2]5,074.00$ >40 hours or project planner per hour [2]106.00$ Permit - Minor - first 20 hours of project planner base fee (flat) [2]703.00$ >20 hours of project planner per hour [2]106.00$ Permit - MINOR W/MINISTERIAL PERMIT flat [2]1,249.00$ Hillside Development Permit - Major - first 40 hours of project planner base fee (flat) [2]3,261.00$ Hillside Development Permit - Minor - first 20 hours of project planner base fee (flat) [2]1,613.00$ Inspection - Additional Planning per hour [2]106.00$ Inspection - Overtime per hour per hour [2]121.00$ Landscape Plan Check / Inspection Fees City Processing Fee per project [2]318.00$ Contractor Cost per project [1] Actual Cost Local Coastal Plan - Amendment flat [2]8,100.00$ Local Facilities Management Fees - as established by Council deposit [1] Actual Cost Local Facilities Management Plan/Amendment - Fee + deposit in minimum increments of $5,000 deposit [1]10,000.00$ Master Plan Master Plan - Pre-Filing Submittal flat [1]8,630.00$ First 200 hours of project planner and 100 hours of project engineer base fee (flat) [2]36,154.00$ >200 project planner hours and >100 project engineer hours per hour [2]311.00$ Major Amendment First 100 hours of project planner and 40 hours of project engineer base fee (flat) [2]17,208.00$ June 14, 2022 Item #7 Page 228 of 454 Fee Name Fee Type Notes Fee/Deposit >100 project planner hours and >40 project engineer hours per hour [2]290.00$ Minor Amendment First 30 hours of project planner and 7 hours of project engineer base fee (flat) [2]2,165.00$ >30 project planner hours and >7 project engineer hours per hour [2]290.00$ Non-Conforming Construction Permit flat [2]905.00$ Notice Fee (+ postage)flat [1] Actual Cost Plan Consistency Determination [2]918.00$ Planned Development (residential/non-residential) - 5 or more lots/units - Major Subdivision per project [2]10,853.00$ Planned Development (residential/non-residential) - 4 or fewer lots/units per project [2]3,914.00$ Planning Commission Agenda and Minutes (+ postage)per page [1] Copy Charge Planning Commission Determination-other flat [2]2,122.00$ Postage (All)flat [1] Current Postage Rate x Number of labels Precise Development Plan flat [2]9,878.00$ Preliminary Plan Review - Major (Other)flat [2]918.00$ Preliminary Plan Review - Minor (SFD)flat [2]258.00$ Reversion to Acreage (Consistent with city payroll records charged against a $3,100 deposit) First 25 hours of project planner and 20 hours of project engineer base fee (flat) [2]5,039.00$ Satellite Antenna Permit flat [2]545.00$ Sign Program Sign Permit (including non-commercial)flat [2]79.00$ Sign Program flat [2]1,369.00$ Modified Minor Sign Program flat [2]907.00$ Modified Regular Sign Program flat [2]3,414.00$ Site Development Plan Minor - Village Area Request for a Parking Option flat [2]1,163.00$ Minor - Residential, less than or equal to 4 units/lots or as required per CMC/PLAN flat [2]5,800.00$ Major - 5 or more units/lots or as required per CMC/PLAN flat [2]14,710.00$ Special Use Permit - Other flat [2]4,451.00$ Special Use Permit - Floodplain flat [2]4,451.00$ Specific Plan Base Fee First 200 hours of project planner and 60 hours of project engineer base fee (flat) [2]33,581.00$ June 14, 2022 Item #7 Page 229 of 454 Fee Name Fee Type Notes Fee/Deposit >200 project planner hours and >60 project engineer hours per hour [2]290.00$ Amendment - Major First 180 hours of project planner and 30 hours of project engineer base fee (flat) [2]25,901.00$ >180 project planner hours and >30 project engineer hours per hour [2]290.00$ Amendment - Minor First 20 hours of project planner and 7 hours of project engineer base fee (flat) [2]1,885.00$ >20 project planner hours and >7 project engineer hours per hour [2]290.00$ Street Name Change flat [2]1,920.00$ Tentative Maps Tentative Parcel Map - Minor Subdivision - 0- 4 Lots/Units flat [2]4,939.00$ Tentative Tract Map - 5 - 49 units/lots flat [2]10,695.00$ Tentative Tract Map - 50 + units/lots flat [2]16,332.00$ Tentative Tract Map Litigation Stay flat [1] 25% of current fee Third Party Review Processing Fee per project [2]652.00$ Consultant Cost per project [1] Actual Cost Variance flat [2]3,670.00$ Variance - Minor flat [2]975.00$ Village Area Village Area Review - Administrative flat [2]533.00$ Village Area Review - Major - Plus Noticing Costs flat [2]3,775.00$ Village Area Review - Minor - Plus Noticing Costs flat [2]2,059.00$ Wireless Communication Third Party Review flat [1] Actual Cost Zone Change flat [2]6,365.00$ Zone Code Compliance Letter flat [2]150.00$ Research Fee per hour [2]150.00$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]106.00$ TOTAL June 14, 2022 Item #7 Page 230 of 454 Fee Name Fee Type Notes Fee/Deposit [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Minor: residential new/remodel, commercial/industrial tenant improvement [4] Major: Commercial/Industrial new [5]Set by Department of Fish and Wildlife. Fish & Game fees are additional to the EIA /EIR fees. Includes $50.00 County Clerk processing fee. Updated with new fees effective Jan. 1, 2022. June 14, 2022 Item #7 Page 231 of 454 Fee Name Fee Type Notes Fee/Deposit Engineering Department Fees Adjustment Plat per project [2]1,670.00$ Building Plan Review Minor Projects, per permit each [3]194.00$ Major Projects, per permit each [4]581.00$ Certificate Certificate of Compliance each [2]1,355.00$ Certificate of Compliance In Lieu of Parcel Map each [2]3,564.00$ Certificate of Correction each [2]1,053.00$ Construction Change Review - Major Base Fee per project [2]889.00$ Plus fee per sheet per sheet [2]291.00$ Construction Change Review - Minor Base Fee per project [2]631.00$ Plus fee per sheet per sheet [2]184.00$ Developer Agreements - Deposit $10,000 increments (Consistent with city payroll records + overhead)deposit [1] Actual Cost Easement Document Processing and Recording - Major (all others) per project [2]845.00$ Easement Document Processing and Recording - Minor (Single Family Lot)per project [2]150.00$ Encroachment Agreement Processing per project [2]437.00$ Grading Permit Investigation Fee (Consistent with city payroll records + overhead)deposit [1] Actual Cost Grading Plan Check Fees (cubic yard) 0 - 100 CY flat [2]549.00$ 101 CY flat [2]1,100.00$ each additional 100 CY up to 1,000 each [2]226.00$ 1,001 CY flat [2]3,290.00$ each additional 1,000 CY up to 10,000 each [2]194.78$ 10,001 flat [2]5,178.00$ each additional 10,000 CY up to 100,000 each [2]280.56$ 100,001 flat [2]7,898.00$ each additional 10,000 CY up to 200,000 each [2]443.00$ 200,001 flat [2]12,669.00$ each additional 100,000 CY up to 400,000 each [2]143.00$ 400,001 flat [2]12,977.00$ each additional 100,000 CY up to 1,000,000 each [2]143.00$ 1,000,001 flat [2]13,902.00$ each additional 100,00 CY each [2]1,290.70$ Grading Permit Fees (cubic yard) 0 - 100 CY flat [2],[4], [5]549.00$ June 14, 2022 Item #7 Page 232 of 454 Fee Name Fee Type Notes Fee/Deposit 101 CY flat [2],[4], [5]557.00$ each additional 100 CY up to 1,000 each [2],[4], [5]103.78$ 1,001 CY flat [2],[4], [5]1,563.00$ each additional 1,000 CY up to 10,000 each [2],[4], [5]105.11$ 10,001 flat [2],[4], [5]2,582.00$ each additional 10,000 CY up to 100,000 each [2],[4], [5]200.67$ 100,001 flat [2],[4], [5]4,527.00$ each additional 10,000 CY up to 200,000 each [2],[4], [5]200.10$ 200,001 flat [2],[4], [5]6,682.00$ each additional 100,000 CY up to 400,000 each [2],[4], [5]305.55$ 400,001 flat [2],[4], [5]13,263.00$ each additional 100,000 CY up to 1,000,000 each [2],[4], [5]1,528.33$ 1,000,001 flat [2],[4], [5]23,139.00$ each additional 100,00 CY each [2],[4], [5]2,148.50$ Improvement Plan Review Fee $0 - $20,000 flat [2]1,757.00$ $20,001 flat [2]3,376.00$ each additional $10,000 up to $50,000 each [2]454.67$ $50,001 flat [2]4,845.00$ each additional $10,000 up to $100,000 each [2]385.00$ $100,001 flat [2]6,919.00$ each additional $10,000 up to $250,000 each [2]576.13$ $250,001 flat [2]16,226.00$ each additional $10,000 up to $500,000 each [2]194.44$ $500,001 flat [2]21,461.00$ each additional $10,000 up to $1,000,000 each [2]104.94$ $1,000,001 flat [2]27,112.00$ each additional $10,000 each [2]251.74$ Improvement Inspection $0 - $20,000 flat [2]413.00$ June 14, 2022 Item #7 Page 233 of 454 Fee Name Fee Type Notes Fee/Deposit $20,001 flat [2]2,183.00$ each additional $10,000 up to $50,000 each [2]678.33$ $50,001 flat [2]4,375.00$ each additional $10,000 up to $100,000 each [2]203.00$ $100,001 flat [2]5,468.00$ each additional $10,000 up to $250,000 each [2]162.87$ $250,001 flat [2]8,099.00$ each additional $10,000 up to $500,000 each [2]187.48$ $500,001 flat [2]13,147.00$ each additional $10,000 up to $1,000,000 each [2]130.20$ $1,000,001 flat [2]20,158.00$ each additional $10,000 each [2]187.17$ Mapping Fees Final Tract Map - Major Subdivision Base Fee per project [2]9,706.00$ additional acre per acre [2]6.00$ Parcel Map - Minor Subdivision per project [2]4,356.00$ Neighborhood Improvement Agreements each [2]204.00$ Oversize Load Permit - 1 trip each [6]16.00$ Oversize Load Permit - Annual/Per Year each [6]90.00$ Quitclaim of Easement each [2]889.00$ Reapportionment Fees for 1911 Act Assessment Districts each [1] Actual Cost Retaining Wall Plan Check Fees Retaining Wall Plan Check Valuation $0 - $50,000 flat [2]450.00$ $50,001 - $250,000 flat [2]2,192.00$ $250,000+flat [2]3,861.00$ Reversion to Acreage deposit [2]3,673.00$ Right-of-Way Permit Minor - Non-Construction each [2]222.00$ Minor - Construction each [2]451.00$ Utility City Processing Fee each [2]365.00$ Inspector's Time hourly [2]144.00$ Utility (by contract)each [2]961.00$ Use - Initial Permit Curb Cafe each [2]451.00$ Outdoor Display each [2]222.00$ Sidewalk Café each [2]451.00$ Use - Annual Renewal Curb Cafe each [2]222.00$ Outdoor Display each [2]222.00$ Sidewalk Café each [2]222.00$ June 14, 2022 Item #7 Page 234 of 454 Fee Name Fee Type Notes Fee/Deposit Village Area - Curb Café (max of two parking spaces)per space/ per year [2]1,292.00$ Secured Agreement Processing - Extension each [2]415.00$ Secured Agreement Processing - Replacement, plus improvement plan revision fees if required each [2]730.00$ Segregation of Assessments - 1- 4 lots (Consistent with city payroll records + overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760-8769 ) deposit [1] Actual Cost Segregation of Assessments - 5 lots or more - fee + $20 per lot (Consistent with city payroll records + overhead, consultant cost and recording fee. Also see Streets and Highways Code Section 8760- 8769) deposit [1] Actual Cost Storm Water Pollution Prevention Plan (SWPPP) Fees Plan Review Fee Tier 1 per site [2]69.00$ Tier 2 per site [2]365.00$ Tier 3 one acre or less [2]835.00$ Tier 3 - Supplemental Fee per acre [2]106.00$ Inspection Fee Tier 1 per site [2]292.00$ Tier 2 per site [2]1,609.00$ Tier 3 one acre or less [2]2,723.00$ Tier 3 - Supplemental Fee per acre [2]443.00$ Storm Water Quality Management Plan (SWQMP) Fees Plan Review - Base Fee each [2]431.00$ Plan Review - For each subsequent acre or portion thereof over one half acre per acre [2]104.00$ Inspection Fee - Base Fee each [2]363.00$ Inspection Fee - For each subsequent acre or portion thereof over one half acre per acre [2]144.00$ Street Vacation - Street/Public Service Easement Vacation - Regular each [2]4,336.00$ Street Vacation - Street/Public Service Easement Vacation - Summary each [2]1,720.00$ Third Party Review Processing Fee per project [2]365.00$ Consultant Cost per project [1] Actual Cost Village Area - Parking In Lieu Fee each [1]11,240.00$ Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]209.00$ June 14, 2022 Item #7 Page 235 of 454 Fee Name Fee Type Notes Fee/Deposit [Notes] [1] Set per City policy [2] Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] Minor: residential new/remodel, commercial/industrial tenant improvement [4] Major: Commercial/Industrial new [5] [6] [7] Maximum limit set by CA Vehicle Code 35795(b)(1) Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan checks extending more than 24 months may be assessed an additional fee of 25% of the current plan check fee. Minor grading plan check fees are 50% of standard plan check fees. Qualifying for minor grading plan check is subject to City Engineer approval per CMC 15.16.062. June 14, 2022 Item #7 Page 236 of 454 Fee Name Fee Type NotesFee/Deposit Building Department Fees New Construction, Additions, and Major Remodels [1] Commercial/Industrial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 500 sqft flat [2]1,038.00$ additional sqft up to 4,999 each [2]0.33$ 5,000 sqft flat [2]2,502.00$ additional sqft up to 9,999 each [2]0.44$ 10,000 sqft flat [2]4,685.00$ additional sqft up to 49,999 each [2]0.04$ 50,000 sqft flat [2]6,415.00$ additional sqft up to 99,999 each [2]0.10$ 100,000 sqft flat [2]11,393.00$ additional sqft each [2]0.11$ Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 500 sqft flat [2]984.00$ additional sqft up to 4,999 each [2]0.54$ 5,000 sqft flat [2]3,433.00$ additional sqft up to 9,999 each [2]0.54$ 10,000 sqft flat [2]6,123.00$ additional sqft up to 49,999 each [2]0.05$ 50,000 sqft flat [2]8,118.00$ additional sqft up to 99,999 each [2]0.14$ 100,000 sqft flat [2]15,012.00$ additional sqft each [2]0.15$ Low and Moderate Hazard Storage - (All newly constructed or added space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 500 sqft flat [2]1,011.00$ additional sqft up to 4,999 each [2]0.35$ 5,000 sqft flat [2]2,608.00$ additional sqft up to 9,999 each [2]0.23$ 10,000 sqft flat [2]3,780.00$ additional sqft up to 49,999 each [2]0.03$ 50,000 sqft flat [2]4,871.00$ additional sqft up to 99,999 each [2]0.01$ 100,000 sqft flat [2]5,324.00$ June 14, 2022 Item #7 Page 237 of 454 Fee Name Fee Type NotesFee/Deposit additional sqft each [2]0.05$ Attached Accessory and Utility Uses - (All newly constructed, added or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule 0 - 200 sqft flat [2]532.00$ additional sqft up to 399 each [2]1.46$ 400 sqft flat [2]825.00$ additional sqft up to 599 each [2]0.67$ 600 sqft flat [2]959.00$ additional sqft up to 999 each [2]0.33$ 1,000 sqft flat [2]1,091.00$ additional sqft up to 2,999 each [2]0.16$ 3,000 sqft flat [2]1,411.00$ additional sqft each [2]0.47$ Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies/uses not specifically addressed elsewhere in this Fee Schedule) 0 - 200 sqft flat [2]532.00$ additional sqft up to 399 each [2]1.46$ 400 sqft flat [2]825.00$ additional sqft up to 599 each [2]0.67$ 600 sqft flat [2]959.00$ additional sqft up to 999 each [2]0.33$ 1,000 sqft flat [2]1,091.00$ additional sqft up to 2,999 each [2]0.16$ 3,000 sqft flat [2]1,411.00$ additional sqft each [2]0.47$ Shell Buildings for all Commercial/Industrial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 0 - 500 sqft flat [2]879.00$ additional sqft up to 4,999 each [2]0.23$ 5,000 sqft flat [2]1,917.00$ additional sqft up to 9,999 each [2]0.28$ 10,000 sqft flat [2]3,301.00$ additional sqft up to 49,999 each [2]0.02$ 50,000 sqft flat [2]4,365.00$ additional sqft up to 99,999 each [2]0.01$ June 14, 2022 Item #7 Page 238 of 454 Fee Name Fee Type NotesFee/Deposit 100,000 sqft flat [2]4,898.00$ additional sqft each [2]0.05$ Commercial/Industrial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 0 - 500 sqft flat [2]772.00$ additional sqft up to 4,999 each [2]0.22$ 5,000 sqft flat [2]1,757.00$ additional sqft up to 9,999 each [2]0.10$ 10,000 sqft flat [2]2,236.00$ additional sqft up to 49,999 each [2]0.06$ 50,000 sqft flat [2]4,526.00$ additional sqft up to 99,999 each [2]0.05$ 100,000 sqft flat [2]6,894.00$ additional sqft each [2]0.07$ Commercial/Industrial Tenant Improvement - Non-structural - (Non- structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 0 - 500 sqft flat [2]698.00$ additional sqft up to 4,999 each [2]0.21$ 5,000 sqft flat [2]1,650.00$ additional sqft up to 9,999 each [2]0.07$ 10,000 sqft flat [2]2,023.00$ additional sqft up to 49,999 each [2]0.05$ 50,000 sqft flat [2]4,019.00$ additional sqft up to 99,999 each [2]0.04$ 100,000 sqft flat [2]6,042.00$ additional sqft each [2]0.06$ Commercial Residential and Multifamily Residential Remodels - Structural - (Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 500 sqft flat [2]825.00$ additional sqft up to 4,999 each [2]0.46$ 5,000 sqft flat [2]2,875.00$ additional sqft up to 9,999 each [2]0.34$ 10,000 sqft flat [2]4,551.00$ additional sqft up to 49,999 each [2]0.07$ 50,000 sqft flat [2]7,187.00$ June 14, 2022 Item #7 Page 239 of 454 Fee Name Fee Type NotesFee/Deposit additional sqft up to 99,999 each [2]0.09$ 100,000 sqft flat [2]11,552.00$ additional sqft each [2]0.12$ Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 500 sqft flat [2]825.00$ additional sqft up to 4,999 each [2]0.27$ 5,000 sqft flat [2]2,023.00$ additional sqft up to 9,999 each [2]0.40$ 10,000 sqft flat [2]4,046.00$ additional sqft up to 49,999 each [2]0.06$ 50,000 sqft flat [2]6,442.00$ additional sqft up to 99,999 each [2]0.09$ 100,000 sqft flat [2]10,701.00$ additional sqft each [2]0.11$ Single Family Dwellings and Duplexes - (All newly constructed or added space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 0 - 1,000 sqft flat [2]1,251.00$ additional sqft up to 2,499 each [2]0.44$ 2,500 sqft flat [2]1,917.00$ additional sqft up to 3,999 each [2]0.28$ 4,000 sqft flat [2]2,342.00$ additional sqft up to 5,999 each [2]0.27$ 6,000 sqft flat [2]2,875.00$ additional sqft up to 7,999 each [2]0.29$ 8,000 sqft flat [2]3,460.00$ additional sqft each [2]0.43$ Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 0 - 1,000 sqft flat [2]1,044.00$ additional sqft up to 2,499 each [2]0.26$ 2,500 sqft flat [2]1,438.00$ additional sqft up to 3,999 each [2]0.14$ 4,000 sqft flat [2]1,650.00$ additional sqft up to 5,999 each [2]0.21$ 6,000 sqft flat [2]2,076.00$ additional sqft up to 7,999 each [2]0.19$ 8,000 sqft flat [2]2,449.00$ June 14, 2022 Item #7 Page 240 of 454 Fee Name Fee Type NotesFee/Deposit additional sqft each [2]0.31$ Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 0 - 200 sqft flat [2]506.00$ additional sqft up to 399 each [2]0.80$ 400 sqft flat [2]666.00$ additional sqft up to 599 each [2]0.26$ 600 sqft flat [2]718.00$ additional sqft up to 999 each [2]0.47$ 1,000 sqft flat [2]905.00$ additional sqft up to 2,999 each [2]0.15$ 3,000 sqft flat [2]1,198.00$ additional sqft each [2]0.40$ Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 0 - 500 sqft flat [2]425.00$ additional sqft up to 4,999 each [2]0.14$ 5,000 sqft flat [2]1,038.00$ additional sqft up to 9,999 each [2]0.07$ 10,000 sqft flat [2]1,384.00$ additional sqft up to 49,999 each [2]0.01$ 50,000 sqft flat [2]1,597.00$ additional sqft up to 99,999 each [2]0.01$ 100,000 sqft flat [2]2,023.00$ additional sqft each [2]0.02$ [Notes] [1] [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. June 14, 2022 Item #7 Page 241 of 454 Fee Name Fee Type NotesFee/Deposit Building Department Fees Minor/Miscellaneous Residential & Commercial Improvements [3] Above Ground Storage Tank per permit [2]250.00$ Cell Site Radio over 30 ft. high each [2]697.00$ Dish, 10 ft. dia. w/decoder each [2]518.00$ Equipment Enclosure each [2]1,184.00$ Awning or Canopy per permit [2]296.00$ Bollards up to 4pcs per permit [2]370.00$ Certificate of Occupancy per permit [2]16.00$ Decks / Balcony Repair each [2]108.00$ New/Replace each [2]889.00$ Demolition of Building Commercial each [2]206.00$ Residential each [2]592.00$ Fence or Freestanding Wall up to 100'each [2]666.00$ Fire Damage Repair - Residential - Minor per permit [2]248.00$ Fireplace Repair/Replace per permit [2]444.00$ Foundation Repair Commercial each [2]555.00$ Residential each [2]555.00$ Greenhouse per permit [2]555.00$ Manufactured House / Building Commercial per permit [2]314.00$ Residential per permit [2]555.00$ Mobile Home (Within a park, per current edition of Title 25, published by California Division of Housing and Community Development.) per permit [2]629.00$ Partition/ Wall - Interior/Non-Structural <100'per permit [2]374.00$ Patio Frame with Cover each [2]108.00$ Frame with Cover & Walls each [2]592.00$ Screen or Plastic Walls each [2]444.00$ Plastering Outside per permit [2]370.00$ Remodel - Residential Kitchen/Bath each [2]377.00$ Other - up to 500 s.f.each [2]518.00$ Other - above 500 s.f per 100 sqft [2]0.37$ Repairs - Miscellaneous Commercial each [2]394.00$ Residential each [2]93.00$ Retaining Wall June 14, 2022 Item #7 Page 242 of 454 Fee Name Fee Type NotesFee/Deposit Non-Engineered - City Standard per permit [2]108.00$ Reroofing Commercial per permit [2]286.00$ Residential per permit [2]96.00$ Roof Structure Repair / Reinforcement Commercial each [2]272.00$ Residential each [2]384.00$ Saunas (Steam)per permit [2]333.00$ Sign Wall - Illuminated per permit [2]150.00$ Wall - Non-Illuminated per permit [2]150.00$ Pole per permit [2]370.00$ Monument per permit [2]150.00$ Skylight Commercial each [2]370.00$ Residential each [2]370.00$ Solar - Residential (Up to 10 kW)per permit [2],[4]289.00$ Per kW above 10kW per kW [2],[4]15.00$ Add Residential Battery Back-up per permit [2],[4]222.00$ Add Residential Panel Upgrade per permit [2],[4]258.00$ Add Reverse Tilt System/ Ground Mount per permit [2],[4]333.00$ Solar - Commercial (Up to 50 kW)per permit [2],[4]666.00$ Per kW between 51kW - 250kW per kW [2],[4]7.00$ Per kW above 250kW per kW [2],[4]5.00$ Spray Booth Install / Clean Room per permit [2]267.00$ Stairs New/Replace First Story each [2]407.00$ Additional Story each [2]333.00$ Repair each [2]407.00$ Siding Stucco each [2]407.00$ Stone/Brick Veneer each [2]429.00$ Storage Racks <8 ft, first 100 lf per permit [2]481.00$ each add'l. 100 lf each [2]88.00$ >8 ft, first 100 lf per permit [2]518.00$ >8 ft, ea. Add'l 100 lf each [2]237.00$ Swimming Pool Commercial per permit [2]246.00$ Residential per permit [2]246.00$ Temporary Seating or Bleachers Install per permit [2]555.00$ Trash Enclosure Install per permit [2]258.00$ Windows / Door June 14, 2022 Item #7 Page 243 of 454 Fee Name Fee Type NotesFee/Deposit Commercial each [2]333.00$ Residential each [2]333.00$ Other Inspections (Per Hour) Inspections outside of normal business hours (minimum charge: two hours)per hour [2]129.00$ Re-inspection fees per hour [2]129.00$ Inspections for which no fee is specifically indicated (minimum charge: one half-hour)per hour [2]129.00$ Additional plan review required by changes, additions or revisions to approved plans (minimum charge: one half-hour)per hour [2]129.00$ Other Building Fees Building Permit Revision, Fee + Third Party Hourly Charge per hour [2] Actual Cost Building Plan Check Fee (8% discount on repetitive plan checks) each [2],[5] Actual Cost Green Building Standards Plan Check and Inspection each [2] Actual Cost Green Building State Standards Fee (SB1473)each [1] $1.00 per every $25,000 in building valuation or fraction thereof (minimum fee $1.00) Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Residential each [1] Pass through from State: $13.00 per $100,000 valuation (minimum $0.50 fee) Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard Mapping Fee - Commercial each [1] Pass through from State: $28.00 per $100,000 valuation (minimum $0.50 fee) Penalty for Commencing Work Before Permit Issuance each [6] Double the permit fee Fees for services not listed will be determined on a case-by-case basis. It will be based on the fully burdened hourly rate and the time of service provided. per hour [2]148.00$ June 14, 2022 Item #7 Page 244 of 454 Fee Name Fee Type NotesFee/Deposit [Notes] [1] Set per City policy [2]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. [3] [4] Limited to maximum amounts set by AB 1414. [5] Plan check fee based on 70% of the current building permit fee and is due upon initial submittal [6] CMC 18.20.010 and CMC 18.04.010 Valuation based on current valuation multiplier published by the San Diego Chapter of the International Code Council. CBC 109.3 Building permit valuations. June 14, 2022 Item #7 Page 245 of 454 Fee Name Fee Type NotesFee/Deposit Building Department Fees Simple Single or Combination Permits (see list of simple items)per permit [1]208.00$ Water Heater Only per permit [1]116.00$ Complex Mechanical Permits FAU less than 100,000 Btu/h per permit [1]518.00$ FAU greater than 100,000 Btu/h per permit [1]666.00$ Floor furnace (including vent)per permit [1]370.00$ Suspended, wall, or floor-mounted heaters per permit [1]296.00$ Appliance vents not included in an appliance permit per permit [1]592.00$ Boiler up to 100,000 Btu/h per permit [1]703.00$ Boiler 100,000 Btu/h to 500,000 Btu/h per permit [1]296.00$ Compressor up to 3 HP per permit [1]333.00$ Compressor up to 3 HP to 15 HP per permit [1]348.00$ Other Complex Mechanical per permit [1]444.00$ Complex Electrical Permits Commercial Appliance per permit [1]296.00$ Power Apparatus per permit [1]296.00$ Motor not over 1 HP each [1]296.00$ Motor over 1 HP and not over 10 HP each [1]296.00$ Motor over 10 HP and not over 50 HP each [1]296.00$ Motor over 50 HP and not over 100 HP each [1]333.00$ Motor over 100 HP each [1]370.00$ Generator not over 1 KW each [1]296.00$ Generator over 1 KW and not over 10 KW each [1]333.00$ Generator over 10 KW and not over 50 KW each [1]444.00$ Generator over 50 KW and not over 100 KW each [1]444.00$ Generator over 100 KW each [1]518.00$ Transformer not over 1 KVA each [1]370.00$ Transformer over 1 KVA and not over 10 KVA each [1]370.00$ Transformer over 10 KVA and not over 50 KVA each [1]407.00$ Transformer over 50 KVA and not over 100 KVA each [1]444.00$ Transformer over 100 KVA each [1]444.00$ Services of 600 volts or less and over 400 amperes to 1000 amperes in rating each [1]444.00$ Services over 600 volts or over 1000 amperes in rating each [1]592.00$ Other Complex Electrical each [1]444.00$ Plumbing, Mechanical, and Electrical Permits - Not Associated with a Building Permit June 14, 2022 Item #7 Page 246 of 454 Fee Name Fee Type NotesFee/Deposit Complex Plumbing Permits Fire Suppression System / Commercial Hood per permit [1]629.00$ Onsite Sewer 6" & Over per permit [1]407.00$ Onsite Water 6" & Over per permit [1]407.00$ Onsite Storm Drain 6" & Over per permit [1]407.00$ Other Complex Plumbing per permit [1]444.00$ [Notes] [1]Set per 2021 - Cost of Service Study and Fee Schedule Update. Indexed to West Region Urban CPI. June 14, 2022 Item #7 Page 247 of 454 Fee Name Simple Mechanical Items: Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system. HVAC change out - existing dwelling Air-handling unit under 10,000 CFM Evaporative cooler Ventilation fan connected to a single duct Hood and duct system Duct systems Miscellaneous mechanical (wall furnace, condensing units, gas outlet/gas test, etc.) Other simple mechanical Simple Electrical Items: Receptacle, switch, and lighting outlets Lighting fixtures Pole or platform-mounted lighting fixtures Theatrical-type lighting fixtures or assemblies Appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating Busways Trolley and plug-in-type busways - each 100 feet or fraction thereof Signs, outline lighting, or marquees supplied from one branch circuit Services of 600 volts or less and not over 200 amperes in rating Miscellaneous apparatus, conduits, and conductors Portable generators less than 10,000 W Temporary power panel/service Temporary power pole Other simple electrical Simple Plumbing Items: Plumbing fixtures Building sewer Rainwater systems Water heater Industrial waste pretreatment interceptor Water piping and/or water treating equipment Repair or alteration of drainage or vent piping Backflow devices Atmospheric-type vacuum breakers Gas test Gas outlets Residential remodel/repairs Other simple plumbing Simple Single or Combination Permits List June 14, 2022 Item #7 Page 248 of 454 Section 3 Development Impact Fees June 14, 2022 Item #7 Page 249 of 454 HOLD FOR NEW MAP FROM GIS June 14, 2022 Item #7 Page 250 of 454 June 14, 2022 Item #7 Page 251 of 454 June 14, 2022 Item #7 Page 252 of 454 June 14, 2022 Item #7 Page 253 of 454 Fee Name Fee Type Notes Fee Level/Deposit Planned Local Drainage Area Fees (PLDA) PLDA A, Low Runoff per acre 7,421.00$ PLDA B, Low Runoff per acre 2,774.00$ PLDA C, Low Runoff per acre 2,692.00$ PLDA D, Low Runoff per acre 2,553.00$ PLDA A, Medium Runoff per acre 14,757.00$ PLDA B, Medium Runoff per acre 5,347.00$ PLDA C, Medium Runoff per acre 3,809.00$ PLDA D, Medium Runoff per acre 4,177.00$ PLDA A, High Runoff per acre 32,158.00$ PLDA B, High Runoff per acre 12,019.00$ PLDA C, High Runoff per acre 11,669.00$ PLDA D, High Runoff per acre 11,065.00$ Low Runoff Potential Medium Runoff Potential High Runoff Potential CF ♦ GC ♦ L ♦ O ♦ OS ♦ P ♦ PI ♦ PI/O ♦ R ♦ R1.5 ♦ R4 ♦ R8 ♦ R15 ♦ R15/L ♦ R15/O ♦ R15/VC ♦ R23 ♦ R30 ♦ OK-TC ♦ VC ♦ VC/OS ♦ V ♦ PLDA FEE CATEGORYGeneral Plan Land Use Designation June 14, 2022 Item #7 Page 254 of 454 June 14, 2022 Item #7 Page 255 of 454 June 14, 2022 Item #7 Page 256 of 454 Fee Name Fee Type Notes Fee/Deposit Affordable Housing Credit Cassia Heights (Southeast and Southwest quadrants)per unit [1]71,405.00$ Tavarua Senior Affordable Apartments (Northwest quadrant)per unit [1] 105,678.00$ Affordable Housing Impact Fee Affordable Housing Impact Fee per unit [1]2,925.00$ Affordable Housing In-Lieu Fee (per single-family market rate unit on single-family lot)per unit [2]8,529.00$ Affordable Housing In-Lieu Fee (residential development projects proposing two to six units), per sq. ft. of net building area per unit per sq. ft. [2]15.00$ Habitat Mitigation Fees, Per Acre Type D - Coastal Sage Scrub per acre [1]37,036.00$ Type E - Non-Native Grassland per acre [1]18,519.00$ Type F - Agricultural Land, Disturbed Land, Eucalyptus Woodland per acre [1]3,704.00$ Traffic Impact Fees Apartment (Inside of CFD 1)per ADT [1]345.00$ Apartment (Outside of CFD 1)per ADT [1]405.00$ Commercial/Industrial Cost Per Trip (Inside CFD)per ADT [1]137.00$ Commercial/Industrial Cost Per Trip (Outside of CFD)per ADT [1]162.00$ Condominium (Inside of CFD 1)per ADT [1]345.00$ Condominium (Outside of CFD 1)per ADT [1]405.00$ Single Family (Inside of CFD 1)per ADT [1]345.00$ Single Family (Outside of CFD 1)per ADT [1]405.00$ [Notes] [1] Set per City policy [2] Updated via City Council Resolution; effective April 1, 2022. June 14, 2022 Item #7 Page 257 of 454