HomeMy WebLinkAboutPUD 2017-0008; SMAC 2021.03.16; FINAL SOILS REPORT; 2021-03-16FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE IMPROVEMENTS SMAC BUILDING CARLSBAD, CALIFORNIA PREPARED FOR MARCH 16, 2021 PROJECT NO. G2123-11-02 Sf Moving 1Coll Actuato,rs Project No. G2123-11-02 March 16, 2021 SMAC Corporation 5807 Van Allen Way Carlsbad, California 92008 Attention: Mr. Jim Sibold Subject: FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING SITE IMPROVEMENTS SMAC BUILDING CARLSBAD, CALIFORNIA References: 1. Final Report of Testing and Observation Services During Site Grading, SMAC Building, prepared by Geocon Incorporated, dated February 6, 2020 (Project No. G2123-11-02). 2. Grading Plans for SMAC, Lot 75 Van Allen Way, Carlsbad, California, prepared by KARN Engineering and Surveying, Inc., City of Carlsbad approval date November 20, 2019. Dear Mr. Sibold: In accordance with the request of Mr. Jason Edwards with Goods and Roberts, your general contractor, we provided compaction testing and observation services during the installation of site improvements at the subject project. We performed our services during site improvements during the period of February 12, 2020 through March 9, 2021. The scope of our services included: Performing in-place density tests on an “on-call” basis during minor grading operations and utility trench backfill operations including electrical trench, fire service, irrigation trench, joint trench, plumbing trench, storm drain, sewer main and water lateral. Performing in-place density tests during the preparation of subgrade for curb/gutter, sidewalk, and during the placement of aggregate base and asphalt concrete pavement. Providing geotechnical consultation services during improvement operations. Performing laboratory tests to aid in evaluating the compaction characteristics of soil conditions encountered and/or used for fill, including asphalt concrete and base materials. Preparing this final report of improvements. GEOCON INCORPORATED G E OT E CHN I CAL ■E NV I RONMENTA L ■ MA T ER I A L S 6960 Flanders Drive ■ Son Diego, California 92121-297 4 ■ Telephone 858.558.6900 ■ Fax 858.558.6159 Geocon Project No. G2123-11-02 - 2 - March 16, 2021 During the construction of site improvements, we observed compaction procedures and performed in- place density tests to evaluate the in-place dry density and moisture content of the fill materials. We performed in-place density tests using a nuclear density gauge in accordance with ASTM Test Procedures D 6983 and D 2950 for soil and asphalt concrete, respectively. Table I summarizes the results of the in-place density tests. We performed laboratory tests on soil and aggregate base samples in accordance with ASTM Test Procedures D 1557 (Maximum Dry Density and Optimum Moisture Content). We performed laboratory tests on asphalt concrete samples in accordance with ASTM Test Procedures D 2726 (Hveem Density), D 2041 (Theoretical Maximum Density), D 1560 (Stability), D 6307 (Asphalt Content) and C 136 (Sieve Analysis). Tables II through IV present the results of the laboratory testing. We tested a sample of asphalt concrete to check conformance with Standard Specifications for Public Works Construction (Greenbook). The results of the laboratory tests indicate the sample of asphalt concrete is in general conformance as presented in Tables III and IV. In general, the results of the in-place density tests indicate utility trench backfill, curb and gutter, and sidewalk subgrade materials possess a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. In-place density test results indicate that the driveway subgrade and aggregate base materials possess a dry density of at least 95 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. In-place density test results indicate that the asphalt concrete possesses a density 95 percent of the Hveem density. Based on observations and test results, we opine the construction of site improvements, which is the subject of this report has been performed in substantial conformance with the recommendations of the project geotechnical report. Additional improvement installation performed at the site should be accomplished in conjunction with our observation and testing services. This office should be notified at least 48 hours prior to commencing additional grading or backfill operations. Adequate drainage provisions are imperative. Under no circumstances should water be allowed to pond adjacent to improvements. Finish grades should be established so that drainage water is directed away from pavements, curb/gutters, and sidewalks to controlled drainage services. Irrigation of landscape areas adjacent to pavements should be monitored to provide just enough water to support plant life. Geocon Project No. G2123-11-02 - 3 - March 16, 2021 Should you have any questions regarding this correspondence, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED Michael C. Ertwine CEG 2659 John Hoobs CEG 1524 Shawn Foy Weedon GE 2714 MCE:JH:SFW:arm (e-mail) Addressee )lOL TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.AC 1 3/2/2021 N Parking Area 0 AC-1 147.2 142.1 97 95AC 2 3/2/2021 N Parking Area 0 AC-1 147.2 142.9 97 95AC 3 3/2/2021 N Parking Area 0 AC-1 147.2 141.3 96 95AC 4 3/2/2021 N Parking Area 0 AC-1 147.2 141.9 96 95AC 5 3/2/2021 SE Parking Area 0 AC-1 147.2 140.2 95 95AC 6 3/2/2021 SE Parking Area 0 AC-1 147.2 140.7 96 95AC 7 3/2/2021 SW Parking Area 0 AC-1 147.2 142.7 97 95AC 8 3/2/2021 SW Parking Area 0 AC-1 147.2 141.3 96 95AC 9 3/2/2021 SW Parking Area 0 AC-1 147.2 142.4 97 95AC 10 3/2/2021 SW Parking Area 0 AC-1 147.2 140.9 96 95AC 11 3/9/2021 Fire Service - Van Allen Way 0 AC-1 147.2 141.2 96 95AC 12 3/9/2021 Fire Service - Van Allen Way 0 AC-1 147.2 142.8 97 95AC 13 3/9/2021 Water Main - Van Allen Way 0 AC-1 147.2 141.6 96 95AC 14 3/9/2021 Water Main - Van Allen Way 0 AC-1 147.2 143.1 97 95Relative Compaction (%)Required Compaction (%)SMAC BuildingG2123-11-02Curve No.Max. Density (pcf)Field Density (pcf)Test No. Date (MM/DD/YY)LocationElev. or Depth (feet) TABLE I SUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.B 1 3/1/2021 NE drive entrance B 4 0 132.8 8.3 125.6 9.7 95 95B 2 3/1/2021 East of Building B 4 0 132.8 8.3 125.5 9.9 95 95B 3 3/1/2021 East of Building B 4 0 132.8 8.3 126.0 9.3 95 95B 4 3/1/2021 SE of Building (Parking Stalls) B 4 0 132.8 8.3 126.1 9.6 95 95B 5 3/1/2021 S of Building B 4 0 132.8 8.3 128.5 10.9 97 95B 6 3/1/2021 S of Building B 4 0 132.8 8.3 129.1 8.8 97 95B 7 3/1/2021 S of Building (Parking Stalls) B 4 0 132.8 8.3 126.6 8.6 95 95Required Relative Compaction (%)SMAC BuildingG2123-11-02Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE I SUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.CG 1 12/18/20 SW Driveway SG 2 0 118.7 13.5 107.5 14.6 91 90CG 2 12/18/20 W Parking Bay SG 2 0 118.7 13.5 108.8 13.9 92 90CG 3 12/18/20 W Driveway SG 2 0 118.7 13.5 107.4 14.5 90 90CG 4 12/18/20 W of Bldg SG 2 0 118.7 13.5 109.0 13.7 92 90CG 5 12/18/20 W of Bldg. Parking Bay SG 2 0 118.7 13.5 108.1 14.7 91 90CG 6 12/18/20 W Parking Bay (Ribbon Gutter) SG 2 0 118.7 13.5 112.9 13.7 9590CG 7 12/22/20 SW Parking Bay SG 2 0 118.7 13.5 107.3 14.0 90 90CG 8 02/16/21 SW of Bldg SG 2 0 118.7 13.5 109.1 12.1 92 90CG 9 02/16/21 NW of Bldg SG 2 0 118.7 13.5 110.4 12.7 93 90CG 10 02/16/21 W of Bldg SG 2 0 118.7 13.5 109.9 13.1 93 90CG 11 02/16/21 W of Bldg SG 2 0 118.7 13.5 110.1 13.9 93 90CG 12 02/16/21 SW of Bldg SG 2 0 118.7 13.5 112.9 12.1 95 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.ET 1 09/23/20 SW corner of Bldg 0 1 0 113.6 16.0 104.6 17.6 92 90ET 2 09/24/20 S of Bldg 0 2 0 118.7 13.5 111.3 15.5 94 90ET 3 09/24/20 S of Bldg 0 1 0 113.6 16.0 102.1 15.8 90 90ET 4 09/24/20 S of Bldg 0 1 0 113.6 16.0 105.2 15.5 93 90ET 5 09/25/20 S of Bldg, on FS 0 1 0 113.6 16.0 103.2 15.8 91 90ET 6 09/25/20 SE of Bldg 0 1 0 113.6 16.0 102.0 19.2 90 90ET 7 09/25/20 E of Bldg 0 1 0 113.6 16.0 102.7 19.8 90 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.FS 1 08/17/20 S. Side of Bldg East of Bay Door -1 1 0 113.6 16.0 102.6 18.8 90 90FS 2 08/17/20SE Corner Lateral for F.S. to bldg-1 1 0 113.6 16.0 103.8 16.8 91 90FS 3 08/17/20SE of Bldg-1 1 0 113.6 16.0 104.6 16.3 92 90FS 4 08/17/20SE of Bldg-1 1 0 113.6 16.0 102.8 19.1 90 90FS 5 08/17/20SE of Bldg, Backflow-1 1 0 113.6 16.0 106.0 16.8 93 90FS 6 08/17/20Lateral for Sevice to Bldg -1 1 0 113.6 16.0 103.3 17.1 91 90FS 7 08/17/20 Fire hydrant SW of Loading Dock-1 1 0 113.6 16.0 104.1 16.692 90FS 8 08/14/20SW Corner of Site-1 1 0 113.6 16.0 105.3 16.1 93 90FS 9 08/14/20SW Corner of Site0 1 0 113.6 16.0 106.1 16.4 93 90FS 10 12/09/20Van Allen Way-3 1 0 113.6 16.0 105.5 16.7 93 90FS 11 12/09/20Van Allen Way-1 1 0 113.6 16.0 102.3 17.3 90 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE I SUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.IT 1 12/23/20 SW Entrance 242 1 0 113.6 16.0 103.0 17.2 91 90IT 2 12/23/20 W Entrance 241 1 0 113.6 16.0 102.7 18.4 90 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.JT 1 09/18/20 South side of Bldg -1 1 0 113.6 16.0 105.4 18.0 93 90JT 2 09/18/20 South side of Bldg -1 1 0 113.6 16.0 102.0 17.8 90 90JT 3 09/18/20 South side of Bldg -1 1 0 113.6 16.0 102.8 17.1 90 90JT 4 09/21/20 SE of Bldg 0 1 0 113.6 16.0 105.0 17.0 92 90JT 5 09/21/20 SE of Bldg -2 1 0 113.6 16.0 104.5 18.1 92 90JT 6 09/21/20 S of Bldg 0 1 0 113.6 16.0 105.7 16.6 93 90JT 7 09/21/20 SW of Bldg, Telecom -2 1 0 113.6 16.0 106.0 19.4 93 90JT 8 09/21/20 SW of Bldg, ET -22 0 118.7 13.5 112.4 14.5 95 90JT 9 09/21/20 SW of Bldg, ET 0 10 113.6 16.0 105.2 18.4 93 90JT 10 09/29/20 Van Allen Way Vault -2 3 0 121.8 11.9 114.5 13.8 94 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.MG 1 12/18/20 SW Driveway 243 2 0 118.7 13.5 107.3 17.1 90 90MG 2 12/18/20 W Driveway 241 2 0 118.7 13.5 108.5 14.5 91 90MG 3 12/22/20 NE Basin Slope 238 1 0 113.6 16.0 103.7 18.9 91 90MG 4 12/23/20 NE Driveway 241 1 0 113.6 16.0 102.8 16.6 90 90Required Relative Compaction (%)SMAC BuildingG2123-11-02Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TTABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.PT 1 02/11/20 W Side Main N-S 0 2 0 118.7 13.5 111.9 16.0 94 90PT 2 02/11/20 W Side Main N-S 0 1 0 113.6 16.0 108.3 17.5 95 90PT 3 02/11/20 N Side Main E-W 0 2 0 118.7 13.5 114.1 15.0 96 90PT 4 02/11/20 N Side Main E-W 0 1 0 113.6 16.0 107.6 15.3 95 90PT 5 02/11/20 Central Deep E-W -4 1 0 113.6 16.0 104.3 20.2 92 90PT 6 02/12/20 E End Central E-W -4 1 0 113.6 16.0 107.4 17.8 95 90PT 7 02/12/20 E End Central E-W -2 1 0 113.6 16.0 104.3 20.9 92 90PT 8 02/12/20 E End Central E-W 0 1 0 113.6 16.0 107.4 17.5 95 90PT 9 02/12/20 W End Central E-W 0 2 0 118.7 13.5 110.4 15.7 93 90PT 10 02/12/20 E End 1st N-S 0 1 0 113.6 16.0 107.9 18.9 95 90PT 11 02/12/20 E Central E-W 0 2 0 118.7 13.5 108.8 17.8 92 90PT 12 02/12/20 E Central E-W -3 1 0 113.6 16.0 107.8 17.4 95 90PT 13 02/12/20 E End 2nd N-S 0 2 0 118.7 13.5 111.1 17.3 94 90PT 14 02/12/20 Central E-W -2 2 0 118.7 13.5 110.7 15.5 93 90PT 15 02/13/20 E End 1st N-S 0 2 0 118.7 13.5 109.9 16.1 93 90PT 16 02/13/20 W End Central E-W -2 1 0 113.6 16.0 97.1 18.0 85 90PT 16 A 02/13/20 W End Central E-W -2 1 0 113.6 16.0 97.0 20.0 85 90PT 16 B 02/13/20 W End Central E-W -2 1 0 113.6 16.0 108.0 19.3 95 90PT 17 02/13/20 E End Central E-W 0 2 0 118.7 13.5 114.2 13.5 96 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE I SUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.SD 1 08/03/20 Line 'A' STA 2+00 -1 2 0 118.7 13.5 107.9 14.5 91 90SD 2 08/03/20 Line 'B' STA 1+50 -2 2 0 118.7 13.5 106.9 15.0 90 90SD 3 08/03/20 Line 'B' STA 1+20 -1 2 0 118.7 13.5 107.3 14.7 90 90SD 4 12/08/20 SW OF BLDG - line 'B' 243 2 0 118.7 13.5 106.6 13.4 90 90SD 5 12/09/20 Southwest Side of Site -1 2 0 118.7 13.5 108.5 14.1 91 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.SG 1 01/20/21 Parking Lot S of Bldg SG 1 0 113.6 16.0 107.5 16.5 95 95SG 1 A 01/20/21 Parking Lot S of Bldg SG 1 0 113.6 16.0 108.5 14.9 96 95SG 2 01/20/21 Loading Dock SG SG 1 0 113.6 16.0 107.6 15.8 95 95SG 3 02/11/21 NW Corner of Lot Entrance SG 1 0 113.6 16.0 108.1 16.9 95 95SG 4 02/11/21 SW Corner of Parking Lot SG 1 0 113.6 16.0 108.9 16.1 96 95SG 5 02/11/21 SW Corner of Parking Lot SG 1 0 113.6 16.0 108.4 15.9 95 95SG 6 02/18/21 Parking Lot S of Bldg SG 1 0 113.6 16.0 107.8 16.5 95 95SG 7 02/19/21 Parking Lot S of Bldg SG 1 0 113.6 16.0 107.7 14.9 95 95SG 8 02/20/21 Loading Dock SG SG 1 0 113.6 16.0 107.9 15.8 95 95Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.SM 1 12/08/20 E of Bldg Sewer Connection 241 1 0 113.6 16.0 102.4 13.5 90 90SM 2 12/08/20 E of Bldg Sewer Connection 238 1 0 113.6 16.0 105.2 17.8 93 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.SW 1 12/22/21 SW of Bldg SG 2 0 118.7 13.5 108.7 13.9 92 90SW 2 12/22/21 S of Bldg SG 2 0 118.7 13.5 106.8 14.8 90 90SW 3 02/17/21 SW of Bldg SG 2 0 118.7 13.5 106.5 14.8 90 90SW 4 02/17/21 SW of Bldg SG 2 0 118.7 13.5 106.9 14.8 90 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE ISUMMARY OF FIELD DENSITY TEST RESULTSProject Name:Project No.:Pre. No. Re.WL 1 12/08/20 Van Allen Way 243 1 0 113.6 16.0 103.8 14.8 91 90WL 2 12/22/20 SW Bldg Tie In 242 1 0 113.6 16.0 102.8 18.0 90 90Test No. Date (MM/DD/YY)LocationElev. or Depth (feet)Required Relative Compaction (%)SMAC BuildingG2123-11-02Curve No.>¾" Rock (%)Max. Dry Density (pcf)Opt. Moist Content (%)Field Dry Density (pcf)Field Moisture Content (%)Relative Compaction (%) TABLE IEXPLANATION OF CODED TERMSAC Asphalt Concrete ITIrrigation TrenchSG SubgradeAD Area Drain JTJoint TrenchSL Sewer LateralBBaseMMoisture TestSM Sewer MainCG Curb/Gutter MGMinor GradingSR Slope RepairDW Driveway MSE Mechanically Stabilized Earth Wall ST Slope TestET Electrical Trench PTPlumbing TrenchSW SidewalkETB Exploratory Trench RGRegradeSZ Slope ZoneFB Footing Backfill RWL Reclaimed Water Lateral UT Utility TrenchFG Finish Grade RWM Reclaimed Water Main WB Wall BackfillFS Fire Service SBTSubdrain TrenchWL Water LateralGT Gas Trench SDStorm DrainWM Water MainA, B, C, …R>¾" ROCK - ROCK CORRECTIONThe laboratory maximum dry density and optimum moisture content can be adjusted for in-place soil that possesses rock larger than ¾ inch. The curve no. is adjusted for the percentage of ¾ inch rock in accordance with ASTM D 4718 or Woodward Clyde guidelines.TEST NO. PREFIXTEST NO. RE.Retest of previous density test failure following additional moisture conditioning or recompactionFill in area of density test was removed during construction operationsCURVE NO.Corresponds to the curve numbers presented in the summary of the laboratory maximum dry density and optimum moisture content test results. The field representative selected the curve no. based on the laboratory test results and field observationsELEVATION OR DEPTHCorresponds to the elevation or the depth, in feet, of the in-place density/moisture content test. The value has been rounded to the nearest whole foot 0GEOCO TABLE II SUMMARY OF LABORATORY TEST RESULTS Project Name:SMAC Building Rock Correction: Project No.:G2123-11-02 Curve No. Description Max. Dry Density (pcf) Opt. Moist Content (%) Specific Gravity Absorption Expansion Index ASTM 4829 Expansion Classification Water Soluble Sulfate (%) ACI 318 Sulfate Severity 1 Gray, Clayey SILT 113.6 16.0 2.65 0.30 2 Light brown, Clayey, fine to coarse SAND; trace gravel 118.7 13.5 2.65 0.30 3 Light brown, Clayey, fine to coarse SAND; trace gravel 121.8 11.9 2.65 0.30 4 Class II recycled base - Moody (plant)132.8 8.3 2.65 0.30 ASTM D 4718 TABLE III SUMMARY OF LABORATORY ASPHALT CONCRETE TEST RESULTS Project Name:SMAC Building Project No.:G2123-11-02 AC Max for Compaction:Hveem Curve No. Description Max. Rice Density (pcf) Hveem Density (pcf) Aggregate Size (In.)Stability Air Voids (%) Oil Content (%) AC-1 1/2-Inch - Parking Areas 156.4 147.2 1/2 50 6 5.6------- Project Name:Project No.: AC-1 % Passing 3/4 inch 100 1/2 inch 89 to 100 98 3/8 inch 74 to 100 91 No. 4 50 to 78 66 No. 8 32 to 60 50 No. 30 14 to 38 29 No. 200 2 to 10 6 Asphalt Binder (%)4.6 to 7.0 5.6 Stability 50 Sample Location Parking Area Materials Source Superior Mission Gorge Date Sampled 3/2/2021 Outside of Specification -- SMAC Building 35+ Sieve Analysis ASTM C 136 (Sieve Size) Greenbook Section 2018 203-6.5.4(A) Specifications Class C3 % Passing G2123-11-02 100 TABLE IV SUMMARY OF ASPHALT CONCRETE LABORATORY TESTS TYPE III C3 -- -- 0 GEOCON