HomeMy WebLinkAboutCUP 2018-0023; BUENA VISTA RESERVOIR SITE (PARK); DRAINAGE STUDY BUENA VISTA RESERVOIR SITE; 2020-05-20DRAINAGE STUDY FOR:
BUENA VISTA RESERVOIR SITE
APN 156-200-16
1605 BUENA VISTA WAY, CARLSBAD, CA 92008
CUP2018-0023 I GR2019-0040 I DWG 521-IA
1ThTT,—r 'r' fl4LIJ4iL Yii
P •.
H ] U LL nj
LAND DEVELOPMENT
ENGINENC
Prepared For:
SCHMIDT DESIGN GROUP, INC.
1310 ROSECRANS STREET, SUITE G
SAN DIEGO, CA 92106
(619) 236-1462
Prepared By:
LATITUDE 33 PLANNING AND ENGINEERING
9968 HIBERT STREET 2ND FLOOR
SAN DIEGO, CA 92131
(858) 751 - 0633
oFESS,0 (b
No. 67697
OF CA01
Nick Psyhogios Date Prepared by: JG
RCE 67697 Expires: 06/2021 Reviewed by: NP
TABLE OF CONTENTS
Executive Summary Page #
Purpose 2
Project Description 2
Vicinity Map 2
Existing Conditions 3
Proposed Conditions 3
Water Quality 4
Discussion and Conclusions 5
Methodology & Model Development
County of San Diego and City of Carlsbad
Drainage Design Criteria 8
Rational Method Hydrologic Analysis 9
Appendix 17
Existing Hydrology Map
Proposed Hydrology Map
Hydrology Calculations
Maps and References 18
Isopluvial Maps
Excerpts from County of San Diego Hydrology Manual
ilPage
EXISTING CONDITION
Under pre-project conditions, the site is in a mass graded state, but has not been built out.
Ground coverage consists primarily of scattered grasses and bushes, exposed soil, and some
impervious pavement serving as a vehicle access road. The existing drainage pattern for the site
directs runoff as surface flow to the adjacent parcels to the East, South, and West and to Buena
Vista Way to the North. From here, storm water continues to surface flow until reaching
existing offsite storm drain infrastructure where it is then conveyed and discharged into Buena
Vista Lagoon.
The existing impervious portion of the project is under a sump condition and can hold up to
300,000 cubic feet of water before overflowing into the existing stand pipe. This basin shown as
E40 on the Existing Hydrology Map is considered self-retaining since does not contribute to the
overall outfall of the project site.
PROPOSED CONDITION
This project proposes to construct a public park consisting primarily of landscaping and garden
areas with some impervious concrete walkways and plazas for pedestrian circulation. A brow
ditch will be constructed along the West, East, and South edges of the property to prevent
runoff from leaving the site and flowing into the adjacent parcels. Additionally, public
improvements consisting of on-street parking stalls, concrete sidewalk, curb ramps, and
crosswalk striping are proposed along the Northern edge of the lot where it meets the Southern
edge of Buena Vista Way.
The majority of onsite storm water will fall on or be dispersed to pervious landscaping areas
before being directed to a proposed biofiltration (BF-1) BMP at the Northwest corner of the
project site.
WATER QUALITY AND HYDROMODIFICATION
The post-construction phase of this project will require permanent BMPs designed to minimize
discharge of pollutants generated on-site throughout the life of the project. The proposed water
quality BMP for the project will include landscape and irrigated areas, and a biofiltration basin.
Priority development projects are also required to implement hydromodification mitigation
measures so that post-project runoff flow rates and durations do not exceed the pre-project
where such increases would result in a potential for increase erosion or significant impacts to
beneficial uses. The proposed biofiltration basin will also provide the required hydromodification
mitigation. For more details regarding the onsite BMP see the Storm Water Quality Management
Plan for the project.
DISCUSSION AND CONCLUSIONS
The onsite drainage areas for this project encompass approximately 3.16-acres and is the limit of
the drainage analysis for this report.
3Page
Methodology & Model Development
County of San Diego and City of Carlsbad Drainage Design Criteria
Rational Method Hydrologic Analysis
7Page
METHODOLOGY & MODEL DEVELOPMENT
The proposed development was analyzed in conformance with the County of San Diego
Hydrology Manual, dated June 2003 and the City of Carlsbad Drainage Standards. The total area
of all basins analyzed are less than one square mile. Therefore, the Rational Method was utilized
to calculate peak storm runoff.
The design is based upon the following:
1) Within floodplain and floodplain fringe areas as defined by the Federal Emergency
Management Agency (FEMA), runoff calculations shall be based upon a 100-year
frequency storm.
2) For all drainage channels and storm drain systems which will convey drainage from a
tributary area greater than or equal to one square mile, runoff calculations shall be
based upon a 100-year frequency storm.
3) For tributary areas under 1 square mile:
The storm drain system shall be designed to carry 10-year, 6-hour underground
and 100-year, 6-hour storm within top of curbs so that the combination of storm
drain system capacity and overflow both inside and outside the right of way will
be able to carry the 100-year frequency storm without damaging adjacent existing
buildings or potential building sites. All culverts must be designed with 1 ft of
freeboard at inlets and headwalls for the 100-year, 6-hour storm.
The storm drain system shall be designed so that the combination of storm drain
system capacity and allowable Street overflow will be able to carry the 100-year
frequency Storm without damaging adjacent property.
Where a storm drain is required under headings 1 or 2 above, then as a minimum,
the drain shall be designed to carry the 10-year frequency storm.
4) Sump areas are to be designed for a sump capacity or outfall of a 100-year frequency
storm.
5) Type B soil shall be used for all areas.
8Page
Rational Method Hydrologic Analysis
Design Storm - 100-year/50-year return interval
Land Use - Residential / Multifamily
Soil Type - Based on geotechnical borings Hydrologic soil group B covers 99% of the project area,
therefore soil group B was assured for all areas.
Runoff Coefficient - In accordance with the County of San Diego Hydrology Manual, runoff
coefficients are as followed:
Undisturbed Natural Terrain uses a coefficient of 0.25.
Low Density Residential (LDR) uses a coefficient of 0.32-0.41.
Medium Density Residential uses a coefficient of 0.45-0.58.
High Density Residential uses a coefficient of 0.0.67-0.77.
Commercial/Industrial uses a coefficient of 0.77-0.87.
When a watershed encompasses solely pavement conditions, a runoff coefficient of 0.95 was
selected.
Method of Analysis - The Rational Method is the most widely used hydrologic model for
estimating peak runoff rates. Applied to small urban and semi-urban areas with drainage areas
less than 0.5 square miles, the Rational Method relates storm rainfall intensity, a runoff
coefficient, and drainage area to peak runoff rate. This relationship is expressed by the equation:
Q=CIA, where:
Q = The peak runoff rate in cubic feet per second at the point of analysis.
C = A runoff coefficient representing the area - averaged ratio of runoff to rainfall intensity.
= The time-averaged rainfall intensity in inches per hour corresponding to the time of
concentration.
A = The drainage basin area in acres.
Computer Software - Autodesk Storm and Sanitary Analysis 2018
This software uses the San Diego County Hydrology Manual standards to calculate
time of concentration. The intensity-duration-frequency curves used in the analysis
are from the County of San Diego.
Design Storm - 100-year/50-year return interval
9Page
Appendix
Existing Hydrology Map
Proposed Hydrology Map
Hydrology Calculations
101 P a g e
:will ~ 0 =61 !;1YL.] [am ll 111=w=uNl%
mloNowl 0 VA ØJØ]0--1*- VA LTA FA1 MAJOR BASIN DI WOE/PROJECT LIMITS II
SURFACE DRAINAGE PATTERNS
STORM DRAIN PIPE DRAINAGE PATTERNS
STORM DRAIN PIPE
FLOWLINE
BASIN DATA
X BASIN NUMBER
Q100/050
VELOCITY
BASIN AREA
/
4 /
MODIFIED SORSO D-75 TYPE
'0' CONCRETE BROW DITCH
/ , ' 7j JUNC11ON
Ji
12" PVC STORM DRAIN PIPE,-45 LF
GFZ
164.0
IL /
/
0
\ / /
/
/
N /
o 25 50 100 150
( IN FEET )
l inch =50 ft.
6 11:16:31 AM - SdmWt Design -
T U 0 !;1YL.]I:1111
;[Luj t wj;lAw i1 MAJOR BASIN DI WDE/PROJECT LIMITS
DRAINAGE PA 1TERNS
FLOWLINE FOR liME OF CONCENTRA liON amewm MOM= ago"
EXIS71NG CHANNEL FLOWLINE
X BASIN NUMBER
BASIN DATA Q100/Q50
VELOCITY
BASIN AREA
o 15 30 60 90
( IN FEET )
1 inch = 30 ft.
- SdWth D.0 - AM Con4t4onLdwQ
50 YEAR EXISTING CONDITIONS I
Autodesk5 Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0) -----------------------------------------------------------------------------------------
Proj ect Description
** * * ** * * * ** * **
File Name .................EX conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method. Rational
Time of Concentration ......FAA
Return Period..............50 years
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date ............. DEC-12-2018 00:00:00
Ending Date ...............DEC-12-2018 07:00:00
Report Time Step ..........00:00:10
Element Count
Number of subbasins .......4
Number of nodes ...........4
Number of links ...........0
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft ---------------------------------------------------
E1O 1.00 268.00 7.2000
E20 0.45 91.00 9.5000
E30 0.51 91.00 19.6700
E40 0.85 298.00 3.2000
************
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area inflow
ft ft ft2
POCO1 OUTFALL
------------------------------------------------------------------------------
0.00 0.00 0.00
P00O2 OUTFALL 0.00 0.00 0.00
P00O3 OUTFALL 0.00 0.00 0.00
P0004 OUTFALL 0.00 0.00 0.00
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.135 0.575
Continuity Error (%) 0.530
Volume Volume
Flow Routing Continuity acre-ft Mgallons
Autodesk Storm and Sanitary Analysis
External Inflow 0.000 0.000
External Outflow 0.063 0.021
Initial Stored Volume . . . 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
* ** * * ************** * ************ * * * * **
Runoff Coefficient Computations Report
** ** * * * * ************* *
------------
Subbasin ElO
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. ------------------------------------------------------------------------------------------
- 1.23 B 0.32
Composite Area & Weighted Runoff Coeff. 1.23 0.32
------------
Subbasin E20
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.45 B 0.32
Composite Area & Weighted Runoff Coeff. 0.45 0.32
---------------
Subbasin E30 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.51 B 0.32
Composite Area & Weighted Runoff Coeff. 0.51 0.32
---------------
Subbasin E40 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
Concrete 0.85 B 0.90
Composite Area & Weighted Runoff Coeff. 0.85 0.90
* * * * * * ********************** *
FAA (Federal Aviation Agency) Time of Concentration Computations Report
************* ******** ** ******** * * * * * * * ******* ************* * *
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin E10 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 268.00
Autodesk Stonn and Sanitary Analysis
Slope M: 7.20
Computed TOC (minutes): 11.91
---------------
Subbasin E20
---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 91.00
Slope (U : 9.50
Computed TOC (minutes): 6.33
---------------
Subbasin E30
---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (,V): 19.67
Computed TOC (minutes): 4.97
---------------
Subbasin E40
---------------
Runoff Coefficient: 0.90
Flow Length (ft) : 298.00
Slope (U: 3.20
Computed TOC (minutes): 4.22
Subbasin Runoff Summary
Subbasin Accumulated Rainfall Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
E1O 0.68 3.46
---------------------------------------------------------------------------------------
0.22 1.11 0.320 0 00:11:54
E20 0.55 5.20 0.18 0.75 0.320 0 00:06:19
E30 0.50 6.06 0.16 0.99 0.320 0 00:05:00
E40 0.50 6.06
---------------------------------------------------------------------------------------
0.45 4.64 0.900 0 00:05:00
Analysis began On: Tue Feb 19 12:05:00 2019
Analysis ended On: Tue Feb 19 12:05:00 2019
Total elapsed time: < 1 sec
Autodesk Storm and Sanitary Analysis
100 YEAR EXISTING CONDITIONS
Autodeske Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0)
-
Project Description
File Name .................EX conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method. Rational
Time of Concentration ......FAA
Return Period..............100 years
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-12-2018 00:00:00
Ending Date ...............DEC-12-2018 07:00:00
Report Time Step ..........00:00:10
*************
Element Count
Number of subbasins .......4
Number of nodes ...........4
Number of links ...........0
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft ---------------------------------------------------
E1O 1.00 268.00 7.2000
E20 0.45 91.00 9.5000
E30 0.51 91.00 19.6700
E40 0.85 298.00 3.2000
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
POCO1 OUTFALL
------------------------------------------------------------------------------
0.00 0.00 0.00
P00O2 OUTFALL 0.00 0.00 0.00
P00O3 OUTFALL 0.00 0.00 0.00
P0004 OUTFALL 0.00 0.00 0.00
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.152 0.650
Continuity Error (%) 0.530
Volume Volume
Flow Routing Continuity - ---------------- acre-ft Mgal1ons --------
Autodesk Storm and Sanitary Analysis
External Inflow 0.000 0.000
External Outflow 0.072 0.023
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
* ** * * *
Runoff Coefficient Computations Report
**************************************
---------------
Subbasin ElO ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 1.23 B 0.32
Composite Area & Weighted Runoff Coeff. 1.23 0.32
------------
Subbasin E20
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
- 0.45 B 0.32
Composite Area & Weighted Runoff Coeff. 0.45 0.32
---------------
Subbasin E30 ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
- 0.51 B 0.32
Composite Area & Weighted Runoff Coeff. 0.51 0.32
------------
Subbasin E40
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
Concrete 0.85 B 0.90
Composite Area & Weighted Runoff Coeff. 0.85 0.90
***********************************************************************
FAA (Federal Aviation Agency) Time of Concentration Computations Report
** ***** * * ******************************* * *
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin E10 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 268.00
Autodesk Storm and Sanitary Analysis
Slope (10: 7.20
Computed TOC (minutes): 11.91
---------------
Subbasin E20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (t): 9.50
Computed TOC (minutes): 6.33
---------------
Subbasin 530 ---------------
Runoff Coefficient: 0.32
Flow Length (ft): 91.00
Slope (%): 19.67
Computed TOC (minutes): 4.97
---------------
Subbasin E40 ---------------
Runoff Coefficient: 0.90
Flow Length (ft) : 298.00
Slope M: 3.20
Computed TOC (minutes): 4.22
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
510 0.77 3.91
---------------------------------------------------------------------------------------
0.25 1.25 0.320 0 00:11:54
E20 0.62 5.88 0.20 0.85 0.320 0 00:06:19
E30 0.57 6.85 0.18 1.12 0.320 0 00:05:00
E40 0.57 6.85 --------------------------------------------------------------------------------------- 0.51 5.24 0.900 0 00:05:00
Analysis began On: Wed Dec 12 09:07:21 2018
Analysis ended On: Wed Dec 12 09:07:22 2018
Total elapsed time: 00:00:01
Autodesk Stan,, and Sanitary Analysis
50 YEAR PROPOSED CONDITIONS I
Autodesk® Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0)
-----------------------------------------------------------------------------------------
Proj ect Description
** * ** ** ** * *
File Name .................PR Conditions.SPF
Analysis Options
Flow Units ................ Cf 5
Subbasin Hydrograph Method Rational
Time of Concentration ......FAA
Return Period..............50 years
Link Routing Method .......Steady Flow
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-04-2018 00:00:00
Ending Date ...............DEC-04-2018 06:00:00
Report Time Step ..........00:00:10
Element Count
Number of subbasins .......2
Number of nodes ...........6
Number of links ...........4
* ********* * * * * **
Subbasin Summary
Subbasin Total Flow Average
Area Length Slope
ID acres ft
S1O
---------------------------------------------------
2.38 386.00 3.1000
S20 0.52 729.00 3.0000
************
Node Summary
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft
J1 JUNCTION
------------------------------------------------------------------------------
166.10 169.85 0.00
PlO OUTFALL 164.00 164.83 0.00 Yes
SO-1 OUTFALL 0.00 0.00 0.00
SO-20 OUTFALL 0.00 0.00 0.00
SUBSURFACE STORAGE 165.85 168.85 0.00
SURFACE STORAGE 168.85 170.10 0.00 Yes
* ********* * *
Link Summary
Link From Node To Node Element Length Slope Manning's
ID -------------------------------------------------------------------------------------------- Type ft % Roughness
Link-Ol ii PlO CONDUIT 46.0 4.5652 0.0110
LOWFLOW SUBSURFACE Ji ORIFICE
OVERFLOW SURFACE Ji ORIFICE
Autodesk Storm and Sanitary Analysis
INF_5 IN/HR SURFACE SUBSURFACE OUTLET
Cross Section Summary
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft2 ft
Cf S
-------------------------------------------------------------------------------------------------
Link-Ol CIRCULAR 0.83 0.83 1. 0.55 0.21
5.53
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.201 0.831
Continuity Error (%) 0.683
Volume Volume
Flow Routing Continuity acre-ft Mgallons
External Inflow 0.173 0.056
External Outflow 0.101 0.033
Initial Stored Volume ... 0.000 0.000
Final Stored Volume 0.135 0.044
Continuity Error (%) 0.000
Runoff Coefficient Computations Report
------------
Subbasin Sb
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff. -----------------------------------------------------------------------------------------
Residential_1DU/AC_or_sess 2.38 B 0.32
Composite Area & Weighted Runoff Coeff. 2.38 0.32
------------
Subbasin S20
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
Residential_1DU/AC_or_sess 0.50 B 0.32
Composite Area & Weighted Runoff Coeff. 0.50 0.32
FAA (Federal Aviation Agency) Time of Concentration Computations Report
Tc = (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Autodesk Storm and Sanitary Analysis
Where:
Tc Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S • Slope (%)
---------------
Subbasin S10 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 386.00
Slope (t): 3.10
Computed TOC (minutes): 18.93
---------------
Subbasin S20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 729.00
Slope (t): 3.00
Computed TOC (minutes): 26.29
Subbasin Runoff Summary
Subbasin Accumulated Rainfall
---------------------------------------------------------------------------------------
Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
Sb 0.81 2.57
---------------------------------------------------------------------------------------
0.26 1.96 0.320 0 00:18:55
S20 0.91 2.08 --------------------------------------------------------------------------------------- 0.29 0.35 0.320 0 00:26:17
Node Depth Summary
Node Average Maximum Maximum
-----------------------------------------------------------------------------------------
Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
J1 0.02 0.09 166.19
-----------------------------------------------------------------------------------------
0 04:27 0 0 0:00:00
PlO 0.02 0.09 164.09 0 04:27 0 0 0:00:00
SO-1 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SO-20 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SUBSURFACE 0.66 1.67 167.52 0 06:00 0 0 0:00:00
SURFACE 0.34 1.04 169.89 0 04:27 0 0 0:00:00
Node Flow Summary
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------
Autodesk Storm and Sanitary Analysis
J]. JUNCTION 0.00 0.13 0 04:27 0.00
PlO OUTFALL 0.35 0.36 0 04:12 0.00
SO-1 OUTFALL 1.96 1.96 0 00:19 0.00
SO-20 OUTFALL 0.35 0.35 0 00:26 0.00
SUBSURFACE STORAGE 0.00 0.28 0 03:24 0.00
SURFACE STORAGE 1.96 1.96 0 04:09 0.00
Storage Node Summary
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft (%) days hh:mm 1000 ft (%) cfs
cfm hh:mm:ss 1000 ft
------------------------------------
SUBSURFACE 4.079 56
-------------------------------------------------------------------------------------------------
0 06:00 1.599 22 0.03
0.00 0:00:00 0.000
SURFACE 2.543 83 0 04:27 0.835 27 0.39
0.00 0:00:00 0.000
Outfall Loading Summary
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
P10
-----------------------------------------------
99.48 0.08 0.36
SO-1 10.55 0.98 1.96
SO-20 14.59 0.17 0.35
System
-----------------------------------------------
41.54 1.23 2.21
Link Flow Summary
-------------------------------------------------------------------------------------------------
-------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
--------------------------------------------------------------------------------------------------------------------------------
Link-Ol CONDUIT 0 04:27 3.95 1.00 0.13 5.53 0.02
Autodesk Storm and Sanitary Analysis
0.11 0 Calculated
LOWFLOW ORIFICE 0 06:00 0.03
0.00
OVERFLOW ORIFICE 0 04:27 0.11
INF_51N/HR OUTLET 0 03:24 0.28
Highest Flow Instability Indexes
All links are stable.
WARNING 107 : Initial water surface elevation defined for Junction Jl is below junction invert
elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jl is below junction maximum elevation.
Assumed surcharge elevation equal to maximum elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SUBSURFACE is below
storage node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SURFACE is below storage
node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
Analysis began on: Tue Feb 19 11:47:01 2019
Analysis ended on: Tue Feb 19 11:47:02 2019
Total elapsed time: 00:00:01
Autodesk Storm and Sanitary Analysis
100 YEAR PROPOSED CONDITIONS
Autodesk® Storm and Sanitary Analysis 2016 - Version 12.0.42 (Build 0) -----------------------------------------------------------------------------------------
Project Description
File Name .................PR Conditions.SPF
Analysis Options
Flow Units ................cfs
Subbasin Hydrograph Method Rational
Time of Concentration......FAA
Return Period ..............100 years
Link Routing Method .......Steady Flow
Storage Node Exfiltration.. Constant rate, free surface area
Starting Date .............DEC-04-2018 00:00:00
Ending Date ...............DEC-04-2018 06:00:00
Report Time Step ..........00:00:10
Element Count
Number of subbasins .......2
Number of nodes ...........6
Number of links ...........4
* ******** * *
Subbasin Summary
****************
Subbasin Total Flow Average
Area Length Slope
ID acres ft
S1O
---------------------------------------------------
2.38 386.00 3.1000
S20 0.52 729.00 3.0000
Node Summary
Node Element Invert Maximum Ponded External
I'D Type Elevation Elev. Area Inflow
ft ft ft2
Jl JUNCTION
------------------------------------------------------------------------------
166.10 169.85 0.00
PlO OUTFALL 164.00 164.83 0.00 Yes
SO-1 OUTFALL 0.00 0.00 0.00
SO-20 - OUTFALL 0.00 0.00 0.00
SUBSURFACE STORAGE 165.85 168.85 0.00
SURFACE STORAGE 168.85 170.10 0.00 Yes
Link Summary
Link From Node To Node Element Length Slope manning 's
ID Type ft % Roughness
Link-Ol Jl PlO
--------------------------------------------------------------------------------------------
CONDUIT 46.0 4.5652 0.0110
LOWFLOW SUBSURFACE Jl ORIFICE
OVERFLOW SURFACE Jl ORIFICE
Autodesk Stomi and Sanitary Analysis
INF_51N/HR SURFACE SUBSURFACE OUTLET
Cross Section Summary
Link Shape Depth! Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft2 ft
cfs
-------------------------------------------------------------------------------------------------
Link-Ol CIRCULAR 0.83 0.83 1 0.55 0.21
5.53
Volume Depth
Runoff Quantity Continuity acre-ft inches
Total Precipitation 0.227 0.939
Continuity Error (%) 0.683
Volume Volume
Flow Routing Continuity acre-ft Mgallons
External Inflow 0.196 0.064
External Outflow 0.125 0.041
Initial Stored Volume .. 0.000 0.000
Final Stored Volume 0.142 0.046
Continuity Error (%) 0.000
Runoff Coefficient Computations Report
---------------
Subbasin Sb ---------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
Residential_1DU/AC_or_sess 2.38 B 0.32
Composite Area & Weighted Runoff Coeff. 2.38 0.32
---------------
Subbasin S20 ---------------
Area Soil Runoff
Soil/Surface Description ----------------------------------------------------------------------------------------- (acres) Group Coeff.
Residential_1DU/AC_or_sess 0.50 B 0.32
Composite Area & Weighted Runoff Coeff. 0.50 0.32
FAA (Federal Aviation Agency) Time of Concentration Computations Report
** * ****************** * ** * ********** ****************** ** * * *
Tc (1.8 * (1.1 - C) * (L0.5) * (S-0.333))
Autodesk Storm and Sanitary Analysis
Where:
Tc = Time of Concentration (mm)
C = Runoff Coefficient
L = Flow Length (ft)
S = Slope (%)
---------------
Subbasin Sb ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 386.00
Slope (%): 3.10
Computed TOC (minutes): 18.93
---------------
Subbasin S20 ---------------
Runoff Coefficient: 0.32
Flow Length (ft) : 729.00
Slope (%): 3.00
Computed TOC (minutes): 26.29
Subbasin Runoff Summary
Subbasin Accumulated Rainfall Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
SlO 0.92 2.90
---------------------------------------------------------------------------------------
0.29 2.21 0.320 0 00:18:55
S20 1.03 2.35 --------------------------------------------------------------------------------------- 0.33 0.39 0.320 0 00:26:17
Node Depth Summary
Node Average Maximum
-----------------------------------------------------------------------------------------
Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
J1 0.03 0.19 166.29 0 04:22 0 0 0:00:00
PlO 0.03 0.19 164.19 0 04:22 0 0 0:00:00
SO-1 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SO-20 0.00 0.00 0.00 0 00:00 0 0 0:00:00
SUBSURFACE 0.71 1.75 167.60 0 06:00 0 0 0:00:00
SURFACE 0.37 1.13 169.98 0 04:22 0 0 0:00:00
Node Flow Summary
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------
Autodesk Storm and Sanitary Analysis
Jl JUNCTION 0.00 0.63 0 04:22 0.00
PlO OUTFALL 0.39 0.89 0 04:21 0.00
SO-1 OUTFALL 2.21 2.21 0 00:19 0.00
SO-20 OUTFALL 0.39 0.39 0 00:26 0.00
SUBSURFACE STORAGE 0.00 0.28 0 03:15 0.00
SURFACE STORAGE 2.21 2.21 0 04:09 0.00
** * * * ****
Storage Node Summary
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft (%) days hh:mm 1000 ft3 (%) cfs
cfm hh:mm:ss 1000 ft
------------------------------------
SUBSURFACE 4.270 58
-------------------------------------------------------------------------------------------------
0 06:00 1.728 24 0.03
0.00 0:00:00 0.000
SURFACE 2.754 90 0 04:22 0.897 29 0.89
0.00 0:00:00 0.000
Outfall Loading Summary
Outfall Node ID
----------------------------------------------
Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
PlO
-----------------------------------------------
99.55 0.11 0.89
SO-1 10.55 1.11 2.21
SO-20 14.59 0.20 0.39
System
-----------------------------------------------
41.56 1.41 2.50
*****************
Link Flow Summary
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
-------------------------------
Link-Ol CONDUIT 0 04:22 6.72 1.00 0.63 5.53 0.11
Autodesk Storm and Sanitary Analysis
0.23 0 Calculated
LOWFLOW ORIFICE 0 06:00 0.03
0.00
OVERFLOW ORIFICE 0 04:22 0.61
INF_51N/HR OUTLET 0 03:15 0.28
Highest Flow Instability Indexes
All links are stable.
WARNING 107 : Initial water surface elevation defined for Junction Ji is below junction invert
elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jl is below junction maximum elevation.
Assumed surcharge elevation equal to maximum elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SUBSURFACE is below
storage node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 110 : Initial water surface elevation defined for Storage Node SURFACE is below storage
node invert elevation.
Assumed initial water surface elevation equal to invert elevation.
Analysis began on: Tue Feb 19 11:25:36 2019
Analysis ended on: Tue Feb 19 11:25:36 2019
Total elapsed time: < 1 sec
Autodesk Storm and Sanitary Analysis
Maps and References
Isopluvial Maps
Excerpts from County of San Diego Hydrology Manual
11Page
0
100 30
LU
(I) LU
LU LL 0 z
LU z
- LU ()
U) a
Ui U) i LL
1 10
LU LU
EXAMPLE:
Given: Watercourse Distance (0) = 70 Feet
Slope(s)=1.3% T =1.8(11'I Runoff Coefficient (C) = 0.41 3V;. Overland Flow Time (T) = 9.5 Minutes
SOURCE: Airport Drainage, Federal Aviation Administration, 1965
Ua20 5
0 F//00,0~0~0,0000
ir
FIGURE
Rational Formula - Overland Time of Flow Nomograph 34
INS 0.111111111111111111111111111111 IN TION
_____________ i '__
11111111
u.' Intensity (i hr) jjjjj~ I
P6 6-Hour Precipitation (in)
11111111
Duration
uu.UUlh 91h'Ih th $Ii u ••••••••.u.uu .!IIh1!uIIh'IhIh15IIlIh.
UIII1!IIi!!IIi 11116421YINk. 111011k, 11,
Jul
h!IIIiII!IIIi
IIIIii!iIIIIIifl
IN 01!lluii !ll!iI011 ui•uuuuuuuiuuuui
BIUU•UIIUIUIIIII
Emmons MEMO uuuuuul
IllIllIllUlIllIll uIIOIHIIIIIIIIII1II;!!IIIInhIIIIIIIIll!I1IIuIuuIi:llI!!uhi!!
IlIllIllIllIllIll IIIOhIIIIIIIIIIIIIIIHII'1!!IIIIIIIIIIIIIIhl!IIh!!Ih!!llD
N,
HIIIIIIIIIIIIIII IlIIIIIllhIIIIIIIIlIIHIIIllIllhIIIIi!!ftIIIIIiI!!IIIiI!!Uhji'1
HIIIIIIIIIIIIIII IHIHIllUhIIIIIIIIIIIIIIIIIIIIIIIlIIflhIIIIIii!iIIIIiIll!HIhhii11
.U•UIUUIUuIuIuI,IuuI••••uUUUUIUIIIuIuuuuuuuulIII •••k'I•uuuUIiiIuIiu
U...UU.UuuuIuIuIuuI....uulIuuuII,uS,,uuuIuuuIul ..._...uIi.iiuuiiuI
..uuuuuuuIIIIuIulIuu..uuuuuuu,sIuuIuuuuu,IuuIIII ....u...I..'uIi,IIIrl .......i U•UIUIIIIIIItIIIIIIi••••uuuuUIUuIuiuuuiuiuuiiiii •••U•U•UiuuIh(uIIirI u••••u ••uIuuuuuiiiuiiuiiuiu••uuuuuiuisuispuuuuuuiiiis •uuuu••uuuuuijaiqii uuuuuuuuuiiiiiuuiiiiu••iuuuuupuiiuiiiuuuuuuiiiip •a•au•uu•iuuujuuiuui .••....i ul.uluuuuuiiuiiiti,uuuuuuuuuuui.i Ill uuuiuuii. .........i..ui.iuuiiiti ___. __..aI..I.l IIIululIIlIuuIIIIIIuuuuIlUuuIIuIuIIIuuIIuuIIIII ••IIlUU goal iIflhlHflhii - •••u•••••u IuuuunupIuupuII,iu.iuupuuuuuuuiuuuiuuuuiiii,..u.u.u.iuuiuujnhuuiiii ••••iur-- iiiiiuilffluiiuuiioiiiiffluiuuuuuuiiiiu••mumaiuiuiuiiuuiiuiiuuiiii •••U•.•..•uuuui 1 iiiiIiiiiIllhuiHuiHuuiiiiflHiiiiiiiii••uuuuuuiUiuiuIHuIIIIIl •••••........l.0 uuuiuiuiuiiu Ill iitiiui Ill uiuiuuiii Ill iiiiiiiiiHUU•uuuu Ill Ill flhiuiuiiitIi ........uuuluuul iiliiilflhllililltillllliUlliliilillllllllliiHi•UiilliillliiiiiHilllllll