HomeMy WebLinkAbout1896 RUTHERFORD RD; ; CBC2021-0377; Recycle(city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.corlsbodco.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. CBC2021-0377 Project Title Phase 3A
Project Address 1896 Rutherford rd APN 212-120-62
Applicant Name Benson Eric Owner [Z]
Last First
Applicant Address 1896 Rutherford rd
Phone r760 14434762 E-mailAddress ebenson@argonautms.com
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential Commercial □ [Z]
Brief Description converting warehouse into lab space
Public Building □
Project Size 8500 Estimated Cost of Project $_1_,_1_0_0_,_0_0_0 ___________ _
(square footage)
Please check the appropriate box:
l ✓l I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief. / /
E . B /_-_. -· / /~::___ Print Name nc en son_ _ ______ Signature_--~ __ / ___ ' _____ Date 12 n.ov 21
Page 1 of3 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) flQ! be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. CBC2021-0377 Project Title Phase 3A
1869 Rutherford rd 212 120 62 Project Address _______________________ .APN --
Applicant Name Benson Eric Phone { 760 )443 4 762
Lost First
Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a (0) check Place a (i.i) check next Place a (LI) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
ro/1-offbins. 1 ton Mixed C&D Debris □ □
Asphalt & Concrete 1/4 ton □ □
Brick/ Masonry/ Tile □ □ □
Mixed Inert Debris □ □ □ Cabinets, Doors, Fixtures, □ □ □ Windows (circle alt that apply)
Carpet □ □ □
Carpet Padding/ Foam □
Cardboard □ □
Ceiling Tile (acoustic) □ □ □
Drywall (used, new, scrap) 1/2 ton □ □ Landscape Debris (brush, trees, D □ stumps, etc.) No dirt.
Unpainted Wood & Pallets □ □
Roofing Materials □ □
Scrap Metal 1/4 ton □ □
Stucco □
Other: □ □ □
TOTAL = 2 tons
To meet 65% Diversion Requirement (estimate) 4000 x 0.65 = 1-3 tons -------------------
Contractor/Owner Signature
k ~imated Waste from above
/,(____ Date
Minimum Required Diversion
\ L fv()'J 7__ I
Page 2 of 4 Rev. 11112118
8:26 AM Roll Off Dispatch Closed Ticket
350-74868 ARGONAUT MANUFACTURE
1896 RUTHERFORD RD CARLSBAD CA
Ticket 378121 Driver code KJMOR
Dumpinfo:Site PAL T Tkt 783XXXX
INC
92008-7326
Requested
Qty
Display
Opened
Closed
4/25/2022
by OCS Driver
by TLOVELAl
Load type FYS Equipment code
Status Code * Additional
Date Time
Dispatched: 3/03/2022 11:13
Loaded/ Drop off:
Restart Ticket:
Finished at landfill: 12:05
by ERIC
3.63 Tax
Points
comments exist for this
.oo Cost
0
ticket*
Time
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Svc Quantity
DTN 3.63
TRP 1.00
Price
49.05
83 .47
242.11
Special Description
EDCO REJ LOAD
Job#
11:29
12:06
Waste
Type
40D 1.00 S/O TKT 376000 MSW
Tax T/P
T
T
T
Bottom F3=Exit F7=Cont Info Fll=View Dates F12=Prev F13=Additional Comments
Pl7=Top FlB•Bottom F20•Profile
EDCO WASTE & RECYCLING SERVICES, INC
224 S. LAS POSAS RD
SAN MARCOS, CA 92078
(760) 744-2700
customer: 1024
COASTWASTE-A/P HEIDI
5960 EL CAMINO REAL
CARLSBAD CA 92008
Commodity
Ticket: 462
Date: 02/09/22
COL
Rate
In:
Out:
per TON
7:37
7:49
Truck:
Container:
Route:
Origin:
INVOICE
9999
08645
086 CARLSBAD
Extended
Charge
45 C & D MIX
[Gross(Inl: 39,920.
Units
4.14
lbs Scl#l Tare 31,640. lbs Scl#l Net: 8,280. lbs]
TOTAL DUE
Construction & Demolition Diversion Certificate •· Diversion Percentage 80%
This certifies that the company listed above has utifized an EDCO facility to divert construcfion demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
t!-fazr411 m:d1aoe2 J-9'-22.
7 Driver CRUZ
f)ccY-if3S{)-CJ01l/8t8
'?-1cr'f ff-371 Ct/
8:27 AM Roll Off Dispatch Closed Ticket Display
Opened
Closed
4/25/2022
KLUJANl
TLOVELAl 350-74868 ARGONAUT MANUFACTURE
1896 ROTBBRFORD RD CARLSBAD CA
Ticket 352937 Driver code KJCAR
Dumpinfo:Site PAL T Tkt 255XXXX
Load type E/R Equipment code
Status Code * Additional
Date Time
Dispatched: 12/02/2021 15:01
Loaded/ Drop off: 15:18
Restart Ticket:
Finished at landfill: 15:41
INC
92008-7326
Requested
Qty
by ERIC
2.19 Tax
Points
co-ents exist for this
by
by
.00 Cost
0
ticket*
Time
15:14 Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Svc
DTN
40D
Quantity
2.19
1.00
Price
49.05
242.11
Special Description Job#
15:23
15:50
Waste
Type
MSW
Tax T/P
T
T
Bottom
P3•Exit P7aCont Info Pll•View Dates Fl2•Prev Pl3•Additional Co-ants
P17=Top P18=Bottom P20•Profile
JOB LOCATION
PU (TRAILER
nADCOUNT
1 2
.... ~ ) t. __ ...,.-"
'
/ X
#LOADS
SIGNATURE
MOODY'S
EL CORAZON RECLAMATION
PO BOX969
BONSALL, CA 92003
(760) 433-3316 • FAX (760) 433-6691
Tl
I FLATBED i:,uBTAIL I \:~L ieND DUMP I' &T
MArRI'/-. --:TV C{!:.I; ) t..,..
3 4 5 6 7 8 9 10
X PRICE OTHER CHARGES
$
TOTAL _
C G'Jf'..')I irAS I C:.
L/!3°V1S Wf""\
TRUCK#
All bills due upon presentation unless otherwise
arranged In advance. Open accounls &ubleet lo
1 1/2% monlh, charge after :JO days unpaid
balance
MOODY'S is not responsible ror damage to
vehicle whKe being loaded or unloaded In
yard.
JOB GOPY 3()7641
8:27 AM Roll Off Dispatch Closed Ticket
350-74868 ARGONAUT MANUFACTURE INC
92008-7326
Requested
Qty
Display
Opened
Closed
by
by
4/25/2022
KLUJANl
TLOVELAl
1896 RtrrH.BRFORD RD CARLSBAD CA
Ticket 345640 Driver code KJCAR
Dumpinfo:Site PAL T Tkt 568XXXX
by ERIK
3.35 Tax
Points
comments exist for this
.00 Cost
Load type E/R Equipment code
Status Code * Additional
Date Time
Dispatched: ll/09/2021 12:10
Loaded/ Drop off: 12:18
Restart Ticket:
Finished at landfill: 13:13
0
ticket*
Time
12:11 Arrived at customer:
stop Ticket:
Arrived at landfill:
Ticket completed:
Svc
DTN
40D
Quantity
3.35
1.00
Price
49.05
242.11
Special Description Job#
12:23
13:25
Waste
Type
MSW
Tax T/P
T
T
Bottom
F3=Bxit F7•Cont Info Fll=View Dates Fl2•Prev F13=Additional Comments
Fl7•Top FlB=Bottom F20•Profile
Ence WAS & c:.CYCLING SERVICES, -INC
224 S. LA P ;s RD
SAN MARCO (.>_ 92078
(760) 744-7
Customer: 0 4 T cc:et: 1387
COASTWAST" -·,; HEIDI :O!a
5960 EL C.01-lll,: RE.;L
CARLSBAD CA-~} 8
Commodity
Date: 11/ 23 / 21
Rat.e
INVOICE
In: 15:53 Truck: 4007/4007
cut, 6:0 -container:
per TON
~oute: 08645
Origin: 086 CA~LSBAD
Extended
Charge
4 5 C & D ~ I.:
[Gross:In · 3S,180.
Units
.91
lbs Sclltl Tare 33,360, lbs Scl~: Net: 1,820. lbs)
_ l'AL DUE
Conslruc11on & -, . r on D1vers1011 Cc, t l1ca1e --Diversion Percentage 81 %
Tl1is certifies I •· t the _·. mpa11y 1stec alJOve has ulilized an EDCO lacilily to divert conslru I on demolilion materials in accordance
wilh LEED requ'ru,ne ii The diversion tonnage is based on an overall tonnage percenlaoe of the respective EDCO l~cilily
'3SO{JOr'/868
JL iver Z,SV L/ {) .{,
9tw_ m~