HomeMy WebLinkAboutSDP 2019-0009; 2051 PALOMAR AIRPORT ROAD; HYDROLOGY STUDY; 2020-06-10LJ\_ \7 kL4
JUN 24 22C
LAND DE'. LOPMENT
ENG:;EEG
S Hyd . o ogy StudyH...
• 2051 PALOMAR AIRPORT RD.
APN: 213-050-39
•• .Carlsbad,.CA
.. Jure'1O,2020
This Hydrology Study has been.prepared by, and under the direction of, the undersigned,. a duly Registered Civil.
__ingineer in the State..óf California.ixceptas.noted, the undersigned. attests to the technical information contained
herein, and has judged to be acceptable the qualifications of any technical specialists providing engineering data for
this report, upon which findings, conclusions, and recommendations are based.
Jacob Vandervis, P.E.
Registered Civil Engineer No. C46301
Exp.: 12/31/20
Prepared for:
*STEELWAVE
• • : Steel Wave '
45.53 Glencoe Avenue
Marina Del Rey, Ca 90292 •
(949)863-0390
TAIT
t1NNI TO TN I £UaLIMCC
Tait& Associates, Inc.
701 N. Parkcenter Drive
Santa Ana, CA 92705
(714) 560-8200
ITAIT JOB # SP84151
ôk W21I&W
1~e 0-ioG Cofjj
Hydrology Study
SP,o1— coc /G1R Q0.20-000j
2051 PALOMAR AIRPORT RD.
APN: 213-050-39
Carlsbad, CA
June 10, 2020
This Hydrology Study has been prepared by, and under the direction of, the undersigned, a duly Registered Civil
Engineer in the State of California. Except as noted, the undersigned attests to the technical information contained
herein, and has judged to be acceptable the qualifications of any technical specialists providing engineering data for
this report, upon which findings, conclusions, and recommendations are based.
Jacob Vandervis, P.E.
Registered Civil Engineer No. C46301
Exp.: 12/31/20
Prepared for: Prepared by:
STEELWAVE I TAIT
IIIIM TD TMI CUaILMGe
Steel Wave Tait & Associates, Inc.
4553 Glencoe Avenue 701 N. Parkcenter Drive
Marina Del Rey, Ca 90292 Santa Ana, CA 92705
(949)863-0390 (714) 560-8200
ITAIT JOB # SP84151
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT & Associates
Table of Contents
Section1 Purpose and Scope....................................................................................................1
Section 2 Project Information...................................................................................................2
2.1 Project Description...........................................................................................................2
2.1.1 Project Location............................................................................................................2
2.2 Hydrologic Setting............................................................................................................3
2.2.1 Watershed ....................................................................................................................3
2.2.2 Existing Topography and Facilities ...............................................................................3
2.2.3 Adjacent Land Use........................................................................................................5
2.2.4 Downstream Conditions ..... .......................................................................................... 5
2.2.5 Existing Drainage Patterns............................................................................................6
2.2.6 Proposed Drainage Patterns.........................................................................................6
2.2.7 Impervious Cover..........................................................................................................6
Section 3 Design Criteria and Methodology.............................................................................8
3.1 Design Criteria ................................................................................................................... 8
3.1.1 Soil Classification ..........................................................................................................8
3.1.2 Rainfall Intensity...........................................................................................................8
3.1.3 Runoff Calculation Method ..........................................................................................8
Section 4 Hydrology and Drainage Analysis .............................................................................9
4.1 Summary of results ..........................................................................................................9
Appendix A— Precipitation, Soil Maps & Supporting Research......................................................A
Appendix B - Existing Hydrology Calculations................................................................................B
Appendix C— Proposed Hydrology Calculations.............................................................................0
Appendix D - Hydrology Map - Existing Conditions.......................................................................D
Appendix E —Hydrology Map - Proposed Conditions.....................................................................E
Appendix F - Proposed Hydraulic Calculations ...............................................................................F
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TA!T& Associates
Section 1 Purpose and Scope
This hydrology study presents an analysis of the hydrologic effects of the development of a 0.72
acre Priority Redevelopment Project, in the City of Carlsbad, California. The total lot area for the
site is 569,127 SF or 13.065 Acres.
This hydrology study addresses runoff from the project site and its impact to the existing
downstream storm drainage system. The study includes calculations for the 2, 10, and 100-year
storm events for both the existing and proposed condition. The study also details the general
project characteristics, the design, criteria and methodology applied to the analysis of the
project. The report provides a design analysis for the drainage facilities -proposed as part of the
project with the drainage improvements being designed to mitigate all rainfall event
frequencies up to a 24-hour, 100-year storm event.
This Hydrology Study fulfills the requirements of the San Diego Regional Water Quality Control
Board (SDRWQCB), the County of San Diego Hydrology Manual (June 2003), and the City of
Carlsbad BMP Design Manual dated February 16, 2016.
The plans and specifications in the Hydrology Study are not for construction purposes; the
contractor shall refer to final approved construction documents for plans and specifications.
TAIT JOB # 5P8415 Page 1
9
-'vt-
u,ca 0
I
1,!
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
Section 2 Project Information
2.1 Project Description
The proposed construction involves the development of approximately 0.72 Acres or 31,323 SF
of combined improvement areas. The total lot area consists of 569,127 SF or 13.065 Acres as
previously mentioned. The redevelopment project will consist mostly of reconfiguring parking
islands and parking striping. To increase the number of parking spaces, three retaining walls
have been proposed. Additionally, the site is designed to divert all runoff towards proposed
treatment and detention BMPs which are incompliance with the City of Carlsbad BMP Design
Manual dated February 16, 2016. For additional information on the BMPs, see the SWQMP
report and associated appendices.
2.1.1 P
The project is located at 2051 Palomar Airport Road in the City of Carlsbad, California, to the
Southwest of Palomar Airport Road and Yarrow Drive, and roughly 0.5 mi south east from the
McClellan-Palomar Airport as graphically shown in Figure 1, below.
-
AIRPORT RD
Figure 1—Vicinity Map (Not To Scale)
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT & Associates
2.2 Hydrologic Setting
This section summarizes the projects disturbance and location in the context of the larger
watershed perspective, topography, percent impervious area, natural and infrastructure
drainage features, and other relevant hydrologic and environmental factors to be protected
specific to the project area's watershed.
2.2.1 Watershed
The project site is located within the "Basin C - Encinas Creek Watershed" as shown on the City
of Calrsbad "Master Plan of Drainage Facilities" and is tributary to the Pacific Ocean. (See
Master Drainage Facilities Maps Located in Appendix A)
2.2.2 Existing Topography and Facilities
The project site consists of a business building and surrounding impervious parking areas. The
site contains spots of landscaped islands and strips of landscape area near the property lines.
DMA ATOT
In the area of redevelopment knows as DMA ATOT which is located near the most southerly
property corner ofthe project site, there is an existing average slope of 2.7% flowing in the
southerly direction diagonally throughout the DMA. There is a total drop of 9.75 FT across the
parking area and 11.6 FT of elevation drop from the southerly end of the parking area to the
rim of the existing storm drain catch basin. Storm water runoff sheet flows across the
previously mentioned parking lot area in the southerly direction until it is collected in the
previously mentioned concrete catch basin Type "G" per S.D. County Std. D-8. An additional
12" PVC storm drain connects to this catch basin as it originates from the easterly corner of the
site collecting the existing building roof drainage. From the Type "G" catch basin, the storm
water is diverted in the southerly direction through a 12" ACP storm drainage line until it is
collected into a concrete catch basin equipped with a curb opening to take on surface drainage
and is delineated as a Type "B" style inlet per S.D. County Std. D-2. From this point storm water
is diverted in the south easterly direction along the radius of the Corte Del Nogal right-of-way
through a 12" ACP storm drain line until it enters another Curb Opening style catch basin type
"B" per S.D. County Std. D-2. From here storm water is diverted through an 18" ACP storm
drainage line in the southerly direction across the Corte Del Nogal right-of-way into the public
storm drainage system per Corte Del Nogal Improvement Plan Dwg. No. 208-2.
TAIT JOB # 5P8415 Page 3
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
DMA BTOT
In the area of redevelopment known as DMA BTOT is located near the northwestern frontage of
the property along Palomar Airport road setback about 55 FT from the existing right-of-way in
the south easterly direction. The area of redevelopment has an average slope of 2.3%, consists
mainly of asphalt pavement and flows in the westerly direction, diagonal across BTOT. In the
westerly most corner of the development area exists a 24"x40" concrete catch basin Type "G"
S.D. County Std, D-8 drain inlet which diverts runoff through an 12" ACP drain pipe from the
parking area westerly into a concrete catch basin Type "F" S.D. County Std. D-7 which is
situated adjacent to the westerly property line. From there runoff is diverted through a 12" ACP
Storm drain line in the northwest direction down a 27% sloped landscaped area into a curb
outlet Type "A" per S.D. County Std. D-25 set in the sidewalk just beyond the right-of-way
along Palomar Airport Rd. From there runoff is diverted through the City of Carlsbad local MS4
drainage facilities.
DMA BPAL,TOT
In the area of redevelopment known as DMA BPAL,TOT located nearest to the most easterly
property corner of the project site, consists mainly of concrete and asphalt pavement areas.
This area was originally used as a utility servicing area and loading dock for shipping and
receiving of materials. The loading dock ramp consists entirely of concrete pavement while the
surrounding areas consist of concrete hardscape directly adjacent to the building and asphalt
pavement running up to the loading dock ramp. There also exists .a landscaped slope which runs
up to the north easterly property line. All the runoff in this area flows in the northerly direction
towards the concrete ramp which at the bottom is equipped with a trench drain and a
rectangular 24"x24" grated drain inlet. As depicted on the existing improvement plans drawing
no. 205-1 storm water is diverted from the drain inlet through a 10" ACP storm drain line in the
northerly direction until it is collected in a concrete catch basin Type "G" per S.D. county std. D-
8. From here runoff is diverted through 15" ACP line at a 1% slope in the northwesterly
direction toward a second concrete catch basin, Type "F" per S.D. County Std. D-7. From there
storm water is diverted in the westerly direction through a 15" ACP line until it enters a storm
drain cleanout Type "A" per S.D. County Std. D-9 which sits just north west of the right-of-way
along Palomar Airport Rd. From here storm water continues in the southwesterly direction
along the Palomar Airport Rd. right-of-way through a 15" ACP storm drain line until it reaches a
curb inlet style catch basin, Type "B" per S.D. County Std. D-2. From here storm water heads in
the, north direction across Palomar Airport Road into the public storm drainage system through
an 18" ACP storm drainage line.
TAIT JOB #5P8415 Page 4
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT & Associates
2.2.3 Adjacent Land Use
The project is bounded by commercial and industrial buildings along all sides of the site.
Adjacent to the north easterly property line exists California Municipal Finance office building
and adjacent impervious pavement areas used for parking. Adjacent to the westerly property
line exists 2 large commercial/industrial style buildings which house multiple tenants such as
Bitchin' Sauce, Newport Wholesale Floral and Chuck's Tire Center. Adjacent to the south
easterly property line exists a commercial office building which includes office space for
Calsense and EEDAR and NPD Group Company Inc. Adjacent to the south westerly property line
exists impervious parking areas which serve K1 Speed Racing and Offshore CrossFit
developments.
2.2.4 Downstream Conditions
The project discharges to MS4 Facilities located at the frontage along Palomar Airport Rd. and
Corte Del Nogal. Nearest to the most northerly property corner along Palomar Airport Road
exists one of the previously mentioned MS4 drainage facilities which is a curb opening style
catch basin drain inlet Type "A" per S.D. County Std. D-25. Per the existing improvement plan
Dwg. 205-1 storm water enters the curb and gutter along Palomar Airport Rd. Additionally per
the Carlsbad Master Drainage Map found in Appendix A the northerly catch basin connects to a
15" to 24" main line which flows south west to the north east along Palomar Airport Rd. runoff
from there is allowed to enter an open space area just north of Palomar Airport Rd. adjacent to
the project site. This open space valley is connected to a downstream culvert and then connects
to a series of storm drain pipes which ultimately drain the surrounding "Basin C" areas into the
Encinas Creek and furthermore into the Pacific Ocean.
Nearest to the most southerly property corner near the cul-de-sac along Corte Del Nogal exists
the second MS4 drainage inlet previously mentioned in Section 2.2.2:'The master drainage
facilities map depicts runoff being diverted in the south westerly direction directly into Encinas
creek and ultimately the Pacific Ocean.
Based on the results of this study, the project mitigation measures proposed will prevent an
increase in runoff for the 100 yr storm event per the San Diego County Hydrology Manual, June
2003. Therefore, the proposed project improvements will not have an adverse effect on the
downstream storm drain system.
TAIl JOB It 5P8415 Page 5
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT& Associates
2.2.5 Existing Draihage Patterns
The existing drainage conveyance is entirely urban type. The site drains to three separate MS4
facilities, as previously discussed in Section 2.2.2, owned and maintained by the City of
Carlsbad. The two major storm drain outlets for the project site exist at the north and west
corners of the project, adjacent to Palomar Airport Road. These facilities are shown on the
"Oak Industries Grading Plan Dwg. NO. 205-1", "Corte Del Nogal Improvement Plan Dwg. No.
208-2) & "City of Carlsbad M54 Map and corresponding Drainage Areas E.2.b.(1)" which can be
found in Appendix A of this report. Also there is an MS4 facility located at the most southerly
corner of the property which outlets into Corte Dc Nogal which also outlets in to the Encinas
Creek. Per the master drainage report and master plan of drainage facilities the project site is
within "Basin C" area of Carlsbad. Basin C encompasses the area of Carlsbad that drains into
Encinas Creek which serves as the main collector of basin storm water runoffs.
2.2.6 Proposed Drainage Patterns
The overall drainage pattern for the site will be maintained. The project will install BMPs in-line
with the current storm drainage facilities therefore, no revisions will be required to the existing
drainage pattern. A considerable amount of the work planned to take place at redevelopment
project can be considered as patchwork where the existing line & grade is maintained but the
configuration of curbs and drive aisles are being re-arranged. Although existing drainage
patterns are being maintained sub-grade components of the redevelopment area are being
replaced which initiates water quality treatment BMPs per the MS4 permit. In addition to the
patchwork areas, three retaining walls will be added in place of landscaped slopes to add
additional parking area. A Hydromodification detention design has been put in place to mitigate
outlet flows to the M54. In addition to the Storm Water Quality Management Plan (SWQMP), a
Hydromodification report has been prepared for this project by REC Consultants dated, January
10, 2020 and can be found in the appendices of the SWQMP report. In addition to these
reports, see the proposed Hydrology Map located in Appendix E of this report for additional
information on the Proposed Drainage Patternsof the project site.
2.2.7 Impervious Cover.
The site can be described as mostly urban type development containing landscaped islands
throughout with parking areas and landscaped buffers around the building. Within the
disturbed area of the project (0.72 ac), the existing site is 58% impervious with developed land
cover consisting of 0.42 Acres of asphalt pavement and concrete hardscape/ improvement
areas and 0.30 Acres of landscaped areas. The proposed project site is 72% impervious with the
TAIT JOB #5P8415 Page 6
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
developed land cover consisting of 0.52 Acres of asphalt pavement and concrete
hardscape/improvement areas and 0.20 Acres of landscaped areas. The site described herein is
designed to sheet flow away from proposed development and be diverted towards proposed
treatment and detention BMPs which are incompliance with the City of Carlsbad BMP Design
Manual dated February 16, 2016. For additional information on the BMPs, see the SWOMP
report and associated appendices.
TAIl JOB U SP8415 Page 7
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TA!T& Associates
Section 3 Design Criteria and Methodology
This section summarizes the design criteria and methodology applied during the drainage
analysis of the project site. The design criteria and methodology follow the San Diego County
Hydrology Manual, June 2003 & the City of Carlsbad BMP Design Manual, February 2016.
3.1 Design Criteria
3.1.1 Soil Classification
In accordance with the Natural Resources Conservation Service Soil Survey, published in 2006,
the project site is located within the hydrologic soil groups of B & D. The project site location
has been graphically shown on a soil group map and a USDA Soil Resource map, which have
been included in the Appendix A section of this report.
3.1.2 Rainfall Intensity
Per the San Diego County Hydrology Manual (2003) Rainfall Isopluvial Map (See Appendix A):
2 YR Rainfall Event 10 YR Rainfall Event 100 YR Rainfall Event
DMA P6 (in/hr) I P24 (in/hr) P6 (in/hr) P24 (in/hr) P6 (in/hr) P24 (in/hr)
ATOT 0.6 1.9 1.8 3.2 2.7 4.7
BTOT 0.6 1.9 1.8 3.2 2.7 4.7
APAL,TOT 0.6 1.9 1.8 3.2 2.7 4.7
Table 1— Rainfall Intensities
3.1.3 Runoff Calculation Method
Runoff calculations for this study were accomplished using the rational method in accordance
with the recommendations of the County of San Diego Hydrology Manual.
Q =CxJxA
O = runoff (cfs)
C = runoff coefficient representing the ratio of runoff to rainfall (San Diego County Hydrology Manual
(2003) Table 3.1
= the time-averaged rainfall intensity in inches per hour corresponding to the time of concentration
A = drainage area (acres)
The calculations for proposed and existing conditions may be found in Appendix B and Appendix
C, respectively.
TAlT JOB #5P8415 Page 8
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT & Associates
Section 4 Hydrology and Drainage Analysis
This section summarizes the quantitative hydrologic analysis of the existing and proposed
conditions of the site for the 2, 10, and 100 year storm events. For the 2 and 10 year
calculations, see the Hydromodification report prepared by REC Consultants dated, January 10,
2020 and found in the appendices of the SWQMP report.
4.1 Summary of results
EXISTING CONDITIONS
The Appendix 0 section of this report contains the existing condition hydrology map. This map
conveys the existing drainage subareas and quantifies the peak flow for 24-hour, 100 Year
Storm Event. See the table below along with the existing condition hydrology calculations which
can be found in Appendix B.
EXISTINGINb1T1ONS
STORM 100 YR
DMA.' CFS (FT3/S)
AT 5.33
BTOT 3.79
BPALJOT 1.36
Table 2— Existing Condition Runoff Flows
PROPOSED CONDITIONS
The Appendix E section of this report contains the proposed condition hydrology map, which
shows the proposed drainage subareas and quantifies the peak flow for 24-hour, 100 Year
Storm Event. See the table below along with the proposed condition hydrology calculations
which can be found in Appendix C.
I PRO DIC-00
STORM 100 YR FLOW INCREASE
DM*1 US (FT3/S) US (FT3/S)
OWTOTE 6.85 1.52
WMT57M 4.65 0.86
IBTOT 1.36 0.0
Table 3— Proposed Condition Runoff Flows
TAIT JOB #5P8415 Page 9
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
DISCUSSION
As seen above from Tables 2 & 3, the drainage area A101 has an increase of flows in the
proposed condition of 1.52 cfs from the existing condition. Comparing existing and proposed
flows for BTOT, there is 0.86 cfs increase in peak runoff volume. Lastly, the drainage area BPAL,TOT
has no increase of flows in the proposed condition from the existing condition. For both DMAs
ATOT& BTOT the proposed development will increase impervious area and therefore increase the
peak flow. This increase in impervious area is due to the redevelopment of the site and
requirement for more parking stalls.
The proposed redevelopment is disturbing 0.72 acres of the site. However, due to the patchy
layout of the proposed improvements, the drainage areas have been designed to mitigate an
area of 2.02 acres. Therefore, the proposed site will mitigate the runoff volume for a larger area
than the existing condition. See the Proposed DMA summary below, for reference. Additional
information on the DMA summary and calculations can be found in the Project SWOMP report
and associated appendices.
PROPOSED DMA SUMMARY
Area ID Area (st) Area (ac)
85th
percentile
depth (in)
Pervious
Area (SF)
Pervious
Area JAC)
ImpervIo
us Area
(SF)
lmpervlo
us Area
(Ac)
Percent
impervious
WeWed
RI
SWQMP
Area FLOW
Soil Type DCV (Cl) ThRU (Q)
(cfs)
7,713 0.177 0.65 1443 0.033 _ 6270 0.144 81 0.75 D 313 0.040
44,661 1.025 0.65 0 0.000 44661 1.025 100 0.90 0 2177 0.277
4,610 0.106 0.65 1448 0.033 3162 0.073 69 0.65 0 152 0.021
FA'=
487 0.011 0.65 151 0.003 336 0.008 69 0.65 0 17 0.002
2,966 0.068 0.65 1008 0.023 1958 0.065 66 0.63 0 101 0.013
2,669 0.061 0.65 1158 0.027 1511 0.035 57 0.55 0 80 0.010
2,989 0.069 0.65 972 0.022 2017 0.046 57 0.64 0 104 0.013
8 3,972 0.091 0.65 0 0.000 3972 0.091 100 0.90 - 0 194 0.025
B 31,731 0.728 0.65 1443 0.033 30288 0.695 95 0.86 D 1484 0.1.89
65 5,917 0.136 0.65 2604 0.060 3313 0.076 55 0.55 - 0 176 0.022
B 13,518 0.310 0.65 3678 0.084 9840 0.226 73 0.68 - 0 500 0.064
A 0 52,374 1.202 0.65 1443 0.033 50931 1.169 97 0.88 D 0.317
[ B 35,703 0.820 0.65 1443 0.033 r 34260 1 0.787 95 0.87 0 1678 0.213
19,435 0.445 0.65 6282 0.144 13153 1 0.302 68 0.64 0 675 0.086
Table 4- Proposed Condition DMA Characteristics
Areas ATOT and BTOT in the proposed condition are designed to maintain the existing peak flow
rates up to the 10 year storm event through detention. (See Hydromodification Report within
the Project SWQMP for additional information).
In regards to DMA ATOT, it is mitigating a total of areas Al & A2 which contain an impervious
area total of 52,374 SF or 1.20 AC. This area is compensating for the disturbed areas of
A1+A3+A4+AS+A6+A7 which includes a combined impervious area total of 21,434 SF or 0.49
AC. Area ATOT will be equipped with a treatment BMP and then a BMP designed to detain and
TAlT JOB #5P8415 Page 10
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT& Associates
infiltrate. The infiltration of the system will reduce the runoffs by approximately 0.31 cfs. In
addition, the detention system is designed to detain 1.41 cfs and discharge at a 0.102 rate. The
total 100 year storm runoff for DMA ATOT will then be 5.13 cfs which is less than the existing
peak runoff of 5.33 cfs. Therefore, there will be no added discharge into the outfalls and no
increase in the peak flow rates once the infiltration and detention are factored in. In addition,
an emergency overflow pipe and riser is located on the detention basin to prevent ponding and
assist in mitigating the larger storm events.
In regards to DMA BTOT, it is mitigating a total of areas 131+132 which contain an impervious area
total of 35,703 SF or 0.82 AC. BTOT is compensating for the mitigation of areas 131+133+134 which
contains an impervious area of 23,407 SF or 0.54 AC. Area BTOT will be equipped with a
treatment BMP and then a BMP designed to detain. The detention system is designed to detain
0.89 cfs and discharge at a 0.102 rate. The total 100 year storm runoff for DMA BTOT will then
be 3.76 cfs which is less than the existing peak runoff of 3.79 cfs. Therefore, there will be no
added discharge into the outfalls and no increase in the peak flow rates once the detention is
factored in. In addition, an emergency overflow pipe and riser is located on the detention basin
to prevent ponding and assist in mitigating the larger storm events.
ULTIMATE RUNOFF CONDITION
STORM 100 Y FLOW INCREASE
DMA CFS(FT3/S) CFS(FT3/S)
ATOT 5.13 -0.20
BTOT 3.76 -0.03
BPALTOT 1.36 0.0
Table 5—Total Runoff Flows after Detention/Infiltration
To summarize, this hydrologic analysis has been conducted for the 24 hour, 100 year storm
event in an effort to mitigate the proposed peak flows to prevent downstream erosion and
existing flow capacities. The site will employ the use of underground detention and infiltration
to control the discharge rate. Therefore, the proposed project improvements will not have an
adverse effect on the downstream storm drain system. See supporting calculations and maps
within Appendix B, C, D, and E.
OVERFLOW BYPASS HYDRAULIC CALCULATIONS FOR BMPs A-i & B-i
An emergency overflow pipe has been added to both detention basins, in the event of a large
storm event. The pipe sizing calculated for the overflow bypass drain lines for BMPs A-i & B-i
shall both be sized a 12" diameter PVC storm drain line. See the hydraulic calculations located
in Appendix F of this report.
TAlT JOB #5P8415 Page 11
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
Appendix A - Precipitation, Soil Maps & Supporting Research
II
Precipitation, Soil Maps & Supporting ResearcT
See Attached Supporting Documents'
TAIT JOB # SP8415 Appendix A
Map Unit Description: Huerhuero loam, 5 to 9 percent slopes, eroded—San Diego County
Area, California
San Diego County Area, California
HrC2—Huerhuero loam, 5 to 9 percent slopes, eroded
Map Unit Setting
National map unit symbol: hbcn
Elevation: 1.100 feet
Mean annual precipitation: 12 to 20 inches
Mean annual air temperature: 57 degrees F
Frost-free period: 260 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Huerhuero and similar soils: 85 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Huerhuero
Setting
Landform: Marine terraces
Down-slope shape: Linear
Across-slope shape: Linear
Parent material: Calcareous alluvium derived from sedimentary
rock
Typical profile
HI - 0 to 12 inches: loam
H2 - 12 to 55 inches: clay loam, clay
H2 - 12 to 55 inches: stratified sand to sandy loam
H3 - 55 to 72 inches:
Properties and qualities
Slope: 5 to 9 percent
Depth to restrictive feature: More than 80 inches
Natural drainage class: Moderately well drained
Runoff class: Very high
Capacity of the most limiting layer to transmit water (Ksat): Very
low to moderately low (0.00 to 0.06 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Salinity, maximum in profile: Nonsaline to very slightly saline (0.0
to 2.0 mmhos/cm)
Sodium adsorption ratio, maximum in profile: 25.0
Available water storage in profile: Moderate (about 6.6 inches)
Interpretive groups
Land capability classification (irrigated): 3e
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: 0
Ecological site: CLAYPAN (1975) (ROI9XDO6I CA)
USDA Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 1 of 2
Map Unit Description: Huertiuero loam, 5 to 9 percent slopes, eroded—San Diego County
Area, California
Hydric soil rating: No
Data Source Information
Soil Survey Area: San Diego County Area, California
Survey Area Data: Version 14, Sep 16, 2019
Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 2 of 2
Map Unit Description: Loamy alluvial land-Huerhuero complex, 9 to 50 percent slopes,
severely eroded—San Diego County Area, California
San Diego County Area, California
LvF3—Loamy alluvial land-Huerhuero complex, 9 to 50
percent slopes, severely eroded
Map Unit Setting
National map unit symbol: hbdx
Elevation: 50 to 3,200 feet
Mean annual precipitation: 8 to 20 inches
Mean annual air temperature: 57 to 64 degrees F
Frost-free period: 150 to 280 days
Farmland classification: Not prime farmland
Map Unit Composition
Loamy alluvial land: 30 percent
Huerhuero and similar soils: 30 percent
Minor components: 7 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Loamy Alluvial Land
Setting
Landform: Drainageways
Parent material: Alluvium derived from mixed sources
Typical profile
HI - 0 to 60 inches: variable
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: B
Hydnc soil rating: No
Description of Huerhuero
Setting
Landform: Ridges
Down-slope shape: Concave
Across-slope shape: Concave
Parent material: Residuum weathered from calcareous sandstone
and shale
Typical profile
Hi - 0 to 1 inches: loam
H2 - I to 40 inches: clay loam, clay
H2 - I to 40 inches: stratified sand to sandy loam
H3-40to 60 inches:
Properties and qualities
Slope: 15 to 30 percent
Depth to restrictive feature: More than 80 inches
=DA Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 1 of 2
Map Unit Description: Loamy alluvial land-Huerhuero complex, 9 to 50 percent slopes,
severely eroded—San Diego County Area, California
Natural drainage class: Moderately well drained
Runoff class: Very high
Capacity of the most limiting layer to transmit water (Ksat): Very
low to moderately low (0.00 to 0.06 in/hr)
Depth to water table: More than 80 inches
Frequency of flooding: None
Frequency of ponding: None
Salinity, maximum in profile: Nonsaline to very slightly saline (0.0
to 2.0 mmhos/cm)
Sodium adsorption ratio, maximum in profile: 20.0
Available water storage in profile: Low (about 5.9 inches)
Interpretive groups
Land capability classification (irrigated): 6e
Land capability classification (nonirrigated): 7e
Hydrologic Soil Group: D
Hydric soil rating: No
Minor Components
Carlsbad
Percent of map unit: 2 percent
Hydric soil rating: No
Chesterton
Percent of map unit: 2 percent
Hydric soil rating: No
Huerhuero
Percent of map unit: 2 percent
Hydric soil rating: No
Unnamed
Percent of map unit: 1 percent
Landform: Drainageways
Hydric soil rating: Yes
Data Source Information
Soil Survey Area: San Diego County Area, California
Survey Area Data: Version 14, Sep 16, 2019
Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 2 of 2
Soil Map—San Diego County Area, California
K
4740 470 47402D 4740 474100 474140 47410
I I I I I I -
K
4743
ilA
41
14
4 f *
/
/ I r J-
F r:
At
VO
-1
41 Re
F74 tiv ;c Ø\ t
I *
33 IlK N
i;
33- 715"N
470 470 4740 47406) 414100 474140 474140 4740 474260 4743.0 474340 474340
K K
10
Map Se: 1:2,080 if printed on A bridscape (lix 85") ebeet.
Meters K N 0 30 60 120 1W
0 100 200 400 6Cr
Map pmjection: Web Mercatx Come- wordinatee: WGS84 Edge tic: IJTM Zone uN WGS84
USDA Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 1 of 3
Soil Map—San Diego County Area, California
MAP LEGEND MAP INFORMATION
Area of Interest (AOl)
Area of interest (AOl)
Soils
El Soil Map Unit Polygons
Soil Map Unit Lines
13 Soil Map Unit Points
Special Point Features
01 Blowout
Borrow Pit
)E Clay Spot
Closed Depression
Gravel Pit
,'. Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
.. Rock Outcrop
+ Saline Spot
" Sandy Spot
. Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area The soil surveys that comprise your AOl were mapped at
1:24,000. * Stony Spot
'l Very Stony Spot Warning: Soil Map may not be valid at this scale.
Wet Spot Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
, Other line placement. The maps do not show the small areas of
0. Special Line Features Contrasting soils that could have been shown at a more detailed
scale.
Water Features
. Streams and Canals Please rely on the bar scale on each map sheet for map
measurements.
Transportation
j. Rails Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Interstate Highways Coordinate System: Web Mercator (EPSG:3857)
US Routes Maps from the Web Soil Survey are based on the Web Mercator
Major Roads projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Local Roads Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required. Background
Aerial Photography This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: San Diego County Area, California
Survey Area Data: Version 14, Sep 16, 2019
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial Images were photographed: Nov 3, 2014 IS
22, 2014
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
Imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Natural Resources Web Soil Survey 10/11/2019
Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—San Diego County Area, California
Map Unit Legend
Map Unit Symbol Map Unit Name Acres In AOl Percent of AOl
HrC2 Huerhuero loam, 5 to 9 percent
slopes, eroded
4.9 73.2%
HrE2 Huerhuero loam, 15 to 30
percent slopes, eroded
0.0 0.3%
LvF3 Loamy alluvial land-Huerhuero
complex, 9 to 50 percent
slopes, severely eroded
1.8 26.5%
Totals for Area of Interest 6.7 j 100.0%
USDA Natural Resources Web Soil Survey 10/11/2019
Niiiiiiiii Conservation Service National Cooperative Soil Survey Page 3 of 3
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
Appendix B - Existing Hydrology Calculations
Existing Hydrology Calculation
See Attached Calculations'
TAIT JOB # 5P8415 Appendix B
Land Use Runoff Coefficient "C" - -
Soil Type Land Use
County Element % Impervious A B C D Number C Value Soil Type
Permanent Open Space 0 0.20 0.25 0.30 0.35 1 0.35 0.35
Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 2 0.46 0.41
Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 3 0.55 0.46
Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 4 0.59 0.49
Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 5 0.63 0.52
Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 6 0.70 0.57
Residential, 10.9 DU/Aor less 45 0.52 0.54 0.57 0.60 7 0.74 0.60
Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 8 0.77 0.63
Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 9 0.83 0.71
Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 10 0.88 0.79
Neighborhood Commercial 80 0.76 0.77 0.78 0.79 11 0.88 0.79
General Commercial 85 0.80 0.80 0.81 0.82 12 0.89 0.82
Office Professional/Commercial 90 0.93 0.84 0.84 0.85 13 0.90 0.85
Limited Industrial 90 0.93 0.84 0.84 0.85 14 0.90 0.85
General Industrial 95 0.87 0.87 0.87 0.87 15 0.90 0.87
NRCS Element
Low Density Residential (LDR)
Low Density Residential (LDR)
Low Density Residential (LDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
Medium Density Residential (MDR)
High Density Residential (HDR)
High Density Residential (HDR)
Commercial/Industrial (N.Com)
Commercial/Industrial (G. Com)
Commercial/Industrial (O.P. Corn)
Commercial/Industrial (Limited I.)
Commercial/Industrial (General I.)
ISOIL TYPE D WAS USED WITH THE %IMPERVIOUS I
C0.90 x (% Impervious) + Cp x (1 - % Impervious)
Equation from San Diego County Hydrology Manual (2003) Section 3
EE1 EEE
.EX-ATOT 000 year)
Existing Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use =
C= 0.80 T 1.8(1.1—C)Ji.
Dist. = 361.09 ft. C
- slope = 2.700%
*Tc = 7.37 mm.
* Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L . Oft 0.3S
Oft r (11.9L3)
= #DIV/01 mm.
** Minimum T = 10 Minutes
Basin Intensity Calculations
Selected Frequency, 100 year
P6 = 2.7 in. P6 must be within
= 4.7 in. 45% to 65% of P24.
P6 / P24 = 57% Adjust P6 as needed.
Adjusted P6= 2.70 in.
T(D) = 7.37 mm. -O.643
= 5.54 in/hr -
7.44P6 '
Basin Flow Calculations
Q IQ=c*I*AI C= 0.80
= 5.54 in/hr
A= 1.202 ac.
10
SP8415 - Existing Hydrology Calculations (DMA Atot).xls Intensity-Duration Design Chart EX - A TOT
10.0
.78 2.
1.0
0.1
1 10 100 1000
AE
EX-BTOT (100 year)
Existing Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use=
C = 0.80 - 1.8(1.1 - c)..Th
Dist. = 284.17 ft. C
- slope = 2.300%
*Tc = 6.90 mm.
* Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L= Oft O315
Oft r,, = [11 .9L 3 )
T= #DIV/0! mm.
** Minimum T = 10 Minutes
Basin Intensity Calculations
Selected Frequency, 100 year
P6 = 2.7 in. P6 must be within
P24 =4.7in. 45% to 65% of P24.
P6 / P24 = 57% Adjust P6 as needed.
Adjusted P6=2.70in.
T,, (D) =6.90 mm. O645 1= 5.78 in/hr -_ 7_44P6
Basin Flow Calculations
Q= 3.79 cfs IQ=C*1*AI C=O80
= 5.78 in/hr
A= 0.820 ac.
5P8415 - Existing Hydrology Calculations (DMA Btot).xls Intensity-Duration Design Chart EX - B TOT
10.0
4.78
1.0 N.
0.1
1 10 100 1000
EEE 1 i
Existing Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use =
C= 0.64 1.8(1.1—C) Th
EX-BPALTOT(I 00 year)
AE
Dist. = 212.10 ft. T C
- slope = 2.200%
= 9.27 mm.
* Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L= Oft
Oft
03$5 (ii .9L 3 T =
T= #DIV/O! mm. A
** Minimum T = 10 Minutes
Basin Intensity Calculations
Selected Frequency, 100 year
P6 = 2.7 in. P6 must be within
P24 =4.7 in. 45% to 65% of P24.
6 / P24 =57% Adjust P6 as needed.
Adjusted P6 2.70 in.
T(D) = 9.27 mm. 1 - D°645 1= 4.78 in/hr -_ 7_44P6
Basin Flow Calculations .
Q 1.36 Ct5 IQ=C*1*AI C= 0.64
= 4.78in/hr
A=0.446ac.
5P8415 - Existing Hydrology Calculations (DMA Bpaltot).xls Intensity-Duration Design Chart EX - B PAL TOT
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT & Associates
Appendix C - Proposed Hydrology Calculations
fPropAsed Hydrology Calculations
See Attached Calculation
TAIT JOB # SP8415 Appendix C
Land Use Runoff Coefficient "C"
Soil Type Land Use
pervious A B C D Number C Value Soil Type
0 0.20 0.25 0.30 0.35 1 0.35 0.35
10 0.27 0.32 0.36 0.41 2 0.46 0.41
20 0.34 0.38 0.42 0.46 3 0.55 0.46
25 0.38 0.41 0.45 0.49 4 0.59 0.49
30 0.41 0.45 0.48 0.52 5 0.63 0.52
40 0.48 0.51 0.54 0.57 6 0.70 0.57
45 0.52 0.54 0.57 0.60 7 0.74 0.60
50 0.55 0.58 0.60 0.63 8 0.77 0.63
65 0.66 0.67 0.69 0.71 9 0.83 0.71
80 0.76 0.77 0.78 0.79 10 0.88 0.79
80 0.76 0.77 0.78 0.79 11 0.88 0.79
85 0.80 0.80 0.81 0.82 12 0.89 0.82
90 0.93 0.84 0.84 0.85 13 0.90 0.85
90 0.93 0.84 0.84 0.85 14 0.90 0.85
95 0.87 0.87 0.87 0.87 15 0.90 0.87
NRCS Element Element %
Permanent Open Space
Low Density Residential (LDR) Residential, 1.0 DU/A or less
Low Density Residential (LDR) Residential, 2.0 DU/A or less
Low Density Residential (LDR) Residential, 2.9 DU/A or less
Medium Density Residential (MDR) Residential, 4.3 DU/A or less
Medium Density Residential (MDR) Residential, 7.3 DU/A or less
Medium Density Residential (MDR) Residential, 10.9 DU/A or less
Medium Density Residential (MDR) Residential, 14.5 DU/A or less
High Density Residential (HDR) Residential, 24.0 DU/A or less
High Density Residential (HDR) Residential, 43.0 DU/A or less
Commercial/Industrial (N.Com) Neighborhood Commercial
Commercial/Industrial (G. Corn) General Commercial
Commercial/Industrial (O.P. Corn) Office Professional/Commercial
Commercial/Industrial (Limited I.) Limited Industrial
Commercial/Industrial (General I.) General Industrial
ISOIL TYPE D WAS USED WITH THE %IMPERVIOUS I
C0.90 x (% Impervious) + Cp x (1 - % Impervious)
Equation from San Diego County Hydrology Manual (2003) Section 3
10.0
N.
1.0
21
I N
IS
J 'I 0.1
1 10 100 1000
PR-ATOT 000 year)
Proposed Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use =
C = 0.88 T - 1.8(1.1—C) th
Dist. = 402.46 ft. C
- slope = 2.600%
*Tc = 5.78 mm.
Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L Oft 0.385
Oft T = [11 .9L3 )
T #DIV/01 mm.
Basin Intensity Calculations
Selected Frequency, 100 year
P6 =
** Minimum T = 10 Minutes
if
2.7 in. - P6 must be within
P24 =4.7 in. 45% to 65% of P24.
P6 / P24 = 57% Adjust P6 as needed.
Adjusted P6=2.70 in.
Tr (D) =5.78 mm.
. 44 D 645 1= 6.48 in/hr - 7
-_• 6
Basin Flow Calculations
Q 6.85 cfs IQC*1*AI C=0.88
= 6.48 in/hr
A=1.202 ac.
SP8415 - Proposed Runoff Calculations (DMA Atot).xls intensity-Duration Design Chart • PR A TOT
10.0
.52
1.0
0.1 ' .-. ..
1 10 100 1000
.EEEEE
__
EE
0*383
PR-BTOT 000 year)
Proposed Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use =
C= 0.87 T 1.8(1.1—CW
Dist. = 312.68 ft. C
- slope 2.100%
*Tr = 5.72 mm.
* Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L— Oft
= 1h193 Oft r
= #DIV/O! mm.
** Minimum T = 10 Minutes
Basin intensity Calculations
Selected.Frequency, • 100 year
P6 = 2.7 in. P6 must be within
P24 = 4.7 in. 45% to 65% of P24.
P6 / P24 = 57% Adjust P6 as needed.
Adjusted P6 2.70in.
T, (D) =. 5.72 mm. 7 44p D °"5 1=6.52 in/hr i f -
-_6
Basin Flow Calculations
Q. 4.65 cfs IQ=C*1*AI C= 0.87
= 6.52 in/hr
A = 0.820 ac.
SP8415 - Proposed Runoff Calculations (DMA Btot).xls Intensity-Duration Design Chart PR-B TOT
10.0
4.78
1.0
SIN
Is
ti
0.1 .
1 10 100 1000
Proposed Conditions
Time of Concentration Calculations
Overland Flow Method
Land Use =
C= 0.64 1.8(1.1—C)f5
PR-BPAL TOT 000 year)
AE
Dist. 212.10 ft. r C
- vs- slope = 2.200%
= 9.27 mm.
Minimum T = 5 Minutes
Natural Watershed (Kirpich)
L Oft
Oft
0385 (ii .9L 3 T =
= #DIV/O! mm. E
** Minimum T = 10 Minutes
Basin Intensity Calculations
Selected Frequency, 100 year
P6 = 2.7 in. P6 must be within
=4.7in. 45% to 65% of P24.
P6 / P24 = 57% Adjust P8 as needed.
Adjusted P6= 2.70in.
T. (D) = 9.27 mm.
- 7 44 D °645 1= 4.78 in/hr - 6
Basin Flow Calculations
Q 1.36CfS IQC*1*AI C=0.64
= 4.78 in/hr
A = 0.446 ac.
SP8415 - Proposed Runoff Calculations (DMA Bpaltot).xls Intensity-Duration Design Chart PR - B PAL TOT
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAIT& Associates
Appendix D - Hydrology Map - Existing Conditions
Existing Conditions Hydrology Map'
See Attached ExhibitT
TAIT JOB It 5P8415 Appendix D
SDP 2019-0009
I SFF HFFT 9 - MAT(I.11 IMP APPROY 7cn' PAST
N 00
-5.
cii) R ~L()
"-0 N. '-N ID o.
' 8 ) <U No U o d CD OC '0
-C N. 00
I-
-t
0. 0
00 00
0 0 tO
0 C 0 LL0
C .ii 00 C') co
0 'E O a) 0) E .2
00 C') C')
ci)
ci) ) .g
0 -J
So OS
ci) 0 C U,
7(1
/
L "•
'.' " '1 I /// (ORIGINATES COLLECTING
ROO DRAINAGE)
/A4 // / / ::
0.01
00
(
00 CO TOT
, ,- EX. 12" PVC STORM DRAIN -
I
\_... 1.20 / ( (ORIGINATE COLLEC11NG
/ ROOF DRAIJGE)
:H Lii . I
__ ' ' - __ -
LIMITS OF
GRADING _
A H / / -
Al
Im"m FIRM
UJI
/ / *
("'A2///
1.A03
1&12"PVCSTORMDRAIN
I 91.14 FS I / I (ORIGINATES COLLECTING 7- / , / Ii, \
/ I '
ROOF DRAINAGE)
/::::::
___ '1 r--1 - :
Fm mom MEMO IN
I / / VEIRN 7 I I / /Slamm NEW PROTECT EX. 12" ACP
/ j-EXIS11NG RIE \/ LSD 'SD_ SP / - 4' t STORM DRAIN LINE PER I / PATH OF/TRAVEL
,r1L=361 ' EX FLOWS / 281.39)TG /J /
DWG NO. 205-1
/ / / / / t HE1T 9.75 /IQ1T8 =533_CFS / / 11
POINT F /-PROTECT EX. CURB INLET
S=' 0.027 _/
/ _•COMPUNCE# P1 4 TYPE "B" SD COUNTY STD
> ' > ' / / D-2 PER DWG. NO. 205-1
/
I
I
/ I'
/
/
?UflPAiIJ
/
/
w-- • I - IWI1 % I I IUI II I II I
I /
/
I /
I /
I /
I -FY 19" Pvr(cTn,
EXISTINGDMA SUMMARY
Area ID Area(sf) Area(ac)
85th
percentile
depth (in)
Pervious
Area (SF)
Pervious
Area (AC)
Irnpeivio
usArea
(SF)
Impervio
usArea
(AC)
Percent
Impervious
Area
Weighted
Runoff Coef
SWQMP
Soil Type DCV(cf)
FLOW
THRU (Q)
(cfs)
A1 7,713 0.177 0.65 3405 0.078 4308 0.099 56 0.55 D 228 0.029
A2 44,661 1.025 065 0 0.000 44661 1.025 100 090 D 2177 0.277
A3 4,610 0.106 0.65 2969 0.068 1641 0.038 36 0.38 0 96 0.012
A4 487 0.011 0.65 100 0.002 387 0.009 79 0.74 D 19 0.002
As 2,966 0.068 065 2496 0.057 470 0.011 16 023 D 36 0.005
A6 2,669 0.061 0.65 916 0.021 1753 0.040 66 0.63 D 90 0.011
A1 2,989 0.069 065 0 0.000 2989 0,069 100 090 0 146 0.019
B1 3,972 0.091 0.65 3158 0,072 814 0.019 20 0.26 D 57 0.007
B2 31,731 0.728 0.65 1443 0.033 30288 0.695 95 0.86 0 1484 0.189
B3 5,917 0.136 0.65 0 0,000 5917 0.136 100 0.90 D 288 0.037
13,518 0.310 0.65 3678 0.084 9840 0.226 73 0.68 D 500 0.064
A P 52,374 1.202 065 6374 0.146 46000 1.056 88 080 0 2277 0.290
35,703 0.820 0.65 4601 0.106 31102 0.714 87 0.80 D 1541 0,196
19,435 1 0.446 0.65 1 6282 1 0.144 13153 0.302 68 0.64 D 675 0.086
MITIGATION AREA (SF) 188077
ATOT+BTOr
IMPERVIOUS AREA (SF) 77102 PERVIOUS AREA (SF) 10975
ACRES= 2.02 ACRES= 1 77 ACRES= 0.25
CATCH BASIN "Illi
COUNTY STD. D -
EX.
RI 4=281.3
IN 276160
\ -_-_- ______ ______ ______ - - - ______ ______ ______ ______ - __ _____________ ______ ______ ______ - iz - - - - _- - - -_- -_-
I RIM=269.77
INV=264.77
\ 4X. 12"/(CP "/ 5'
..jV=268.53
TORM
/ / /
IN AJNE
/ PROTECT EX. CURB
/ /" // -- INLET TYPE "8" SD
AIIMW STD. D-2 ---------
70457' --- ------------ / PER DWG NO 205-1 PROTECT EX. -_
-I_ RIM=26977 18"ACP STORM N 475952 W -- ---- ---- -* - DRAINAGE LINE
-• INV=268.53 W PER CORTE DEL
I =94R rA1 NOGAL IMPROVEMENT
EST1MG__CONDITIONS
STORM YR
DMA
-
CFSFT/5
A'ror 53
Br'IT ZL7
FtLTDT
H
LEGEND
DMA INFORMATION: \\\\ FULL DEPTH ASPHALT PAVEMENT 120 PROPOSED CONTOURS '¼
20 30 4 0 I.I.Ii
UNDERLYING HYDROLOGICAL SOIL GROUP DMAs A & D CONTAIN BOTH SOILS TYPE B & : EXISTING LANDSCAPE AREA (xxx.xx)FS EXISTING ELEVATIONS
. D ALL OTHER DMAs CONTAIN SOIL TYPE D '
PROPOSED ELEVATIONS
APPROXIMATE
PROPOSED HARDSCAPE IMPROVEMENT XXX.XX FS IN FEET)
DEPTH TO GROUNDWATER:_____________ GROUNDWATER GREATER THAN 30' BELOW
GRADE GRIND EXISTING AC PAVEMENT 2" MIN -_- PROPOSED RETAINING WALL
(II) EXISTING NATURAL HYDROLOGIC FEATURES NONE - - - MITIGATION AREA LIMITS '________SD_ PIPE FLOW ARROWS
-o
Z .0
- Ui
0
O -
L.
>,, z w Ld
oQ 04
oo
-J 0 ° o 04 > UJ < o<> (/) <
o o
>-
F-a.°-i°° <<IIIZ 0
I
LO LO Z
(- 'r< Ui
Z<04 i
(1)0 0
Uj 0-
00
MITIGATION AREA
88,077SF0R2.02AC - IMPERVIOUS % PERVIOUS %
EXISTING CONDITIONS 77,102 SF orl.77AC 88 10,975 SF orO.25AC 121
PROPOSED CONDITIONS - 85,191 SF orl.96AC 97 2,886 SF or0.O7AC
DISTURBED AREA
31,3235F0R0.72AC IMPERVIOUS % PERVIOUS
EXISTING CONDITIONS - 18,279 SF or 0.42 AC 58 13,044 SF or 0.30 AC 42
PROPOSED CONDITIONS - 22,539 SF or 0.52 AC 1 72 8,784 SF or 0.20 AC 28
I-i(UIULU ULIUN UtAUI. II'(LAIMNI: I<UliIL.I/J<Y IiIU-HLII'AIIUN
POTENTIAL POLLUTANT SOURCE AREAS TRASH AREAS, PARKING LOTS
EXISTING DRAINAGE OFFSITE (DRAIN TO
PACIFIC OCEAN):TBD
SITE DOES NOT LIE WITHIN CRITICAL COARSE
CRITICAL COARSE SEDIMENT YIELD AREA: SEDIMENT YIELD AREA. SEE EXHIBIT IN
ATTACHMENT 1 OF WQMP REPORT
- FLOW PATH
DRAINAGE AREA
--(120)-- EXISTING CONTOURS
A
.357 ACREAGE
DRAINAGE PATTERN
0
UNDERGROUND SERVICE ALERT rn
0 Call: TOLL FREE
1-800-422-4133
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG
TWO WORKING DAYS BEFORE YOU DIG
ENGINEERS NOTE TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES, PIPES, AND/OR
STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO
EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR
SHALL ASCERTAIN THE TRUE VERTICAL AND HORIZONTAL LOCATION OF THOSE
UNDERGROUND UTILITIES TO BE USED AND SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES, SHOWN OR NOT SHOWN
HEREON. IF THE CONTRACTOR ENCOUNTERS ANY DISCREPANCIES, CONFLICTS
OR AREAS WHICH HE FEELS UNWORKABLE, HE SHALL N011FY THE GRADING
ENGINEER IMMEDIATELY PRIOR TO CONTINUING OR DEVIATING FROM THIS PLAN.
UNAUTHORIZEDCHANGES&USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED
CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE
APPROVED BY THE PREPARER OF THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL BE MADE
TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR
FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL
-c
cc N c'.j U') - 0 0 c'.Jc-.j 00
- 0
I-N- (f) U)
zQ o .0
w0w2wZ E 61 t<> LU !<- m
O r N
LU
N
0
Io
N
0
0F2
2019-0009
U
BlOT
II
DRIVE ENTRY \ \ / 0.82
JI
/
\ \ • : : : :1: : : : ______ _______ ______ ________ ______ _______
\
I: ,-- EX. 24X40N IDI
I (SINGLE) S.D. (
EXISTING DMA SUMMARY
Area ID Area (4) Area (ac) percentile Pervious Pervious
Area (SF) Area (Ac) us Area us Area Percent Weighted
Impervious Runoff Coef. Soil Type DCV (cf) THRU (Q)
85th Impenhlo Irnpervio FLOW
depth (in) (SF) (Ac) SWcMP (cfs)
A t 7,713 0.177 065 3405 0.078 4308 0.099 56 055 D 228 0.029
A, 44,661 1.025 065 0 0.000 44661 1.025 100 090 D 2177 0,277
A, 4,610 0.106 065 2969 0.068 1641 0.038 36 038 0 96 0.012
A4 487 1 0.011 0.65 100 0.002 387 0.009 79 0.74 0 19 0.002
As 2,966 0.068 0.65 2496 1 0.057 470 0.011 16 0.23 0 36 0.005
A5 2,669 0.061 0.65 916 0.021 1753 0.040 6. 0.63 D 90 0.011
-
2,989 0.069 0.65 0 0.000 2989 0.069 100 090 0 146 0.019
3,972 0.091 065 3158 0.072 814 0.019 20 026 D 57 0.007
31,731 0.728 0.65 1443 0.033 30288 0.695 95 0.86 D 1484 0.189 95 0.86
B, 5,917 0.136 0.65 0 0.000 5917 0.136 100 0.90 0 288 0.037
B 13,518 0.310 0.65 3678 0084 9840 0 226 73 0.68 D 500 0.064
A T 52,374 1.202 0.65 6374 0146 46000 1.056 88 080 D 2277 0.290
35,703 0.820 065 4601 0106 31102 0714 87 080 0 1541 0196 ____ - A - - - - - ------ -
B -, 19,435 0.446 0.65 6282 0.144 13153 0.302 68 064 D 675 '0.086
MITIGATION AREA (SF)88077 IMPERVIOUS AREA (SF) 77102 PERVIOUS AREA (SF) 10975 ATOT+BTOT
ACRES 1 202 ACRES 177 ACRES=! 025 -
/
L \\\\)
MITIGATION AREA
88,077 SF OR 2.02 AC IMPERVIOUS 1% PERVIOUS
EXISTING CONDITIONS 77,102 SF or 1.77 AC 88 10,975 SF or 0.25 AC 12
85,191 SF or 1.96 AC 97 2,886 SF or0.O7AC 3 PROPOSED CONDITIONS
DISTURBED AREA !! k 8 S7 0.023 : \ I \ I
'j
RIM=285.82 L=284.17'
H OF TRAVEL
Q100=3.79 CF'Sj
I I I
/ I I IF --
E)ST1NG CONDITIONS
5TOR1J1 IOOYF
DMA CF T/
ATOT 533
r . -
BPILTCT 1 F
\
ININT TYPE "( \
)UNTY SID. D-8 \. -
31,323 SF OR 0.72 AC IMPERVIOUS % PERVIOUS
EXISTING CONDITIONS 18,279 SF or 0.42 AC 58 13,044 SF or 0.30 AC 42
PROPOSED CONDITIONS 22,539 SF or 0.52 AC 72 8,784 SF or 0.20 AC 28
I / I DWG.I N,cc2o -1. 1 1 : :cc€X.:c2i: ACP
SDP
SEE SHEET 2
I L I /44
i1 1 (UHH" All
SEE SHEET 1-
_f 7rT 41 jIIriiciiiFnTU muiij
I F
SHEET INDEX MAP
SCALE 1"=200'
LEGEND:
FULL DEPTH ASPHALT PAVEMENT
PROPOSED LANDSCAPE AREA
PROPOSED HARDSCAPE IMPROVEMENT
GRIND EXISTING AC PAVEMENT 2" MIN.
- - - MITIGATION AREA LIMITS 00
10
PROTECT 12 ACP / / I - .• -) - FLOWPATH LO
EXISTING CONTOURS 0
120- PROPOSEDCONTOURS 0 P(i P
co 0 Ifl \f POEC1 EXCTCH BASIN TYPE F SD - ----N 4759'2W 70457 --- - --- -_ - (XXXXX)FS EXISTING ELEVATIONS
CL I \ \ COUNT(STDD-7Y'ERDG..-NOO5-1 - =- =-=-= -=- -----=.------- - °<
I =283.00'
-
- XXX.XX FS PROPOSED ELEVATIONS
INV=280.00 I -..
I B - PROPOSED RETAINING WALL
PAL,TOT -- ---.- ---. go SD PIPE FLOW ARROWS • 0.45 I...
A DRAINAGE AREA
0 0 _____ __________ N 4759'52" W - - ___57958. -=--- ---==---.----__.--z.---
-.I.C) IC) '-EX.15"ACP - _ - F I I CTADIA r'IDAIIJ ------------1 _-.----.---• .- STORM LJRtIfl --------I-r_---------------- ---- - - - I\
>< j UNEPER DWG T J
EX. CATCH BASIN 0 0
TYPE S.D.:::.:::::::.::::::::::::::: :::::::.--
I.E •/\coUN'1sTD D-7 0_ a 7/N\I///-\ __________ '::H __H[ • 1 4
LINE PER DWG 0 P ~ :: I I I : 1: 0 0-
I \ - -
B .
RIM 29475 r EXIS11NG -REMOTE
I INV289.00 Bpoi EX FLOWS I 3 PATH OF TRAVELmom /
<
I Qi =1.39CF
I 0.14 .• .:TI::::::;::1 .
X I
NEX. 15" ACP STORM DRAIN I I EX. 24'X24" GRATED . . . . . L=212.1O' I A S LINE PER DWG NO. 205-1 w u I DRAIN INLET I A HEIGHT= 4.64' ' 7
EX. DRAIN CLEANOUT
TYPE *A* PER S.D. U) EX.-7 INV=289.50 I
COUNTY SM. D-9 TRENCH PER IMPROVEMENT PLAN 0
0 DRAIN NO. 205-1 4 291.85 FS
0.31
1 I- .. . i pjj ,:-'
I rEX. 12" PVC STORM DRAIN EX. 15" ACP STORM 10 Lij Ui I 1 I. " (ORIGINATES COLLECTING
D
NO. 205-1
RAIN LINE PER DWG :l I /
ROOF DRAINAGE)_-
__ __ __
I EXISTING BUILDING I I
• I \ ? \ A6 /\ \
SEE DETAIL BELOW - MATCHLINE APPROX. 350' WEST
I
TO REMAIN ' i
TT
I 'Hi --
0.
SEE DETAIL ABOVE - MATCHLINE APPROX. 350'NORTH 0 w 0
x. 15"
ACP STORM I DRAIN LINE
I
O I \S - EX. CATCH BASIN
18"
TYPE "B" PER S.D. __I 0 ACP STORM COUNTY STD. D-2
a. DRAIN LINE
a. PER DWG
NO. 205-1
10 to
I
IN FEET)
ot
c,_ o
oa) 00
0 C.)
0 C 0
LL c . 00 (') co
0
CO a)0) E .6 00
00 V U)
U, ci)
ci) 0)0 C = <0
U)0 0
10
ci) 0 C
U,
JI
z
>-LU
_J oa Lu -
OWzo
o
o LIJ 0 a
i.,-
I
><..coWww
0-0 LC C-9 -
z<c..4
-
(/)O
--J
IC)
C\j
EX 12" PVC STORM DRAIN
I (ORIGINATES COLLECTING
ROOF DRAIAG1
/i
SEE SHEET I . MATCHLINE APPROX. 250' WEST
/
DRIVE ENTRY
1 INCH =20 FEET
UNDERGROUND SERVICE ALERT rn S Call: TOLL FREE.
1-800-422-4133
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
TWO WORKING DAYS BEFORE YOU DIG
No. C46301
EXP. 12-31-20
ENGINEERS NOTE TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES, PIPES, AND/OR
STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, 1HERE ARE NO
EXISTING U11U11ES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR
SHALL ASCERTAIN THE TRUE VERTICAL AND HORIZONTAL LOCATION OF THOSE
UNDERGROUND UTILITIES TO BE USED AND. SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO ANY PUBLIC OR PRIVATE U11LI11ES, SHOWN OR NOT SHOWN
HEREON. IF THE CONTRACTOR ENCOUNTERS ANY DISCREPANCIES, CONFLICTS
OR AREAS WHICH HE FEELS UNWORKABLE, HE SHALL NO11F'( THE GRADING
ENGINEER IMMEDIATELY PRIOR TO CONTINUING OR DEVIATING FROM THIS PLAN.
UNAUTHORIZED CHANGES & USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED
CHANCES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE
APPROVED BY THE PREPARER OF THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL BE MADE
TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR
FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEP11NG.
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT& Associates
Appendix E -Hydrology Map - Proposed Conditions
'Proposed Hydrology Map
See Attached Exhibii
TAIT JOB # 5P8415 Appendix E
SDP 2019-0009 U
PROPOSED _DMA _SUMMARY
Area ID Area(sf) Area (ac)
85th
percentile
depth (in)
Pervious
Area (SF)
Pervious
Area (AC)
Impervia
us Area
(SF)
Impervio
us Area
(AC)
Percent
Impervious
SWQMP
Area
Weighted
Runoff Coef. Sol lType DCV(cf)
FLOW
THRU (0)
(cfs)
A 7,713 0.177 0.65 1443 0.033 6270 ' 0.144 81 0.75 0 313 0.040
A7 44,661 1.025 0.65 0 0.000 44661 1.025 100 0.90 0 2177 0.277
A 4,610 0.106 0.65 1448 0.033 3162 0.073 69 0.65 D 162 0.021
A4 j 487 0.011 0.65 151 0.003 336 0.008 69 0.65 0 17 0.002
A 2,966 0.068 0.65 1008 0.023 1958 0.045 66 0.63 D 101 0.013
A, 2,669 0.061 0.65 1158 0.027 1511 0.035 57 0.55 0 80 0.010
A7 2,989 0.069 0.65 972 0.022 2017 0.046 67 0.64 0 104 0.013
B1 3,972 0.091 0.65 0 0.000 3972 0.091 100 0.90 0 194 0.025
B2 31,731 0.728 0.65 1443 1 0.033 30288 0.695 95 0.86 0 1484 0.189
5,917 0.136 0.65 2604 0.060 3313 0.076 56 0.55 0 176 0.022
B4 13,518 0.310 0.65 3678 0.084 9840 0.226 73 0.68 0 500 0,064
A 52,374 1.202 0.65 1443 0.033 50931 1.169 97 0.88 0 2491 0.317
B, 35,703 0.820 0.65 1443 0.033 34260 0.787 96 0.87 0 1678 0.213
19,435 0.446 0.65 1 6282 1 0.144 13153 0.302 68 0.64 j 0 675 0.086
MITIGATION AREA (SF)
Ar+B
88077 IMPERVIOUS AREA (SF) 85191 PERVIOUS AREA (SF) DISTURBED AREA (SF) 2886 A1+A3+A4+AS+A6+Al+Bj+B31 31323
ACRES; _2.02 ACRES=1 1.96 ACRES= 0.07 0.72 ACRES=
ml
(/) F
a'
/
Ic / _c
_ntrrr,%r r
I I.
/ I
/
I
V rita,-. ry I L I LA. IL r V%o IN .
N
SEE SHEET 2
- - - - - - -
1, I -
C
- ' ''
I1-1 ii
PAR. 'A C I .-J PARCEL MAP 99
CIA
1fH+
SEE SHEET 1-
j >J_
SEE SH
_99iI flhh1f?
( A2I
Cn
I
I=f/NILNLN
ir
INN STORM DRAIN (ORIGINATES
COLLECTING ROOF
'
N / DRAINAGE)
Ljj
00
.,,, I ,- - - .
PROTECT EX. 12" PVC 00 CID C114 STORM DRAIN (ORIGINA7S I COLLECTING ROOF ' / 00
DRAINAG9'\
\III
Ilk
:% LIMITS OF
GRADING
40
W 292.07 ES
Is
/1 IV
co Z . .. E / I 'r-3: /
, E PRECISE GRADIN
4.
PROTECT "Ei !~,p
STORM DRAIN (ORIGI AT o=48'
COLLECTING ROOF
.NT PI
41) rAT,,T PR FLOWS
Sill) 01-00=6.85 CPS __SD ______ S
,RE-ROUTED 'I
EX. 12 PE P4)
S= 1026 __
0) z
0
(I) z -
- w I-
-
SHEET INDEX MAP \
SCALE 1"=200'
o z
-- xD
01:
CL CL
0U) 00
0 0 (N co 0 C C 0 -0 Lt
00
U
OC 'O a< Lt)0 0)0 Z • r C N.5. 0
EJSTNG CONrMTICN1S.
STORM
_2Ml CIS (F175T
IL1T 33
,I-PROTECT EX. 12" ACP
/ STORM DRAIN LINE PER
/ DWG NO. 205-1
i-PROTECT EX. CURB INLET
f TYPE "B" SDRSD D-2
PER DWG. NO. 205-1
RIM=269.77
INV=264.77
.JV=268.53
PROPOSED coNpmQNs
STORM
-
WOYR FLOW INCEASE
DMA C ,S FT CFS(ET/S)
Aiür 635 -
F0I -'.i.E5 - ___
I Ei5 OO
I PROPRIETARY, I \! _- 3MPAF1
BlO-F1LTRA11ON
BI CLEPN MW_L_8.12_4'.k1.5"LC
MAX. EA ENT FLOW RTE=OJ346 CS
I_ SEE bETAILI 1 'ON SHEETI 6
z
F-2
LJ<
I>
><o
UJZ w
ULTIMATE RUNOFF COND.rnON
STORM 100 YR FLOW INCREASE
DMA CFS (FT /S) CES___('EV/S
A -OT 5.1.3 U.20
T0T 3.76 -0O3
PAL.TCT
Au
rn __ ',
77
* KI A 7' A' Z')" UI I'I ._)'.JL U - -
-, *- -
/
Table 5 --Total Runoff Fkws after DetenticmJInfthratior '
Wo) 0 I Oy'j
0 0a
o LIJ
a
>- WSF<
I iCO
w
UI
c l:cN
00 -J
00
cLL° 0 c.sJ
STORM TABLE _DRAINPIPE
PIPE DIAMETER
(IN)
SLOPE
(%)
LENGTH
(FT)
REQ. CAPACITY
(CFS)
% FULL
(DEPTH/DIA.)
P1 12 25.40% 24.9 6.85 41%
P2 -.12 0.50% 22.8 1.24 48%
P3 12 2,75% 23.6 6.85 92%
P4 12 . 25.90% 26.0 16.48 70%
P5 24 0.50% 30.3 18.47 90%
PS 12 1.57% 5.0 4.65 79%
P7
PS
12
12
1.70%
1.75%
34,2
17.3
4.65
4.65
76%
75%
P 12 23.50% 19.9 4.65 34%
P10 12 1.75% 4.9 4.65 75%
P11 I 12 6.18% 16.1 4.65 49%
MITIGATION AREA DMA INFORMATION:
DMAs A & D CONTAIN BOTH SOILS TYPE B & UNDERLYING HYDROLOGICAL SOIL GROUP: D ALL OTHER DMAs CONTAIN SOIL TYPE D
APPROXIMATE DEPTH TO GROUNDWATER: GROUNDWATER GREATER THAN 30' BELOW
GRADE
EXISTING NATURAL HYDROLOGIC FEATURES: NONE
PROPOSED DESIGN SURFACE TREATMENTS: PROPRIETARY BIO-FILTRATION
POTENTIAL POLLUTANT SOURCE AREAS: TRASH AREAS, PARKING LOTS
EXISTING DRAINAGE OFFSITE (DRAIN TO TBD PACIFIC OCEAN):
SITE DOES NOT LIE WITHIN: CRITICAL COARSE
CRITICAL COARSE SEDIMENT YIELD AREA: SEDIMENT YIELD AREA. SEE EXHIBIT IN
ATTACHMENT 1 OF WQMP REPORT.
88,077 SF OR 2.02 AC • IMPERVIOUS % PERVIOUS
EXISTING CONDITIONS 77,102 SF orl.77AC 88 10,975 SF orO.25AC 121
PROPOSED CONDITIONS 85,191 SF orl.96AC 97 2,886 SF orO.O7AC 31
(IN FEET )
1 INCH = 20 FEET
DISTURBED AREA
131,3235F0R0.72AC IIMPERVIOUS
EXISTING CONDITIONS 18,279 SF or 0.42 AC
PROPOSED CONDITIONS 22,539 SF [orO.52AC
-
TPERVIOUS
58 f 13,044 SF I orO.3OAC 1421
8,784 SF f orO.2OAC 128]
Q Co c'.i c LI') °
03
1- N- 35 o I-u "4 0 z - 0 wOw°'uiZ F-F--01 [ENGINEERS NOTE TO CONTRACTOR: I
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES, PIPES, AND/OR
coo
I STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF I I AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO I
EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR I
I SHALL ASCERTAIN THE TRUE VERTICAL AND HORIZONTAL LOCATION OF THOSE I No. C46301
ç31 \\ -20)J/ I UNDERGROUND UTILITIES TO BE USED AND SHALL BE RESPONSIBLE FOR ANY I
I
I DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES, SHOWN OR NOT SHOWN I
I HEREON. IF THE CONTRACTOR ENCOUNTERS ANY DISCREPANCIES, CONFLICTS I Cfjt_1
I OR AREAS WHICH HE FEELS UNWORKABLE, HE SHALL NOTIFY THE GRADING I
[ENGINEER IMMEDIATELY PRIOR TO CONTINUING OR DEVIATING FROM THIS PLAN. OF 2
I - -V.-- -------V
PROPOSED LANDSCAPE AREA (XXX XX)FS EXISTING ELEVATIONS
PROPOSED HARDSCAPE IMPROVEMENT XXX.XX FS PROPOSED ELEVATIONS
GRIND EXISTING AC PAVEMENT 2" MIN. PROPOSED RETAINING WALL - -
- - - MITIGATION AREA LIMITS SD ' PIPE FLOW ARROWS
. • - FLOW PATH A DRAINAGE AREA
- --(123)- EXISTING CONTOURS 0.357 ACREAGE
-....--.- DRAINAGE PATTERN
UNDERGROUND SERVICE ALERT rn S Call: TOLL FREE
1-800-422-4133
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
TWO WORKING DAYS BEFORE YOU DIG
UNAUTHORIZED CHANGES & USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED
CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE
APPROVED BY THE PREPARER OF THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL BE MADE
TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR
F1JR11-IER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL
SDP 2019-0009
BT~iTOTj
I
DRIVE ENTRY O.83j)
\ \
\- - - - -
one) 0A \ - ---
/
-- /
1// \
IN N
Qlk
PR
/ t
SE I
______ ___ N
bco
(1 ____
FOR CIFC INSTALLATION
••
____
- MAX DISCFLGE: Q=O26 CFS
'
0.73
iø Q2=O.56 CES Q10=O.89 C S I
EA11O INSRUC1ONS
-
____
I DETEN11O PiE W RIF1C
PRE-EENT
0 1 t RDI I I •
rrBMP
L(MlTSpF-
\
SEE DETAIL -2-OF-SHEl
00 BIO-CLEAN N
I I
ii •iihiI1thIIui IL PMCa
1iI F
ad
i1IlllllliOO!iO!ll!Iti
_DMA _SUMMARY
Area ID Area (sf) Area (ac) percentile Pervious Pervious us Area us Area Percent Weighted Soil Type DCV (cf) THRU (0) Area (SF) Area (AC) Impervious Runoff Coef.
85th Impervio Impervio Area FLOW
depth (in) SWQMP (cfs)
A1 7,713 0.177 0.65 1443 0.033 6270 0.144 81 0.75 D 313 0.040
A 44,661 1.025 0.65 0 0.000 44661 1.025 100 0.90 0 2177 0.277
A 4,610 0.106 0.65 1448 0.033 3162 0.073 69 0.65 0 162 0.021
A1 487 0.011 0,65 151 0.003 336 O08 69 0.55 D 17 0.002
2,966 0.068 0.65 1008 0.023 1958 0,045 66 0.63 D 101 0.013
A6 1 2,669 0.061 0.65 1158 0.027 1511 0.035 57 0.55 •D 80 0.010
2,989 0.069 0.65 972 0.022. 2017 0.046 67 0.64 0 104 0.013
B1 3,972 0.091 0.65 0 0.000 3972 0.091 100 0.90 0 194 0.025
B2 31,731 0.728 0.65 1443 0.033 30288 0.695 95 0.85 D 1484 0.189
B 5,917 0.136 0.65 2604 0.060 3313 0.076 56 0.55 0 176 0.022
13,518 -0.310 0.65 3678 0.084 9840 0.226 73 0.68 0 500 0.064
AT 52,374 1.202 0.65 1443 0.033 50931 1.169 97 0.88 0 2491 0.317
35,703 0.820 0.65 1443 0.033 34260 0.787 96 0.87 D 1678 0.213
B1 19,435 0.446 0.65 6282 0.144 13153 0.302 68 0.64 0 675 0,086
MITIGATION AREA (SF) 88077 IMPERVIOUS AREA (SF) 85191 PERVIOUS AREA (SF) 2886 DISTURBED AREA (SF) 31323 ATar BTort Ai+A3+A4+As+A6+A7+Bi+B3
ACRESI 2.02 I ACRES 1.96 ACRES=, 0.07 I ACRES= 0.72
Cl) z 0 Cl)
0 w -
0
0 C/)
uJ
N
\
\
0.021
-EXt STiNG CONDITIONS
STORM
DMA CFS T')
AUT 5,33
PALTD1 • _________________
I
IW
Iz
III...
4 SCREENING FILTER DEVICE
0 / \ o(EFLpW oJTE LflI Ii't I rPRoPRIARY BlO-flLTR)1ON * -. • "N I____ PP (9) • 1k IITI :1 'I I BIO CLEAN MWS-L-8-8-5'-6"-V-HC C11
I
t I I 'V1I 'II I 'I I MAX. TREATMENT \ / I - -. - FLOW RATE=0.237 CFS N / _ISEE DETAIL 2 ON SHEET 3 \ D • - Iv • - -,_------------_--___________________j____________*_ -••--*• -•. •--
pi un, CE PLATE PER SAN D lt~o
*TdR \ \ \ \ \ -
- DAIU
k E IN 06-f,
EW
i 11) ___ ' INLET PIP
/çPRTEcTEX'CATdIsAsR4T POINT OF '- N 472b - 70457
- ThE \ \ \ SDRSD b 7 PE -DNG.--ttO. L COMPUANCETE2
2
rBPAL,`T~OT
0.45
N 47 59'52" W -57r9.58,',_,=,== .-.-.-
- -
.......
•... N
[[PR FLfOi [q=4.65 J
PROPOSED OMDONS
STORM iD0YP, FLOW I N CR EASE
DMA FT1/) CFS FT/S1
ATçJY 6.85 12
B-10 4.55
09A 70r .L36
ULTIMATE-RUNOFF CONDITION
STORM 100 YR FLOW INCREASE
DMA CES F1/S) CPS FT/5
ATÔT 5.13 -020
PROPOSED
TCIT _176
I -s .. - DPALTOT
Table-Total Runoff flows after DtitionJIcditrticri
a
CL a-
SHEET INDEX MAP
SCALE 1"=200'
LEGEND:
FULL DEPTH ASPHALT PAVEMENT
.
PROPOSED LANDSCAPE AREA
-
- - - • .
PROPOSED HARDSCAPE IMPROVEMENT
GRIND EXISTING AC PAVEMENT 2" MIN.
- - - MITIGATION AREA LIMITS . 0 0
. - FLOW PATH
N. - - • - EXISTING CONTOURS .? LO
'- 0)
120 PROPOSED CONTOURS 8
(XXX. XX)FS EXISTING ELEVATIONS .
XXX.XX FS PROPOSED ELEVATIONS . !
_C N. 00 ..
- PROPOSED RETAINING WALL 0
_SD_ PIPE FLOW ARROWS
AREA
0)
z -o
IJJ
SEE SH EET
2
-~ ~m
Tm
EXISTING BUILDING
TO REMAIN
STORM DRAIN PIPE TABLE
PIPE DIAMETER SLOPE LENGTH REQ. CAPACITY % FULL
EE
PS
(IN) (%) (FT) (CFS) (DEPTH/D!A.)
P1 12 25.40% 24.9 6.85 41%
P2 _12 CLSO% 22.8 1.24 481Y0
P3 12 2.75% 23.6 6.85 92%
- P0 -
- - P4 - 12 25.90% 26.0 16.48 7(%
24 0.50% 30.3 18.47 90%
12 1.57% 5.0 4.65 79%
P7 12 1.70% 34.2 4.65 76516
12 1,75% 17,3 4.65 75%
P9 12 23.50% 19.9 4.65 34%
P 10 12 • 1.75% 4.9 4.65 75%
P11 12 • 6.18% 16.1 4.65 49%
PROTECT EX. iT PVC-
STORM DRAIN (ORIGINATES
COLLECTING ROOF
DRAINAGE)
MITIGATION AREA
(IN FEET )
1 INCH = 20 FEET PROTECT
STORM DRAIN
COLL
88,077 SF OR 2.02 AC IMPERVIOUS % PERVIOUS
EXISTING CONDITIONS 77,102 SF or 1.77 AC 88 10,975 SF or 0.25 AC 12
PROPOSED CONDITIONS 85,191 SF orl.96AC 97 2,886 SF orO.O7AC 3
/ DISTURBED AREA
31,323 SF OR 0.72 AC IMPERVIOUS PERVIOUS
EXISTING CONDITIONS 18,279 SF or 0.42 AC 58113,044_SF or 0.30 AC 42
PROPOSED CONDITIONS 22,539 SF or 0.52 AC 72 [8,784 SF or 0.20 AC 28
UNDERGROUND SERVICE ALERT
rn
I Call: TOLL FREE
1-800-422-4133
KNOW WHAT'S BELOW.
CALL BEFORE YOU DIG.
TWO WORKING DAYS BEFORE YOU DIG
11 '~\
04 00
ENGINEERS NOTE TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES, PIPES, AND/OR LO
STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO
EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR
SHALL ASCERTAIN THE TRUE VERTICAL AND HORIZONTAL LOCATION OF THOSE
UNDERGROUND U11LI11ES TO BE USED AND SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES, SHOWN OR NOT SHOWN
HEREON. IF THE CONTRACTOR ENCOUNTERS ANY DISCREPANCIES, CONFLICTS cr;
OR AREAS WHICH HE FEELS UNWORKABLE, HE SHALL NOTIFY THE GRADING
ENGINEER IMMEDIATELY PRIOR TO CONTINUING OR DEVIATING FROM THIS PLAN.
UNAUTHORIZED CHANGES & USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED
CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE
APPROVED BY THE PREPARER OF THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE
NTH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL BE MADE
TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR
FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL
OFW
U-
U)
_j 0 0-
D -
0 a >- WSHo< 0 >.. 3-
au_
0
w
uJ<cs,1 0 0 0 U)
_J 0 0
oo_ I
00
LI) 1
LO C:) 0 C/) (N ED..
LO
(I)
C/
)
0)
0
0 0 N LI) C). 00 E
C
04
4
I-N 0-
U) C..
Q)
z'Q o -'
>
0wS2ujZ E I-WH>F-
<I<w<0
cD 0.
I a 2
0 N
a
0 N
OF C
-
2051 Palomar Airport Road Hydrology Study
Carlsbad, California by TAlT& Associates
Appendix F - Proposed Hydraulic Calculations
Proposed Hydraulic Calculations.
See Attached Calculations'
TAIT JOB 4* SP8415 Appendix F
STORM PIPE TABLE _DRAIN
PIPE DIAMETER
(IN)
SLOPE (%) LENGTH
(Fl)
REQ. CAPACITY
(CFS)
% FULL
(DEPTH/DIA.)
P1 12 25.40% 24.9 6.85 41%
P2 12 0.50% 22.8 1.24 48%
P3 12 2.75% 23.6 6.85 92%
P4 12 25.90% 26.0 16.48 70%
P5 24 0.50% 30.3 18.47 90%
P6 12 1.57% 5.0 4.65 79%
P7 12 1.70% 34.2 4.65 76%
P8 12 1.75% 17.3 4.65 75%
P9 12 23.50% 19.9 4.65 34%
P10 12 1.75% 4.9 4.65 75%
P11 12 6.18% 16.1 4.65 49%
Channel Report
Rydraflow Express Extension for Autodesk® AutoCAD® Civil 31® by Autodesk, Inc.
LINE P1 - 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 276.77
Slope (%) = 25.40
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 6.85
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.41
= 6.850
= 0.30
= 22.59
= 1.39
= 0.98
= 0.98
= 8.34
Depth (ft)
- 1.23
Elev (ft)
'0— -
277.50 0.73
277.00 0.23
276.50 -0.27
10 -0.77
1 2 3
Reach (ft)
Section
Section
271.50
271.00
270.50
270.00
Depth (ft)
- 1.68
1.18
0.68
0.18
-0.32
2
- -0.82
3
Channel Report
Hvdraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
LINE P2- 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 270.32
Slope (%) = 0.50
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 1.24
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Friday, Jun 19 2020
= 0.48
= 1.240
= 0.37
= 3.31
= 1.53
= 0.47
= 1.00
= 0.65
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 310 by Autodesk, Inc.
LINE P3- 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 270.82
Slope (%) = 2.75
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 6.85
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Friday, Jun 19 2020
= 0.92
= 6.850
= 0.76
= 9.06
= 2.57
= 0.98
= 0.54
= 2.20
Elev (ft) Section Depth (ft)
10 - 1.18
271.50
271.00 0.18
270.50 -0.32
10 -0.82
1 2 3
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
LINE P4- 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 277.08
Slope (%) = 25.90
N-Value = 0.012
Calculations
Compute by: Q vs Depth
No. Increments = 10
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.70
= 16.48
= 0.59
28.00
= 1.98
= 1.00
= 0.92
= 12.89
Depth (ft)
- 1.92
Elev (ft)
0— -
278.50 1.42
278.00 0.92
277.50 0.42
277.00 -0.08
0 - -0.58
1 2 3
Reach (ft)
Section
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31® by Autodesk, Inc.
LINE P5- 241N DIA
Circular
Diameter (ft) .= 2.00
Invert Elev (ft) = 270.30
Slope (%) = 0.50
N-Value = 0.012
Calculations
Compute by: Q vs Depth
No. Increments = 10
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 1.80
= 18.47
= 2.98
= 6.20
= 5.00
= 1.55
= 1.20
= 2.40
Elev (ft) Section Depth (ft)
10 - 2.70
2.20
1.70
1.20
0.70
0.20
-0.30
-0.80
0 1 2 3 4
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
LINE P6 -121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 282.78
Slope (%) = 1.57
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Cr11 Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Friday, Jun 19 2020
= 0.79
= 4.650
= 0.67
= 6.99
= 2.19
= 0.90
= 0.81
= 1.55
Depth (ft)
-1.22
Elev (ft)
0— -
283.50 0.72
283.00 0.22
282.50 -0.28
0 -0.78
I 3
Reach (ft)
Section
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
LINE P7- 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 281.63
Slope (%) = 1.70
N-Value 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Friday, Jun 19 2020
= 0.76
= 4.650
= 0.64
= 7.25
= 2.12
= 0.90
= 0.85
= 1.58
Depth (ft)
- 1.37
Elev (ft)
0- -
282.50 0.87
K.M1111 0.37
281.50 -0.13
0
no 1 3
01*1
Reach (ft)
Section
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3138 by Autodesk, Inc.
LINE P8- I2IN DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 276.89
Slope (%) = 1.75
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.75
= 4.650
= 0.63
= 7.36
= 2.10
= 0.90
= 0.87
= 1.59
Elev (ft)
lu
Section Depth (ft)
- 1.11
277.50 0.61
277.00 0.11
276.50 -0.39
I lic
-0.89
Reach (ft)
- -0.96
3 2
Section
282.50
282.00
281.50
Depth (ft)
-1.54
1.04
0.54
0.04
281.00
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3130 by Autodesk, Inc.
LINE P9- 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 281.46
Slope (%) = 23.50
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Cnt Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.34
= 4.650
= 0.24
= 19.56
= 1.25
= 0.90
= 0.95
= 6.29
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® CMI 3138 by Autodesk, Inc.
LINE PlO - 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) = 281.55
Slope (%) = 1.75'
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ftls)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.75
= 4.650
= 0.63
= 7.36
= 2.10
= 0.90
= 0.87
= 1.59
Elev (ft) Section Depth (ft)
- 1.45
282.50 0.95
282.00 0.45
281.50 -0.05
0 p L 2 3
-0.55
Reach (ft)
277.50
277.00
276.50
)0
2
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
LINE P11 - 121N DIA
Circular
Diameter (ft) = 1.00
Invert Elev (ft) .-..•. .276.59
Slope (%) = 6.18
N-Value = 0.012
Calculations
Compute by: Known Q
Known Q (cfs) = 4.65
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL(ft)
Friday, Jun 19 2020
= 0.49
= 4.650
= 0.38
= 12.08
= 1.55
= 0.90
= 1.00
= 2.76
Elev Section Depth (ft)
)0- -1.41
Reach (ft)
0.91
0.41
-0.09
-0.59