Loading...
HomeMy WebLinkAbout2646 STATE ST; ; CBR2020-0935; PermitPERMIT REPORT Residential Permit Print Date: 05/10/2022 Job Address: 2646 STATE ST, CARLSBAD, CA 92008 Permit Type: BLDG-Residential Work Class: Demo Parcel#: 2031012000 Track#: Valuation: $3,449.60 Lot#: Occupancy Group: Project#: DEV2017-0236 #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Plan Check#: Project Title: THE SEAGLASS (city of Carlsbad Permit No: CBR2020-0935 Status: Closed -Finaled Applied: 05/05/2020 Issued: 05/06/2020 Finaled Close Out: 05/10/2022 Inspector: Final Inspection: TAlva 06/02/2021 Description: SEAGLASS: DEMOLISH 560 SF STRUCTURE IN PREPARATION OF TOWN HOME CONSTRUCTION Applicant: PROPHET SOLUTIONS ROD BOONE Property Owner: 2646 SEA GLASS LLC PO BOX 17506 5845 AVENDIA ENCINAS, # #138 CARLSBAD, CA 92008 RANCHO SANTA FE, CA 92067 (858) 334-9490 FEE SB1473 GREEN BUILDING STATE STANDARDS FEE BUILDING PERMIT FEE ($2000+) STRONG MOTION-RESIDENTIAL BUILDING PLAN CHECK FEE (BLDG) Total Fees: $106.46 Total Payments To Date: $106.46 Balance Due: AMOUNT $1.00 $61.74 $0.50 $43.22 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov (city of Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan Check _C_B_R_2_0_2_0-_0_9_35 __ Est. Va I u e ~3'--'-,4-'-4--'-9.c...... ____ _ PC Deposit --------- Date _5_15_12_0 ______ _ Job Address 2646 STATE ST Suite: _____ APN: __________ _ CT/Project #:_S_E_A_G_L_A_s_s _____________ Lot#: ___ _ Fire Sprinklers: 0 YES O NO Air Conditioning: 0 YES O NO Electrical Panel Upgrade: 0 YES O NO BRIEF DESCRIPTION OF WORK: DEMOLISH 560 SF STRUCTURE IN PREPARATION FOR FUTURE CONDOS 0 Addition/New: _____ Living SF, ____ Deck SF, ____ Patio SF, ____ Garage SF Is this to create an Accessory Dwelling Unit? 0 Y ON New Fireplace? 0 YON, if yes how many? __ D Remodel: _____ SF of affected area Is the area a conversion or change of use? 0 Y ON 0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _ □solar: ___ KW, ___ Modules, Mounted:ORoof OGround, Tilt:O YO N, RMA: 0 YON, Battery:OY ON, Panel Upgrade: OY ON D Reroof: ___________________________________ _ D Plumbing/Mechanical/Electrical Only: ________________________ _ [ZJ Other: DEMOLITION APPLICANT (PRIMARY CONTACT) PROPERTY OWNER Name: ROD BOONE Name: 2646 SEA GLASS LLC Address: _________________ Address: PO BOX 17506 City: _______ State:, ___ ,Zip: ____ City: RANCHO SANTA FE State:_C_A __ ,Zip: 92067 Phone: 858-334-9490 Email: ROD@PROPHETSOLUTIONSINC.COM DESIGN PROFESSIONAL Name: _________________ _ Address: ________________ _ City: ________ State: ___ ,Zip: ____ _ Phone: _________________ _ Email: _________________ _ Architect State License: ___________ _ Phone: ___________________ _ Email: ____________________ _ CONTRACTOR BUSINESS Name: PROPHET SOLUTIONS Address: 5845 AVENI DA ENCINAS City: CARLSBAD State:_C_A __ Zip: 92008 Phone: ___________________ _ Email: ___________________ _ State License: 995571 Bus. license: ACTIVE ------------- (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov B-1 Page 1 of 2 Rev. 03/20 _ .. •• O· O• ~~,,,,,,.., ~I ... -- MfltT OATI ____ _ _ ,..,_,,....,.~.,_,,,,..,.....'li»!Jl";\l ...... ~4 .... U-: ., c--- !HC ro IOWING!C1,1101ilg■,~H!CJl!'l~~!SIIMI \OIWY ~· ~~ .. ~ ...... ,..,,.:.w,: ................................. ~ ... ........ I MM ,..,._...t' __ ~.....,..,_.,.~I YH "- ~ --·-------·---....... .,.,,. J:Ok _,,,,._..,__UIDINf• .. __.N...,.,,_1 .... tll ... ...... _, ...... All9"1',_.a,IIIIIJC&ller____.. ....... _, ...... .,....... .. _, ........ l'MI __ ,,.,,..._., ____ .. __ _ Anll(4"' CfilT\f~'.'9'- ~ ........... ,.. ................... ~,,__ .... __ ._.., ........ -" ..... .......,.,.,,,. .. -... ---.. ..,..._ --.. -----&'GMIII•-----...... ---·--"" ,o,c;,n, ~ "~---~--------....,•an• o;na1> --..:tr, _____ ....., ___ .,. ______ ,_ - April 14, 2020 Building Department c/o City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 Re: 2646 State St -Demolition For the purposes of CT2018-0004, I/ Tao Yu (Member and Authorized signer), on behalf of 2646 Sea Glass, LLC, the Legal Owner of the above referenced property, do hereby approve and authorize the demolition of the simple existing remnant structure or other secondary trees or facilities as may be required. IF you have any additional questions or concerns, please do not hesitate to contact me directly.(949) 680-5578. The appropriate Resolution is attached confirming my authority for this action. Sincerely, 1~ Tao Yu - Member and Authorized Signer 2646 Sea Glass, LLC 7922 Dagger St. San Diego, CA 92111 (CA.\<.o.. : TI t\4 14 o) RE MAY O 5 2020 Cl t 1.. BU/L Building Permit Inspection History Finaled {_ City of Carlsbad PERMIT INSPECTION HISTORY for {CBR2020-0935) Permit Type: BLDG-Residential Work Class: Demo Status: Scheduled Date 06102/2021 Closed -Finaled Actual Inspection Type Start Date 06/02/2021 BLDG-11 Fou n datio n/Ftg/Pie rs (Rebar) BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLDG-Structural Final BLDG-Electrical Final Tuesday, May 10, 2022 Application Date: 05/05/2020 Owner: 2646 SEA GLASS LLC Issue Date: 05/06/2020 Subdivision: Expiration Date: 11/29/2021 IVR Number: 26237 Address: 2646 STATE ST CARLSBAD, CA 92008 Inspection No. Inspection Status Primary Inspector Reinspection Inspection 158700-2021 158699-2021 COMMENTS June 2, 2021: Partial Pass Tony Alvarado Passed Tony Alvarado 1. Demolition of existing single-family residence structure-approved. 2. Removed building structure, capped-off all utilities: electrical conduit lines, plumbing sewer lines, and domestic water lines terminated-scope of demolition work-approved. June 2, 2021: 1. Demolition of existing single-family residence structure-approved. 2. Removed building structure, capped-off all utilities: electrical conduit lines, plumbing sewer lines, and domestic water lines terminated-scope of demolition work-approved. June 2, 2021: 1. Demolition of existing single-family residence structure-approved. 2. Removed building structure, capped-off all utilities: electrical conduit lines, plumbing sewer lines, and domestic water lines terminated-scope of demolition work-approved. Reinspection Incomplete Complete Passed Yes Yes Yes Page 1 of 1 TYPE OF I INSPECTION DONS DEPUTY INSPECTIONS 218 W. A VE. CORDOBA, SAN CLEMENTE ,CA. 92672 Office (949) 413--6248 • Fu (949) 361-2118 REGISTERED INSPECTOR'S DAILY REPORT Job No. REINFORCED COHCAl!TE ~ § STRUCTURAL. ST~EL WEL0INO REQUIRED POSTT£NSIC)llj CONCfU:Tf FIRE PROOFIH<J PentlllNo. I o• 0 1 ( _J STRUCTURAL MASONRY PRE.TENSIONED CONCRETE .1,.. , l'"")I 11 Jurt~on \ ,.. . ... .... JOBNNIE -X"..-..1__.AS:--.:::,,, Coµ'.::),.o.S DA~ ,/ >-,,. I s jM IT I~ Ir !Fis JOSAOORESS ~~'\""E" OENEJW. ::i j·-\ t: I - -I(,... CONTRACTOR ClTY 8U'B- I ~~ ,LJ CONTRACTOR --4< ._ -MATI!RIAL OISCRIPTION ARCHITECT l }.. ~\ ~ / IZr:,~¥.? ENGINEER' ~T~So,-\. -~(,..a INSPECTOR'S NAME WEATHER ')•4 r .j~,.(~!:, --TESTS PERFORMED- TYPE °" AAMPLE SLUMP otlAJIITITY IN SET A.I..JU1 r .... 'lNAl . ON!UIIPl'FS 1 __..,. ' 2 ~ -- 3 'i/ - INSPECTION SUMMARY-t.OCA TIONS OF WOR1S INSPECTED, TEST SAMPLES TAKEN.TYPES OF WORK INSPECTED. AMOUNT"' MA TERW. . ·Pl>.CED, UST ALL ITEMS OF CdRRECTION, LOCATIONS (GRID LINES, FLOOR, .ETC.), DISCUSSIONS WITH CONTRACTOR, SUPERINTENDENT. AACHJT-ECT, ENGltEER, SOILS ENGINEER, ETC., SIZE OF BOLTS EPOXJEO, STRUCTIJRAL CONNECTIONS fWF_LO WADE. H.T. BOl.TS ETC.) ---r-r=r" -.?.__'-..i~ ~--~~t~~ l t ,F .t:-t s- c~ ,z,,~ '> ' ✓) PE~.;,.r<' < r.....,J ~~':::. 10' c..'("~Ll' ~)-.. -~...., (r.l lo'' c'J,-~l.i... • . (.,~~, ..... (' ~. - ( .l J r-. l < ...C:-l L l '> ~.:::c.r-E:----. -~ -~ ~ \ ;f.,:=;dl' ' . - I r •,,F_ .6.._ ~s ~1<;$'4-G?. ~t,., ~,e a) . ~~ , ( {1~.A t?...llw..}<..E.~ ~'Z /.j::j! = s .zs--~..) r-s,. t"l J -I ) ~ ""i=<_ A-u - -I C..w, v.. \ >..__) A'-"-('CJ i?rr.,":{7!. I J, \ j)L~r" (=:" #4.jtc ... tL c_ \~l.l.J I, I r --Z., (_(._J"'P-,._~. Jf'\, ~E:~ CERTIFICATE Qf CO;MPLIAHCE Conlalved o" next page D Pav• ___ of __ _ I hereoy certify .._ I haw oti.erved ID the bat ot my knowledge w1 I TW~ ~ I THE OUT I REG. 3 I O.T, HOURt I of lhe llbo'<le reponad wor1( I.Ille,$ oti«wiM not.d. I ha~ found this wort lo bt;, ~ wltll lht Aflprowd Plan$, SpecMlca1lons, and\ tipp\lcabieseciionta(hGo'NTilfl,·IMdngL.aws. 0 c MA -.(' ' r Ill 9GNATURE ~ RE(;l$11:REO DEPVlY INSPECT~ \ - l SPECIA&.TY UCENC£NO. All lmpecticm baed an a fflll1ioMn of .C bcNr, aad owr 4 lloar-s -1 boar n,,iainsm JI\ addiciol), lnJ 'cnopcttiOll CXlcnc!q put 110011 oow wiU bl an 1-hol.w Jlll.nimum. Approved 8y ____ =-.--~--------- Pro;ect Supa,r1ntancieat i I GEOSOILS, INC. W.O.: _____ 7:_5:..:4c.4·_:C:_-Sc_C::__ ___ _ Geotechnical-Coa$tal -Geologic -Environmental DATE: 08107120 ------------ NAME: _____ c.T_:O_:D_:D ____ _ HOURS: 2.5 ------------ FOOTING TRENCH OBSERVATION SUMMARY CLIENT NAME: CARLSBAD VILLAGE PARTNERS PROJECT NAME: SEAGLASS ------------ LOCATIONfTRACT: ___________ _cS:_T:_A:..:T_:E:..:S:_T:_Rc::E:::E:_T.:_, C=:A_:R_:L:::S:_:B::_Ac::D:_V:_l_:::LLA=..:.:G:..:E::,_:9_:::20:..:0:::8 ___________ _ UNIT/PHASE/LOTS: GRID LINES 1 -4 -----------------'==----------------- REFERENCED GEOTECHNICAL REPORT: # 7544 GEOSOILS. INC OBSERVATION SUMMARY TG INITIALS --------08/07I20 DATE -------- TG INITIALS -------- 08/07/20 DATE -------- TG INITIALS ----'----- 08/07/20 OATE -------- ____ TG_:_ __ INITIALS 08/07/20 DATE -------- A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and are in general conformance with those indicated in the geotechnical report. A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was in general accordance with the recommendations of the geotechnical report. FOLLOW NOTES PROVIDED BELOW. NOTES TO SUPERINTENDENT/FOREMAN 1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period time for such, and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.), we should be contacted to perform additional site observations and/or testing. 4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. NOTES TO BUILDING INSPECTOR Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading. Digital Delivery pat@prophetsolutionsinc.com 08/07/20 Representative of GeoSoils, lnc. GEOSOILS, INC. W.O.: 7544-C-SC Geotechnical-Coastal -Geologic -Environmental ------------DATE: 07/15/20 ------------ NAME: TODD --------------HOURS: 2 ------------ FOOTING TRENCH OBSERVATION SUMMARY CLIENT NAME: CARLSBAD VILLAGE PARTNERS PROJECT NAME: SEAGLASS ------------ LOCATION/TRACT: ___________ ___cS:_:T_:_A_T_E...cS __ T_:_R::::E::::E_:_T-_, C.c..A_R...cLccS_::B_:_A.:cD_V_IL_LA_G_E_:_,.:_92:c0:..:0_8 ___________ _ UNIT/PHASE/LOTS: GRID LINES 5 -10 ------------------------------------ REFERENCED GEOTECHNICAL REPORT: # 7544 GEOSOILS, INC OBSERVATION SUMMARY TG INITIALS --------07115/20 DATE TG INITIALS -------- 07/15/20 DATE ------ TG INITIALS ------ 07/15/20 DATE INITIALS ------ DATE ------- A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and are in general conformance with those indicated in the geotechnical report. A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was in general accordance with the recommendations of the geotechnical report. FOLLOW NOTES PROVIDED BELOW. NOTES TO SUPERINTENDENT/FOREMAN 1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period time for such, and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.), we should be contacted to perform additional site observations and/or testing. 4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. NOTES TO BUILDING INSPECTOR Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading. Digital Delivery pat@prophetso1utionsinc.com 07/15/20 Representative of GeoSoils, Inc. " VAN July 27. 2020 City of Carlsbad I 635 Faraday Ave. Carlsbad, Ci\ 92008 YR #2005 SUB.IECT: FOUNDATION FORM ELEVATION CERTfflCA TION FOR THE SEA GLASS AT 21H6 STATE ST., PROJECT NO. CT20I8-0004, DWG NO. 519-2A To Whom It May Concern, Please be advised that on July 25. 2020 this office surveyed the foundation fo1111 elevations for the above referenced project. We have found the location and elevation of the fonns to have been constructed vertically and horizontally in conformance with the approved plans. The vc11ical control for this project is the City of Carlsbad H.M. PT. No. 130, stamped Cl .SB-130 L.S. 6215. Elevation: 40.91 NGVD 29. Datum: Mean See Level. If you have any questions regarding the above. please do not hesitate to contact this office. Sincerely, VAN RYN ENGINEERING, INC. fli1:- .1L11n A. Yan Ryn. P.E .. P.l..S. Principal Land Surveyor 11440 West Bernardo Ct., Ste 300, San Diego, CA 92127 I ph 858.367-3504 j vanryncnginccring.com ll ASBESTOS SURVEY CONDUCTED AT 2646 State St. Carlsbad., CA 92008 JMR JOB# 1-1495 Issued to: EA/Econ Renovation 5839 Mission Gorge Rd #3 San Diego CA 92120 DecE,mber 1, 2015 MAYO 5 zozo •.~ Envtronmenlal hrvlcetl, Inc. ENEcon Renovation 5841 Mission Gorge Rd San Diego CA 92120 RE: 2646 State St., Carlsbad CA 92008 PROJECT: Asbestos Survey ENEcon Renovation December 1, 2015 An asbestos survey was performed by JMR Environmental Services, Inc. (JMR) at 2646 State St., Carlsbad CA 92008 on November 19, 2015. The purpose of this survey was to determine the presence of friable (easily crumbled by hand pressure) and non-friable asbest,)s-containing materials within the house. This survey addressed the following types of building materials: • 9 X 9 Floor Tile & Associated Black Felt Backing • 12 X 12 Floor Tile • Sheet Vinyl • Drywall/Joint Compound • 12" X 12" Ceiling Tile • Window Putty • Roofing Material • Roof Penetration Mastic • Transite Vent Pipe This report includes laboratory results and a list of asbestos-containing materials with estimates of square and linear footag1~. Recommendations as to the most practical remedial action shall also be provided. Procedure Sample analysis of bulk materials was performed in accordance with EPA.600/R-93/116 Test Method: Method for the Determination of Asbestos in Bulk Building Materials. This procedure involves examination of the samples with a petrographic microscope utilizing polarized light, a procedure commonly known as polarized light microscopy (PLM). All results generated via bulk asbestoi; analysis are reported in terms of approximate percent by volume. Laboratory results and field data sheets are attached. I I J i---4560 Alvarado Canyon Rd., Suite 2D. San Diego, CA 1)2120 Tel (619) 858-7260 Fax· (619) 858-7264 1 .. · Asbestos Results The following tables include an inventory of the identified asbestos-containing materials for this project. Total% by Approx.* Mi~ditl l Locatiag b~ ~olume Quaali~ Ggaditio□ .. 9 X 9 Floor Tile -Chrysolile 7% 200 Sq Ft Good Living room under skip sheet, west bedroom bottom layer Window Putty -Chrysotile 2% 15 Sq Ft Fair Exterior Windows Transite Vent Pipe -Assumed Assumed 8Sq Ft Good At the Wall Heater Asbestos 7-65% Roof Penetration Mastic -Assumed 2-7% 2 Sq Ft Fair Roof Asbestos * Quantities are approximations and not for bidding purposes. LF: Unoer feet .. The following condmon types we,e used to assess the asbestos-cont1ining materials: Good Material is intact and shows no Signs of damagn or detettoratfon. No debris is present. Fair Moderate damage or deterioration. Material is f'Jreaking up into layers or beginning to come loose from the subMrate. The material is deterlontting In small areas. Minor debris may be present. Poor Sewn d11mage or deterioratkm. The material is non-cohesive. Pieces are dislodged and debris is evident. Non-friable materlsl has become friable. Unknown -Materials located but impossible to assess, i.e., underneath new finishes. Discussion/Recommendations All accessible areas were inspected for possible asbestos-containing materials. If materials that are similar to those found to be asbestos containing are observed they must be assumed positive until tested to prove otherwise. Due to the non-destructive nature of the survey, inaccessible areas (such as inside walls) were not sampled. If during renovation suspect materials are observed in these areas, bulk sampling and analysis is recommended prior to resuming the renovation activities. 9 X 9 Floor Tile Asbestos fibers were detected in the 9 X 9 floor tile located in the living room under the skip sheet and the west bedroom bottom layer. The 9 X 9 floor tile is in good condition. Asbestos containing floor tile is considered to be non-friable with a low potential for fiber release, unless aggressively disturbed as occurs in renovation or demolition. This material must be removed in accordance with all local, state, and federal regulations prior to renovation or demolition. Window Putty Asbestos fibers were detected in the window putty material located on the exterior windows. This material is in fair condition. Window putty is considered to be friable with Asbestos Survey 2646 State St., Carlsbad CA 92008 a low potential for fiber release while in place. If this material is disturbed, the fiber release potential can increase significantly. This material must be removed in accordance with all local, state and federal regulations prior to renovation or demolition. Transite Vent Pipe Asbestos fibers are assumed present in the transite vent pipe located at the wall heater unit. The transite vent pipe is in good condition. This material is non-friable with low potential for fiber release unless broken, sanded, or otherwise disturbed. This material must be removed in accordance with all local, state, and federal regulations prior to renovation or demolition. t Assumed Asbestos Type and Percent,3ge Penetration Mastic Asbestos fibers were assumed present in the penetration mastic. The penetration mastic appears to be good condition. This material was identified at roof penetrations (vents, ducts, etc.) on the roof. This material is non-friable and presents a very low potential for fiber release if intact. This material must be removed in accordance with all local, state, and federal regulations prior to renovation or demolition. t Assumed Asbestos Type and Percentage If asbestos-containing materials are to be removed or disturbed for demolition or renovation then a licensed, Californi.~ Division of Safety and Health (Cal/OSHA) registered asbestos abatement contractor must be used and the work must conform to Title 8, Section 1529 of the California Code of Regulations. If asbestos is present in quantities greater that 1 % then all work must also conform to Federal Environmental Protection Agency (EPA) regulations Title 40 CFR 61 Final Rule, and Federal Occupational Safety and Health Adrninistration (OSHA) regulations Title 29 CFR 1926.1101. Various other federal, state, or local regulations may apply as well. JMR Environmental Services Inc. appreciates the opportunity to provide these services. Sir;teeeely, \ ) . / /J);,Jf',.-) \"/fJA";•}'Y·: ,,, ' ' David Weaver, Project Manager Asbestos Certification #15-54 7 4 Reviewed by, ~ <--..--!~ 2.._ Derik Martin, General Manager Asbestos Certification #96-2068 Asbestos Survey 2646 State St., Carlsbad CA 92008 ASBESTOS LABORATORY RESULTS Asbestos Survey 2646 State St, Carlsbad CA 92008 JMRJob# 1-1495 JMR Lab Number 1-1495-111915 Project: 2646 State Street Date Analyzed November 24, 2015 Carlsbad, CA 92008 Room Temperature 25•c Type ,1f Total Other Sample Asbestos Percentage Materials Gross Number Sample ID Presef1t by Volume Present Appearance 182004 01. 12xl2 Floor Tile (Stone Pattern) None Dt tected Cellulose 1% Homogeneous Living, West Bedroom, Kitchen, East Calcite Non~Fibrous Bedroom VinyVPlastic Tan 182005 02. 9x9 Floor Tile(Green) Bottom Layer Chrysotile 7% Cellulose 1% Homogeneous Living Room Under Skip Sheet, West Calcite Fibrous Bedroom Under Flooring Vinyl/Plastic Green 182006 03. 9x9 Floor Tile(Green) Bottom Layer Chrysotile 7% Cellulose 1% Homogeneous Living Room Under Skip Sheet, West Calcite Fibrous Bedroom Under Flooring Vinyl/Plastic Green 182007 04. 9x9 lllack Floor Felt None D,!tectcd Cellulose 60% Homogeneous Living Room Under Skip Sheet. West Bitumen Fibrous Bedroom Under Flooring Black 182008 05. 9x9 Black Floor felt None D .:tccted Cellulose 60% Homogeneous Living Room Under Skip Sheet, West Bitumen Fibrous Bedroom Under Flooring Black 182009 06. Sheet Vinyl (White) Middle Layer None Detected Cellulose 5% Layered West Bedroom Fiberglass 5% Fibrous Calcite Beige Vinyl/Plastic 182010 07. Cove Base Material (Black) None Detected Cellulose 1% I fomogeneous Living room, Bathroom, Ea<;t Bedroom Calcite Non-Fibrous Vinyl/Plastic Gray 182011 08. l2xl2 Floor Tile (Wood Pattern) None Cetected Cellulose 1% Homogeneous Top Layer Calcite Non-Fibrous Bathroom Vinyl/Plastic Brown 182012 09. 12xl2 Floor Tile (Off White) None [ elected Cellulose 1% Homogeneous llottom Layer Calcite Non-Fibrous Bathroom Vinyl/Plastic Off White 182013 I 0. I 2x 12 Floor Tile None [•etected Cellulose 1% I fomogeneous (Brown Floral Pattern) Calcite Non-Fibrous Bottom Layer Kitchen, Under Skip Vinyl/Plastic Brown Sheet East Bedroom Black 182014 11. Drywall/ Joint Compound None lletected Cellulose 5% Layered Throughout Interior Paint Fibrous Calcite White Gypsum Vermiculite 182015 12. Drywall / Joint Compound None Iletected Cellulose 5% Layered Throughout Interior Paint Fibrous Calcite White Gypsum Vermiculite EnYironmental 5erwlces, Inc JMRJob# 1-1495 JMR Lab Number 1-1495-111915 Project: 2646 State Street Date Analyzed November 24, 2015 Carlsbad, CA 92008 Room Temperature 25"C Type of Total Other Sample Asbestos Percentage Materials Gross Number Sample ID Prese11t by Volume Present Appearance 182016 13. Drywall/ Joint Compound None O(,tected Cellulose 20% Homogeneous Throughout Interior Calcite Fibrous Gypsum Off White 182017 14. Drywall/ Joint Compound None Detected Cellulose 5% Layered Throughout Interior Fiberglass 2% Fibrous Paint White Calcite Gypsum 182018 15. Drywall I Joint Compound None D,-:tected Cellulose 5% Layered Throughout Interior Paint Fibrous Calcite White Gypsum 182019 16. 12xl2 Ceiling Tile None D.:tected Cellulose 90% Homogeneous Living Room Paint Fibrous Brown No Sample Transite Vent Pipe Assumed Asbestos Collected At Wall Heater Unit 182020 17. Window Putty None Detected Cellulose 1% Homogeneous Windows -Exterior Paint Non~Fibrous Calcite Tan Binder 182021 I 8. Window Putty None Detected Cellulose 1% Homogeneous Windows-Exterior Fiberglass 2% Non-Fibrous Paint Tan Calcite Binder 182022 19. Window Putty Chryso1ile 2% Cellulose 1% Homogeneous Windows~ Exterior Paint Fibrous Calcite Tan Binder 182023 20. Roof Core None [·etected Cellulose 10% Layered Roof Fiberglass 5% Fibrous Calcite Black Quartz Bitumen No Sample Roof Penetration Mastic Assum,1d Asbestos Collected Roof Environmental Sel'Ylces, Inc .. JMR EN\I\RONMENTAL SERVICES, INC JMR I.AB Jo# PAGE ( ~ OF :Y 4560 ALVARADO CANYON RD, STE #2D, SAN DIEGO CA 92120 TEL: 619.858.7260 FAX: 619.858.7264 l-l'-l~S -l l 19 l 5 ASBESTOS BULK CHAIN OF CUSTODY -FIELD USE CLIENT NAME CONTACT ADDRESS ~ f\ ( [ C C>G ~ 0 ~ \"l lo J\ 5 ~.n<-- CITY, STATE & ZIP JMRJOB# 2 61.{~ S}~ ,S-ttv-..-t PROJECT LOCATION: (' Dfi_noJ. (A 91.t:>D~ } SERVICE {PLEASE CHECK ONE): }(SURVEY '.J CLEARANCE ::i INVESTIGATION o SAMPLE COLLECTION o OTHER *SPECIFY IN COMMENTS REPORTDUEDATE : -----------,------- LABNERBAL TURNAROUND TIME: □ RUSH □ NEXT DAY o 2 DAYS ~ DAYS o 4 DAYS JMR LAB# SAMPLE# MATERIAL SAMPLED LOCATION RESULT i 1.. ,C l't. t\1;,,-r-\'.~~ c_ 'S-tol\ l. ~--~ v---t.-,' P...-1.n . . -. ··-b ()(:)~ 0 0 ~ lb l 0 ·z. --l 0~ uG i:>( l~ ,.:lq_,\&~) ~ l1x:~ o\i>t.-~ ~---~ ~\-\ ~ RELINQUIS~ED B_Y~~v:v-, yv v .< >IV:--: \ DATE: \ \ I.. "t ") ~--·-· I I ,--.. ,-... RECEIVED BY: t,,,. >::::: \ bN:: cc , tvt:'. IN"__, , DA TE: \ \ ~ t' ~ U> 1 -s-TIME: 1 l--1 .:s:::: ~ REVISED 7/2015 7-/ C -, I -I. _j_j_ { ..,r1 #.Ji') I-. Nu ~~ ~~~""'-M) N, ND ,... ~A~'-" . ~,.;..,...r .,~t ~"'-.\-~o..:~ ~ ·-W5> COMMENTS: P,a. ~\"t:5 ±~ ~" PAYMENT METHOD: _______ _ AMOUNT: ------- REPORT DUE DATE: -------------------- l;_k\\ JMR ENVIRONMENTAL SERVICES, INC JMR LASio# PAGE Li:JF 3 4560 ALVARADO CANYON RD, STE #2D, SAN DIEGO CA 92120 TEL: 619.858.7260 FAX: 619.858.7264 ASBESTOS BULK CHAIN OF CUSTODY -FIELD USE CLIENT NAME CONTACT ADDRESS CITY, STATE & ZIP JMR JOB# PROJECT LOCATION: SERVICE (PLEASE CHECK ONE): o SURVEY o CLEARANCE c INVESTIGATION o SAMPLE COLLECTION o OTHER *SPECIFY IN COMMENTS REPORT DUE DATE : ----------~---- LABNERBAL TURNAROUND TIME: □ RUSH □ NEXT DAY □2 DAYS o 3 DAYS o 4 DAYS JMRLAB# SAMPLE# MATERIAL SAMPLED LOCATION RESULT ('e>20lY . t\ T ~"' \-.. ,_;\ -r. I\: ;t:,r--Ni) -t)t) N\) -. o I b l ~ I -· !.Xl1.. u,_; U .M.. --NSc... " e\ Ii!.,, ~"-\ t~\"'-1 \.) ":-~ ~s \,..>: "c\.""""" ~ -E ><\v, t> ,_ - RELINQUISHED BY: _____________ _ COMMENTS: _____________________ _ DATE ________ TIME: _______ _ RECEIVED BY: ----------------PAYMENT METHOD: _______ _ AMOUNT: -------0 ATE: ________ TIME: _______ _ REPORT DUE DATE: __________________ _ •. REVISED 7/2015 .. JMR ENVIRONMENTAL SERVICES, INC JMR LAB ICY# PAGE20 F 3 4560 ALVARADO CANYON RD, STE #2D, SAN DIEGO CA 92120 TEL: 619.858.7260 FAX: 619.858.7264 ASBESTOS BULK CHAIN OF CUSTODY -FIELD USE CLIENT NAME CONTACT ADDRESS CllY, STATE &ZIP JMRJOB# PROJECT LOCATION: SERVICE (PLEASE CHECK ONE): o SURVEY o CLEARANCE o INVESTIGATION o SAMPLE COLLECTION o OTHER *SPECIFY IN COMMENTS REPORTDUEDATE : _________ --.-___ _ LABNERBAL TURNAROUND TIME: □ RUSH o NEXT DAY o 2 DAYS o 3 DAYS o 4 DAYS JMR LAB# SAMPLE# MATERIAL SAMPLED LOCATION RESULT {'61-~2-3 1-:c (l..~~ ~rlL (2..~~ ND ~'S (_ ~~~~ ~Q..~ ra.--r.~"' t"'~=,\ ~ ~ RELINQUISHED BY: COMMENTS: DATE: TIME: RECEIVED BY: PAYMENT METHOD: AMOUNT: DATE: --TIME: REPORT DUE DATE: REVISED 7/2015 LEAD PAINT INVESTIGATION CONDUCTED AT 2646 State Street Carlsbad CA 92008 JMR JOB# 1-1495 Issued to: ENEcon Renovations 5839 Mission Gorge Rd. San Diego, CA 92120 November 31, 2015 MAYO 5 2020 ~ Envlronmenlal Service•, Inc. '-~' V f . November 30, 2015 EA/Econ Renovations 5839 Mission Gorge Rd. San Diego, CA 92120 RE: 2646 State Street., Carlsbad CA 92008 PROJECT: Lead Paint Investigation EA/Econ Renovations, An investigation to identify the presence of lead-based paint (LBP) was performed by JMR Environmental Services Inc. (JMR) at 2646 State Street., Carlsbad CA 92008, on November 19, 2015. JMR's survey included a thorough inspection of the subject house. Every room in the house was tested, including the exteriors of structure. The purpose of this survey was to determine the presence and assess the co111dition of LBP on fixed and painted surfaces. Many building components at this site appeared to be homogeneous. The buildings located on these properties are currently scheduled for demolition. Equipment used to perform the survey was a Niten XLp 300 Analyzer. This report includes XRF results, paint chip results, and a site map. Also attached are a summary of Cal/OSHA's Lead in Construction Standard Title 8, CCR Section 1532.1 and a copy of the California Department of Public Health (CDPH) Inspector's Certification. Lead Standards Several government agencies have definitions for what amount of lead constitutes paint to be considered "lead-based." The Department of Housing and Urban Development (HUD) has designated the amount to be 1.0 mg/cm2, via XRF, or 5,000 ppm, via Atomic Absorption Spectrometry (AAS). The HUD regulations are related to potential hazards in the home environment and not to construction activities. CDPH has created lead-related regulations that have been adopted into Title 17 of the California Code of Regulations. These regulations also define LBP as surface coatings containing lead concentrations of 1.0 mg/cm2, via XRF, or 5,000 ppm, via AAS. The CDPH regulations apply only to lead hazard abatement activities. 4560 Alvarado Canyon Rd .. Suite 2D, San '.liego, CA 92120 Tel. (619) 858-7260 Fax: (619) 858-7264 __ rl. The Consumer Product Safety Commission (CPSC) has defined lead-based paint as surface coatings containing lead concentrations greater than 90 ppm, via AAS. In 1978, the CPSC banned the sale of lead-based paint to consumers and the use of lead-based paint in residences and public buildings. The California Department of Occupational Safety and Health (Cal/OSHA) Lead in Construction Standard (Title 8, CCR Section 1532.1) requires contractors to protect their workers when there is a potential for lead exposure due to the construction activities. Currently, Cal/OSHA has no lead concentration listed where contractors are exempt from Title 8, CCR Section 1532.1. Test Procedures Representative fixed, painted, surfaces were tested using the Niten Xlp 300 Analyzer. Results greater than 0.5 mg/cm2 are considered to be positive for lead. Paint chip samples are collected from representative components when XRF results are inconclusive. Paint chip samples are also collected from damaged paint with negative XRF results. Paint chip samples are then analyzed in a laboratory using Atomic Absorption Spectrometry (AAS). A total of zero paint chip sample(s) were collected during this investigation. Sites are surveyed using the clockwise theory. When using this theory the inspector must first identify the main entry point of the unit, enter at that location, sample that room first, and then sample all remaining rooms in a clockwise rotation. The wall numbers are also identified using the clockwise theory. Walls are numbered in the following manner. When an inspector is standing in the entry way to a room, that entry wall is wall #A; the wall immediately to the inspector's left is wall #B; the wall opposite the inspector is wall #C; and the wall to the inspector's right is wall #D. XRF assays were performed using the "unlimited" mode. At this setting the XRF continues to assay the substrate until is has determined the painted surface to be either positive or negative with a confidence level of 95%. XRF assay results are given on the following pages. Positive assay results are shaded. Discussion In this summary the tested surfaces are grouped into one of three ranges of lead content. The purpose of this is to categorize the surface lead content as relatively high, mid-ranged, or relatively low. This will help in complying with the Cal/OSHA lead standard as explained later. Furthermore, this categorization identifies which surface coatings HUD, CDPH, and CPSC consider "lead-based." lead Paint Investigation 2646 State St., Carlsbad CA 92008 Based on XRF and laboratory results, the following surfaces are considered to contain lead concentrations in excess of 0.05 mg/cm2 or 1,000 ppm. • Interior -wood sills and window components. interior door jambs • Kitchen -walls. ceiling. baseboards. ceramic countertop tile. wood cabinetry • West bedroom -all walls and ceiling • Exterior -walls. wood sills and window components. door jambs. columns, fascia and eaves A visual inspection determined several paints to be in "fair" or "poor" condition, including but not necessarily limited to the following: • Exterior eaves • Loose and peeling paints must be removed and remaining paint stabilized prior to building demolition. Please note that although some of the tested paints did not exceed the HUD/CDPH definition of LBP, all site paints should be considered having a lead content requiring dust controls and personal protection during building demolition or renovation, in compliance with Title 8, CCR Section 1532.1. This is further explained in the following section. Cal/OSHA Compliance Recommendations Title 8, CCR Section 1532.1 requirements apply to all construction activities where lead is disturbed and a potential for employee exposure exists. Since common lead analysis methods have a minimum detection limit, a painted surface cannot be shown by practical means to be completely lead-free. In effect, Cal/OSHA's requirements apply to all paint that is disturbed by an employee. Newer paints often contain small amounts of lead (up to 90 ppm is allowed) due to contamination during the manufacturing process. When any amount of lead is disturbed an employee initial exposure assessment must be performed. If an employer has exposure data (air sample results) from similar workplace operations and conditions within the past 12 months then this data can be utilized. If employee exposure data from similar workplace operations are not available, then initial air monitoring is required. Several provisions are required during the initial air monitoring including respiratory protection, protective clothing, change areas with storage facilities, hand washing facilities, biological monitoring, and various types of training (see the included summary of Title 8, CCR Section 1532.1 ). We recommend initial air monitoring begin in areas where painted surfaces have higher Lead Paint Investigation 2646 State St., Carlsbad CA 92008 lead concentrations so that the results, if favorable, can apply to other painted surfaces with similar or lower lead concentrations (if the work practices are similar). Favorable results would be those that are below the a¢tion level of 30 micrograms per cubic meter of air (µg/m3). Inspection Limitations This investigation was planned, develop¢d, and implemented based on previous experience in performing LBP investigatiC1>ns. This inspection was patterned after Chapter 7 of the HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (1997 Revision). JMR utilized state of the art practices and techniques in accordance with regulatory standards while performing this investigation. Evaluation of the relative risk of exposure to lead identified during this investigation is based on conditions observed at the time of the investigation. JMR cannot be responsible for changing conditions that may alter the relative exposure risk or for future changes in accepted methodology. JMR Environmental Services Inc. appreciates the opportunity to provide these services. Sincerely, ~A \fuw-i/\ David Weaver, Project Manage\. JMR Environmental Services Inc CDPH Certification # 15363 Lead Paint Investigation 2646 State St., cartsbad CA 92008 Appendices: XRF Results XRF Calibration fom, Site Plan Summary of Title 8, CCR Section 1532.1 CDPH Inspector's Certification Lead Paint Investigation 2646 State St., Carlsbad CA 92008 XRF RESULTS Lead Paint lm,estigation 2646 State St., Carlsbad CA 92008 Customer: EA/Econ Renovations JMR Environmental Services, Inc. Project: 2646 State Street 4560 Alvarado Canyon Rd, Ste 20 Carlsbad, CA 92008 San Otego, CA 92120 --------~-----5UIISTl!A~ ... ~ ll/19/201511:31 SHU'IT£R_CAL S8.09 cps final 38S.24 6.35 0 1.05 0 0 0 11/19/2015 ll:32 CALIBRATION 3S mg/ cm •2 final Positive l 1 0.1 1 0.1 < LOO 0.43 3 11/19/2015 ll:33 CALIBRATION 3S mg/ cm •2 final Positive 1 1 0.1 1 0.1 < LOO 0.43 4 11/19/201511:33 CALIBRATION 35 mg/cm•2 Final Positive 1 1 0.1 1 0.1 <LOO 0.42 5 11/19/201511:34 PAINT 3.69 mgf an•2 final LIVING ROOM A ENTRY DOOR WOOD INTACT Neaative 1 05 0.2 o.s 0.2 <LOO 1.12 6 11/19/201S 11:34 PAINT 2.1 mg/ cm •2 Final LIVING ROOM A ENTRY DOORJAMB WOOD INTACT Negative 1 < LOO 0.03 < LOO 0.03 < LOO 1.9 7 ll/19/201511:35 PAINT 2.62 mg/ cm •2 Final LIVING ROOM A WALL WOOD INTACT Negative 1 < LOO 0.24 < LOO 0.24 < LOO 8 11/19/201511:35 PAINT 2.1 mg/ cm •2 final LIVING ROOM A WINDOW COMPONENT WOOD INTACT 9 11/19/201511:35 PAINT 4.74 mg/cm•2 Final ~"?:;'.t. · · ~~ .· -~ --:--INT.I\Cf 10 11/19/201S11:36 PAINT 4.19 mg/cm•2 Fina! ~...;_.8 ~~ _!lfACI'. 11 11/19/2015 11:36 PAINT 7.36 mg/ cm •2 Final LIVING ROOM B WALL WOOD INTACT Negative l 0.5 0.2 0.5 0.2 < LOO 1.05 12 11/19/201511:36 PAINT 7.89 mg/cm•2 Final LIVING ROOM C WALL DRYWALL INTACT NegatJVe 1 <LOO 0.03 <LOO 0.03 <LOO 0.79 14 11/19/201511:37 PAINT 3.15 mg/ cm •2 Final LIVING ROOM D DOORJAMB DRYWALL INTACT Negative 1 < LOO 0.03 < LOO 0.03 < LOO 2.01 1S 11/19/201511:38 PAINT 6.29 mg/ cm •2 Final KITCHEN A WALL DRYWALL INTACT Negative 1 < LOO 0.03 < LOO 17 11/19/2015 11:38 PAINT 4.72 mg/ cm •2 final KITCHEN B WALl _.,.....__,..,.,,=-_DRYWALL INTACT 18 11/19/2015 11:39 PAINT 3.1S ms/ cm •2 Final ~ c :., • c~ WIM!iaii~--wqQI) -INTACJ 19 11/19/201511:39 PAINT 10.57 ms/cm•2 Final ~-·---~:.,,--,' t -, . \Nkl.-_---u ;:,.-~,·-;;;._:_,_,;_, ':•~---__ ·---.«:r 20 11/19/201S11:40 PAINT 8.4 mg/cm•2 final ~-__ ,, ·'c · •" .. < -~X. .. : --~-IN1llCJ 21 11/19/201S11:40 PAINT 3.14 mgf cm•2 Final ~/, ; C. CBUNii. __ -_ .,,,~ -Dll'MAU. INTACT 22 11/19/2015 11:41 PAINT 11.04 m11 / cm •2 Final ~~~~-, •• --: ~~•i~,,7 ... :~· •11tfACr :-,q-f-· 1'."fflM' .. ,:;1.,,-•• r . :i.r.:-,~ 23 11/19/201S 11:41 PAINT 3.68 m11 / cm •2 final ~-_ _ · ' 1110._ · JlOOIIIAMi;; :·' · -· __ :zl ._ WQOI) 8ffACT ~ j ~. 1 1 24 11/19/201511:42 PAINT 4.74 mg/ cm •2 final ~ .-0 ... tA8INErllY -. . • ' . WOOi)" INTACT --~ fliaSlllwt --r . , J 1.1 2S 11/19/201S11:42 PAINT 1.58 mg/cm•2 final ... · _,{' <-~,,; -,:; ,~ ... ~ 26 11/19/201511:44 PAINT 6.85 ms/ cm •2 final EAST BEDROOM D DOORJAMB WOOD INTACT Negative 1 0.6 0.2 0.6 0.2 < LOO 1.05 27 11/19/2015 11:44 PAINT 5.2B m11 / cm •2 final EAST BEDROOM A DOORJAMB WOOD INTACT Negative 1 0.7 0.2 0.7 0.2 < LOO 1.05 28 11/19/2015 11:44 PAINT 2.09 mg/ cm •2 Final EAST BEDROOM A WALL WOOD INTACT Negative 1 < LOO 0.03 < LOO 0.03 < LOO 2.97 29 11/19/2015 11:44 PAINT 3.14 me/ cm •2 final EAST BEDROOM A WALL DRYWALL INTACT Negative 1 < LOO 0.14 < LOO 0.14 < LOO 2.24 30 11/19/201S11:45 PAINT 6.84 mg/cm•2 final EAST BEDROOM A WAU DRYWALL INTACT Negative l <LOO 0.97 <LOO 0.3 <LOO 0.97 31 ll/19/201511:45 PAINT 3.16 mg/cm•2 Final EAST8EOROOM 8 WAU ORYWALl INTACT Negative l <LOO 0.44 <LOO 0.44 <LOO 1.43 32 11/19/2015 11:45 PAINT ------:Z.l mg/ cm "2 Ftnal E1ur8EDROOM""----s----Att WOOD--llffAEJ--Negative--1--<l00---0.83 < l-09 0.0~-lOO-~-- 33 ll/19/201511:45 PAINT 2.1 mg/cm•2 final EASTBEDROOM B WINDOWCOMPONENT WOOD INTACT Neaative 1 <LOO 0.34 <LOO 0.34 <LOO 2 34 11/19/2015 11:46 PAINT 2.12 ms/ an •2 final EAST BEDROOM C ENTRY DOORJAMB WOOD INTACT Neaative 1 < LOO 0.03 < LOO 0.03 < LOO 1.83 35 11/19/2015 11:46 PAINT 2.09 mg/ cm •2 Final EAST BEDROOM C ENTRY DOORJAMB WOOD INTACT Negative l < LOO 0.03 < LOO 0.03 < LOO 2.33 36 11/19/201511:46 PAINT 2.1 m11/ cm •2 final EAST BEDROOM C WALl WOOD INTACT Negative 1 < LOO 0.18 < LOO 0.18 < LOO 2.62 37 11/19/201S 11:46 PAINT 2.1 me/cm•2 Final EAST BEDROOM D WAU WOOD INTACT Neaative 1 <LOO 0.16 <LOO 0.16 <LOO 2.71 38 11/19/201511:47 PAINT 2.1 me/ cm •2 Final EAST BEDROOM D WINDOW COMPONENT WOOD INTACT Negative 1 < LOO 0.21 < LOO 0.21 < LOO 1.97 39 11/19/201511:47 PAINT 3.14 mg/cm•2 final EASTBEDROOM D CEILING WOOD INTACT Negative l <LOO 0.29 <LOO 0.29 <LOO 1.21 40 11/19/201511:48 PAINT 3.67 mg/cm•2 Final BATHROOM A WAU Dil.WAU lliTACT NO!iotl\ie 1 <lOO C.03 <LOO 0.03 <tOO 1.22 41 ll/19/201511:48 PAINT S.77 mg/ cm •2 Final BATHROOM B WAU DRYWALL INTACT 42 11/19/201511:48 PAINT 3.66 mg/cm•2 final ~~ C "'~CQMPONENT "WOOi)-INTACT ---:;: .,,..-P!:ioiti,.. ---:cu --o:a_ Q_ -o..a-< 43 11/19/201511:49PAINT 6.32mg/cm•2 Final BATHROOM c WAU ==~--DRYWALL INTACT • Nega~e -l<LOD -0.03<LOD o.o;";wo 0.84 44 11/19/2015 11:49 PAINT 3.69 mg / cm •2 final BATHROOM D WAU DRYWALL INTACT Negative 1 < LOO 0.03 < LOO 0.03 < LOO 1.19 45 11/19/201511:SO PAINT 2.11 mg/cm•2 final BATHROOM D CEILING DRYWALL INTACT Negative 1 <LOO 0.03 <LOO 0.03 <LOO 2.22 46 11/19/2015 11:51 PAINT 2.65 ms/ cm •2 final WEST BEDROOM A OOORJAMB WOOD INTACT Negative 47 ll/19/201511:51 PAINT 6.82 mg/cm•2 final ~~---,J' -~-:-. --~•.tt>-~"'iiri'AO"" ·'ff. "~ 48 ll/19/201511:52 PAINT 4.73 mg/cm •2 Final tw.r;$(1IEDIIOOM 1-.-~ --_ OIMNAU 11(1:ACT -~~ Poilllff 49 11/19/2015 11:S2 PAINT 6.28 me/ cm •2 Final I~ c:_ .jfrp;.. -------D.!'W'.2!!-19'~ f Pmllill'L 51 11/19/201511:S3 PAINT 5.8 mg / cm •2 final WEST BEDROOM D WINDOW COMPONENT WOOD INTACT Negative 1 0.7 0.2 0.7 0.2 < LOO 0.9 52 11/19/2015 11:54 PAINT 2.12 mg / cm •2 final WEST BEDROOM D BASEBOARD WOOD INTACT Neaative l < LOO 0.11 < LOO 0.11 < LOO 2.28 53 11/19/201511:54 PAINT 4.77 mg/cm•2 final ~"1)'-",;;"':-WAU-_-=-" -~~ INTACh· T -~ 55 11/19/2015 11:55 PAINT 2.1 m& / cm •2 final EXTERIOR A ENTRY DOOR WOOD INTACT Neaative 1 < LOO 0.1 < LOO 56 11/19/201511:56 PAINT 2.1 mg/cm•2 final EXTERIOR A ENTRYDOORJAMB WOOD INTACT Negative l <LOO 0.03 <LOO 57 11/19/201511:56 PAINT 3.71 mg/cm •2 final ~-....... -DOOIUAMil-.-.. WOOD. INTACT ~·-Positive"' -;-:-t"u -'O~U S8 11/19/2015 11:57 PAINT 4.73 ms/ cm •2 Final ~ IC _EAylS . _ ~ W000 _ INTACT ,.:;_;_: l'OsitM!_ :__~ ~ l _ ~ 59 11/19/201S 11:57 PAINT 3.16 mg/ cm •2 Final EXTERIOR A HANDRAIL WOOD INTACT Negative 1 < LOO 0.11 < LOO 0.11 < LOO 1.77 60 11/19/201511:57 PAINT 3.16 mg/ cm •2 Final :UiRIOR ~ A . ~i ·,-&:.;':.. WOQQ_ _:-1N,l'ACT'~. ::;-----~ -71 L 21 ·-5} _::"4_ "i,L -it:_ S.Is Customer: EA/Econ Renovations JMR Environmental Sefvices, Inc. 4560 Alvarado C.nyon Rd, Ste 2D Son Dioao, CA 92120 61 11/19/2015 11:58 PAINT 2.62 me/ an •2 Final --- 62 11/19/2015 11:58 PAINT 3.17 me/ an •2 final 63 11/19/2015 11:58 PAINT 4.22 me/an •2 Final 64 11/19/201511:59 PAINT 4.76 me/cm •2 Fonol 65 11/19/2015 U:00 PAINT 5.25 me/an•2 Finol 66 11/19/2015 12:00 PAINT 2.09 me/cm •2 Anal 67 11/19/201512:01 PAINT 4.72 me/an •2 Final 68 11/19/2015 12.-01 PAINT 3.17 mc/cm•2 Final 69 11/19/2015 12:02 PAINT 4.72 me/cm•2 Anal 71 11/19/2015 U:03 PAINT 3.16 me/ cm •2 Fu,al 72 11/19/2015 12:03 PAINT 21.52 me/ cm •2 Final 73 11/19/2015 U:06 SHUTTER_CAl 56.17 cps Fu,al 74 ll/19/201512:07 PAINT 19.91 me/cm •2 Final 76 11/19/2015 12:08 PAINT 19.97 me/ an •2 Fmal 78 11/19/2015 12:09 PAINT 20.04 me/ cm • 2 final 1 Positive l l.l 0.1 1.1 Positive l l 0.1 1 Positive l l 0.1 1 Project: 2646 State Street C.risbad, CA 92008 0 0.02 0 0.1 < LOO 056 0.1 < LOO 0.58 0.1 < LOO 0.55 Lead Paint Investigation 2646 State Sl. Carlsbad CA 92008 XRF CALIB TION FORM Inspector: Thomas Copich Date: November 23, 2015 JMR Job#: 1-1495 Device: NffON XLP300 Job Name: EA/Econ State St Pro·e t Job Address: 2646 State St.. Carlsba CA 92008 C l"b f Ch k T I U d -0 4 I / 2 & 0 2 a I ra 10n ec o erance se : . 1a,cm +. macm I 2 Use Level Ill (1.02 mg/ cm2) NIST SRM Pa nt film First Calibration Check Time: 1st 2nd Reading 3rd Reading st Average 1st Average -1.02 Reading mg/cm2 1.0 1.0 1.0 1.0 -0.04 Second Calibration Check Time: --------- 1st 2nd Reading 3rd Reading ~st Average 1st Average -1.02 Reading mg/cm2 1.0 1.0 1.0 ~.o -0.04 I Third Calibration Check {If Needed) Time: --------- 1st 2nd Reading 3rd Reading 1st Average 1st Average -1.02 ReadinQ I mg/cm2 •use the Test Mode Reading -Tolerance Values for EDAX/MAP-4: Minus Value = -0.4 mg/cm2 Positive Value = +0.2 mg/cm2 SITE PLAN Lead Paint Investigation 2646 State St., Carlsbad CA 92008 r ,( -· [ ~ .J ,c r ~ c' ' 0 1 (11 9 ~ J) ,f .., ~ SUMMARY OF CAUOSHA'S LEAD IN CONSTRUCTION STANDARD TITLE 8, CCR SECTION 1532.1 lead Paint Investigation 2646 State St., Carlsbad CA 92008 . . . State of California-Health and Human Services Agency catifomla Department of Public Health LEAD HAZARD EVALUATION REPORT Section 1 -Date of Lead Hazard Evaluatlon i. I -I q-LC (s Section 2 -Type of Lead Hazard Evaluation (Check one bo~ only) c;;r(ead Inspection O Risk assessment O Clearance Inspection D Other (specify) ___________ _ Section 3 -Structure Where Lead Hazard Evaluation Waa onducted Address [number, street, apartment (If appllcable)J City County Zip Code r...Jc ~ "2.J.}~\?:, Construction date (year) of structure 0 Multi-unit building ~gle family dwelling D Other (specify), _________ _ Section 4 -Owner of Structure (If business/agency, llat co tact person) Name Telephone number ~(~ t.-l Address [number, street, apartment (If appllcable)J City State Section S -Reau Its of Lead Hazard Evaluatlon (check all th t apply) 0 No lead-based paint detected. B(ead-bas~ paint detected. D No lead hazards detected. ~ad haz"rds detected. Section 6 -lndlvldual Conducting Lead Hazard Evaluation N~ I / !.___.h'-.1 ~ \.JJ~ Telephone number Address (number, street, apartment (If appllcable)] City State COPH certification number Section 7 -Attachments Zip Code Zip Code Date A. A foundation diagram or ske:~h of the structure Indicating the srcifc locations of each lead hazard or presence of lead-based paint; 0 B. Each testing method, device, and sampling procedure used; C. All data collected, Including quality control data, laboratory res~ts, including laboratory name, address, and phone number. First copy and attachments retained by Inspector Second copy and attachments retained by owner COPH 8552 (6,07) T~ird copy only (no attachments) mailed or faxed to: ifomla Oepanment of Public Health ldhood Lead Poiso:1!119 Prevennoo Branch Reports Marina Bay PiJlk~ay._ ~":!t~pg P, Th:r:.: Floer hmond, CA 94ff1JK°•6•103' i.,i.,. Fax: (510) 620-555f' ·,., • pDf• t , : :,.,:n :{:. n1tro t·', V' ,<•,•0.-,= ,•. j'', r·• ;!"' .. , 1 ff· : •li' :J'> ( i q ,,, .. :, "· ••, I , ) ' :: ,·"1,, •'(_ ' • r · } S v,.~ ~ .,.u w' ...,.;, ~ "•wF * •: ~ .. ,;: ~ ,,. AP-CD 10124 OLD GROVE ROAD SAN DIEGO, CA 92131 ____;;____ PHONE: (858) 586-2650 All l'GUlllll w llllmcl apcdcomp@sdcountv.ca,gov Cll■H If 111 DIHI APCD2019-ASB-000903 Submitted: Aug 07, 2019@ 5:19 PM NOTIFICATION: ASBESTOS REMOVAL, RENOVATION, AND DEMOLITION OPERATIONS Project Type: Demolition Facility Name: Facility Location: 2646 State Street. Carlsbad, CA 92008, (858) 334-9490 Facility Owner: 2646 Sea Glass LLC, 7822 Daggel Street, San Diego. CA 92111, (858) 337.9490 Renovation -Start Date: Wednesday, Aug 21, 2019 Demolition • Start Date: Thursday, Aug 22, 2019 End Date: Wednesday, Aug 21, 2019 End Date: Saturday, Aug 31, 2019 Regulated Asbestos Containing Material (RACM) Type Category Condition Removal Method Asbestos to be removed: HlA Asbestos Survey lnfonnatlon Amount Total RACM: • Asbestos Surveys are required prior to Renovation or Demolition. A copy of the survey must be maintained on site for the duration of the project. Survey not conducted because suspect materials presumed to contain asbestos (asbestos to be handled/disposed of per Rule 1206). Survey Conducted:~ Date Conducted: Dec 3 2015 Asbestos Present: ~ Survey Company: JMR Title: Certification: Certified Asbestos Consultant (CAC) Surveyor: David Weaver Certification Num: 15-5474 Certification Exp Date: Nov 1, 2019 Detection Procedures: fJ.M Asbestos Work Practices: Amended Water/ Critical Barriers/ HEPA Vacuum/ Negative Air Machines/ Water / hand tools Bulldlng Information Size Age Floors Units Prior Use Present Use 1400 30 House/Condo/Apartment House/Condo/Apartment Demolition Operation ACM Disturbed by Demolition: JiQ All RACM Previously Removed: JiQ RACM Remain in Building: JiQ Demolition with Category I Materials: ~ Category I / Category II Materials: Vinyl floor tile Window putty Supporting Structural Members Demolished: ~ Demolition with Category ii Materials: Yes Cement Pipe Roof penetrations Demolition Work Practices: Axes / Hammers I Shovels Contact Person: John Denton Demolition Contractor: JANUS CORPORATION Address: 1220 Keystone Way, Vista, CA 92081 Contingency Plan Phone: (760) 598-7374 Immediate demarcation of area. immediate bagging, HEPA vacuuming, wet piping, possible engineering controls/ Isolate Area/ Post Signs/ Secure Area / Stabilize I Stop Work I Survey APC294_ Oniine_Asbestos_Submission_Notilication v1 .0 (03/2019) Ct, LU MAY O 5 2020 Page 1 of2 . APCD 10124 OLD GROVE ROAD SAN DIEGO, CA 92131 _ ..,.._ PHONE: (858) 586-2650 i■ruuJiii CIIJii" 11111m apcdcomp@sdcounty.ca.gov COl■TY If Ill llfll Transport and Landfill Contacts Non-Asbestos Transporter: Business Name: JANUS CORPORATION Address: 1220 Keystone Way, Vista, CA 92081 Non-Asbestos Landfill: Business Name: South Yuma County Landfill Address: 19536 South Avenue 1 E, Yuma, AZ 85365 Completed By: Name: Maricela Lamas Afflllatlon: Janus Corporation Certifies all of the following: APCD2019-ASB-000903 Submitted: Aug 07, 2019@ 5:19 PM Phone: (760) 598-7374 Phone: (928) 341-9300 Dat8: Aug 7, 2019 1. An individual trained in accordance with District Rule 1206(1)(8) will be on site during asbestos removal; and, 2. Documentation that the required training has been completed and is current will be made available to the District upon request; and, 3. The information on this notification is complete and correct and I am accepting legal responsibility for the information on this form. Original notffications must be submitted to the District at least 1 O working days prior to removal or demolition. Revised notifications must be submitted prior to the original start date. The District must receive payment by close of business of the next working day after the effective date of the notification. The District considers submitted Notifications (original and revised) without the required fee(s) as stated in Rule 40(1)(2) to be considered invalid. Notffications shall expire within 365 days from the effective date. APC294_ Online_Asbestos_Submission_Notification v1 .0 (03/2019) Page 2 of 2 Rod Boone From: Sent: Maricela Lamas <maricelal@januscorp.com> Wednesday, January 29, 2020 9:43 AM To: Rod Boone; John Denton Subject: Attachments: RE: 2646 State St Project -Sea Glass Notification 10 day to start 2019.08.22.pdf Rod, APCD requires a 10 day notification when performing demo as well. If I am not mistaken, the City of Carlsbad is requiring you to provide the APCD demo notification for the final removal of the structure you mentioned. We submitted a notification for the porch and eve demo only, attached. We did not submit a notification for the asbestos removal because the asbestos was non-friable and it is not regulated by them. You will still need to provide the survey and let them know the non-friable asbestos was already removed when submitting the demo notification. Please let me know if you have any questions. Thank you, Maricela Lamas I Administrative Assistant JANUS CORPORATION I 1220 Keystone Way, Vista, CA 92081 P 760-598-7374 I F 760-598-8294 I Email maricelal@januscorp.com Building Trust in the Construction Industry for 30 Years. From: Rod Boone [mailto:rod@prophetsolutionsinc.com] Sent: Tuesday, January 28, 2020 8:19 PM To: John Denton <johnd@januscorp.com> Cc: Maricela Lamas <maricelal@januscorp.com> Subject: Re: 2646 State St Project -Sea Glass John, All I would need, I think, at this point, is IO day ACPD notification permit... you previously sent me everything else! Thanks, Rod Get Outlook for iOS 1 From: John Denton <johnd@januscorp.com> Sent: Tuesday, January 28, 2020 7:27:07 PM To: Rod Boone <rod@prophetsolutionsinc.com> Cc: Maricela Lamas <maricelal@januscorp.com> Subject: RE: 2646 State St Project -Sea Glass Rod, That's the key work "hazardous material "APCD only regulates Hazardous asbestos. We remove non -hazardous asbestos (Non Friable) and the all the lead was all removed. So you have nothing on site once you get a demo and APCD demo permit. We did get an APCD demo permit for porch and eve removal and give copy of asbestos report to them. We can furnish non friable waste manifest, lead waste manifest, 10 day APCD demo notification permit copy and testing results. John Denton I Branch Manager JANUS CORPORATION j 1220 Keystone Way, Vista, CA 92081 P 760-598-7374 I F 760-598-8294 I C 619-571-7703 I Email johnd@januscorp.com Building Trust in the Construction Industry for 30 Years. From: Rod Boone fmailto:rod@prophetsolutionsinc.com] Sent: Tuesday, January 28, 2020 4:53 PM To: John Denton <johnd@januscorp.com> Subject: 2646 State St Project -Sea Glass John, I now need to pull a demolition permit for the final removal of the structure left behind after the abatement work. The Demolition form B-9, from Carlsbad, requires "proof of application to County of San Diego Air Pollution Control District". Do you have anything that will satisfy this requirement? I have attached their form B-9 for reference. Rodney A. Boone Prophet Solutions, Inc. 5845 Avenida Encinas, Suite 138 Carlsbad, CA 92008 Cell: (858) 334-9490 Main: (760) 999-2146 rod@)prophetsolutionsinc.com ~PROPHET0 rz-, SOL UT I □ r'J 5~ 2 Company: H.M. Pitt Labs, Inc. 9590 Chesapeake Dr · Ste 5 · San Diego, CA 92123 Janus Corporation 1220 Keystone Way Vista, CA 92081 Job Site: 2646 Slate Street, Carlsbad, CA 92008 Lab Notes: Lab Number: 170180-238754 Tel: 619-474-8548 Fax. 858-412-3305 Date Entered: Analyzed By: Customer PO / Claim#: Contract Number: Data Sampled 08/23/2019 08/26/2019 Rafael Agu ii era Job#319228 Who Sampled Kenneth Trump GENERAL ANALYSIS Analysis Number: 170180-1 Date Received: 8/26/:2019 Customer Number: 01 Location: Analysis: Results: Comments: Clearance Wipe· 1 Sq. Ft.· Kitchen Floor Wipe Sample-Lead (NIOSH 9100-M, NIOSH 7082-M) 5.4 uglft2 Reporting Limit= 5.0 ug/ft2 -Unless otherwise specified, the samples were received in an acceptable condition and met all holding time and preservaHon. handling requirements. The laboratory does not correct for field or matrix blanks. -This rep:irt shall not be repr0duced, except in full, without the written approval of H.M. PITT LABS, INC. No use of this report for promofional or advertising purposes is permitted without the written approval of H.M. PITT LABS, INC. -All samples tested as submitted to the lab. H.M. PITT LABS, INC. does not assume responsibility for the accuracy of the lnFormation submitted with the samples unless done by an employoe of H.M. PITT LABS, INC. -All analytlcal batch data met quality control criteria unless otherwise noted. *H.M. Pitt Labs, Inc. is en EPA*reoognized NLLAP Laboratory accredited through AIHA~LAP, LLC ELLAP (Lab ID# 10167S). IIPPIIIIIIBllY:_~_~ __ s_._Qz(_· __ latlll: 18/2712811 LELAND S. PITT, Cl-I Page 1 of 1 @ . . .. £~:>'-'\--vi 7°'° ll,~ H.M. PITT LABS, INC. 9590 Chesapeake Drive Suite 5 San Diego, CA92123 619-474-8548 858-412-3305 Lead Chain of Custody Record !WO#: a(JJ'-/.S Lab #: \ T6 ( '-/, (j CUSTOMER INFORMATION PROJECT INFORMATION ANALYSIS REQUESTED BmTo: ~A6'>\J.S Sampled By: -----~ \~~ Dale: Condition Amount Metals Other AC<lress: I~ l l ,_N£fl~~ Location:..:,~ ~ ~ A---0: ~ 1 \Jr~A. G...b 9ao~1 ' ( '~1:,,._.,_ I.'<. '9.D Q.~ (}2..-.o-P-.. Phone: J (aQ-,5'Z1,f3-l 3 7, PO#: "' "' N Fax: -, (;-_50,fl,-,:,,_,-,~l~ µob/Claim #: ~ g ~ 'N ~ le ~ Sample# SAMP E DESCRIPTION Color ~ fr I'-~ Is CX) ~ l /'I, !EA.'i> .olA'c:£ I,~ I;>'£"-) ,.;,I-J/ ,-r() .. ..e:. I F l..pl!) r. y ' - Y.· ... "f.---""' '-··1 (/' i,,,---.._ I ./ REQUIRED nJRNAROUNO Relinquished by: I' ~A'~ '~..,f~•~.--~J ·-...,..1 Received by: ~J;,~1 ,q -Datemme: Date/Time: ,~,vo g -7,r,, l'1 ~SH* -Specify 4.1{ HL Rellnqulshed by: Receivadby: 01Day 020ay 03Day Date/Time: Oetefiime: Q40ay Other ~ronDMa: 10111no13 • Rush may require an extra charge II. !\I. PIIT LARS.l'-;C. s·1 \ I L\11 , I 01 l I.I. \R \ \f L Asbestos D Lead~ Client Work Order# Lab ID# Pro 'ect Location Other Date CAC/CSS Cert# Contractor MateriaJ Relq!)ved ,.W_..14-l-l.5_,__ _____ W_li_t-/_ )..,iio, l'J i::l _t: A ' I" CONTAINMENT CLEANLINESS: PASS FAIL ABATED SURFACES FREE OF VISIBLE, SUSPECT DEBRIS WALLS & FLoORS FREE OF SUSPECT DEBRIS ABATED SURFACES ENCAPSULATED WALLS & FLOORS ENCAPSULATED FINAL CLEARANCE SAMPLES: ALL PHASE CONTRAST MICROSCOPY SAMPLES EQUAL TO OR LESS THAN 0.01 FIBERs/CUBJC CENTIMETER AVERAGE OF TEM AIR SAMl>LES EQUAL TO OR LESS THAN 70 STRUCTURES PER SQUARt: MILLIMET.t:R FINAL LF..AD SOIL SAMPLE RESULTS BEWW TITl,E 17 CCR CHAPTER 8 CRIT.EIUA FINAL SURFAC); LEAD DUST SAMPLE RF.SUL TS BELOW TITLE 17 CCR, CHAPTER 8 CRITERIA VISUAL INSPECl'ION ONLY, NO SAMPLES CLEARANCE AIR SAMPLE RESULTS TYPE SAMPLE# ~ I y... ')(. PASS RF..SULT s .'{ IPiiPf m,~, /i'· (!_" INDUSTRIAL HYGIENEST SIGNATURE: ~ ~1,"',r FAJL TYPE SAMPLE# s ~s01L NIA v r-, NIA REsULT --- \10\'10 WIPE BATCH PREPARATION AND ANALYSIS LOG SHEET Batch# Q~J_t;;l(f ·-( * Elevated Reporting Limit due to sample dilution. Date: 8/U /1q !Run# Metals \"!CS:ztj A •• Elevated Reporting-Limit due to minimal amount of sample available for analysis. Prep Method: EPA 3050b-M AA Result Sample Final Final Results Pb mg/L Cd mg/L Cr mg/L Zn mg/L Weight Vol. Pb I Cd I Cr Zn Quality Control NIOSH 9100-M EPA 7130-M EPA 7190-M EPA 7950-M fo\ (mL) ug/112 I RL I uwfl' I RL \ ug/112 RL ug,1112 RL Method Preparation Blank (PB) ND 50 Blank Ghost Wipe Lot# 224D 020218 EXP 08/21 Lab Control Std (LCS) (mg/L) (. (l S"S" 0.250 50 ERA Metals in Soil Lot# D098-540 Lab Control Std (LCS) (mg/L] I I I I Matrix Blank Spike (MBS) (mg/LJ C-l-H,7 0.250 50 ERA Metals in Soil Lot# D096-540 Matrix Blank Spike Dup (MBSD) (j ,1-\?7 (mg/L) 0.250 50 ERA Metals in Soil Lot# D096-540 Reporting Limit Verification (RLV] 1.1-1C\<\ 1..m ih J,~ 100 0.500 mL lOOppm MBSD Lot# 190404-6 Pg. 95 (mg/L) / Analysis Date ofRLV LABNUMBER 1 70\~ ' a.~3i 10 5,1.\ S:c, •• I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 / 19 / 20 A ~ Re\lle'i0n: 3 01/02/13 Betc;h Preo1ration Sheet-Sr:iid AR Analvzed Bv: ' - H.M. Pitt Labs, lnc. 4901 Mor~na BoulevJlrd, Suite 203 San Diego, ( 'A 92 I 17 Analytical • Enviromnental • ItidustriaJ Hygiene • Chemistry Batch#: 0 'i'z-G(9 -I Lab#s: (70180 Run #: Metals ICf og.u, ft Matrix: Wipe Standard Lot#: 190404-2 pg 93 !CV Lot#: 190404-4 pg 94 Quality Control Report QC Source: L8b0r.11tory Control Standard (LCS), Matrix Blank Spike (MBS), & Matrix D!ilflk Spike Dupllca!e (MBSD) Analyte Pb Cd Cr fEPA 7420-M\ fEPA 7130-Ml fEPA 7190-Ml Method Blank /ma/Ll Reportina Limit /ma/L \ 0.5 0.1 0.2 LCS FLAA Result (ma/LI LCS Final Result /mn/1,n\ LCS Value I ma/Im\ 66 143 107 LCS Acceptable Ranae {mo/ko\ 52.8-79.2 106-151 83.5-120 Zn lEPA 79SO-Ml 0.2 254 194-286 LCS Source ERA Metats in Soil Cat #540 lot # D098-540 LCS % Recoverv LCS % Recoverv Limits 80-120 80-120 80-120 80-120 Matrix Blank Solke Ima/kn\ q7. i.t Matrix Blank Snike Dup {malkal qs-_y MBS % Recoverv q 1-0 MBSD % Recoverv iq ,2 MBS, MBSD % Recovery Limit 75-125 75~ 125 75-125 75-125 MBS, MBSD Soike Amt {ma/ka\ 107 318 277 256 MBS MBSDRPD ?., ,0 7 MBS, MBSD RPD Limit 12.46 25 25 25 Calculated Limits -LCS (% Recovervl 86 "·107.83 LCS results meet limits? (Ye;) No Yes No Yes No Yes No Calculated Limits -MBS (% Recoverv\ 85.91-117.73 MBS results meet limits? (YJ) No Yes No Yes No Yes No ~alculated Limits -MBSD 1% Recoverv\ 84.~-115.42 MBSD results meet limits? (ve0 No Yes No Yes No Yes No Pb Soil (NIOSH 9100) ND 0.5 Lo~('~ '2.17 210 167-238 Cat #540 Lot# D098-540 \(i'3.\L\ 80-120 -- Reviewed By: _______ _ Re\/lsior1; 9 12/05117 R, Eli.AP-Meta!s QC Repon for Wipe AA 4901 Morena Boulevard, Ste 203, San Diego, CA 92117 Phone: (619) 474-8548 Fax: (619) 474-6128 - - Company: Job Site: Lab Notes: H.M. Pitt Labs, Inc 9590 Chesapeake Dr· Ste 5 · San Diego, CA 92123 Janus Corporation 1220 Keystone Way Vista, CA 92081 2646 State Street, Carlsbad, CA 92008 Lab Number: 170180-238753 Tel: 619-474-8548 Fax: 858-412-3305 Date Entered: Analyzed By: Customer PO/ Claim#: Contract Number: Date Sampled 08/23/2019 08/26/2019 David Spurling Job #319228 Who Sampled Kenneth Trump EVALUATION: PHASE CONTRAST MICROSCOPY • NIOSH 7400 METHOD Analysis Number Customer Date PCM Number Sampled Sample Type 170180-2 01 06/23/19 Area Location/Person: Living Room/Bedroom Comments: 170180-3 02 06/23/19 Field Blank Location/Person: Field Blank Comments: 170180-4 03 06/23/19 Field Blank LocatiOn!Person: Field Blank Comments: 170180-5 LB 06/23/19 Lab Blank Location/Person: Lab Blank Comments: Start Time 8/23/19 12:45 Stop Time 6/23/1914:15 Fibers Per Flow Fibers Fields CC 15 2 100 <0.01 0 100 0 100 0 100 -All samples tested as submitted to the lab. H.M. PITT LABS, INC. does not assume responsibility for the accuracy of the information submitted with the samples unless done by an employee of H.M. PITT LABS, INC. -Any numerical value which calculates to be less than 0.01 should be viewed as <0.01 due to the inaccuracy of the NIOSH 7400 method at that range. -Comments such as "Overloaded", "Dirty", 'Wet Fitter", "Uneven Disbursement of Fibers•, or "Torn Filter" illustrate that the analyst found discrepencies or problems with the sample and results are not considered accurate. APPRIIIED BY: ad,f'-.c-P s. G:dc( DalBd: 18/:!ll/2111 LELAND S. PITT, Cli Page 1 of1 "' H.M.PITT LABS1 INC Phone (619)474-8548 Fax (858)412-3305 9590 Chesapeake Drive San Diego, CA 921Z3 Air S;,imQ!ing_B!!nchshe_et -ASBESTOS !WO# -;io,Js- LAB# 130 11012<1 Dalen/,,.,.,, /10. Abatement Company: Loca~r .. J.j/o ST, Company to be Billed AM vS ~.,._,_.,"'--'--'=-------- Sample# Sfi.rnple Type Location ~ Worker or Area Description Time ON JTime OF nme ON "'"imeOFI Pre Flow Post Flow Time Volume Fibers Fields I ~PE l,. V tfJ (,, ~0 rl.AA. j i<£t::,'f;J,r,¢,M ·1;2; '/5 J~!E ~o Ji'S"C 1.-) j CC) lank l:S-1-S-.,;,,__ 2 B CAJ' E ~I-E'.1 3" "R ~IIW~ I 0 {£2, CJllA~k\ ,3 Br.~ E 'I. t) t<}I ( Blank 'l B " A P E IA~ ~L ,vvi,/,.., (/ {. Q:; Blank B C A P E Blank BCAPE Blank BC APE Blank SCAPE Blank BC APE Blank B C A P E Blank SCAPE Blarl< SCAPE Blank BCAPE Blank SCAPE Blank Personals Work Activities Fibers/CC ' ,, I ,._,-~~-'-~ --------------------------------------------- Notes:--------------------------------------------------- B = Baseline 1 ~-! _ _.. ,-. / -) C: Clearance Sampled By: ' · '-•~ • •• :. I • ""'~~I .._) £ :2:J A A -Area ~lanm1JM o4.te / P :: Personal , 1 _,. / ..... ~ _,. __ ., ....... #If~--. • '; E = Excursion Analyzed By: · · , ' •--e-~.._.,.,.,.,f ...,..,, 1 yC~~• __ £Jr;?{! 1 Page \ of__,_ SM""'" ~lq Fl:w!t,iooO,,ta 10/2112003 IL '.\I. PITT L.Ut<., I\C, ~I ,\It'll '\I 01· CI t\R\\( I Asbestos Lead D Client Work Order# Lab ID# Pro· ect Location CONTAINMENT CLEANLINESS: ABATED SURFACES FREE OF VISJBLF, SUSPECT DEBRlS WALLS & FLOORS FREE OF SUSPECT DEBRIS ABATED SURFACES ENCAPSULATED WALLS & FLOORS ENCAPSULATED FINAL CLEARANCE SAMPLES: ALL PHASE CONTRAST MICROSCOPY SAMPLES EQUAL TO OR LESS THAN 0.01 FIBERS/CUBIC CENTIMETER AVERAGE OF TEM AIR SAMPLES EQUAL TO OR LESS THAN 70 STRUCTURES PER SQUARE MILLIMETEk FINAL Ll:AD SOJL SAMPLE RESULTS BEWW '!'ITLE 17 CCR: CHAPTER 8 CRITERIA FINAL SURFACE LEAD DUST SAMPLE RESULTS BELOW TITLE 17 CCR, CHAPTER 8 CRITERIA VISUAL INSJ>ECTJON ONLY, NO SAMPLES CLEARANCE AIR SAMPLE RESULTS ··rnF. SAMPLE# A I Contractor Material Removed /J !:,. ~ li'J'l-'h~ qi_ FKllO~:tJL..E. PASS FAIL NIA ')L )' v ~ PASS FAIL NIA :><, X: y X X RESULT TYPE SAMPLE# RESULT <,of .t:t-... TVPE LEGEND; /1, A= AIR INDUSTRIAL HYGU,:NEST SIGNATURE: . l le.:, _W s=smL ,.., /__ / DAfE:~15 ENVIROCHECK. Page 1 of 1 2211 West Orangewood Avenue Orange, CA 92868 Tel: (714) 937-0750 Fax: (714) 937-0755 www.envirocheck.com Toxicity Characteristic Leaching Procedure (TCLP) (800) 665-7586 Customer: Janus Corporation Job Location: 2646 State Street 1220 Keystone Way Carlsbad, CA 92081 Vista, CA 92081 Job Number: 319-228 Toxicity Characteristic Leaching Procedure (TCLP) Analysis for Lead (Pb) Original TCLP Sample Lab Reference Weight Result Date No. ID Lab ID (g) Location Material Description (mg/L) 8/23/2019 1 1419090024 1419080197 100.26 Exterior Lead 9.6 8/23/2019 2 1419090025 1419080198 100.02 Interior Kitchen Wall Lead 1.8 Date Received: 08/26/2019 Date Analvzed; 09/04/2019 Condition of Samples:Good LCS %Recovery: 104% DLCS %Recovery: 109% Matrix Spike %Recovery; 103.8% Duplicate Matrix Spike %Recovery: 106.7% Precision: 5.1% Report Date: 9/4/2019 ~t~----"" ::. ;-,~~:,.,,_L--/ :·· ·.,_(,,,": ") ,--...__.--- Analvst: QC Date: 9/4/2019 QC: Russell Chhith Julie Nguyen TCLP Regulatory Level for Lead (Pb) in Construction Debris by Atomic Absorption: Below Smg/L {Sppm) considered Non-RCRA Hazardous Waste. Equal to or above 5mg/L (Sppm) considered RCRA Hazardous Waste. Envirocheck, tnc. is accredited by the California Department of Public Health (CDPH) Environmental Laboratory Accreditation Program (ELAP), Cert No. 2723 (Fields of Testing 114 & 115) for the analysis of TCLP samples. Reporting Limit is 0.2ppm. Analysis is based on EPA SW- 846 methods 1311, 3050B, and 7000B_ Results relate only to items actually tested. Matrix and method blanks are not used to correct sample results. LCS = Laboratory Control Sample DLCS = Duplicate Laboratory Control Sample. RCRA = Resource Conservation and Recovery Act. Lead Report SF univ ver 2 3g Rec a,2112019 soqf A~ Sempra Energy utlllty~ Notice of Service Discontinuance PERMIT DEPARTMENT, CITY OR COUNTY OF: CARLSBAD SERVICE WILL BE DISCONTINUED TO: ADDRESS: 2646 STATE STREET CARLSBAD 92008 BY: (Date) January 15, 2020 ~ ELECTRIC METER NO. _0=-:5:...-1.:::03::..:1cc.1=-5 _____ _ ~ GAS METER NO. -=00=8'-'-12=8=2=2 _____ _ ALL SERVICE LINES WILL BE: REMOVED. THIS BUILDING CAN BE MOVED OR RAZED AFTER THE ABOVE DATE. PHONE: 760-476-5611 DATE: January 15, 2020 PM Forms: NoticeofServiceDiscontinuanca BLANK Revised: 6/20/06 DEMOLITION ASBESTOS CERTIFICATION ADDRESS: _ ___j2=,!e,!..:J.lL._.5,U=:........s!.!.:.....,.......l..!:4~,..{.!.a\!..:b:..:c.d::::.._+--=-:::....:____!...:::;=::~-.,..---- USE OF BUILDING TO BE DEMOLISHED: S~<'"IC-e SQUARE FEET 8ou r~ T RE PROPERTY OWNER: 2C.."1, C ADDRESS: fl '::A-. II I PHONE (_q'(Ct) G.FQ -S°!?B APPLICANT: t-o jl i-... t 5c, [ vTI , · ADDRESS: ~~r Av .. 1\04 &t\1114J tl.13r fu{5bo.d PHONE (7'-0) 'iq<f-2..1'-ll- ' , 'f z.uo e -------------------------------------·---------------------------------------------------------------· Section 19827.5 of California Health and Safety Code states in part: "A demolition permit shall not be issued by any city ... as to any building or other structure except upon receipt from the permit appllcant of a copy of each written asbestos notification regarding the building that has been required to be submitted to the United States Environmental Protection Agency or to a designated state agency, or both, pursuant to Part 61 of Title 40 of the Code of Federal Regulations, or the successor to that part. The permit may be Issued without the applicant submitting a copy of the written notification If the applicant declares that the notification is not applicable to the scheduled demolition project_" ---------------------------------------- As applicant for a demolltlon permit In the City of Carlsbad, I certify that; I have read the excerpt from Section 19827.5 of the Health and Safety Code provided above; the information I have provided on this form is true and correct; and I further certify the following: ()Q.. On the attached ___ pages are copies of all written asbestos notifications regarding the above referenced building that are required to be submitted to the United States Environmental Protection Agency or to Part 61 of Title 40 of the Code of Federal Regulatlons, or successor to that part. ( ) I declare that the written asbestos scheduled de'u:~.proJect. notification is not applicable to the App1Jl,,,e.si£L Date MAY O 5 2020 Rev. 11/12/18