HomeMy WebLinkAboutCUP 2018-0023; BUENA VISTA RESERVOIR SITE (PARK); FOUNDATION PLAN REVIEW BUENA VISTA RESERVOIR SITE; 2019-12-20GEOCON
INCORPORATED
4 ow
GEOTECHNICAL • ENVIRONMENTAL a MATERIALS
Project No. G2225-52-01
December 20, 2019
RECORD COPY
Schmidt Design doup, Inc.
1111 Sixth Avenue, Suite 500
San Diego, California 92101
Attention: Mr. Mark Moss
Subject: FOUNDATION PLAN REVIEW
BUENA VISTA RESERVOIR SITE
CARLSBAD, CALIFORNIA
1111001 Date
References: 1. Update Geotechnical Investigation, Buena Vista Reservoir Site, Carlsbad,.
California, prepared by Geocon Incorporated, dated December 1.8, 2019 (Project
No.G2225-52-01). .
2. Landscape Construction Details for: Buena Vista Reservoir Site, City of Carlsbad,
California, prepared by Schmidt Design Group, plot dated December 9, 2019
(Sheets LC-2.5 and LC-2.7).
Dear Mr. Moss:
In accordance with your request, we reviewed the referenced foundation plans for the proposed shade
structure and sail shade and subject project. Based on our review of the plans and the information
contained within the referenced geotechnical reports, we opine' the plans and details have been
prepared in substantial conformance with, recommendations presented in the referenced geotechnical
report.
Our review was limited to geotechnical aspects of project development and did not include the review
of other details on the referenced plans. Geocon Incorporated has no opinion regarding other details
found on the referenced plans, civil, structural or otherwise, that do not directly pertain to geotechnical
aspects of site development.
If you have any questions regarding this letter, or if we may be of further service, please contact the
undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
7 Ili A. James
RCE 79438
KAJ:SFW:dmc
114,
-\ ~ ~ 4'*\~
..
A.
No. 79438
'") Shawn 271 Foy Weedon.
' GE4
(1/del) Addressee
6960 Flanders Drive IN San Diego, California 92121 N Telephone (858) 558-6900 M Fax (858) 558-6159