This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Building Inspector prior to Final Inspection.
Site Development Mandatory
4.106.2 A plan is developed and implemented to manage storm water drainage during construction. {X)
4.106.3 The site shall be planned and developed to keep surface water away from buildings. (X )
Construction plans shall indicate how site grading or a drainage system will manage all surface water
flows.
Energy Efficiency
4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (X)
the California Energy Standards.
Water Efficiency and Conservation
Indoor Water Use
4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X)
1. Water saving fixtures or flow restrictors shall be used. 7/01/2011
2. A 20 percent reduction in baseline water use shall be demonstrated.
4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (X)
exceed maximum flow rates. 7/01/2011
4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X)
comply with specified performance requirements. 7/01/2011
Outdoor Water Use
4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-(X )
based.
Enhanced Durability and Reduced Maintenance
4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings
in plates at exterior walls shall be protected against the passage of rodents by closing such openings (X)
with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.
Construction Waste Management Plan
4.408.1 A minimum of 65 percent of the construction waste generated at the site is diverted to recycle or (X )
salvage. Recycled material receipts from approved recyclers must be attached to this form.
4.408.2 Where a local jurisdiction does not have a construction and demolition waste management (X)
ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the
enforcing agency.
Building Maintenance and Operation
4.410.1 An operation and maintenance manual shall be provided to the buildinq occupant or owner. (X )
Environmental Quality
Fireplaces
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed
woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. {X)
Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances.
8-51 Page 1 of 2 Rev. 5/17
Pollutant Control
4.504.1 Duct openings and other related air distribution component openings shall be covered (X )
during construction.
4.504.2.1 Adhesive, sealants and caulks shall be compliant with voe and other toxic compound (X)
limits. (X}
4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (X)
4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for
ROC and other toxic compounds. (X )
4.504.2.4 Documentation shall be provided to verify that compliant voe limit finish materials
have been used. (X)
4.504.3 Carpet and carpet systems shall be compliant with voe limits.
4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X}
defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or
be certified under the Resilient Floor Covering Institute (RFCI} FloorScore program. (X)
4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior
finish systems shall comply with low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X )
4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X}
enclosure.
Indoor Air Quality and Exhaust
4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom. (X)
Environmental Comfort
4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X)
fan is off. Covers or louvers shall have a minimum insulation value of R-4.2.
4.507.2 Duct systems are sized, designed, and equipment is selected using the following
methods: (X)
1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent.
2. Size duct systems according to ACCA 29-0 (Manual D) or equivalent
3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent.
Installer and Special Inspector Qualifications
702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X)
systems.
702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (X )
competence in the discipline they are inspectinQ.
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: z_G,2-'-\ VA-\M~ fwe.. Plan Check Number:
Print Name: p~'i; r Coc.-s+ ~,y;f: SignedQ--K)A___
License Number: 1 o Y osi--i Date: 3. Li~ l ioi.z,...
8-51 Page 2 of 2 Rev. 5/17
(city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www. carlsbadca.gav
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unle~ou ~ self-hauling'--"1iastg_Managemenl_Qr ap_J)_r_oved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. Cb~ '2-b '2 I -_ll 4 "i_ Project Title
Project Address 7..G, Z.'-i 'J2hv \_':) Ave_ APN
,..,....
Applicant Name j_A<,'-t--l('l,_
Other
□ Last First
Applicant Address Lll,_1 o _5 ~\ •~c.. 1:l , .. C fV-L 164P_
Phone f 7bo ) /;68 zl"\13 E-mail Address -f1!.C:oo...-,~~ASHv--e+ ?o~@3..,_ ... :\_cc-,-,.
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential
8l
Brief Description _ A, e~ ,.\IO"
Commercial
□
Project Size _ ·-Estimated Cost of Project $
(square footage)
Please check the appropriate box:
Public Building □
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
IY I I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
0 ----..
Print Name \ ~ '--) AC \r--lTD Signature Q~A-___ Date 7 /I'-/ /-µ 'l._\_
Page 1 of 3 Rev. 2.10.21
(city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Section 4.408.1 and Section 5.408.1 of the 2016 California Green Building Standards requires at least 65% of non-hazardous
construction debris is recycled and/or salvaged for reuse.
With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste
Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from
your project.
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the
Applicant's responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up
companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion
receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
httQjj_VoJww.sanditeRQ,gQ\/L'l,nviro_r,_me_n_tal-servi~e_s/recycling/~<:1/index.shtrnl.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source
Separated Recycling Facility.
Part 1 -Before the Project Begins
Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table.
a. Submit completed and signed form to City with Building Permit application.
Part 2 -During and After the Project
Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully
completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table.
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum)
65% of the waste generated by your project.
c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector
prior to requesting final inspection.
Rev. 11112/18
{City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Un~ou are self-hauling, Waste Management or aQQIQved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. __________________ Project Title
Project Address__J-.(. l 4 --------APN -----------
Applicant Name Pc f Co 0,<.~ Cof\St
Last First
Owner Contractor Architect Other
-0 ® 0 0
Applicant Address 2e ~t.\ LA-µ_;-r~c-. \)r, ":)._; ~L E u i "i t c.._ CA C\ 2-081
Phone ( 7 b() l bbf, £q 11 E-mail Address _ ( e.c £>"-S+ COi\$\ "-'.{_\-lo/\_@_~""'-"-;/, G-O,.,.._ _
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential
~
Brief Description ~oc.>W\
Commercial
□
Public Building □ f o...l~:l:. A ... ~ l½"" .\:"--mo,..,.._
Project Size ___________ Estimated Cost of Project$ C:-D I<..
(square faatage)
Please check the appropriate box:
Industrial □
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
6ZJ I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief. \)
Print Name ri E (c,,sf-Co11s ~ Signature %~ A__ Date _ 'J lz 'i_fl,c]i 2,
Page 1 of4 Rev. 11/12118
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. __________ Project Title
Project Address~z_lo_1.._'-l_~j):,.,~'°-'-5_1'r_ll_e,~ ______________ .APN
Applicant Name '.y,ij,~ Coo..c;.\-Ccdf: Phone (7{,0) 685 8lll~
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets
Windows
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Estimated Place a ( ✓) check Place a(✓) check next Place a(✓) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
~ ✓
', ✓
0
0
'I ✓
D
✓
0
0
z.
To meet 65% Diversion Requirement (estimate)
Contractor/Owner Signature
Q ~ Toto/ Estimated Waste from above
.__, .A--._ Date
Minimum Required Diversion
Page 2 of4 Rev. 11112/18
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Print Name f' E.. Coc~<;r Col\. S~-
Address ___ Date ~3~/=z_'t~/_z._-i. _____ _,
SECTION B Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in~ for each material ,and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Example:
01/05/2018
Palomar Transfer Station, 5960 El
Concrete (broken) 5 tons Camino Real
-760 603-0153
s I Ii\
8/M/z
I\ /ti ht
%/zt., /l l uYI c, r (/. t-(..
11.hr.,/z1 Co!\crde.
Diversion Rate Achieved
' 7~
1.7 b
L-\.11
'l.
2,.
\
7...
L.
• ·z_ z;-
ti z.•r 7.
Total of columns A + B + C
;,...i • ...,.~ Tf=s
... '---;"' £1;.,
I•
I/
;, 65%
o,65%0
Total of columns A+ B
Contractor/OwnerSignature_Q..,,__,'--'-~--=--""'_)-____"'---------·Date j /zq_ /Z..L
Attach the following documentation to this Report: Return completed form and documentation to:
Original recycling weight tickets, landfill weight tickets City of Carlsbad
Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor)
Any other relevant information to support Recycling Report 1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of4 Rev. 11/12118