HomeMy WebLinkAboutCDP 15-23; LANAKAI MAIN GATE; FINAL SOILS REPORT; 2022-04-12Report of Geotechnical Engineering Observations And Compaction Testing April 12, 2022
Lanikai Main Gate Project, 6550 Ponto Drive, Carlsbad, California Page 2
2. "Preliminary Pavement Section Design And Plan Review, Proposed Lanikai Main Gate
Improvement Project, 6550 Ponto Drive, Carlsbad, California", prepared by SMS
Geotechnical Solutions, Inc., dated September 28, 2021 .
II. SITE CONDITIONS
Site conditions at the project were found to be substantially the same as described in the referenced
Preliminary Pavement Section Design And Plan Review report (Reference 2).
The project portions of the property were generally underlain by at very shallow depths by Old
Paralic Deposits mantled by a thin section of natural to disturbed sandy to silty sand native ground.
III. LABORATORY TESTING
Pertaining maximum dry densities and optimum moisture contents for the representative onsite soils
and imported Class 2 base (ASTM D 1557) were determined by sampling and performing laboratory
Maximum Dry Density & Optimum Moisture content tests per ASTM Dl557. The asphalt
maximum densities were provided to us by the project contractor obtained from the respective
materials plant(s). Pertinent test results are summarized on the attached Laboratory Maximum Dry
Density & Optimum Moisture Content List, Figure 3.
IV. GROUND PREPARATION AND GRADING OPERATIONS
Prior to the remedial grading operations, any surface improvements and old pavings vegetation,
roots and tree stumps, concrete slab and old foundation, buried structures were removed and cleared
for the project areas, as appropriate. Upper surficial loose and compressible soil mantle within the
Approximate Limits of Compacted Fill/Paving Improvements area (see attached Approximate
Compaction Tests Location Maps, Figures 1 and 2) was then over-excavated and removed.
Removals were extended to the underlying Old Paralic Deposits, but not less 12 inches below rough
finish sub grade. All exposed bottom of removals and over-excavations were visually examined, and
probed to assure competent Old Paralic Deposits exposures suitable for receiving new fills.
Earth deposits generated from the onsite over-excavations and subgrade preparations consisted of
sandy to silty sand (SM/SP) materials ranging to very low expansion potential ( expansion index less
than 20 based on ASTM D4829 classification).
Site subgrade soils were properly processed, moisture conditioned to near optimum moisture levels,
manufactured into a uniform mixture, placed in thin (approximately 8 inches thick maximum)
horizontal lifts and mechanically compacted with a Skip Loader (Deerer 201 0L ), tandem roller
(MOMAG BW 138 AD & BW 90 AD) to at least 95% of the corresponding laboratory maximum
density per ASTM Dl 557. The Class 2 base materials were spread and compacted utilizing a Skip
Loader (Deerer 2010L), tandem roller (Volvo DD25B), a jumping jack, and a vibratory plate to at
Report of Geotechnical Engineering Observations And Compaction Testing April 12, 2022
Lanikai Main Gate Project, 6550 Ponto Drive, Carlsbad, California Page 3
least 95% of the corresponding laboratory maximum density per ASTM D1557. Water was
provided with a water hose.
The asphalt paving was spread and compacted to the minimum specified thickness per project
improvement plans with a tandem roller (CAT CB 24B), a jumping jack, and a vibratory plated to
at least 95% of the corresponding laboratory maximum.
Engineering observat.ion and compaction testing of the site work improvements and paving sections,
placed within the designated areas of the project property, were intermittently provided by this office
from May 25, 2021 through April 6, 2022. Approximate limits of the site work and paving
improvements, and field compaction test locations, as roughly established in the field by a hand
level and pacing/tap measure form staking provided by others, or relative to identifiable features
located at the site and noted on the project plans are shown on the enclosed Approximate
Compaction Tests Location Maps, Figures 1 and 2.
Field density tests establishing both the in-place dry densities and moisture contents were performed
in accordance with the ASTM D6938 (Nuclear Gauge) test methods, as the fill/pavement section
placement progressed. Test locations were placed to provide the best possible coverage. Areas of
low compaction, as indicated by the field density tests, were brought to the attention of the project
contractor. These areas were reworked by the contractor and retested. Field compaction test results
are tabulated on the enclosed Compaction Test Results, Figures 4 and 5. Engineering observations
and compaction test results indicated that the site work sub grade preparations and paving base and
asphalt sections within the approved areas (see Approximate Limits of Compacted Fill/Paving
Improvements on the enclosed Approximate Compaction Tests Location Map, Figures 1 and 2) were
properly placed and compacted to at least the minimum compaction levels at the tested locations,
where required and as specified.
Site work preparations and remedial paving subgrade grading were conducted in substantial
conformance with Chapter 18 (Soils and Foundations) and Appendix "J" (Grading) of the 2019
California Building Code (CBC), applicable codes, the Grading Ordinances for the city of Carlsbad
and current engineering standards, as appropriate. All observations and testing were conducted by
a representative from this office under direct supervision of the project geotechnical engineering.
V. CONCLUSIONS AND RECOMMENDATIONS
In our opinion, all site earthworks and paving operations were completed in substantial conformance
with the project soils report (see References), approved plans, city of Carlsbad grading ordinances,
applicable codes and current engineering standards, and are acceptable for their intended use.
VI. LIMITATIONS
Our description of the site works and paving improvement operations, as well as observations and
testing services described herein, are limited to the work intermittently performed by this office from
Laboratory Maximum Dry Density & Optimum Moisture Content List
(ASTM D1557)
PROJECT NO:
PROJECT NAME:
LOCATION:
REPORT DATED:
Test Results:
Soil Type (1):
Maximum Dry Density:
Optimum Moisture:
Soil Type (2):
Maximum Dry Density:
Optimum Moisture:
Maximum Dry Density:
Maximum Dry Density:
Maximum Dry Density:
FC-18-08-147
Lanikai Main Gate Improvement
Ponto Drive, Carlsbad
April 12, 2022
Brown to Red-Brown Silty Sand (Onsite)
134.4 PCF
8.5%
¾" Class 2 Recycled Base {Import)
120.5 PCF
11.3%
¾"Mix.Asphalt (Superior Ready Mix.)
148.0 PCF
¾"Mix.Asphalt (Vulcan)
150.l PCF
½"Mix.Asphalt (Vulcan)
149.0 PCF
FIGURE3
COMPACTION TEST RESULTS
PROJECT NO: FC-18-08-147
PROJECT NAME:
PROJECT LOCATION:
Lanikai Main Gate Improvement
Ponto Drive, Carlsbad
FIELD COMPACTION TEST RESULTS (ASTM D6938):
Approximate Approximate
Date Test Test Test
No. Location Elevation (MSL)
(ft)
05/25/2021 I Main Gate Parking Stall Finish Subgrade
05/25/2021 2 Main Gate Parking Stall Finish Subgrade
06/04/2021 3 Main Gate Area Finish Subgrade
06/04/2021 4 Main Gate Area Finish Subgrade
06/08/2021 5 Main Gate Area Finish Subgrade
06/08/2021 6 Main Gate Area Finish Subgrade
06/08/2021 7 Main Gate Area Finish Subgrade
09/14/2021 8 Main Gate Parking Stall Finish Base Grade
09/14/2021 9 Main Gate Parking Stall Finish Base Grade
09/14/2021 10 Main Gate Parking Stall Finish Base Grade
09/14/2021 11 Main Gate Parking Stall Finish Base Grade
09/15/2021 12 Main Gate Parking Stall ¾"Mix.AC
09/15/2021 13 Main Gate Parking Stall ¾"Mix.AC
09/15/2021 14 Main Gate Parking Stall ¾"Mix.AC
09/15/2021 15 Main Gate Parking Stall ¾"Mix.AC
09/15/2021 16 Main Gate Parking Stall ¾"Mix.AC
09/15/2021 17 Ponto Drive Resurfacing ¾"Mix.AC
09/15/2021 18 Ponto Drive Resurfacing ¾" Mix.AC
10/05/2021 19 Main Gate Area Finish Subgrade
Field Field
Moisture Dry Soil
(%) Density Type
(pct)
7.5 128.8 I
7.4 127.8 I
7.9 128.5 I
8.0 128.2 1
8.3 129.5 I
7.1 127.7 I
8.0 128.0 2
13.1 114.7 2
13.4 114.5 2
12.9 115.0 2
11.9 115.7 2
-143.1 -
-143.7 -
-141.0 -
-141.4 -
-142.1 -
-140.7 -
-141.2 -
7.4 127.7 I
SMSGeotechnical Solutions, Inc.
Max.
Dry
Density (pct)
134.4
134.4
134.4
134.4
134.4
134.4
134.4
120.5
120.5
120.5
120.5
148.0
148.0
148.0
148.0
148.0
148.0
148.0
134.4
Relative
Compaction Comments
(%)
96
95
96
95
96
95
95
95 Max. Density Per Contractor
95
95
96
97 Max. Density Per Contractor
97
95
96
96
95
95
95
FIGURE4
FIELD COMPACTION TEST RESULTS (ASTM D6938):
Approximate Approximate Field Field Max. Relative Test Test Dry Soil Date No. Test Elevation (MSL) Moisture Density Type Dry Compaction Comments
Location (ft) (%) (pct) Density (pct) (%)
10/05/2021 20 Main Gate Area Finish Subgrade 7.8 127.9 1 134.4 95
10/05/2021 21 Main Gate Area Finish Subgrade 8. 1 128.5 1 134.4 96
I 0/07/202 1 22 Main Gate Area Finish Subgrade 7.9 128.2 1 134.4 95
10/07/2021 23 Main Gate Area Finish Subgrade 7.6 127.7 1 134.4 95
10/13/2021 24 Main Gate Area, Spectrum Trench Finish Subgrade 8.8 128.0 1 134.4 95
10/13/2021 25 Main Gate Area ¾"Mix.AC -140.9 -148.0 95
10/13/2021 26 Main Gate Area ¾"Mix.AC -141.1 -148.0 95
10/13/2021 27 Main Gate Area Finish Base Grade 11.5 114.8 2 120.5 95
10/13/2021 28 Main Gate Area Finish Base Grade 12.4 114.5 2 120.5 95
10/13/2021 29 Main Gate Area ¾"Mix.AC -142.4 -148.0 96
I 0/13/2021 30 Main Gate Area ¾"Mix.AC -143.0 -148.0 97
10/13/2021 31 Main Gate Area ¾"Mix.AC -142.4 -148.0 96
01/10/2022 32 South Exit Gate Approach Finish Base Grade 10.4 114.5 2 120.5 95
01 /10/2022 33 South Exit Gate Approach Finish Base Grade 11.3 115.0 2 120.5 95
01/10/2022 34 South Exit Gate Approach ¾"Mix.AC -144.2 -150.1 96 Max. Density Per Contractor
01/10/2022 35 South Exit Gate Approach ¾"Mix.AC -143.8 -150.1 96
01/10/2022 36 South Exit Gate Approach ¾"Mix. AC -145.7 -150.1 97
04/06/2022 37 Ponto Drive Resurfacing ½"Mix.AC -144.6 -149.0 97 Max. Density Per Contractor
04/06/2022 38 Ponto Drive Resurfacing ½"Mix.AC -143.2 -149.0 96
04/06/2022 39 Ponto Drive Resurfacing ½"Mix. AC -142.9 -149.0 96
04/06/2022 40 Ponto Drive Resurfacing ½"Mix.AC -143.6 -149.0 96
04/06/2022 41 Ponto Drive Resurfacing ½"Mix.AC -144.7 -149.0 97
SMS Geotechnical Solutions, Inc.
FIGURE 5
SMS Geotechnical Solutions, Inc.
Consulting Geotechnical Engineers
FIELD REPORT
Phone: 760-602-7815
smsgeosol.inc@gmail.com
5931 Sea Lion Place
Suite 109
Carlsbad, CA 92010
Field Reports will be distributed to the parties listed below within 14 days. Reports of non-compliant conditions will be distributed Immediately.
Project Name: Core Capital Investments, Main Gate Improvement Date: 10-04-2021
Project#: FC-18-08-147 Time Arrived: 2:45 PM lime Departed: 3:15 PM
Project Location:. __ ....;.P...;;o..;..n..;..to~D..;..r·.:.• ...;;C_a_rl_sb_a_d ___ _ Time On-Site: 0.5 Hr. Travel Time: 0.5 Hr. ·--------Contractor:. ______________ _ Equipment Skip Loader/ Roller Total Time: 1.0 Hr. ----------
'Type of Inspection
GP# Jg. erm1
D Engineered Fill
Bid P ·u
Summary of observations & testing:
D Foundation
p t resen
g Subgrade
Jason
Arrived at 2:45 PM as directed.
Observed main entrance subgrade section. Probe testing found sugrade
to be in unyielding materials. Operation was not completed at the east
end side (Spectrum open trenches) and scheduled for tomorrow afternoon
to perform compaction testing.
□--------
Test Location
Continued on next paae? Yes/N£ Page of
The Work ~WAS □WAS NOT
IN ACCORDANCE WITH 11-iE REQUIREMENTS OF THE
APPROVED PL.ANS AND GEOTECHNICAL INVESTICATION
REPORT.
CC: Clfent: ___________ _
Project Architect ________ _
Structural Engineer: _______ _
Project Inspector: ________ _
Contractor: __________ _
White
~ ~ ~
Signature of Client Representative Engl" ..... -~ciah
Shawn Bahramian
Please Print Name / Trtle Print Name / Title
Yellow -Contractor
Registration # ____ 1c_c_#_9_2_4_4_6_12 ___ _
Pink -Building Official
Shawn Bahramian/ ICC # 9244612
MET
—————
Import
N/ A
Shawn Bahramian
1
2
3
4
95%
95%
95%
P
P
P
P
Core Capital Investments, Main Gate Imp.FC-18-08-147
Carlsbad
City of Carlsbad
J & S Asphalt
*Max density per J & S Superintendent
0.75 Hr.9:45 AM 12:45 PM 3.0 Hrs.
——-
Plant: Superior Ready Mix Concrete, Product Code: 10-232, Type III C2, Order#51710
Base Coarse Asphalt (3/4" Mix)148.0 PCF*
Roller/ Whacker/ Skip Loader/
Vibratory Plate
6550 Ponto Drive
Parking Stall AC
5
6
7
4"+/-—
—
—
—
3/4" Mix ACParking Stall
Parking Stall
Parking Stall
Parking Stall
Parking Stall
Ponto Dr. Resurfacing
Ponto Dr. Resurfacing
P
P
P
95%
95%
Arrived at 9:45 AM per scheduled by Jason. Observed AC placement for main gate visitor parking stall. A tack coat was applied for perimeter edges &
existing surfaces. Contractor placed the 3/4" mix asphalt in one 4-inch (+/-) lift. Average temperature of the asphalt at time of placement exceeded 280
degrees. Hot mix asphalt was spread using a skip loader, and mechanically compacted with tandem smooth-drum vibratory roller ( CAT CB24B) and
vibratory plate alongside the curbs. Performed in-place density testing (ASTM D6938) and results exceeded minimum 95% compaction requirements.
#1
#2
#3#4
#5
#6
#7
143.1 95%96.7%
143.7 97.1%
141.0 95.3%
141.4 95.5%
142.1 96.0%
140.7 95.1%
141.2 95.4%95%
—
—
—
J & S Asphalt
Approx. Compaction Test Location Map
Ponto Dr. AC Resurfacing
09-15-2021
Shawn Bahramian/ ICC # 9244612
MET
—————
Import
N/ A
Shawn Bahramian
1
2
3
4
Finish Base Grade
Finish Base Grade
Finish Base Grade
Finish Base Grade
2
2
2
2
95%
95%
95%
P
P
P
P
95%
Core Capital Investments, Main Gate Imp.09-14-2021 FC-18-08-147
Carlsbad
City of Carlsbad
J & S Asphalt
Roller/ Whacker/ Skip Loader
3/4" Class II Base (Recycled)11.3%120.5 PCF*
6"+/-
1:45 PM 0.75 Hr.3:00 PM 1.25 Hrs.
The class II base material was moisture-conditioned, mixed and placed. Compaction was met with whacker, vibratory plate and tandem smooth-drum
vibratory roller (VOLVO DD25B). Probe testing found base section to be in unyielding and dense materials.
Performed in-place density testing (ASTM D6938) and results exceeded minimum 95% compaction requirements.
*Max density per J & S SuperintendentPlant: Moodys El Corazon Recycling, Job # 200.766
Approx. Compaction Test Location
#1
#2
#3
#4
13.1%
13.4%
12.9%
11.9%115.7
114.5
115.0
114.7 95.2%
95.0%
95.4%
96.0%
J & S Asphalt
6550 Ponto Drive
Parking Stall Base Grade
Arrived at 1:45 PM per scheduled by Jason. Observed class II base placement for main gate visitor parking stall.
Parking Stall
Parking Stall
Parking Stall
Parking Stall
2
AC placement can be carried on as planned.