HomeMy WebLinkAboutCD 2019-0018; QUARRY CREEK PA R-4B; Consistency DeterminationCORNERSTONE COMMUNITIES
PROJECT TEAM
OWNER:
CORNERSTONE COMMUNITIES
4365 Executive Dr., Suite 600
San Diego, CA 92121
Contact: Jack Robson
(858) 458-9700 x120
(858) 452-3600 FAX
Email: JRobson@cornerstonecommunities.com
ARCHITECT:
STARCK ARCHITECTURE+ PLANNING
2045 Kettner Blvd. Suite 100
San Diego, CA 92101
Contact: Dan Mullen
(619) 299-7070 x104
(619) 295-8768 FAX
Email: dan@starckap.com
CIVIL ENGINEER:
SB&O
3990 Ruffin Road, Suite 120
San Diego, CA 92123
Contact: Aaron Parker
(858) 560-1141 x103
(858) 560-8157 FAX
Email: aaronp@sboinc.com
LANDSCAPE ARCHITECTS:
HOWARD ASSOCIATES, INC.
2442 Second Ave.
San Diego, CA 92101
Contact: John Howard
(858) 718-9660 x:102 OFFICE
(858) 871~0679 CELL
Email: john@howardassoc.com
CARLSBAD,CA
VICINITY MAP
,:; Q'
Cl ~
i;j
(j
CJ MIRA ff COSTA COLLEGE El CAMINO
COUNTRY CLUB ~
V/C/;V/TY AJAP
NOT TO SCALE
MARRON
RO.
THOMAS BROTHERS PG. I 707 GRID A-2
2006 EDITION
SIT£
/AKE
PROJECT DATA
PROJECT DSCRIPTION:
TYPE OF CONSTRUCTION:
CODE:
OCCUPANCY GROUP:
NUMBER OF STORIES:
FIRE SPRINKLERS:
NUMBER OF UNITS:
NUMBER OF BEDROOMS:
NUMBER OF BATHROOMS:
ACOUSTICAL REQUIREMENTS:
( qpproie.d)
REPLACE EXISTING TWO-STORY SINGLE FAMILY HOMES
ON LOTS 18-24 WITH THREE-STORY W/ ROOF DECK
SINGLE FAMILY HOMES. SCOPE INCLUDES PLANS 18, 2A,
2B, 3A, 3B, AND 3C ELEVATIONS.
TYPE V 8 (NON RATED CONSTRUCTION)
2016 CRC
R-3 I SINGLE FAMILY DWELLING UNIT
3
YES, NFPA 13D
7 UNITS: PLAN 1 = 1 UNIT.
PLAN 2 = 2 UNITS.
PLAN 3 = 4 UNITS.
PLAN 1X = 3 BEDROOMS, 1 OPT. BEDROOM.
PLAN 2X = 3 BEDROOMS, 1 OPT. BEDROOM.
PLAN 3X = 3 BEDROOMS, 1 OPT. BEDROOM.
PLAN 1X = 3 BATHROOMS.
PLAN 2X = 3 BATHROOMS.
PLAN 3X = 3 BATHROOMS.
ALL DWELLING UNITS WILL INCLUDE AIR CONDITIONING
AND THEREFORE WILL COMPLY W!TH ACOUSTICAL
REQUIREMENTS FOR MECHANICAL VENTILATION.
*FOR ADDRESSES, MASTER PLAN NUMBER,
AND APN NUMBERS SEE ATTACHED
·.
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
SITE PLAN
AREA ANALYSIS SHEET INDEX
CYPRESS
PLAN 1XA (3 STORY WITH ROOF DECK) 4BR / 3.58A
FIRST FLOOR 790.3435 S.F.
SECOND FLOOR 1108.131 S.F.
ISHEET NO. !SHEET111LE
1 '111LESHEET
THIRD FLOOR 354.158 S.F. PLAN 01
TOTAL LIVING AREA 2252.632 S.F.
ROOF DECK 291 S.F. 2 ~~~~-T~_L_'?~~ .... ~E~OND FLOOR PL~NS ~-~!~'
GARAGE 431 S.F.
PLAN 2XA (3 STORY WITH ROOF DECK) 4BR / 3.SBA
3 THIRD FLOOR, & ROOF PLANS -'1XA' _________ i ______ .. EX~R"i"OR-El..EVATIONS -·1xs··{Tll:.:s:cCA_N=)-~·---------
FIRST FLOOR 778.118 S.F. PLAN 02 ---·--._,, __ ..... _, ..... ,. __ ,. _____ -------------------------"------·------------.. -".
SECOND FLOOR 1249.852 S.F. ----------------------------------
THIRD FLOOR 404.953 S.F.
TOTAL LIVING AREA 2432.923 S.F.
ROOF DECK 336 S.F.
5 FIRST FLOOR, SECOND FLOOR PLANS -'2XA'
6 -itH1RO FLOOR, & ROOF PLANs--•fu• -------------
, _______ 7 ..... _ ·--~~fiORJlify_}\jiON·s-: ·ij.A,.{SPANiSH ME01TERRJI.NEA~>
a EXfE~~-~.§L-~~_110Ns-:"2Xs1-{fui¢A~L---------
GARAGE 428 S.F.
PLAN 3XA (3 STORY WITH ROOF DECK) 4BR / 3.SBA
FIRST FLOOR 803.644 S.F. 9 'FIRST Fli:)OR, SECOND FLOOR PLANS-~ ;3XA·
SECOND FLOOR 1233.481 S.F.
THIRD FLOOR 436.5885 S.F.
TOTAL LIVING AREA 2473.713 S.F.
ROOF DECK 351S.F.
10 TI-IIRD FL0i5~-&-ROOF PLANS -•3){A•· -----------..
11 cE(TERloR _ELEVAiiONs-·:•3XA' {SPANl_sH)i1EDiTE--RRA-. -. -NEA-____ -N-)---~ 12 ----:EXTERf61fELE\fA:fiONS ~ '3)i:B_'_ (nis.~_AN)-__ , ___ -··--------
13 --~-~~?~-~~~II.C!ti?i__:_';!_~~-i~~-~-1,II_A_N) ---------
1~ ______ . ~!=)~MB~~A TlO!'J -~-~~_COLOR SCHEME/ENHANCEMEN"TS EXHIBIT PLAN
GARAGE 423S.F.
.~----·-
. ' ' . :
' .. ., ' -.. , , ... , ..
CONSIST.ENCY I>~ EXBIB!t'
FOll~PROJECTNO. HP ID-DI {5)/D-l&-ytP D J&-D ' jJ ~·it: .20,q-09ig:~: y7 '·•' !•.·
... ... ..,.._ -~2 ~~-• 11-ZL,,~.
~------
1 OF 14
f"'
~
PI an n
K CYPRESS PHASE 9 -CONSISTENCY DETERMINATION TITLESHEET
Arch tectul'e + ng
2045
6 1 9
Kettner
2 9 9
Boulevard
7 0 7 0
Su te 1 0 0
w
San
w w
Diego
s t a
California
r c k a p
92101
C O m
APPLICANT: CORNERSTONE COMMUNITIES
2019026P01 .DWG CD 2019-0018 ISSUE DATE: 10/07/19
Architecture +
K
Planning
2045
6 1 9
0 I
I
. BAT'71
I: 0 :II lg
I
I
~-------------:--==:=ti]
II I I II
II I I II , OPT. DECK I II
I II
I II
I II
I II oFTT. sL. GL. DR 1 11
MAS ER BR.
14'-5" 1X 15'-3"
0
ll!liOOWINII ~0~NDRY
1: I rt--, I I I I DN 17R --, --+-H---llf--+-i-Jl--+_.l_l-J---4--HII i I 1
I I
0
BR2
10'-0" X 12'-4"
BR3
10'-0" X 10'-0"
LL_...J
SECOND FLOOR PLAN
Kettner
2 9 9
Boulevard
7 0 7 0
Suite 100 San
w w w
Diego California
.starckap.
92101
C O m
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
(
~
,---7 I I
I I
l ,.,._ I OPT SL. GL. DR1 1
r==tr==t
: DINING or lLl 11'-4" X 12'-0"
I bdbd
,, r 7n: I i
I
I
""
I i I Ii II I LT-' 9--': :: I
I
'
I II I
Os.; I II I
I II I 011 I II I ot UI I
I I
' ' KITCHEN I
I
I
I
'
D
D
D
I
I
SLGL □O
IVIN
1 '-7" X 16'19"
a-ll
II
II
II 0
II
II ~-
-
El~:! r,-1-~l!r~-~1~, ... '7i:11ff1111:_1,7 i1FF1•,·1_1!11~!11 I I
L __ X
~ L J_ _j -L l I . '1 I :, ~'i'm71...,j-l----, ' ' I , ,1, i 1' I I' I II UP 17R
11 i i I i : 1] ! \ !I I: I !I 11 J
1,1 I I I __:_. _ _l : I, 1i. 11 11 I, 11 11
:co,
I
I
_JII , , 1 < , ...J _ L. ~,i,"...,~ll~k'\1111 ___ _..,_ ..
_ _c '\
I
I
I
I
I
I GARAGE
I 20'-4" X 20'-5"
I
I
I
I
I
I
I I
L
■ J
TECH
I 'I 11
FIRST FLPOR PLAN
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P22.DWG CD 2019-0018
2 OF 14
PLAN 1X
FLOOR PLANS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
Architecture +
,......
-...,; K
Planning
N IL ' }-~ I-
~
if-----=-------------~
111 I! I
111 Ii I ='F-----r-Fr-~~=---r-=----~,.,-, 111
1 Ii I
1'-011
TYP
I □ I Iii -" Ill I -----y I 11 i 1 111
I I
I
□ I
It-
I
I
I
I
I
I
I
I
I
I
I
I
G-
ROOF DECK
14'-3" X 19'-6" --1
! I
[J
!:::ILOPE 3.5: 1 2 TYf'. UNO.
l
l
T
t-
7
I
I ---+-t
I
_J
-~
I
--1
I
1--+r➔I
I
I
L---F--_u
I
I
I
I
I
I
I
" I I I LJ I
I
I
I
I
I ,-----I
: --1 -------} iii
1'
f------__ ------+ ---I 1 :i
I I 11
: I Ji I I u__ _____ __]J
ROOF PLAN
2045 Kettner Boulevard Suite 100 San Diego California 92101
619 299 7070 www.starckap com
------------------------~
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
n
:
: --1 t-
i
I
I
I
, --flii\S STUB R i , 1 11 0PTB -+,", ROOF ECK
! I I! 14'-3" X 19'-6" I I 1:
I I I
L _ _jJ
I
I
THIRD FLOOR PLAN
I
I-
I
ii
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P23.DWG CD 2019-0018
3 OF 14
PLAN 1X
THIRD FLOOR/ ROOF PLAN
3/16"=1'-0"
ISSUE DATE: 10/07/19
LEFT SIDE ELEVATION
REAR ELE VATION
K
A,-ch i tectul'e + P l ann i ng
2045
6 1 9
Kettne r
2 9 9
Bo ul eva r d
7 0 7 0
Su i te 1 00
w
San
w w
Diego
s t a
Ca l ifornia
r c k a p
CD: 2019-00 18 (RELATED : CT: 16 -05 & CD: 2018-0021 )
"' ' i:,
() -' '< . -"' ' U"
T.O. R IDGE
T.O . PLAT-5
T.O. FLR.. SHI:ATHIN6
T.O. PLATES
T.O. FLR. SHEATHIN6
T .O. PLATES
FRO NT ELEVATION
RIGHT SIDE ELEVAT IO N
CYPRESS PHASE 9 -CO NSISTE NCY DETERMINAT ION
92 1 01
C O m
APPLICANT: CORNERSTONE COMM UNITI ES
20 19026P28.DWG CD 2019-0018
TYPICAL BUILDING MATERIALS
~ '5' GONG.RTE TILE ROOF.
0 FLAT GONC.-RETE ROOF TILE.
0 PLASTER EAVE.
0 2X RESAV"!N FASCIA SOARD.
0 .2x RESAJA:N RAKE BOARD.
0 4x RAKE SOARD
[2J 4x RESAV"IN RAi=TER TAILS.
0 RESAf"IN )'11000 BEAM/ 3RAGKET.
GJ PLASTER V"!ALL BUTTRESS.
~ RESAJ/'I.N Y'l.OOD TRl:--1.
[2_-2] HARDBOARD SID IN6 PER HATGH SGHEDULE.
[,::;] INTEGRAL GOLOR PLASTER F INISH.
[,] PLASTER JOINT.
B VINYL V'I.INDOV"{ -RECESSED 2" MIN. / SLIDING-G-LASS
DOOR.
~ PL ASTER f"IINDOV"I TR IH .
~ 2X 1"(000 Y'l.lNDQ)'II TRIM AT SIDING.
Q2I ENTRY DOOR.
~ SEG TIONAL GARAGE DOOR. a DECORATIVE FINIAL.
§g 3 " DEEP PLASTER RECESS.
~ DEGORAT IYE VENT T ILE.
§ F A6RIG A~NING.
~ OPTIONAL )'IIQOD DEC.I<.
§j DEGORATIYE PLASTER TRIM.
~ DEGORAT IYE PLASTER GORBEL.
~ MET A L 6UARDRAIL/ RAILIN6/POT5HELF
§3 Y'I.OOD GUARDRAIL/ RAILING.
~ MET A L BALG-ONY.
~ DEGORATIYE tv!ET AL 6RILLE.
~ STONE VENEER.
~ DEGORA TIYE V'-IOOD SHUTTER.
e3 DEGORATIYE ROSETTE.
• ALL /f\lOOD AND MET AL ELEMENT S T O BE PAINTED.
HATCH SCHEDULE
PLASTER
PAINTED HARDBOARD LAP SIDING
HARDBOARD SHINGLES
[] BOARD AND BATT SIDING
TUSCAN
SCHEME 5
4 OF 14
PLA N 1XB
EXTERIOR ELEVATIONS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
K
Architecture + Planning
MAST R BR.
15'-0" X 15'-0"
f===
OPT.\FR DR
\
' '
-:-:-:-: ------------=-p~
, 11
: II : II
' II I II
OPT. DECK 1 11 I 11
! II
: 11
I II i II
r----
11,--+-i--~I
B TH 2
I
I
I
I
I
10·-~·~ ~'-o" I
I
I
L
SECOND FLOOR PLAN
,,
Ii I
Ii I
'I I
M. BATH
JJNEN
BR3
10'-0" X 15'-0"
0
TECH
DN17R
--
' 11
II
'
2045 Kettner Boulevard Suite 100 San Diego California 92101
619 299 7070 www.starckap.com
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
, ·-··-··-·
fn1 -bPTSLIDINGDt ---7
~T4-Pl'JNELSTACKING1SLGLDR , ----------------0:
j I >
I
I
I
I
I
I I
I I
I
I I
I
I ____ .._I
~---1 I
I
I
I
I
I
I
I
I
I I ' ■
IVIN
1 '-0" X 16' 8"
I GARAGE
20'-4" X 20'-5"
I
I
I
I
I
n I
II...__ I ::~~ --------7
II I II
II "' " '-I-I
LI ...... ~~~==-,liil
i==f i==f
UP 17R
I •
11
1 i
::, OPT SLIDING ~R
;;1
ii'
I
II
II ~r ,,,
;:
L ,-_J L_ ___ _
I
I
I
FIRST FL POR PLAN
I
I
L.·-··-··-. -.. -.. -.. -.. -.. -.. -.. _._ .. -.. -.. -.. -
! i ' __ J -_J
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P32.DWG CD 2019-0018
5 OF 14
PLAN 2X
FLOOR PLANS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
---------------------------------------
K
Architecture + Planning
1 '-0"
TYP
r------
1
I
I
I
C
'
-----7__
r
I
I
I
I
I
I
I
I
I
I
I
I
I
FS I
I
I
I
I
I
I
I
I
I
->D:
I
I
;;;;;;=:~~~~~~~~~~~~ccQ
l
--1'-
II
II
,---------------'
I [J r
I --i---I
I I I
I I
SLOPE: 3.5:12 TYP. U.N.O.
I
I
I
I
L
l
I
I r·--__Ll
l
-------
I
I
I
I
I
I
I --------------I
I
I
I
I
I
[J
l
L _____ _
: □
: f-
~----+J -)
l---__ ---_
[J
,----_]
ROOF PLAN
2045 Kettner Boulevard Suite 100 San Diego California 92101
619 299 7070 www.starckap.com
-----------------
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
I ' I
I I I l
I
I
I ROOF DECK GAS STUB FOR ,-TQPTBBQ 16'-0" X 19'-10"
1_,i,11 <'>I -) p
I I !I
! I 11
I I 11
L_.lfi 0 ! i I I 17--I ' r(J'.11
l',,...._....;Ji
' i I i i '
~ : I I I \ Ii
i I I \ ii
' 11 I 1 '-.. !I I I I I ---_jJ ii
J I I ' I I en--" I I II ii
II !ONUS ROt'j/ OPT BR 4 :: I I I
II I I
II 13'-0" X 19' 9" / 1 '-5" X 13'-0" i7 I I
II I I
II :Ir~~ ~:'J
II ,...___
'I
Q, -~
X -
\ l!r-------F;..:-, Cr 7
\ I 1111 \
I Ii
I
\._/ IIIIQPT BATH 3 ', FAU I
I J-\ !Ill ,,...--.._ .___ 0, '·L J ; \ 1111 ( \ ,------
; \ 1111 \, •• / I 0 / \1111 ~ : I
i ' ~ -
i
II II
THIRD FLOOR PLAN
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P33.DWG CD 2019-0018
--------~-
6 OF 14
PLAN 2X
THIRD FLOOR/ ROOF PLAN
3/16"=1 '-0"
ISSUE DATE: 10/07/19
---------------------
LEFT SIDE ELE VAT ION
REAR ELEVATION
K
Al"chitectu1re + Planning
m m m
r rr=-=-=-711 --------------I Ii r-1 II I I I
I II I I II I I I
I II I I II I I
' If I II) I
1------------.S:.. ,, -
2045
6 1 9
Kettner
2 9 9
Bou l evard
7 0 7 0
Su i te 100
w
San
w w
Diego
s t a
, "
Californ i a
r c k a p
CD: 20 19-0018 (RELATED: CT:16-05 & CD: 2018-0021 )
R
T.O. PLATES
T.O. f'LR. SHEATHING --
T.O. PLATES --
b
T.O. FLR. SHEA THIN
T.O. PLATES
FRONT ELEVATIO N
RIGHT SIDE ELEVATIO N
CYPRESS PHASE 9 -CONS ISTENCY DETER MINATIO N
9210 1
C O m
APPLICANT: CORNERSTONE COMMUNITIES
2019026P37.DWG CD 2019-0018
TYPICAL BUILDING MATERIALS
~
0
0
0
0
0
'5' C.ONGR TE TIL.E ROOF.
PLAT CONCRETE ROOF TILE.
PLASTER EAVE.
2x RESAWN FASC..IA BOARD.
2X RESAY'{N RAKE BOARD.
4X RAl<.E BOARD.
[2J
0
~
[i"g
4x RE5AV'l.N RAFTER TAILS.
RESAV'IN V'iOOD BEAM/ BRACKET.
PLASTER l"IALL BUTTRESS.
RESAY'I.N Y'iOOD TRIM.
[2]
@]
~
HARDBOARD SIDING PER HATCH SCHEDULE.
INTEGRAL GOLOR PL ASTER FINISH.
PLASTER .JOINT.
B V INY L ~INDOY'! -RECESSED 2 " MIN./ SLIDING GLASS
DOOR.
~ PLASTER JA.IINDOJl',I TRIM.
~ 2X 11'1.00D V'I INDOV'-1 TRIM AT SIDING,.
[221 ENTRY DOOR.
~ SEG TIONAL GARAGE DOOR.
B DEC.ORATIVE FINIAL.
~ 3" DEEP PLASTER RECESS.
§3 DECORATIVE V ENT TIL.E.
§ FABRIC AY'iNIN6.
§ OPTIO N AL JAI.OOD DECK
§j DEGORATIVE PL.A5T ER TRIM.
§ DECORATIVE PL.ASTER CORBEL.
~ MET AL GUARDRAIL/ RAILIN6/POTSHELF.
§3 JAI.OOD 6UARDRAIL/ RAIL.ING.
~ METAL BALCONY.
Ej DECORATIVE MET AL. GRILLE.
e9 STONE VENEER.
e2) DECORATIVE Y"tOOD SHUTTER. a DECORAT IVE ROSETTE.
• ALL. Y"IOOD AND METAL. ELEMENTS TO BE PAINTED.
HATCH SCHEDULE
PL.ASTER
FAINTED HARDBOARD LAP SIDING
HARDBOARD SHINGLES
a BOARD AND BATT SID ING
SPAN ISH MEDITERRANEAN
SCHEME 2
7 OF 14
PLAN 2XA
EXTER IOR ELEVATIONS
3/16"=1'-0"
ISSUE DATE: 10/07/19
LEFT SIDE ELEVATION
REAR ELEVATION
K
A,chitecluz-e + Planning
2045
6 1 9
Kettner
2 9 9
Boulevard
7 0 7 0
11
suite 1 0 0
w
San
w w
Diego
s t a
Ca l ifornia
r c k a p
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
T.O.RIDGE
T.O. PLATES
T.O. FLR. SHEATHING
T.O. PLATES
T.O. FLR. SHEATHING
T.O. PLATES
T.O.SLAB
FRONT ELEVATION
RIGHT SIDE ELEVATION
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
92101
C O m
APPLICANT CORNERSTONE COMMUNITIES
2019026P38.DWG CD 2019-0018
TYPICAL BUILDING MATERIALS
[2J '5' C.ONGRTE TILE ROOF.
0 FLAT CONCRETE ROOF TILE.
0 PLASTER EAVE.
0 2X RESAJl'IIN FASCIA BOARD.
0 2X RESAY'IN RAKE BOARD.
0 4X RAKE BOARD.
[2] 4x RESAY'IN RAFTER TAILS.
0 RESAJ."iN V'iOOD BEAl'-1/ BRAGKET.
~ PLASTER !"I.ALL BUTTRESS.
~ RESAlf\lN V'iOOD TRIM.
~ HARDBOARD SIDING PER HATGH SCHEDULE.
~ INTEGRAL GOLOR PLASTER FINISH.
~ PLASTER .JOINT.
B VINYL Y'!INDOJl'I -RECESSED 2" MIN./ SLIDING GLASS
DOOR.
~ PLASTER l"IINDOY't TRIK.
~ 2x J/"IOOD V"'ilNDOV'I TRIM AT SJDING.
[23 ENTRYDOOR.
~ SEGTIONAL GARAGE DOOR.
B DECORATIVE FINIAL.
§g 3" DEEP PLASTER RE:GESS.
~ DECORATIVE VENT TILE.
§I FABRIC Al-"•H--IING.
~ OPTIONAL )l';QOD :DECK
§j DECORATIVE PLASTER TRIM.
~ DECORATIVE PLASTER C.ORSEL.
~ t-1ET AL GUARDRAJL/ RAILING/FOT5HELF
e2] V'tOOD GUARDRAIL/ RAILING.
~ MET AL BALCONY.
§] DEC.ORATIVE MET AL 6RILLE.
~ STONE VENEER.
~ DEC.ORA TIVE Y'-IOOD SHUTTER.
~ DECORATIVE ROSETTE .
., ALL )1';00D AND METAL ELErv;ENTS TO BE PAINTED.
HATCH SCHEDULE
P!..ASTE:R
PAINTE:D HARDBOARD LAP SIDING>
HARDBOARD SHING!..ES
[] BOARD AND 6A TT SIDING
TUSCAN
SCHEME 6
8 OF 14
PLAN 2XB
EXTERIOR ELEVATIONS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
K
Architecture + Planning
rr-================-I 1FF----------------=Fl,
11 i I Ii
11 i I II
!1 1 OPT. DECK I 11
!i ! I II
li i I II
d ! I II
ii i D.12 I II Ii I OPT. SL. GL. T. I II
" I ~ ' I ~1111111"'1'!"1 !WIit ...... ~~
l_l ~'~li--========J--. r-----1. ~
I I ~
IV /<\STER E ~--I
12'-6" X 16'-0' I ~
IJf----+-i----~: a--+----..._ ~ BR2
10'-0" X 12'-0"
-: \;Ii
~=-:JIii--! ~_//~ \:::=,.....~--II
J ~ /ii ,----x~~ -
:i~ ( " 11
__ Q __
M BATH 1 ~ i,.---
0
0 <; IA f-rl-7 ii i ILA~NDRY i! "" -i-c...L_-" ( .,· 1-o 111r-,--7 '
' I I "'----1111.:::>'<~"'!!JI LL J
0 G)i
I
BATH2 ~: LINEN ------
"-[t>~iilo;:::( =
BR3
10'-0" X 12'-0"
I----------
I
SECOND FLOOR PLAN
TECH
I IL
-
-
2045 Kettner Boulevard Suite 100 San Diego California 92101
619 299 7070 www.starckap.com
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
rr------------------~ ID □,
I I
I I
I I
---7
OPT 4-Pi<',NEL STACKING, L GL DR I
1' 1'
' hi -I D I
I
I
I
I
[:] i
D
' a~2· I
I CC ~ I
I ~ I I ,-
I gp
01b
I
,-,1
' II II
I II II
D , ....
D L _ _JI II
f"I
I
I KITCHEN ~ /
I -~=-,--...,_,r-V .. .-------
L -X : R I p IW!MWH!lll R✓~! -~
I~ 7 ENT~. i
\ 6U:=P ~17:=R i--.t:-----i
GARAGE
20'-2" X 20'-3"
e---r---7
------1 I
I I -----, I I ----J ----
c I I 'r ,r -, I! 1 11 I
I ~-~I :: T 'ii R : r 1 1 IL ___ ..JL ___ _j
f, I I _J-! -----
t1:::1c=:==1E==:=:=c=:=:c::::11 STORAGE '
----
L _________ r
FIRST Fl OOR PLAN
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P42.DWG CD 2019-0018
9 OF 14
PLAN 3X
FLOOR PLANS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
·--~------------
K
Architecture+ Planning
----------·--------
1 '-011
TYP
~================~
111 ii I
111 II i
111 II!
111 II!
111 II i
111 111
111 11 i
111 II i r------------7
1
I
I
I
I
I
I
I
I
I
I
I
□
I
I
I
1
T I
I
I
I -·-------------
I
I
I
I :□ I
I
I
I
I
I
:+=-=====--~
[J :
1 :
ROOF PLAN
CJ
SLOPE: 3.5:12 TYP. U.N.O.
T
1
2045 Kettner Boulevard Suite 100 San Diego
619 299 7070 www.sta
7
I
-H I I
ii I
I _J
I r--ee--~
I
I
I -+++-->I
I
I
k--ff---~
I
I
I
I
I
I
b:
I
I
I
I
California
rckap.
9 2101
C O m
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
ROOF DECK
17'-0" X 19'-0"
---j
" • I
1
T
~rBeiNUS ROOM/ OP"J1 BR 4
THIRD FLOOR PLAN
19'-3" X 21'-8" I 10'-6" X 13<2" 0 ::
11
i I
11
i I bd ::
:I
I ; :
r----7
I I
I FAU I
I I L ____ _j
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT: CORNERSTONE COMMUNITIES
2019026P43.DWG CD 2019-0018
10 OF 14
PLAN 3X
THIRD FLOOR/ ROOF PLAN
3/16"= 1 '-0"
ISSUE DATE: 10/07/19
------------
rn
LEFT SIDE ELEVATION
REAR ELEVATION
K
Al'chitecture + Planning
2045
6 1 9
-=-=-:::;11
I r-1 II I
I I I II I
I I I 11 1
I p I
<I
Kettner
2 9 9
I
Boulevard
7 0 7 0
Suite
41
1 0 0
w
San
w w
Diego
s t a
Ca l ifornia
r c k a p
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
T.O. RIDGE
T.O. PLATES
. T.O. FLR. SHEA THINS
T.O. PLATES
()
' :..r.
11)
' i;
T.O. FLR. SHEATHING
T.O. PLATES
' i;
FRONT ELEVATION
' I
I
I
I
I
I
I
I
I
I
! s-
: _r
!
: _rs
'-----{
l_
l_
~--'-----~l -=-,~-------+--~-~--r--------1 I
I
I
I
I
I L ______ _
RIGHT SIDE ELEVATION
----
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
APPLICANT CORNERSTONE COMMUNITIES
-
92101
C O m 2019026P47.DWG CD 2019-0018
TYPICAL BUILDING MATERIALS
OJ '5' GONG-RTE TILE ROOF.
0 FLAT CONCRETE ROOF T1LE
~ PLASTER EAV=.
~ 2x R::.SAJ.'11.N FASCIA BOARD.
0 2X RESAJl'\N RAKE BOARD.
0 4X RAl<.E BOARD.
[2] 4x RESAY"-N RAFTER TAILS.
0 RESAJl'!N V'-{00D BEAM/ BRACKET .
~ PLASTER Y'"t.A.LL BUTTRESS.
G:g RESAJl'!N J,'iOOD TRIM.
E2] HARDBOARD SIDING PER HATGH SCHEDULE.
~ INTEGRAL COLOR PLASTER FINISH.
~ PLAST;:.R JOINT.
B VINYL J.'11.INDOV'i -RECESSED 2" MIN./ SLIDIN6 6LASS
DOOR.
~ PLASTER 1-"'tlNDOY'{ TRIM.
~ 2x ll"IOOD JAIINDO)I',{ TRlt--1 AT SIDING_
li:3 ENTRY DOOR.
~ SECTIONAL GARAGE DOOR.
B DECORATIVE FINIAL.
§] 3" DEEP PLA5TER REC-ESS.
E.J DEGORAT!VE VENT TILE_
a FABRIC AJ."LNING.
el OPTIONAL Y-IOOD DEGK.
§j DEGORATIVE PLASTER TRIM.
§] DEGOR.ATIV=. PLASTER GORBEL.
§] MET A L GUARDRAIL/ RAILING/POT SHELF.
§3 Y'I.OOD GUARDRAIL/ RAILING.
§] MET AL BALCONY.
§1 DECORATIVE MET AL GRILLE.
~ STONE VENEER.
~ DECORATIVE /AIOOD SHUTTER.
§] DECORATIVE ROSETTE.
• ALL Y"IOOD AND METAL ELEMENTS TO BE PAINTED.
HATCH SCHEDULE
□ PLA&TER
~ PAINTSD HARDBOARD LAP &IDING
HARDBOARD SHIN6-LES
[] BOARD AND BA TT &IDING
SPANISH MEDITERRANEAN
SCHEME 3
11 OF 14
PLAN 3XA
EXTERIOR ELEVATIONS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
LEFT SIDE ELEVATION
REAR ELEVATION
K
Ar-chitectur-e + ng
2045
6 1 9
Kettner
2 9 9
i L ___ J
I I 1-----1
I I 1,-.n.-7
I 11..---..ll I
~~r.e1l 42'1NC,..
Boulevard
7 0 7 0
Suite 100
w
San
w w
Di ego
s t a
California
r c k a p
CD: 2019-0018 (RELATED : CT: 16 -05 & CD: 2018-0021)
T.O.RIDGE
--
T.O. FLR. SHEATHING
T.O. PLATES
i,-
T.O.SLAB
FRONT ELEVATION
RIGHT SIDE ELEVATION
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
92101
C O m
APPLICANT: CORNERSTONE COMMUNITIES
2019026P480WG CD 2019-0018
TYPICAL BUILDING MATERIALS
[,J
0
0
0
0
0
'5' C.ONGRTE TIL::. ROOF.
FLAT GONGRETE ROOF TILE,
PLASTER EAVE.
2X RE5AV'iN fASGIA BOARD.
2x RESAV'IN RAKE BOARD.
4x RAKE BOARD.
[,]
0
~
4x RESAJ."'{N RAFTER TAILS.
RESAV'iN V"IOOD SEAH/ BRAC..KET.
PLASTER V'iALL BUTTRESS.
~
r,::;i
@]
~
HARDBOARD SIDIN6 PER HATGH SGHEDULE.
INTEGRAL GOLOR PLASTER FINISH.
PLASTER JOINT.
~ VINYL Y"IINDOY"I -REC.ESSED 2" MIN. / SLIDING G>LA55
DOOR.
~ PLASTER V'ilNDOV'i TRIM.
~ 2x )11100D Y-..:INDOV'i TRll--1 AT SIDING.
[:] ENTRY DOOR.
~ SECTIONAL GAR.A.GE DOOR.
B DEGORATIVE FINIAL.
eg 3" DEEP PLASTER RECESS.
E2I DECORATIVE v::.NT Tll-E.
[§I FABRIG A.11"-:NING.
§j OPTIONAL V{QOD DEGK.
§3 DEC.ORA TIVE PLASTER TRIM'.
~ DEGORATIVE PLASTER GOR6EL.
~ MET AL GUARDRAIL/ R.AILIN6/POTSHELF.
0 Y"iOOD GUARDRAIL/ RAILING.
~ MET AL 6ALGONY.
§3 DEGORATIVE MET AL GRILLE.
~ STONE V ENEER.
6 DEGORATIVE JIII.OOD SHUTTER.
§ DECORATIVE ROSETTE.
• ALL 1"!000 AND MET AL ELEMENTS TO BE PAINTED.
HATCH SCHEDULE
□ PLASTER
~ PAINTED HARDBOARD LAP SIDING
HARDBOARD SHINGLES
[] BOARD AND BATT SIDINS
TUSCAN
SCHEME 5
12 OF 14
PLAN 3XB
EXTERIOR ELEVATIONS
3/16"=1 '-0"
ISSUE DATE: 10/07/19
LEFT SID E ELEVATION
·---------------
REAR ELEVATION
Ar-ch tectuire t
,..,,.
~
PI an n
K
ng
2045
6 1 9
-----,
I r-1 II I
I I I II I
I I I II I
' '
ll
Kettner
2 9 9
rr---
1 Ii r----
11
Ii I II
I II , II
'
Bou l evard
7 0 7 0
Su it e 100
w
San
w w
Di ego
s t a
California
r c k a p
CD: 2019-0018 (RELATED: CT:16-05 & CD: 2018-0021)
T.O.RIDGE
:i,
' io
T.O. PLATES
T.O. PLATES
FRONT ELEVATION
~
=
r-....,
RIGHT SID E ELEVATION
CYPRESS PHASE 9 -CONSISTENCY DETERMINATION
92101
C O m
APPLICANT: CORNERSTONE COMMUNITIES
2019026P49.DWG CD 2019-0018
TYPICAL BUILDING MATERIALS
CJ 'S' GONGRTE TILE ROOF.
0 FLAT GONGRETE ROOF TILE.
0 PLASTER EAV E.
G .2X RESA/AIN FASCIA SOARD.
0 2x RESAY"IN RAKE SOARD.
0 4x RAKE BOARD.
12] 4X RESA)",IN RAFTER TAILS.
0 RESAY'-IN i"IOOD SEAM/ BRACKET.
~ PLASTER /AIALL B UTTRESS.
~ RESAJAIN JAIOOD TRlt,.,1.
~ HARDBOARD SIDING PER HATCH SGHEDLJLE.
~ INT EGRA L GOLOR PLASTER FINISH.
~ PLASTER JOINT.
B VINYL V'IINDOY'I. -RECESSED 2" MIN./ SLIDING 6LASS
DOOR.
~ PLASTER Y'-IINDOV'l TRIM.
B 2x r-100D Y'-IINDO)"II. TRIM AT SIDING.
~ ENTRY DOOR.
~ SEG TIONAL &AR . .r....&E DOOR.
(23 DECORATIVE FINIAL
§g 9" DEEP PLASTER RECESS.
§::2] DEGORA TIVE VENT TILE.
§ FABRIC, AJ."'{NING.
~ OPTIONAL Jf\l.OOD DEGK.
~ DEGORATIVE PLASTER IRIH
~ DEGORATIVE PLASTER GORBEL.
el MET A L &UARDRAIL/ RAILIN&/POTSHELF.
§2j Y-1000 GUARDRAIL/ RAILING.
~ MET A L BALC,ONY.
El DEGORATIY':: HET AL GRILLE.
eg STONE VENEER.
~ DEGORATIVE Y':OOD SHUTTER.
~ DEGORATIVE ROSETTE_
• ALL ~QOD .A.ND MET AL ELEMENTS TO BE PAINTED.
HATCH SCHEDULE
PLASTEfi:.
PAINTED HARDBOARD LAP SIDINS
HARDBOARD 5HINGt1..ES
[[] BOAF<D ANO BA TT 51DIN6
CRAFTSMAN
SCHEME 8
13 OF 14
PLAN 3XC
EXTERIOR ELEVATION S
3/16"=1 '-0"
ISSUE DATE: 10/07/19
EXISTING 3-STORY (W/ ROO ECK)
PRODUCTION UNITS TO REMAIN
13 UNITS
•• •••
CORNERSTONE: CYPRESSATT8~i~FfffS~-R\o/E: 2018
-
002 1
)
BLDG NUMB ER / ELEVATION STYLE/ COLOR SC H EME/ ENHANCEMENTS
REVISED DATE: 07/18/19
COLOR
SCHEME 1
COLOR
SCHEME 2
COLOR
SCHEME 3
□
COLOR
SCHEME 4
COLOR
SCHEME 5
□
□
COLOR
SCHEME 7
COLOR
SCHEME 8
A = SPANI SH B = TUSCAN C = CRAFTS MAN
LOT
NUMBER 7
rn w
PLAN _J
NUMBER
LELEVATION
TYPE
REVERSED
UNIT
LOT
NUMBER 7
au w
PLAN _J L ELEVATION
NUMBER TYPE
X = 3 STORY UNIT
~·······································································
MODELS =
SCHEME4 SCHE ME 1
{jij w
SCHEME 7
·······································································~
K: REAR ELEVATION
W/ ROOF DEC '=:---,
: 25 • • • • :r-#-J • • •
•
• • • • • • • • • • • •
LEFT SIDE ELEVATION
FRONT ELEVATION
-------'=Q~S~TING 3-STORY (W/ ROOF DECK)
MO EL UNITS TO REMAIN
3 UNITS
CYPRESS PHASE 9 -CO NS ISTE NCY DETERMINATION
RIGHT SIDE ELEVATION
14 OF 14
Architecture+ Planni11g
2045 Kettner Bou l evard Suite 10 0 San Diego Ca lif or ni a 92 101
679 299 7070 www .s tarckap .c om
APPLI CANT CORNERSTONE COMM UNITIES
2019026P71.DWG CD 2019-0018
BLDG.NUMBER/ ELEVATION STYLE/
COLOR SCHEME/ENHANCEMENTS
EXHIBIT PLAN
ISSUE DATE: 10/07/19