Loading...
HomeMy WebLinkAboutPRE 2019-0017; TERRA BELLA DEVELOPMENT; Preliminary Review (PRE)CITY OF CARLSBAD APPLICATION FORM FOR PRELIMINARY REV CITY USE ONLY Project Number: PROJECT NAME: Terra Bella Development LLC, 6479 Surfside Lane, Carlsbad Assessor's Parcel Number(s): 214-021-11-00 ---------------------------Des c rl pt ion of proposal (add attachment if necessary): New single family residence, two stories plus basement, total area excluding exterior unenclosed decks 4,471 s.f., including 545 s.f. garage. Would you like to orally present your proposal to your assigned staff planner/engineer? Yes 00 □ No Please list the staff members you have previously spoken to regarding this project. If none, please so state. Sarah Cluff, Planning. Christopher Glassen, Engineering. OWNER NAME (Print): Terra Bella Development LLC MAILING ADDRESS: 687 Blossom Road CITY, STATE, ZIP: Encinitas, CA. 92023 TELEPHONE: 646-290-0811 ------------EMAIL ADDRESS: MengXusd@outlook.com *Owner's signature Indicates pennission to conduct a preliminary review for a development proposal. I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST 9/M~E. ~~ 07/08/2019 SIGNATURE DATE APPLICANT NAME (Print):_ M_e_n_g_X_u ______ _ MAILING ADDRESS: 687 Blossom Road CITY, STATE, ZIP: Encinitas, CA. 9!9!9-92024 TELEPHONE: 646-290-0811 ------------EMAIL ADDRESS: MengXusd@outlook.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AN~ TO THE BEST OF MY KNOWLEDGE. ~Lr: 07/08/2019 SI DATE APPLICANT'S REPRESENTATIVE (Print): Edward King Schultz Ill ---------------------------MA I LING ADDRESS: P.O. Box 173 -------------------------------CI TY, STATE, ZIP: Cardiff, CA. 92007 TELEPHONE: _8_58_-58_7-_9_77_0 _____________ .,.,R~E;;;:;. . .,.,..c .... ri--.,.:+l'v/-FE=-1D1-+-- EMAIL ADDRESS: ted@schultzarchitecture.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND COR CT T BEST OF OWLEDGE. ~~~-.e:-~·~~~~~~ 07/08/2019 DATE JUL 2 4 2019 CITY OF CARLSBAD PLANNING DIVISION IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND EiNllfw.lil,ifflE P OPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. FEEREQUIREDIDA~ RECEIVED BY: - P-14 Page3of3 Revised 03/17 PRELIMINARY REVIEW CHECKLIST Staff would like to know what information you primarily want from this review. With this known, we can focus most of our attention on researching and answering your main questions(s). Please check the one or two boxes below which best describes the information you would like us to concentrate on, and/or check the box marked "other'' and tell us in your own words what information you would like from us. IX! SITE DESIGN: Focus is on reviewing issues such as development standards (setbacks, building height, etc.), hillside compliance, landscaping, signage, open space requirements, and other physical aspects of zoning. Plans adequately illustrating these features are needed for review. 0 LAND USE: Focus is on determining the compatibility of the proposed land use with the existing general plan and zoning designations, determining whether staff could support a general plan amendment or zone change, and determining compatibility of the proposed land use with surrounding land uses. ~ ARCHITECTURE: Focus is on establishing quality architecture and checking its compatibility with the surrounding area and against any applicable guidelines or plans. Building elevations or other architectural information are needed for review. ~ ZONING INTERPRETATIONS: Focus is on interpreting any aspects of the zoning ordinance. ~ LAND DEVELOPMENT ENGINEERING STANDARDS: Focus is on reviewing all engineering-related issues, such as grading, drainage, Best Management Practices for Storm Water Pollution Control, circulation and traffic, street vacations, easements, subdivisions, etc. l8J OTHER: In the space below, please list any oth:_2sues you would like us to review. ~ }'<:r1}4.C-~ 'JAA-,,..,.$fl\ ITT"~ ;~~:f'>c;>-,05 P-14 Page 2 of 3 Revised 03/17 ". • schlJL TZ ARCHITECTURE DATEQ Too 07/16/2019 City of Carlsbad Planning Department 1635 Faraday Ave. Carlsbad, CA. 92008-7314 TRANSMITTAL JUL 2 ~ 2019 CITY OF CARLSH/ ) PLANNING OIVISIC,r~ PROJECTQ PROJECT NUMBERQ TERRY BELLA DEVELOPMENT LLC 6479 SURFSIDE LANE 2019.07 RE□ Preliminary Review Submittal a SENDING [8J PRINTS □SAMPLES □ORIGINALS 0 SPECIFICATIONS 0 SHOP DRAWINGS 0 DISKETTE □FAX 0 OTHER QFOR [8J ACTION 0 INFORMATION 0 BIDDING 0 QUOTATION 0 RETURN □OTHER □ □ QVIA □MAIL 0 MESSENGER [8J HAND 0 BLUEPRINTER □OVERNIGHT □FAX □MODEM 0 E-MAIL FAX NO.: NUMBER OF PAGES (INCLUDING THIS TRANSMITTAL}: 4 + 4-sets IF YOU DID NOT RECEIVE ALL PAGES OR IF NOT LEGIBLE, PLEASE CALL 858-587-9770 DESCRIPTION Attached are four sets of plans folded to 8-1/2"x11" each, including the following drawings: 1. Site Plan 2. Basement Floor Plan 3. First Floor Plan 4. Second Floor Plan 5. Roof Plan 6. Section through structure 7. Elevations (all four sides} Questions: 1. We are showing steps down to the sidewalk (outside of the building setback) -is this allowed? If not, how can we provide access to the front door since there is an existing grade difference between the sidewalk and the area that we are building on. 2. We are showing two treads on the west side of the structure that go down to existing grade. We could grade up to that area. 3. We are showing a rooftop deck, and the glass surround and spiral stair that are within the setback, however the edge of roof at the roof deck extends 24" into the setback - please confirm this is agreeable. 4. For lot coverage, we are taking the portions of the building that 'touch the ground', so the second floor that overhangs the driveway is not included. Please confirm that this is acceptable, and or provide feedback as to how lot coverage is calculated. SCHULTZ ARCHITECTURE D ARCHITECTURE□PLANNING□INTERIOR DESIGN P.O. Box 173 □ Cardiff, CA 92007 □ E-mail:ted@schultzarchitecture.com □ Work: 858-587-9770 □ Cell: 858-245-4288 @ We are sh~g a 'light well' for a window in the basenv :.,. The dimension from the bottom of the ins\.,,,.,.>f the light well to existing exterior grade ._ AllOUt 5'. Are we required to have a wall or handrail around this? If so, is this allowed as shown (to encroach into the rear yard setback)? 6. Please confirm that the height we show is acceptable (given that we have a driveway to the basement area). rT:'t We are considering a 'roof top spa'. If we do this, then the spa will have to be V surrounded by the glass rail, which means that the roof top deck will become a bit larger. There should be a distance between the spa and the glass rail so that nobody can stand with their feet on the spa and glass rail at the same time. Are there any stipulations as to how this would need to be done? 8. What is the sequence of submittals? In other words, I'm assuming there is a submittal to the H.O.A., or City Council for La Costa Downs Specific Plan submittal and approval, as well as a submittal to California Coastal Commission (I'm assuming that this is processed directly with the California Coastal Commission, and not through the city of Carlsbad to accomplish this)-please clarify. Thanks 0 Ted Schultz SCHULTZ ARCHITECTURE D ARCHITECTUREDPLANNINGDINTERIOR DESIGN P.O. Box 173 c Cardiff, CA 92007 □ E-mail:ted@schultzarchitecture.com □ Work: 858-587-9770 □ Cell: 858-245-4288