HomeMy WebLinkAbout2445 MARK CIR; ; CBR2019-2431; PermitPERMIT REPORT
Residential Permit
Print Date: 03/18/2022
Job Address: 2445 MARK CIR, CARLSBAD, CA 92010-2816
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Project Title:
BLDG-Residential
1671604400
$140,105.80
Work Class:
Track#:
Lot#:
Project#:
Plan#:
Constructio'n Type:
Orig. Plan Check#:
Plan Check#:
Description: GILBERT: 297 SF ADDITION// 1,930 SF REMODEL
Applicant:
SWIFT PERMITS
AMY EYRAUD
3129 IMPINK PL
JAMUL, CA 91935-3214
(619) 592-0498
FEE
Property Owner:
GILBERT JUSTIN WAND LILI D
2445 MARK CIR
CARLSBAD, CA 92010
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
BUILDING PERMIT FEE ($2000+)
5B1473 GREEN BUILDING STATE STANDARDS FEE
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
SWPPP INSPECTION FEE TIER 1-Medium BLDG
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
STRONG MOTION-RESIDENTIAL
BUILDING PLAN CHECK FEE (BLDG)
Addition
Total Fees: $2,151.84 Total Payments To Date: $2,151.84
(city of
Carlsbad
Permit No: CBR2019-2431
Status: Closed -Finaled
Applied: 09/04/2019
Issued: 10/28/2019
Finaled Close Out: 03/18/2022
Inspector:
Final Inspection:
Balance Due:
CRenf
03/15/2022
AMOUNT
$182.00
$175.00
$771.55
$6.00
$55.00
$246.00
$92.00
$66.00
$18.21
$540.08
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
( Cicyof
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check C()f-;;l.0\9 ~ ;:)C/3/
Est. Value 1P I LJ diJ0C:. '80
PC Deposit ---------
Date °f-L/ -I 1
Job Address '2-Y~l? 1'-1ov:t Ci C, Suite: _____ APN: __________ _
CT/Project#: __________________ Lot#: ___ _
Fire Sprinklers: yes/ no Air Conditioning: yes/ no Electrical Panel Upgrade: yes/ no
BRIEF DEscR1PT1ON oF woRK, -'-""'""J4h-4o+ll~R...~--'h'--4,,11o>J.J.Lf _,._(),,___-"r?Yr:n=-..::c.L..L.Uc..,_'>cu.f~oLll--=:::;+---a""--"cl"--'cJ..!~_,_i _.:._:b..,,-o""----'-n_,__..,,o-f-:c...,___
~q7 s.
0 Addition/New: ;).CJ 1= Living SF, ___ Deck SF, ___ Patio SF, ____ Garage SF
Is this to create an Accessory Dwelling Unit? Yes/ No New Fireplace? Yes/ No, if yes how many? __
D Remodel: 11 C/ 30 SF of affected area Is the area a conversion or change of use? Yes/ No
0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _
□ Solar: ___ KW, ___ Modules, Mounted: Roof/ Ground, Tilt: Yes/ No, RMA: Yes/ No, Battery: Yes/ No
Panel Upgrade: Yes/ No
LJ Reroof: _____________________________________ _
LJ Plumbing/Mechanical/Electrical Only: _________________________ _
c::_J Other: ____________________________________ _
APPLICANT (PRIMARY CONTAC ) PROPERTY OWNER
Name: ~ Name:Ju:-\:in:-i L-i\1' C-;ii\bftj
Address: ~.[Jl'!;i,=:__,,.,_,._L..:._;_--"'--'----c....-----cc--Address: '2. 4 Y t;" lv\.OI Y-\C.... C \y--,
City: S-D State:(QI Zip: 'Z.ll9 City:Qly1St23d State:(4 Zip:q?OIO
Phone: lol9 · qqc.,,j · '7"'?'73--: Phone: ______________ _
Email: p.e cmi~@ p-ex:mi:J:s io MobOn~mail: _______________ _
(~
DESIGN PROFESSIONAL
Name: _________________ _
Address: ________________ _
City: ________ State: ___ .Zip: ___ _
Phone: _________________ _
Email: _________________ _
Architect State License: ___________ _
CONTRACTOR BUSINESS
Name: fl1'1Y:\'"O~\
Address: Cf6<...I') J2.iver Sb
City: /a{vsi de. State:.(a__Zip: q")-dl..( O
Phone: ___________________ _
Email:----~~~~------------
State License: I O f O I I Ii, Bus. License: j;) Y 31 ';) !5
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
B-1 Page 1 of 2 Rev. 06/18
( OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
17 I have and will maintain a certificate ot consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued.
n I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My wo,kecs' compensation insucance caccie, and policy numbe, ace: Insurance Cor3'my Name: ~~~i;)\Q, ~1P®
Policy No7 lq CXX) I q 8d9, ICj I Expiration Date: I j I '¢0 -e_, \) e..,v-e 'i:, -l,: \::) '('~ yy, \ ~ \ \ I',~
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONTRACTOR SIGNATURE:
( OPTION B ): OWNER-BUILDER DECLA
I hereby affirm that I am exempt from Contractor's License La or the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's license Law).
DI am exempt under Section ________ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. D Yes D No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work {include name/ address/ phone/
contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone/ type of work):
OWNER SIGNATURE: LJAGENT DATE: _____ _ ---------------------------
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: _____________________ _ Lender's Address: _____________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D Yes D No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D Yes D No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes D No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time
after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Buildi Code).
APPLICANT SIGNATURE:
1635 Faraday Ave Carlsbad, CA
B-1
: 760-602-2719 Fax: 760-602-8558
Page 2 of 2
Email: Building@carlsbadca.gov
Rev. 06/18
PERMIT INSPECTION HISTORY for (CBR2019-2431)
Permit Type: BLDG-Residential
Work Class: Addition
Status: Closed -Finaled
Application Date: 09/04/2019 Owner: COOWNER GILBERT JUSTIN WAND
LILI D
Issue Date: 10/28/2019 Subdivision: EL CAMINO MESA UNIT# 2
Expiration Date: 07/05/2022
IVR Number: 21522
Address: 2445 MARK CIR
CARLSBAD, CA 92010-2816
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date
Friday, March 18, 2022
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
Status
Passed
Yes
Yes
Yes
Yes
Yes
Page 2 of 2
Building Permit Inspection History Finaled
(city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2019-2431)
Permit Type: BLDG-Residential Application Date: 09/04/2019 Owner: COOWNER GILBERT JUSTIN WAND
LILI D
Work Class: Addition Issue Date: 10/28/2019 Subdivision: EL CAMINO MESA UNIT# 2
Status: Closed -Finaled Expiration Date: 07/05/2022 Address: 2445 MARK CIR
IVR Number: 21522 CARLSBAD, CA 92010-2816
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Dale Start Date Status
08/18/2021 08/18/2021 BLDG-21 164442-2021 Passed Chris Renfro Complete
U nderground/U nderflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-22 Sewer/Water 164443-2021 Passed Chris Renfro Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/26/2021 08/26/2021 BLDG-11 165248-2021 Passed Chris Renfro Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/27/2021 10/27/2021 BLDG-23 169414-2021 Passed Chris Renfro Complete
Gas/TesURepairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLOG-84 Rough 169415-2021 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
01/04/2022 01/04/2022 BLDG~33 Service 173793-2022 Passed Chris Renfro Complete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/15/2022 03/15/2022 BLDG-Final Inspection 178318-2022 Passed Chris Renfro Complete
Friday, March 18, 2022 Page 1 of 2
DATE: 10-24-2019
JURISDICTION: Carlsbad
PLAN CHECK#.: CB-CBR2019-2431
PROJECT ADDRESS: 2445 Mark Cir.
✓• EsG1I
SET II
PROJECT NAME: Gilbert Addition and House Remodel
✓APPLICANT r JURIS.
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ EsGil staff did not advise the applicant that the plan check has been completed.
D EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted:foj24lt'l (bf.JY\) Email:
Mail Telephone Fax In Person
0 REMARKS:
By: David Kniff AIA
EsGil
10-10-2019
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
•
DATE: 9-18-2019
JURISDICTION: Carlsbad
PLAN CHECK#.: CB-CBR2019-2431
PROJECT ADDRESS: 2445 Mark Cir.
✓• EsG1I
A SAFEbuilr Company
SETI
PROJECT NAME: Gilbert Addition and House Remodel
□ APPLICANT
□ JURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Amy Eyraud
D EsGil staff did not advise the applicant that the plan check has been completed.
~ EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Amy Eraud
ontacted~1---r8" A (bylt,) Email:
Mail Te~phone In Person
ARKS:
Telephone#: 619-994-5557
By: David Kniff
EsGil
Enclosures:
9-6-2019
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92 I 23 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad CB-CBR2019-2431
9-18-2019
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK#.: CB-CBR2019-2431
PROJECT ADDRESS: 2445 Mark Cir.
FLOOR AREA: 297 s.f. addition
Remodel of 1,930 s.f.
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: 9-18-2019
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
STORIES: 1
HEIGHT:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 9-6-2019
PLAN REVIEWER: David Kniff
This plan review is limited to the technical requirements contained in the California version of
the International Residential Code, International Building Code, Uniform Plumbing Code,
Uniform Mechanical Code, National Electrical Code and state laws regulating energy
conservation, noise attenuation and access for the disabled. This plan review is based on
regulations enforced by the Building Department. You may have other corrections based on
laws and ordinance by the Planning Department, Engineering Department, Fire Department or
other departments. Clearance from those departments may be required prior to the issuance of
a building permit.
Present California law mandates that construction comply with the 2016 edition of the California
Code of Regulations (Title 24), which adopts the following model codes: 2015 IRC, 2015 IBC,
2015 UPC, 2015 UMC and 2014 NEC.
The above regulations apply, regardless of the code editions adopted by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2015 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad CB-CBR2019-243 l
9-18-2019
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK#.: CB-CBR2019-2431
PREPARED BY: David Kniff
BUILDING ADDRESS: 2445 Mark Cir.
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
Remodel 1930 46.51
Addition 297 169.50
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code CB By Ordinance
1997 UBC Buildin 9 Permit Fee i-•
I 1997 UBC Plan Check Fee l!l
Type of Review: Complete Review
j Repetitive Fee i Other , \ :"'J Repeats i Hourly
EsGil Fee , , ,
DATE: 9-18-2019
Reg. VALUE
Mod.
1 Structural Only
/
E:=:=]Hr.@• (
~
Comments: In addition to the above fee, an additional fee of$
$ /hr.) for the CalGreen review.
($)
89,764
50,342
140,106
$501.ssJ ;
is due ( hour@
Sheet of
Carlsbad CB-CBR2019-2431
9-18-2019
PLANS
1. Please make all corrections, as requested in the correction list. Submit
FOUR new complete sets of plans for commercial/industrial projects (THREE sets
of plans for residential projects). For expeditious processing, corrected sets can
be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil is complete.
2. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code).
3. Plans show the square footage of 286 s.f. yet the building permit application
shows the new addition to be 297 s.f. Please revise plan to reflect the correct
square footage.
4. If there is no complying barrier between the pool and any proposed new doors,
please show how compliance with section AV100.2 for pool safety will be
achieved (i.e. exit alarm; self-closing, self-latching device with the release at least
54" from the floor, etc.).
5. On the cover sheet of the plans, specify any items that will have a deferred
submittal (trusses, fire sprinklers/alarms, etc.). Additionally, provide the following
note on the plans: "Submittal documents for deferred submittal items shall be
submitted to the registered design professional in responsible charge, who shall
review them and forward them to the building official with a notation indicating
that the deferred submittal documents have been reviewed and that they have
been found to be in general conformance with the design of the building. The
deferred submittal items shall NOT be installed until their design and submittal
documents have been approved by the building official."
6. Where is Sheet A7? Sheet index shows a roof plan yet it isn't attached to the
plans.
7. Sheet index shows that S4 is Roof Framing yet S4 is a detail sheet. Please
revise.
Carlsbad CB-CBR2019-2431
9-18-2019
FIRE PROTECTION
8. Show locations of permanently wired smoke alarms with battery backup, per
Section R314:
a) Inside each bedroom.
b) Outside each separate sleeping area in the immediate vicinity of the
bedrooms.
c) On each story, including basements.
d) Such smoke alarm locations shall comply with the following:
i) They shall be not less than 3' from the door opening of a bathroom.
ii) They shall be at least 20' from a cooking appliance.
iii) They shall be at least 3' from supply registers of heating/cooling
systems.
iv) They shall be at least 3' from the tip of the blade of a ceiling-
mounted fan.
• NOTE: When more than one smoke alarm is required to be installed, the
alarm devices shall be interconnected in such a manner that the actuation of
one alarm will activate all of the alarms in the unit.
9. In existing buildings, when alterations, repairs or additions requiring a permit
occur (or when one or more sleeping rooms are added), the dwelling unit shall be
provided with smoke alarms located as required for new dwellings; the smoke
alarms shall be interconnected and hard wired. Exception: Smoke alarms in
existing areas need not be interconnected and hard wired where the alterations
or repairs do not result in the removal of interior wall or ceiling finishes exposing
the structure, unless there is an attic, crawl space, or basement available which
could provide access for hard wiring and interconnection without the removal of
interior finishes. Section R314.8.1.
10. In dwelling units within which fuel-burning appliances are installed (and in
dwelling units having attached garages), show the locations of permanently wired
carbon monoxide alarms with battery backup, per Section R315:
a) Outside each separate sleeping area in the immediate vicinity of the
bedrooms.
b) On each story, including basements.
• NOTE: When more than one carbon monoxide alarm is required to be
installed, the alarm devices shall be interconnected in such a manner that the
actuation of one alarm will activate all of the alarms in the unit.
Carlsbad CB-CBR2019-2431
9-18-2019
11. When alterations, repairs or additions are proposed for dwelling units within
which fuel-burning appliances are installed (and in dwelling units having attached
garages), the dwelling unit shall be provided with carbon monoxide alarms
located as required for new dwellings; the carbon monoxide alarms shall be
interconnected and hard wired. Exception: Carbon monoxide alarms in existing
areas need not be interconnected and hard wired where the alterations or repairs
do not result in the removal of interior wall or ceiling finishes exposing the
structure, unless there is an attic, crawl space, or basement available which
could provide access for hard wiring and interconnection without the removal of
interior finishes. Section R315.2.
ROOFS
12. Show location of attic access with a minimum size of 22"x30", unless the
maximum vertical headroom height in the attic is less than 30". Access must be
provided to each separated attic area (if over 30 sq. ft.), shall be located in a
hallway or other readily accessible location and 30" headroom clearance is
required above the opening. Section R807.1.
STRUCTURAL
13. The plans shall indicate that special inspection will be provided for the following
work. (CBC Chapter 17 and Section 107.2)
a) High-strength bolts. Periodic inspection should be provided for
installation of high-strength bolts in accordance with AISC specifications.
Section 1705.2
b) . Expansion anchors. Periodic special inspection should be provided for
anchors installed in hardened concrete. Section 1705.3.
14. Note is cut off on left side of S3. Widen viewport.
15. Detail 17/S5. How is fascia attached?
16. Detail 16/S5 Remove Parapet wall or guardrail portion of the detail.
ELECTRICAL
17. Per CEC Article 210.11 (C)3, note on the plans that bathroom circuiting shall be
either:
a) A 20 ampere circuit dedicated to each bathroom, or
b) At least one 20 ampere circuit supplying only bathroom receptacle outlets.
18. Show at least one wall switch-controlled lighting outlet to be installed in every
habitable room; in bathrooms, hallways, stairways, attached garages, and
detached garages with electric power; and at the exterior side of outdoor
Carlsbad CB-CBR2019-2431
9-18-2019
entrances or exits. At interior stairways show 3-way switching for lighting outlets
at each floor level where there are six or more steps. CEC Article 210.70(A).
19. Show on the plans a wall receptacle within 36" of each lavatory in the bathroom.
CEC 210.52(0).
20. New outlet shown at the exterior of the Living Room shall also be noted as Water
Proof.
PLUMBING
21. Specify on the plans: Water conserving fixtures: New water closets shall use no
more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8
GPM, lavatories are limited to 1.2 GPM, and showerheads may not exceed 1.8
GPM of flow. CPC Sections 407,408,411,412. Please change green notes
to reflect shower head change to 1.8gpm.
RESIDENTIAL GREEN BUILDING STANDARDS
22. Recycling. Note on the plans that a minimum of 65% of construction waste is to
be recycled. CGC Section 4.408.1.
23. Recycling. Note on the plans that the contractor shall submit a Construction
Waste Management Plan, per CGC Section 4.408.2.
24. Note on the plans that when a shower is provided with multiple shower heads,
the sum of flow to all the heads shall not exceed 1.8 gpm @ 80 psi, or the
shower shall be designed so that only one head is on at a time. CGC Section
4.303.1.3.2.
25. Pollutant control. Note on the plans that during construction, ends of duct
openings are to be sealed, and mechanical equipment is to be covered. CGC
Section 4.504.1.
26. Pollutant control. Note on the plans that VOC's must comply with the
limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and
4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood
Products. CGC Section 4.504.2.
27. Interior moisture control. Note on the plans that concrete slabs will be
provided with a capillary break. CGC Section 4.505.2.1.
28. Interior moisture control. Note on the plans that the moisture content of wood
shall not exceed 19% before it is enclosed in construction. The moisture content
needs to be certified by one of 3 methods specified. Building materials with
visible signs of water damage should not be used in construction. The moisture
content must be determined by the contractor by one of the methods listed in
CGC Section 4.505.3.
Carlsbad CB-CBR2019-2431
9-18-2019
29. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star
rated, vented directly to the outside and controlled by a humidistat. CGC
4.506.1.
30. Note on the plans that prior to final inspection the licensed contractor, architect or
engineer in responsible charge of the overall construction must provide to the
building department official written verification that all applicable provisions
from the Green Building Standards Code have been implemented as part of the
construction. CGC 102.3.
Residential Energy Lighting Requirements: ES 150.0(k}
31. All installed luminaires shall be high-efficacy in accordance with ES TABLE
150.0-A. Light sources that are not marked "JAS-2016-E" shall not be installed in
enclosed luminaires. ES 150.0(k)
32. In bathrooms, garages, laundry rooms, and utility rooms at least one luminaire
shall be controlled by a vacancy sensor.
33. Dimmers or vacancy sensors shall control all LED style luminaires. Two
exceptions: Fixtures installed in hallways or (closets under 70 square feet).
34. Recessed can light fixtures shall be IC listed, air-tight labeled, and not be
equipped with a standard medium base screw shell lamp holder. ES 150.0(k)
35. SFD outdoor lighting fixtures that are attached to a building are required to be
high efficacy, be manually on/off switch controlled, and have both motion sensor
and photocell control. See ES 150.0(k) 3 for additional control options.
Residential ventilation requirements: ES 150.0(o)/ASHRAE 62.2
36. Kitchens require exhaust fans with a minimum 100 cfm ducted to the exterior.
Detail compliance by including a complying exhaust fan or a ducted range hood
to the exterior.
37. Bathrooms require exhaust fans (minimum 50 cfm) to be ducted to the exterior.
A bathroom is defined "as a room with a bathtub, shower, or spa or some similar
source of moisture".
38. Residential bathroom exhaust fans shall be energy star rated and shall be control
by a humidistat capable of an adjustment between 50 and 80% humidity.
CalGreen 4.506.1. Exception: Control by a humidistat is not required if the
bathroom exhaust fan is also the dwelling whole house ventilation.
Carlsbad CB-CBR2019-2431
9-18-2019
MISCELLANEOUS
39. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
40. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. lfthere are other changes, please briefly
describe them and where they are located in th.e plans.
• Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes □ No □
41. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding
these plan review items, please contact David Kniff at EsGil. Thank you.
' solidforms . . eng1neer1ng
9474 Kearny Villa Rd, Suite 215, San Diego, CA 92126
Evan Coles, P.E. (858) 376-7734
evan@solidformseng.com
STRUCTURA L CALCULA TI O NS
Gilbert Residence
244 5 Mark circle, Carlsbad , CA 92010
08/13/19 : Proj ect # 19-163
Table of Contents
Design Criteria & Loads .................................................. 1
Gravity A nalysis & Design .............................................. 2-6
Lateral Analysis & Desig n .............................................. 7-15
Foundat ion A nalysis & Desig n ..................................... 16
Design Criteria
Building Code:
Concrete:
Masonry:
Mortar:
Grout:
Reinforcing Steel:
Structural Steel:
Bolting:
Welding:
Wood:
Soil:
Design Loads
Load 1
DL Asphalt Shingle Roof
Plywood
Joists
Insulation
Drywall
Electrical/Mech./Misc.
Other
Total DL
LL Residential Roof
Total Load
Load 3
so lidforms
engineering
2015 IBC/2016 CBC -ASCE / SEI 7-10
ACI 318-14 [fc = 2500 psi -No Special Inspection Req.'d (U.N.O.)]
TMS 402-13/ACI 530-13 [Normal Wt.-ASTM C90-fm=1500 psi-Spec. Insp. Req.'d]
ASTM C270 [fc = 1800 psi Type SJ
ASTM C476 [fc = 2000 psi]
ASTM A615 [Fy = 40 ksi For #4 Bars & Smaller/ Fy = 60 ksi For #5 Bars & Larger]
AISC 360-10, 14th Edition
W Shapes (I Beams): ASTM A992, High Strength, Low Alloy, Fy = 50 ksi
HSS Shapes (Rect.): ASTM AS00, Carbon Steel, Fy = 46 ksi
HSS Shapes (Round): ASTM AS00, Carbon Steel, Fy = 42 ksi
Pipe Shapes: ASTM A53, Grade B, Carbon Steel, Fy = 35 ksi
All other steel: ASTM A36, Fy = 36 ksi
A307 / A325-N / A490-N (Single Plate Shear Conn.)
E70 Series Typ. (E90 Series for A615 Grade 60 Reinforcing Bars)
Shop welding to be done in an approved fabricator's shop.
Field welding to have continuous Special I nspection.
NDS-15
Soil Classification (Table 1806.2):
Allowable Bearing Pressure =
Lateral Bearing Pressure =
Active Pressure =
At-rest Pressure =
Coefficient of Friction =
(2Sf Load 2
4.0
(SW, SP, SM, SC, GM, & GC)
1500 psf (Table 1806.2)
150 psf/ft (Table 1806.2)
30 psf/ft (Table 1610.1)
60 psf/ft (Table 1610.1)
0 .25 (Table 1806.2)
Int. Wall
DL Drywall
1.5 2x4 Studs@ 16"o.c.
3.5
1.5
2.5
1.0
0.0
14
20
34
Load 4
... .
Misc.
other
Total Load
Ext. Wall 1
DL Stucco
2x4 Studs@ 16"o.c.
Drywall
Insulation
Misc.
other
Total Load
Ext. Wall 2
. .
Page 1 of 16
08/13/19
(2Sf
5.0
1.0
1.0
7
~sf
10.0
1.0
2.5
1.5
1.0
16
so lidforms Page 2 of 16
08/13/19
engineering
[ Multiple Simple Beam
i■l◄i8ii!?O•@•lfi11• !iM1@¥i:lJri•#•li11\-i¥111·ildMil1f·I
Description : ROOF GRAVITY [RJ1 , RB1-RB3, RH1_-________ _
Wood Beam Design: RJ-1 Calculations per NOS 2015, IBC 2015, CBC 2016, ASCE 7-10
1.75x9.25, Microllam LVL, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species : Trus Joist Wood Grade: MicroLam LVL 2.0 E
BEAM Size:
Fb -Tension 2,600.0 psi Fe -Prll 2,510.0 psi Fv 285.0 psi Ebend-xx 2,000.0 ksi
Fb -Compr 2,600.0 psi Fe -Perp 750.0 psi Ft 1,555.0 psi Eminbend -xx 1,016.54 ksi
Density 42.010 pcf
Applied Loads
Beam self weight calculated and added to loads
Unif Load: D = 0.0140, Lr = 0.020 k/ft, Trib= 2.0 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual:
0.419; 1
1,416.23 psi at
3,380.00 psi
+D+Lr+H
Fb : Allowable :
Load Comb :
Max fv/FvRatio = fv : Actual:
Fv : Allowable :
Load Comb:
Max Reactions (k)
Left Support
Right Support
0.157: 1
55.80 psi at 356.25 psi
+D+Lr+H
Q 1..
0.29
0.29
Lr
0.36 0.36
9.000 ft in Span # 1
0.000 ft in Span # 1
------------------------0(0 0280) Lr(0 040)
.ti
Max Deflections
1.75x9.25
18.0 ft
Transient Downward 0.41 1 in Total Downward 0.748 in
288 >240 Ratio 524 >360 Ratio
LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC: +D+Lr+H
0.000 in
9999
LC:
J
Wood Beam Design : RB-1 [Gridline 61 Calculations per NOS 2015, IBC 2015, CBC 2016, ASCE 7-10
BEAM Size : 3.5x11.875, Parallam PSL, Fully Braced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Trus Joist Wood Grade : Parallam PSL 2.0E Wood Species :
Fb -Tension
Fb -Compr
2,900.0 psi Fe -Prll 2,900.0 psi Fv 290.0 psi Ebend-xx 2,000.0 ksi
2,900.0 psi Fe -Perp 625.0 psi Ft 2,025.0 psi Eminbend -xx 1,016.54 ksi
Density 45.070 pcf
Applied Loads
Beam self weight calculated and added to loads
Unif Load: D = 0.0140, Lr= 0.020 k/ft, Trib= 16.0 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual:
0.371 · 1
1,343.27 psf at
3,625.00 psi
+D+Lr+H
Fb : Allowable :
Load Comb :
Max fv/FvRatio =
fv : Actual : Fv : Allowable :
Load Comb:
0.266: 1
96.32 psi at
362.50 psi
+D+Lr+H
Max Reactions
Left Support
Right Support
(k) Q l. Lr
1.84 1.84 1.36
1.36
5.750 ft in Span # 1
0.000 ft in Span # 1
~-3.5x11.875 ~
11.50ft ---J
.ti
Max Deflections
Transient Downward 0.130 in Total Downward 0.226 in
611 >240 Ratio 1064 > 360 Ratio
LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC: +D+Lr+H
0.000 in
9999
LC:
solid forms
engineering
Page 3 of 16
08/13/19
[ Multiple Simple Beam
l!Al/8Wi!CII1•1ti13• 1@@a;_;mro1a,1,,,aat1•11,i@11,t•I
Wood Beam Design : RB-2
Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 --------BEAM Size : 4x12, Sawn, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species :
Fb -Tension
Fb -Compr
Douglas Fir -Larch Wood Grade : No.2
900.0 psi Fe -Prll 1,350.0 psi Fv 180.0 psi Ebend-xx 1,600.0 ksi
580.0ksi
Density 31.21 O pcf
900.0 psi Fe -Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Applied Loads
Beam self weight calculated and added to loads
Unif Load: D = 0.0140, Lr= 0.020 k/ft, Trib= 1.625 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual :
Fb : Allowable :
Load Comb:
0.1 38; 1
171.39 psi at
1,237.50 psi
+D+Lr+H
5. 750 ft in Span # 1 ~ 4x12
Max fv/FvRatio =
fv : Actual :
Fv : Allowable :
Load Comb:
0.052: 1
11.74 psi at
225.00 psi
+D+Lr+H
(k) Q 1.
0.18
0.000 ft in Span# 1
.E
Max Deflections
Transient Downward
Ratio
11.50ft
0.019in Total Downward
7131 >360 Ratio
0.038 in
3633 >240
Max Reactions
Left Support
Right Support 0.1 8
J.r
0.19 0.19 LC: Lr Only LC: +D+Lr+H
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
0.000 in
9999
LC:
Wood Beam Design: RB-3 [Supportino RB-1 @ Gridline Cl
Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10
BEAM Size: 3.5x7.0, Parallam PSL, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Trus Joist Wood Grade : Parallam PSL 2.0E Wood Species :
Fb -Tension
Fb -Compr
2,900.0 psi Fe -Prll 2,900.0 psi Fv 290.0 psi Ebend-xx 2,000.0 ksi
2,900.0 psi Fe -Perp 625.0 psi Ft 2,025.0 psi Eminbend -xx 1,016.54 ksi
Applied Loads
Beam self weight calculated and added to loads
UnifLoad: D=0.0140, Lr=0.020k/ft,0.0ftto1.750ft, Trib=9.125ft
Unif Load: D = 0.0140, Lr= 0.020 k/ft, 1.750 to 6.50 ft, Trib= 3.375 ft
Point: D = 1 .40, Lr = 1.90 k@ 1.750 ft
Design Summary
Max fb/Fb Ratio =
fb: Actual : Fb : Allowable :
Load Comb:
Max fv/FvRatio =
fv : Actual :
Fv : Allowable :
Load Comb :
0.573; 1
2,075.61 psi at
3,625.00 psi
+D+Lr+H
0.494 : 1
179.17 psi at
362.50 psi
+D+Lr+H
1.755 ft in Span# 1
0.000 ft in Span # 1 6.50 ft
Density
Q 1. .s. 'l:J. .E l::I
Max Deflections
Transient Downward 0.087 in Total Downward
1.32 Ratio 893 >360 Ratio
45.070 pcf
0.153 in
511 >240
Max Reactions (k)
Left Support
Right Support 0.57
J.r
1.78
0.76 LC: Lr Only LC: +D+Lr+H
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
0.000 in
9999
LC:
solidforms
engineeri ng
Page 4 of 16
08/13/19
!iM1@►i1Ui•iC•)l11t-ia,i•ii1;:411,1,I
Wood Beam Design : RH-1 [Gridline 11 Calculations per NOS 2015, IBC 2015, CBC 2016, ASCE 7-10
BEAM Size:
Wood Species :
Fb -Tension
Fb-Compr
Applied Loads
4x4, Sawn, Fully Braced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Douglas Fir -Larch Wood Grade : No.2
900.0 psi Fe -Prll 1,350.0 psi Fv 180.0 psi Ebend-xx
900.0 psi Fe -Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Beam self weight calculated and added to loads
Unit Load: D = 0.0140, Lr= 0.020 k/ft, Trib= 9.0 ft
1,600.0 ksi
580.0 ksi
Density 31.21 O pcf
Design Summary
Max fb/Fb Ratio =
fb : Actual :
Fb : Allowable :
Load Comb:
0.614; 1
1,036.65 psi at
1,687.50 psi
+D+Lr+H
2.000 ft in Span # 1 ~ 4x4
Max fv/FvRatio =
fv: Actual :
Fv : Allowable :
Load Comb:
0.289: 1
65.01 psi at
225.00 psi
+D+Lr+H
Max Reactions
Left Support
Right Support
(k) Q .!. .!.r
0.36
0.36
0.26
0.26
0.000 ft in Span # 1
'1:1.. .E
Wood Beam Design : RH-2 [Gridline 31
!i
4.0 ft
Max De ectIons
Transient Downward 0.052 in Total Downward 0.089 in
537 >240 Ratio 921 >360 Ratio
LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC: +O+Lr+H
0.000 in
9999
LC:
Calculations per NOS 2015, IBC 2015, CBC 2016, ASCE 7-10
BEAM Size: 4x8, Sawn, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Douglas Fir -Larch Wood Grade : No.2 Wood Species :
Fb -Tension
Fb-Compr
Applied Loads
900.0 psi Fe -Prll 1,350.0 psi Fv 180.0 psi Ebend-xx
900.0 psi Fe -Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Beam self weight calculated and added to loads
Unit Load: D = 0.0140, Lr= 0.020 k/ft, Trib= 25.0 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual :
Fb : Allowable :
Load Comb:
Max fv/FvRatio =
fv : Actual:
Fv : Allowable :
Load Comb:
0.351; 1
512.69 psi at
1,462.50 psi
+D+Lr+H
0.260: 1
58.41 psi at
225.00 psi
+D+Lr+H
1.750 ft in Span# 1
2.905 ft in Span# 1
.s
---Max DeflectIons
0.010 in
1,600.0 ksi
580.0ksi
Density 31 .210 pct
Total Downward Max Reactions
Left Support Right Support
(k) Q !.
0.62
l.r
0.88 0.88
J:! Transient Downward
Ratio 4400 >360 Ratio
0.016 in
2572 >240
LC: +D+Lr+H 0.62 LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
0.000 in
9999
LC:
solidforms
engineering
Page 5 of 16
08/13/19
Wood Beam Design: RH-3
Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10 -------~---------BEAM Size: 5.25x14.0, Parallam PSL, Fully Braced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Wood Species :
Fb -Tension
Fb -Compr
TrusJoist Wood Grade : ParallamPSL2.0E
2,900.0 psi Fe -Prll 2,900.0 psi Fv 290.0 psi Ebend-xx 2,000.0 ksi Density 45.050 pcf
2,900.0 psi Fe -Perp 750.0 psi Ft 2,025.0 psi Eminbend -xx 1,016.54 ksi
Applied Loads
Beam self weight calculated and added to loads
Unit Load: D = 0.0140, Lr = 0.020 k/ft, Trib= 16.0 ft
Design Summary
Max fb/Fb Ratio =
fb: Actual:
Fb : Allowable :
0.293; 1
1,042.66 psi at 7.250 ft in Span# 1
3,563.50 psi
Load Comb :
Max fv/FvRatio =
fv: Actual : Fv : Allowable :
Load Comb:
+D+Lr+H
0.194:1 70.47 psi at 13.340 ft in Span# 1
362.50 psi
+D+Lr+H
Max Reactions
Left Support
Right Support
(k) Q !. Lr
2.32
2.32
w. .E
1.79
1.79
!:l
14.50 ft
Max De ect1ons
Transient Downward 0.133in Total Downward 0.236 in
736 >240 Ratio 1305 > 360 Ratio
LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC: +D+Lr+H
0.000 in
9999
LC:
j
Wood Beam Design : RH-4 rsetween Gridlines 4 & 51 Calculations per NDS 2015, IBC 2015, CBC 2016, AS~
BEAM Size: 4x8, Sawn, Fully Braced
Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending
Douglas Fir -Larch Wood Grade : No.2 Wood Species :
Fb -Tension
Fb -Compr
Applied Loads
900.0psi Fc-Prll 1,350.0psi Fv 180.0psi Ebend-xx
900.0 psi Fe -Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Beam self weight calculated and added to loads
Unit Load: D = 0.0140, Lr= 0.020 klft, Trib= 16.0 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual:
Fb : Allowable :
Load Comb:
Max fv/FvRatio =
fv : Actual :
Fv : Allowable :
Load Comb :
0.777; 1 1,135.78 psi at
1,462.50 psi
+D+Lr+H
0.385: 1 86.57 psi at
225.00 psi
+D+Lr+H
Q .L.
3.250 ft in Span # 1
0.000 ft in Span # 1 L ~eflect1ons
.E !:l Transient Downward 0.073in
1,600.0 ksi
580.0 ksi
Density 31.210 pcf
Total Downward Max Reactions (k)
Left Support Right Support 0.75
Lr 1.04
1.04 Ratio 1073 >360 Ratio
0.125 in
625 >240
LC: +D+Lr+H
0.000 in
9999
0.75 LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC:
[ Multiple Simple Beam
181◄113Wltltl•lfi'13•
so lidforms
engi n eering
Page 6 of 16
08/13/19
!iMdM►i':ltti•j•)i11t-iaei·li11MiJ
Wood Beam Design : RH-5 fGridline 91 Calculations per NDS 2015, IBC 2015, CBC 2016, ASCE 7-10
BEAM Size : 4x4, Sawn, Fully Braced Using Allowable Stress Design with ASCE 7-16 Load Combinations, Major Axis Bending
Douglas Fir -Larch Wood Grade : No.2 Wood Species :
Fb -Tension
Fb -Compr
Applied Loads
900.0 psi Fe -Prll 1,350.0 psi Fv 180.0 psi Ebend-xx
900.0 psi Fe -Perp 625.0 psi Ft 575.0 psi Eminbend -xx
Unif Load: D = 0.0140, Lr= 0.020 k/ft, Trib= 3.0 ft
Design Summary
Max fb/Fb Ratio =
fb : Actual :
Fb : Allowable :
Load Comb:
Max fv/FvRatio =
fv : Actual:
Fv : Allowable :
0.114; 1
192. 70 psi at
1,687.50 psi
+D+Lr+H
1.500 ft in Span # 1
2.710ft inSpan#1
3.0 ft
1,600.0 ksi
580.0 ksi
Density 31.210 pcf
Load Comb :
Max Reactions (k)
Left Support
Right Support
0.067: 1 15.11 psi at
225.00 psi
+D+Lr+H
.12 !. l.r
0.09
0.09
'1:J. .E tl
Max De ect1ons
Transient Downward 0.005 in Total Downward 0.009 in
3854 >240 0.06
0.06
Ratio 6552 >360 Ratio
LC: Lr Only
Transient Upward 0.000 in
Ratio 9999
LC:
Total Upward
Ratio
LC: +D+Lr+H
0.000 in
9999
LC:
Seismic Design
solidforms
eng in ee rin g
Page 7 of 16
08/13/19
Design Variables Base Shear Calculation (ASCE 7-10 Sec. 12.8 & Supplement 2)
Latitude= 33.17 (12.8-2) V = C5W Cs= S05*1/R = 0.120
Longitude= -1117.32
Site Class = D
Occupancy= II Table 1.5-1
(12.8-3) for TSTL: S01 *1/(RT) Where: Cs max. = for T>TL: S01*TL*l/(RT2) (12.8-4)
Seis. Category = D Table 11.6-1 & 2
I = 1.0 Tables 1-1 & 11.5-1
R = 6.5 Table 12.2-1
(12.8-5) for S1<0.6:0.044S051~0.01 Where: Cs min. = (12.8-6) forS,~0.6: 0.5S1*1/R
Ss = 1.100 Section 11.4.1
S1 = 0.424 Section 11.4.1 DL Area Len.
Fa= 1.060 Table 11.4-1 Material (psf) {ft') (ft)
Fv = 1.576 Table 11.4-2 Load 1 14 3067
SMs = Ss*Fa = 1.166 (11.4-1)
SMl = S1*Fv = 0.668 (11.4-2}
.__
Q) Q)
0. > 0. Q) Ext. Wall 1 16 277 :::::> ...J
S05 = 2/3*SMs = 0.777 (11.4-3) Int. Wall 7 200
S01 = 2/3*SM1 = 0.445 (11.4-4) 3067
All other structural systems Table 12.8-2
Ci= 0.02 Table 12.8-2
X= 0.75 Table 12.8-2
TL= 8 Figure 22-15
Ta = (i*hnx = 0.104 (12.8-7)
T =Ta= 0.104 Section 12.8.2
hn = 9.0 Section 12.8.2.1
Cs= 0.120 Section 12.8.1.1
k= 1 Section 12.8.3
¼ = 4 Table 12.2-1
l::i.a = hsx * 0.025 Table 12.12-1
Vertical Distribution of Forces & Allowable Elastic Drift (ASCE 7-10, Sec. 12.8.3 & 12.8.6)
Level Wx hx h/ Wxh/ Fx Fx (psf) % P ?'ixe allow.
Upper Level 66.3 9.0 9.0 596 7.9 2.6 100% Yes 0.675
66.3 596 8 3
Level Forces (ASCE 7-10, Sec. 12.10.1.1)
Level Wx IWx Fx IFx Fpx Fpx (ASD) Where:
Roof 66.3 66.3 7.9 7.9 10.3 7.2 Fmln. = 0.21SosWx
Fmax. = 0.41SosWx
66.3 7.9
=
=
Ht.
(ft)
8
8
0.659 Max.
0.034 Min.
w
(kips)
42.9
17.7
5.6
66.3
Where:
Oxe allow. = l::i.a *I/Cd
(Section 12.8.6)
p : Redundancy Check
Required if story shear
Is > 35% of base shear
(Section 12.3.4.2)
solidforms
engi n eeri ng
Page 8 of 16
08/13/19
Wind Design
Wind Pressures for MWFRS ASCE 7-10 -Envelope Procdedure Method 2
Design Variables
Occupancy =
Iwind =
Basic Wind Speed (mph) =
Exposure Category =
Topographic Kzt =
Width (ft) =
Length (ft) =
Roof Pitch
Eave Ht. (ft) =
Ridge Ht. (ft) =
Mean Roof Ht (ft) =
'A=
8=
'AKztI =
2a (ft) =
Min. Design Load (psf) =
II Table 1.5-1
1. 00 Tables 1.5-2
110 Figure 26.5-lA
B Section 26. 7 .3
1 Section 26.8.2
60.0 Transverse
70. 0 Longitudinal
4: 12
10.0
20.0
15.0
1 Figure 28.6-1
18.4
1.0
12.0 Figure 28.6-1 Note 9
16.0 Section 28.4.4
Ps = 'AKztlPs3o (28.6-1) Note: (-) Horiz. Pressures shall be zero.
Horiz. Press.
(psf) A B C
Transverse 25.8 -7.3 17.2
Longitudinal 19.2 -10.0 12.7
tttttttttt~1 t~t~t~t~t~t~tt~t
Vertical I 1--------"'"'"''' -------------------7
i------Width, W =
--r Ridge
Eave height
height
Wind pressures are In psf
•Because wind presence is less than 2ero (0), use O for design.
D
-4.1
-5.9
Transverse Governing Design Force:
Transverse Tributary Area:
Transverse Governing Design Pressure:
22.4 kips
1400 ft2
16.0 psf
ttt1tt1t11+ttffffffft
Vertical
8 I ----r-Ridge -le! E"ve height
19 l j j ~ '%1////////,w///////&//////,W,w////////m//////,i/////,1///, hart l
i----L/2-----4---u2 ----i
Wind pressures are in pgf
Longitudinal Governing Design Force:
Longitudinal Tributary Area:
Longitudinal Governing Design Pressure:
14.4 kips
900 ft2
16.0 psf
E
-23.1
-23.1
Vert. Press. Overhangs
F G H ECH GCH
-15.7 -16.0 -12.0 -32.3 -25.3
-13.1 -16.0 -10.1 -32.3 -25.3
Transverse
Zone Ps Area Force (k) Total (k)
A 25.8 120 3.1
B 0.0 120 0.0
C 17.2 580 10.0 13.1
D 0.0 580 0
Min. 16.0 1400 22.4 22.4
E -23.1 360 -8.3
F -15.7 360 -5.7
G -16.0 1740 -27.8 -62.7
H -12.0 1740 -20.8
Min. -16.0 4200 -67.2 -67.2
Longitudinal
Zone Ps Area Force (k) Total (k)
A 19.2 144 2.8
B
C 12.7 756 9.6 12.4
D
Min. 16.0 900 14.4 14.4
E -23.1 420 -9.7
F -13.1 420 -5.5
G -16.0 1680 -26.9 -59.1
H -10.1 1680 -17.0
Min. -16.0 4200 -67.2 -67.2
Lateral Design
Upper Level
Seis. Area (ft') =
Shear Line Len.Tot. (ft) =
Wind Relative to Ridge =
Wind Lengths:
l+i = Vert.Trib Height (ft) =
lw = Dist to Adj Gridline (ft) =
Shear Above: Line =
Vx,.ro,e (Seis/Wind) =
%Trib. of Load =
N-S Line:
560
17
Parallel
Left Right
I 9.0
I 26.0
-
--
solidforms
eng in ee rin g
F
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwall Tot. (ft) = 6
-
---
-
Shearwall
Strength Design Seis. Force: Fx =
Maximum Wind Pressure: Px =
YxSels(ASO) = Area/2*Fx*p*0.7 =
xWind = LH*Lw/2*Px*0.6 = V
-
'I.Vx (Above) =
Yx Total =
3.5:1 = (h/2L}* Vx/L =
Use Shearwall Type=
Seis.
2.6
506
506
Wind
psf
16.0 psf
lbs
1123 lbs
lbs
1123 lbs
113 187 plf
@
Page 9 of 16
08/13/19
vxAbv.Trib. (Seis/Wind) = with LTP4 clips@ 48 "o.c. 39%
Wood Shearwalls =
Length =
Load Type=
Shear Load (lbs) =
Wall DLDlst. (psf) =
Resis. DLo;51. (plf) =
Resis. D4>olnt (lbs) =
D4>olnt Dist (ft) =
MomentOT (lb-ft} =
1MomentReslst. (lb-ft) =
Uplift (lbs) =
UpliftAbove =
Upli~et. =
Left Holdown =
Right Holdown =
W1
3
Seis. I Wind
253 562
16
2026 4493
283 346
697 1659
697 1659
Per Plan
Per Plan
Upper Level N-S Line:
Seis. Area (ft'} = 560
Shear Line Len.Tot (ft) = 17
Wind Relative to Ridge = Parallel
Wind Lengths: Left Right
l+i = Vert.Trib Height (ft) = I 9.o
lw = Dist to Adj Gridline (ft) = I 28.0
Shear Above: Line = -
VxAbove (Seis/Wind) = --
%Tnb. of Load =
vxAbv.Trib. (Seis/Wind) =
W2
3
Seis. I Wind
253 562
16
2026 4493
283 346
697 1659
697 1659
Per Plan
Per Plan
J
p = 1.0
SDs = 0 777
Plate Ht. (ft} = 8
Lwall Tot. (ft) =
-
--
0
-
-
-
-
-
See Perforated Shearwall Cales on Following Pages
for entire length of grid line F
W3 W4 Ws Ws
I
-
I I I
0 0 0 0 0 0 0
------
------
------
------
Perforated Shearwall Seis. Wind
Strength Design Seis. Force: Fx = 2.6 psf
Maximum Wind Pressure: Px = 16.0 psf
YxSeis (ASO) = Area/2*Fx *p*0.7 = 506
Yxw,00 = LH*Lw/2*Px*0.6 =
'E.Vx (Above) =
YxTotal = 506
lbs
1210 lbs
lbs
1210 lbs
-0
-
-
-
-
'Resisting Moment DL is reduced by 0.6-0.14'5os for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Lateral Design
Upper Level N-S Line:
Seis. Area (ft') =
Shear Line Len.Tot (ft) =
Wind Relative to Ridge =
Wind Lengths:
LH = Vert.Trib Height (ft) =
I.,. = Dist to Adj Gridline (ft) =
Shear Above: Line =
VxAb<Ne (Seis/Wind) =
%Trlb. of Load =
vxAbv.Trlb. (Seis/Wind) =
Wood Shearwalls =
Length =
Load Type =
Shear Load (lbs) =
Wall DLDlst. (psf) =
Resis. D~st. (plf) =
Resis. Dl+>oint (lbs) =
Dl+>oint Dist (ft) =
MomentoT (lb-ft) =
1Momentiies1st. (lb-ft) =
Uplift (lbs) =
UpliftAbove =
Upli~et. =
Left Holdown =
Right Holdown =
Upper Level
Seis. Area (ft') =
Shear Line Len.Tot (ft) =
1822
8
Perpendicular
Left Right
I 9.0
I 48.0
-
--
W1
8
Seis. I Wind
1648 2074
16
13182 16589
2012 2458
1489 1884
1489 1884
Per Plan
Per Plan
N-S
1822
7
Line:
Wind Relative to Ridge = Perpendicular
Wind Lengths:
~ = Vert.Trib Height (ft) =
I.,. = Dist to Adj Gridline (ft) =
Shear Above: Line =
VxAb<Ne (Seis/Wind) =
0/o-r,ib. of Load =
VxAbv.Trlb. (Seis/Wind) =
Wood Shearwalls =
Length =
Load Type =
Shear Load (lbs) =
Wall DLDlst. (psf) =
Resis. Dloist. (plf) =
Resis. DLPo1nt (lbs) =
Dli>o1nt Dist (ft) =
MomentoT (lb-ft) =
1Momentiies1st. (lb-ft) =
Uplift (lbs) =
UpliftAbove =
Upli~et. =
Left Right
I 9.0
I 48.0
-
--
W1
7
Seis. I Wind
1648 2074
16
13182 16589
1540 1882
1791 2263
1791 2263
Left Holdown = Per Plan
solidforms Page 10 of 16
08/13/19 engi n eeri n g
C
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
LwallTot. (ft) = 8
-
--
W2
I
0 0
--
--
--
--
H
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwall Tot. (ft) = 7
-
--
W2
I
0 0
--
--
--
--
-
0
-
-
-
-
-
0
-
-
-
-
-
Shearwall
Strength Design Seis. Force: F x =
Maximum Wind Pressure: Px =
Vx5e1s(ASD) = Area/2*Fx*P*O.7 =
Vxw100 = LH*Lw/2*Px *0.6 =
"i.Vx (Above) =
Vx Total =
Vx/L =
-
Use Shearwall Type=
Seis.
2.6
1648
Wind
psf
16.0 psf
lbs
2074 lbs
lbs
1648 2074 lbs
206 259 plf
@
with LTP4 clips @ 24 "o.c. 77%
for entire length of grid line C
W3 W4 Ws W5
I
-
I I
0 0 0 0
----
----
----
----
Shearwall
Strength Design Seis. Force: F x =
Maximum Wind Pressure: Px =
0
-
-
-
-
Seis.
2.6
I
0
-
-
-
-
Wind
psf
16.0 psf
Vx5e1s(ASD) = Area/2*F,*p*O.7 = 1648 lbs
V xWloo = LH*Lw/2*Px*O.6 = 2074 lbs
"i.Vx (Above) = lbs
Vx Total = 1648 2074 lbs
Vx/L = 235 296 plf
-
Use Shearwall Type= @
0
-
-
-
-
with LTP4 clips @ 24 "o.c. 88%
for entire length of grid line H
W3 W4 Ws W5
I I I I
0 0 0 0 0 0 0
-------
-------
-------
-------
Right Holdown = Per Plan
'Resisting Moment DL is reduced by 0.6-0.14*So, for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Lateral Design
Upper Level N-S Line:
Seis. Area (ft') = lS0
Shear Line Len.Tot. (ft) = 9.25
Wind Relative to Ridge = Perpendicular
Wind Lengths: Left Right
1..+i = Vert.Trib Height (ft) = I 9.0
I...,. = Dist to Adj Gridline (ft) = I 6.0
Shear Above: Line= -
v~ (Seis/Wind) = --
0/oi-rtb. of Load =
vxAbv.Trib. (Seis/Wind) =
solidforms
eng i neering
A
p = 1.0
Sos = 0.777
Plate Ht. (ft) = 8
Lwau Tot. ( ft) =
--
---
Perforated Sheaiwall Seis. Wind
Strength Design Seis. Force: F, = 2.6 psf
Maximum Wind Pressure: P, = 16.0 psf
V><Sels.(ASOJ = Area/2*F,*p*0.7 = 136 lbs
259 lbs
lbs
259 lbs
V xWlnd = LH*Lw/2*P, *0.6 =
DI, (Above) =
V x Total = 136
-0
See Perforated Sheaiwall Cales on Following Pages
Upper Level E-W Line:
Sels. Area (ft') = 560 2
Shear Line Len.Tot. (ft) = 28 p = 1.0
Wind Relative to Ridge = Perpendicular Sos= 0.777
Wind Lengths: Left Right Plate Ht. (ft) = 8
1..+i = Vert.Trib Height (ft) = I 9.0 Lwau Tot. (ft) =
I...,. = Dist to Adj Gridline (ft) = I 18.0
Shear Above: Line = --
v~ (Seis/Wind) = ----
0/oi-rtb. of Load =
V xAbv.Trib. (Seis/Wind) =
See Perforated Sheaiwall Cales on Following Pages
-
-
Perforated Sheaiwall Seis.
Strength Design Seis. Force: F, = 2.6
Maximum Wind Pressure: P, =
V><Sels(ASDJ = Area/2*F,*p*0.7 = 506
xWlnd = LH*Lw/2*Px *0.6 = V
Dix (Above) =
V x Total = 506
Wind
psf
16.0 psf
lbs
778 lbs
lbs
778 lbs
-0
'Resisting Moment DL Is reduced by 0.6-0.!4*5os for Sels.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Page 11 of 16
08/13/19
Lateral Design
Upper Level
Seis. Area (ft2) =
Shear Line Len.Tot. (ft) =
Wind Relative to Ridge =
Wind Lengths:
41 = Vert.Trib Height (ft) =
'-w = Dist to Adj Gridline (ft) =
Shear Above: Line=
v_,. (Seis/Wind) =
0/o,-rib. of Load =
vxAbv.Trib. (Seis/Wind) =
Wood Shearwalls =
Length=
Load Type=
Shear Load (lbs) =
Wall DLDlst. (psf) =
Resis. Dl.o;s1. (plf) =
Resis. D4'oint (lbs) =
DLP<>nt Dist (ft) =
MomentaT (lb-ft) =
1Momen~st. (lb-ft) =
Uplift (lbs) =
UpliftAt>ove =
Uplift:tiet. =
Left Holdown =
Right Holdown =
Upper Level
Seis. Area (ft2) =
Shear Line Len.Tot. (ft) =
Wind Relative to Ridge =
Wind Lengths:
41 = Vert.Trib Height (ft) =
'-w = Dist to Adj Gridline (ft) =
Shear Above: Line =
v_,. (Seis/Wind) =
0/o,-nb. of Load =
VxAbv.Tnb. (Seis/Wind) =
E-W Line:
2622
27
Parallel
Left Right
I 9.o
I 50.0
-
--
w,
11
Seis. I Wind
2371 2160
16
350
18970 17280
14204 17351
454 -7
N/A N/A
E-W Line:
2622
23
Perpendicular
Left Right
I 9.0
I 50.0
-
--
so lidforms
engi n eerin g
3
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwoll Tot. (ft) = 11
-
---
-
Shearwall
Strength Design Seis. Force: F x =
Maximum Wind Pressure: Px =
V~s(ASOJ = Area/2*Fx*P*0.7 =
xWlnd = LH*Lw/2*Px *0.6 = V
-
r.v, (Above) =
Vx Total =
Vx/L=
Use Shearwall Type=
Seis.
2.6
2371
Wind
psf
16.0 psf
lbs
2160 lbs
lbs
2371 2160 lbs
216 196 plf
@
Page 12 of 16
08/13/19
with LTP4 clips@ 24 "o.c. 26%
W2
I
0 0
--
--
--
--
8&9
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwall Tot. (ft) =
-
--
0
-
-
-
-
-
for entire length of grid line 3
W3 W4 Ws
I
-
I
0 0 0 0
----
----
----
----
Perforated Shearwall
Strength Design Seis. Force: F x =
Maximum Wind Pressure: Px =
V~s(ASOJ = Area/2*Fx*P*0.7 =
xWlnd = LH*Lw/2*P, *0.6 = V
-
r.v, (Above) =
V, Total =
I
0
-
-
-
-
Seis.
2.6
2371
2371
w6
I
0
-
-
-
-
Wind
psf
16.0 psf
lbs
2160 lbs
lbs
2160 lbs
0
0
-
-
-
-
See Perforated Shearwall Cales on Following Pages
'Resisting Moment DL Is reduced by 0.6-0.14*S,,. for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Lateral Design
Upper Level
Seis. Area (ft') =
Shear Line Len.Tot (ft) =
Wind Relative to Ridge =
Wind Lengths:
41 = Vert.Trib Height (ft) =
Lw = Dist to Adj Gridline (ft) =
Shear Above: Line=
VxAtx,,e (Seis/Wind) =
o/orr;b. of Load =
vxAbv.Trib. (Seis/Wind) =
Wood Shearwalls =
Length =
Load Type =
Shear Load (lbs) =
Wall DLo;st. (psf) =
Resis. Dlo;st. (plf) =
Resis. Dlp01nt (lbs) =
Dli,,,;nt Dist (ft) =
MomentoT (lb-ft) =
1Momen4'es1st (lb-ft) =
Uplift (lbs) =
UpliftAbove =
Uplif4iet. =
Left Holdown =
Right Holdown =
Upper Level
Seis. Area (ft') =
Shear Line Len.Tot. (ft) =
Wind Relative to Ridge =
Wind Lengths:
41 = Vert.Trib Height (ft) =
lw = Dist to Adj Gridline (ft) =
Shear Above: Line =
VxAtx,,e (Seis/Wind) =
%Tr1b. of Load =
VxAbv.Trib. (Seis/Wind) =
Wood Shearwalls =
Length =
Load Type =
Shear Load (lbs) =
Wall DL01st. (psf) =
Resis. Dlo;st (plf) =
Resis. D~int (lbs) =
D~int Dist (ft) =
MomentoT (lb-ft) =
1Momen4'estst. (lb-ft) =
Uplift (lbs) =
UpliftAtx,,e =
Uplif4iet. =
Left Holdown =
Right Holdown =
E-W Line:
150
5
Parallel
Left Right
I 4.0
I 9.0
-
--
W1
2.5
Seis. I Wind
136 173
16
1085 1382
196 240
444 571
N/A N/A
N-5 Line:
200
8
Parallel
Left Right
I 9.o
I 20.0
-
--
W1
7
Seis. I Wind
181 864
16
77
300
3
1447 6912
2909 3554
-225 517
N/A N/A
solidforms Page 13 of 16
08/13/19 eng in ee rin g
4
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwall Tot. (ft) = 2.5
-
--
W2
I
0 0
--
--
--
--
E
p = 1.0
Sos= 0.777
Plate Ht. (ft) = 8
Lwall Tot. (ft) = 7
-
--
W2
I
0 0
--
--
--
--
-
0
-
-
-
-
-
0
-
-
-
-
-
Shearwall
Strength Design Seis. Force: Fx =
Maximum Wind Pressure: Px =
vxSeis(ASO) = Area/2*Fx*P*0.7 =
xWincl = LH*Lw/2*Px*0.6 = V
r>lx (Above) =
Seis.
2.6
136
Wind
psf
16.0 psf
lbs
173 lbs
lbs
Vx Total = 136 173 lbs
plf 3.5:1 = (h/2L)* Vx/L = 87 69
-@ Use Shearwall Type=
with LTP4 clips @ 48 "o.c. 21%
for entire length of grid line 4
W3 W4 Ws
I I I
0 0 0 0
----
----
----
----
Shearwall
Strength Design Seis. Force: Fx =
-
Maximum Wind Pressure: Px =
Vx5e1s(ASOJ = Area/2*Fx*p*0.7 =
xWincl = LH*Lw/2*Px*0.6 = V
-
'F.Vx (Above) =
Yx Total =
VJ L =
Use Shearwall Type=
0
-
-
-
-
Seis.
2.6
181
W5
I
0
-
-
-
-
Wind
psf
16.0 psf
lbs
864 lbs
lbs
181 864 lbs
26 123 plf
@
0
-
-
-
-
with LTP4 clips@ 48 "o.c. 64%
for entire length of grid line E
W3 W4 Ws W5
I I I I
0 0 0 0 0 0 0
-------
-------
-------
-------
'Resisting Moment DL Is reduced by 0.6-0.14*Sos for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Perforated Shear Wall Analysis
solidforms
eng i neer i ng
Page 14 of 16
08/13/19
Wood Framed Shear Walls with Openings (SEAOC Design Manual Vol. II)
Gov.
Grid Line: Upper Level J Force: Wind = 1210 lbs
Sos = 0.777333 Uniformly Distributed Resisting DL = 100 plf
Wall Dimensions (ft) W1
Window 2.5
Hl = 1 ...............................
H2 = 1
...............................
H3 = 6
Max Shear=
Overturning Moment =
1Resist. Overturning Moment =
Resulting Uplift Force =
Header Strap Tension =
Sill Strap Tension =
W2
5
10 ft
242 plf
9677 lbs*ft
3000 lbs*ft
668 lbs
454 lbs
328 lbs
W3
2.5
I
Holdown Per Plan
CS16 Strap
CS16 Strap
8 ft
27%
19%
'Resisting Moment DL Is reduced by 0.6-0.14*Sos for Sels.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Gov.
Grid Line: Upper Level A Force: Seismic =
Sos= 0.777333 Uniformly Distributed Resisting DL =
Wall Dimensions (ft) W1 W2 W3
Window 3.5 2 3.5
Hl = 1 ...............................
H2 = 3
...............................
H3 = 4
9 ft
Max Shear = 38 plf [>
Overturning Moment = 1085 lbs*ft
1Resist. Overturning Force = 696 lbs*ft
Resulting Uplift Force = 43 lbs N/A
Header Strap Tension = 38 lbs CS16 Strap
Sill Strap Tension = 21 lbs CS16 Strap
I
136 lbs
35 plf
8 ft
2%
1%
'Resisting Moment DL is reduced by 0.6-0.14*Sos for Sels.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
Vert. Shear Force Above Header
I 181 I
Header Strap Tension
V (lb) =I 151 I I 454 I I 151
V (plf) =I 60
Shear t bove o1enin~
I 181 60
V (lb) =I
Horiz. Force @ Openi~
605 1 605
Shear @ Opening
V (plf) =I 242 I I 242
Vert. Shear Force Below Sill
T (lb) = I 786 I
V (lb) =I 277
Sill rap Teron
I 328 1 277
Shear Below Sill
V (plf) =I 111 I 131 I 111
Vert. Shear Force
T (lb) =I 968 I -968
Vert. Shear Force Above Header
I 38 I
Header Strap Tension
V {lb) =I 30 I I 38 I I 30
V (plf) =I 9
Shear t bove o1eninb=J I 38 9
V {lb) =I
Horiz. Force @ Openi~
68 I 68
Shear @ Opening
V (plf) =I 19 I I 19
Vert. Shear Force Below Sill
T (lb) = I 83 I
V {lb) =I 47
Sill rrap Terion
I 21 I 47
Shear Below Sill
V (plf) =I 13 I 21 I 13
Vert. Shear Force
T (lb) =I 121 I -121
Gov.
so lidforms
engi n eer ing
Grid Line: Upper Level 2 Force: Wind :::
S05 = 0.777333 Uniformly Distributed Resisting DL =
778 lbs
112 plf
Wall Dimensions (ft) W1 W2 W3
Window 2 9 2
Hl = 1
H2 = 2
H3 = 5
13 ft
;:::::::::=:::=··············· ............ ======....==========:.'I,.
Max Shear=
Overturning Moment =
1Resist. Overturning Force =
Resulting Uplift Force =
Header Strap Tension =
Sill Strap Tension =
194 plf
6221 lbs*ft
5678 lbs*ft
42 lbs
538 lbs
323 lbs
N/A
CS16 Strap
CS16 Strap
'Resisting Moment DL is reduced by 0.6-0.14*Sos for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
32%
19%
Grid Line: Upper Level 8 & 9 Seismic:::
Sos= 0.777333 Uniformly Distributed Resisting DL =
1134 lbs
plf
Wall Dimensions (ft) w,
Window 2.5
Hl = 1 ...............................
H2 = 5
·········"'"''""""""'"'"" H3 = 2
Max Shear=
Overturning Moment =
1Resist. Overturning Force =
Resulting Uplift Force =
Header Strap Tension =
Sill Strap Tension =
W2
6.5
11 ft
361 plf
9072 lbs*ft
0 lbs*ft
825 lbs
1173 lbs
754 lbs
W3
2
I
Holdown Per Plan
CS16 Strap
CS16 Strap
8 ft
'Resisting Moment DL is reduced by 0.6-0.14*Sos for Seis.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
69%
44%
Grid Line: Upper Level 8 & 9 Seismic:::
Sos= 0.777333 Uniformly Distributed Resisting DL =
1237 lbs
plf
Wall Dimensions (ft) W1 W2 W3
Window .---=2=.5-----6""'.~5 ____ --'2=·=-5-~ I
8
ft
Hl = 1 ...............................
H2 = 5
H3 = 2
Max Shear=
Overturning Moment =
1Resist. Overturning Force =
Resulting Uplift Force =
Header Strap Tension =
Sill Strap Tension =
11.5 ft
377 plf
9897 lbs*ft
0 lbs*ft
861 lbs
1224 lbs
787 lbs
Holdown Per Plan
CS16 Strap
CS16 Strap
'Resisting Moment DL is reduced by 0.6-0.14*Sos for Sels.(12.14.3.1.3) & 0.6 for Wind (2.4.1)
72%
46%
Page 15 of 16
08/13/19
Vert. Shear Force Above Header
1 120 1
Header Strap Tension
V (lb) =l~(-15-0)~, I 538 ! l~(-15-0)~,
~--Shear Above o1enin~
v (plf) =I (75) ! I 120 . LJm...j
.----'-H.:..;oriz. Force @ Openi~
V (lb) =I 389 ! LJ!!LJ
___ Shear @ Opening
V (plf) =I 194 I 1,--1-94--,
Vert. Shear Force Below Sill
T (lb) = I 359 I
V (lb) =I 66
Sill !trap TeTion
I 323 1 66
Shear Below Sill
V (plf) =I 33 I I 72 I I 33
Vert. Shear Force
T (lb) =I 479 I I -479
Vert. Shear Force Above Header
1 361 1
.----Header Strap Tensio~n __ ~
V (lb) =I (580) ! I 1173 ! I (631) I
Shear Above o1enin~
v (plf) =l,---(2-32_)_,I I 361 . LQillJ
__ ..:..H:..;;oriz. Force @ Openi~
V (lb) =I 593 ! L..2iLJ
___ Shear@ Opening ~-~
v (plf) =I 237 ! ! 338
Vert. Shear Force Below Sill
T(lb) = I 464 !
Sill rrap TeTion V (lb) =~I -(1_6_1)~, 754 1,--(2_13_)~,
Shear Below Sill
v (plf) =I (64) I 232 ! I (106) !
---Vert. Shear Force ---
T (lb) =I 825 ! I -825
Vert. Shear Force Above Header I 377 I
Header Strap Tension
V (lb) =~I (-60-5)~, I 1224 ! ~I -(6-05-)~,
..---.,-,Shear Above o1enin~
v (plf) =I (242) J J 377 . LQillj
--...;.H.:..;oriz. Force@ Openi~
V (lb) =I 619 ! ~
.----Shear @ Opening .----
v (plf) =I 247 I I 247
Vert. Shear Force Below Sill
T (lb) = I 484 I
---Sill rap TeTion V (lb) =I (168) I 787 ~I _(1_68_)~
Shear Below Sill
v (plf) =I (67) I 242 I I (67) I
---Vert. Shear Force ---
T (lb) =I 861 I I -861
Foundation Design
Distributed Loads
solidforms
engineeri ng
Page 16 of 16
08/13/19
Grid line: 2 q= 1500 psf (Note: All loads are psf and lengths are ft)
w= Ext. Wall*Ht. + Int. Wall*Ht. + R1*Span/2 + R2*Span/2 + F1*Span/2 + F2*Span/2= Total Load
W= 16 * 9.0 + 7 * + 34 * 18.0 /2 + * /2+ * /2+ * /2= 450 plf
Gov. Load: D+Lr = 450 plf Use: 12 "Wide x 12 "Deep w/ ( 2 ) #4 Bars T&B
Grid line:
w=
w= 16 *
Grid line:
w=
w= 16 *
q=
Ext. Wall*Ht.
+ 7 *
q=
Ext. Wall*Ht.
+ 7 *
Concentrated Loads
Pad Ftg: q=
D( )+Lr(
v'(144* I
Use:
Pad Ftg: q=
D( )+Lr(
v'(144* I
Use:
Pad Ftg: q=
D( )+Lr(
v'(144* I
Use:
Pad Ftg: q=
D( )+Lr(
v'(144* I
Use:
Pad Ftg: q=
D( )+Lr(
v'(144* I
Use:
Loaded:
psf (Note: All loads are psf and lengths are ft)
+ Int. Wall*Ht. + R1*Span/2 + R2*Span/2 + F1*Span/2 + F2*Span/2= Total Load
+ 34 * /2 + * /2+ * /2+ * /2= 0 plf
plf Use: "Wide x "Deep w / ( 2 ) #4 Bars T&B
Loaded:
psf (Note: All loads are psf and lengths are ft)
+ Int. Wall*Ht. + R1*Span/2 + R2*Span/2 + F1*Span/2 + F2*Span/2= Total Load
+ 34 * /2 + * /2+ * /2+ * /2= 0 plf
plf Use: "Wide x "Deep w / ( 2 ) #4 Bars T&B
Loaded:
psf
)+L( ) + W( ) + E( ) = # Total Load
## # Factored Load
)= "Min. Square Dimension
"Sqr. X "Deep with #4 Bars Ea. Way Loaded:
psf
)+L( ) + W( ) + E( )= # Total Load
## # Factored Load
)= 11 Min. Square Dimension
"Sqr. x "Deep with #4 Bars Ea. Way Loaded:
psf
)+L( ) + W( ) + E( ) = # Total Load
## # Factored Load
)= " Min. Square Dimension
"Sqr. x "Deep with #4 Bars Ea. Way Loaded:
psf
)+L( ) + W( ) + E( ) = # Total Load
## # Factored Load
)= 11 Min. Square Dimension
"Sqr. X "Deep with #4 Bars Ea. Way Loaded:
psf
)+L( ) + W( ) + E( ) = # Total Load
## # Factored Load
)= 11 Min. Square Dimension
"Sqr. x "Deep with #4 Bars Ea. Way Loaded:
(city of
Carlsbad
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www .carlsbadca.gov
PURPOSE
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
.,. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
.,. Details on CAP ordinance requirements are available on the city's website .
.,. A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and
download the latest form.
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
BP No. Qb{<. 0\ Ci\ 9'-o? L-f-3 I
'2-.Y!-Ji, MO.rl'-Cir. Carlsb:,d, (__g 9'2010
V) (q _ g Cf l{ _ .f:S:::~ Contact Email p,e ,c-r.-'> ~ -\--l @ ~e__'('"'yy--, 1-ti; i >"
\J\. 0'"' ;)"' • C. O yY'\
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Email:
Page 1 of 6 Revised 08/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) from worksheet:$ 11 1 Ye~ /{?">· 80
I . I I ' ~esldential (Low-r1s9 High-rise mixed-use building in which at least 20% of its conditioned floor
area Is residential use
A h'gh rise resident'al building ·s 4 or more stories including a
□ New construction 2A, 3A, 1B, 2B,
4A 3B, 4A
'R Additions and alterations:
□ BPV < $60,000 N/A N/A All residential additions and alterations
:;81" BPV ;e $60,000 39 4A 1-2 family dwellings and townhouses with attached garages
□ Electrical service panel upgrade only only
'Multi-family dwellings only where interior finishes are removed
□ BPV ;e $200,000 1A, 4A' 1 B, 4A' and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
D Nonresidential
□ New construction 18, 2B, 3B, 4B and 5
□ Alterations:
□ BPV ;e $200,000 or additions ;e 1,000 1B, 5 square feet
□ BPV ;e $1,000,000 18, 2B, 5 Building alterations of ;e 75% existing gross floor area
□ ;e 2,000 sq. ft new roof addition 2B, 5 1 B also applies if BPV ;e $200,000
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for
more information when completing this section.
A. Residential addition or alteration c $60,000 building permit valuation.
See CMC section 18.30.190.
Year Built Single-family Requirements
~fore1978 Select one:
D Duct sealinq 01\ttic insulation D Cool roof
D 1978 and later Select one:
D Lighting package D Water heating Package
D Between 1978 and 1991
D 1992 and later
D N/A _________ _
D Exception: Home energy score~ 7
(attach certification)
Multi-family Requirements
D Attic insulation
Select one:
D Duct sealinq D Attic insulation D Cool roof
Select one:
D Lighting package D Water heating package
B. D Nonresidential' new construction or alterations c $200,000 building permit valuation,
or additions c 1,000 square feel D NIA
Updated 8/15/2019
..
2
City of Carlsbad Climate Action Plan Consistency Checklist
See CMC 18.21.155 and CALGreen Appendix AS, Division AS.2-Energy Efficiency.
A5.203.1.1 Choose one: D .1 Outdoor lighting D .2 Warehouse dock seal doors
D .3 Restaurant service water heating (comply with California Energy Code secbon 140.5, as amended)
D .4 Daylight design PAFs D .5 Exhaust air heat recovery
D N/A _________ _
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget D .90 Energy budget D N/A
AS.211.1"
D On-site renewable energy D N/A
A5.211.3"
D Green power (if offered by local utility provider, 50% minimum renewable sources) D NIA
A5.212.1
D Elevators and escalators D NIA
AS.213.1
D Steel framing D N/A
• Includes hotels/motels and high-rise residential buildings
"For alterations~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply
with CMG 18.30.130 instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building penmit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic
requirement (28 below) instead. 2) If projectincludes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8)
(high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc'
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x#d.u.)
'Fomnula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
D
D
D
D
kWdc
8. D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof
area by ~2,000 square feel Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA) Method
GFA:
□If< 10,000s.f. Enter 5 kWdc
Min. System Size:
□ lf.e 10,000s.f. calculate: 15 kWdc x (GFA/10,000)"
kWdc
"Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Updated 8/15/2019 3
City of Carlsbad Climate Action Plan Consistency Checklist
Annual TDV Energy use: .. ' ______ x .80= Min. system size: _____ kWdc
"'Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A D Residential and hotel/motel new construction
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
□ For systems serving individual dwelling units choose one:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1(c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with all of the following:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction
Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater( s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
Updated 8/15/20 I 9 4
•.
City of Carlsbad Climate Action Plan Consistency Checklist
4. Electric Vehicle Charging
A UResideritial New construction and major alterations'
~e refer to Carlsbad Ordinance CMC section 18.21.140 when com letin this section.
One and two-family residential dwelling or townhouse with attached garage:
)1{Qne EVSE Ready parking space required □ Exception :
□ Multi-family residential □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable Ready Installed
Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number)
EVSE Installed= Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces-EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Total
'Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building pem,it valuation~ $60,000
or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation ~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
B D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable Ready Installed I Total
I
Calculation· Refer to the table below·
Total Numberof ParkinQ Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Spaces
Updated 8/15/2019 5
City of Carlsbad Climate Action Plan Consistency Checklist
5. D Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to detenmine whether or nor your penmit requires a TOM plan. If TOM is applicable to your
penmit, staff will contact the applicant to develop a site-specific TOM plan based on the penmit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all), 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 10th Edition
13
11
4.5
3.5
3
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
, Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
Applicant Signature: __________________ _ Date: ______ _
Person other than Applicant to be contacted for TDM compliance (if applicable):
Name(Printed): ___________________ _ Phone Number: _____ _
Email Address ___________________ _
Updated 8/15/2019 6