HomeMy WebLinkAboutPRE 2022-0036; VIEJO CASTILLO HOMES; Admin Decision LetterAugust 16, 2022 Kirk Moeller KM Architects, Inc. 2888 Loker Ave E, Suite 220 Carlsbad, CA 92010 8FILE COPY SUBJECT: PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES APNs: 216-170-14-00 & 216-170-15-00 {'Cityof Carlsbad Thank you for submitting a preliminary review application for a new condominium project consisting of six, three-story, multiple-family-dwelling structures. Each of the proposed 18 units will contain four bedrooms, three full bathrooms, one powder room, kitchen, dining and living areas, and an attached two-car garage. The provided project plans identify three 900-square-foot outdoor community recreation areas, two stormwater retention areas, and six guest parking spaces located on the adjacent street (Viejo Castilla Way). Vehicular access to the new residential units will be provided from Viejo Castilla Way by way of two drive isles connected to the public street. The project site is approximately 0.86 acres and is currently divided into two, undeveloped parcels. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: 1. General Plan and zoning designations for the property are as follows: a. General Plan: R-23 Residential, 15-23 dwelling units per acre (du/ac). b. Zoning: Residential Density-Multiple (RD-M). c. La Costa Master Plan (MP 149). 2. The project requires the following permits: a. Carlsbad Tract Map (CT) b. Planned Development Permit (PUD) c. Hillside Development Permit (HDP) 3. Slope Analysis. A slope analysis will be required upon formal project submittal. Pursuant to CMC Section 21.95.130, a slope analysis and slope profile shall be illustrated on a constraints map, and shall accompany all development submittals which propose grading or development of slopes which Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 442-339-2600 www.carlsbadca.gov PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Pa e 2 have a gradient of fifteen percent or more and have an elevation differential greater than fifteen feet. The slope analysis shall identify the acreage of all natural and manufactured slopes within each of the following slope categories: a. 0 -less than 15 percent slopes b. 15 -less than 25 percent slopes c. 25 -40 percent slopes d. Slopes greater than 40 percent In particular, the project will need to comply with the hillside development and design standards contained in CMC Section 21.95.140 4. Net Developable Acreage: Based on the information provided in a previous Tentative Tract Map approval for the site (CT 04-19), the property has a net developable site acreage of 0.80 acres pursuant to CMC Section 21.53.230. This net developable site acreage of 0.80 acres would still allow for the development of 18 dwelling units (du). The slope analysis constraints map discussed in comment 3 will verify the developable acreage. 5. SB 330 Streamline Application Process. The Housing Crisis Act of 2019 (SB 330) established a preliminary streamline application process for housing projects. It is not mandatory unless applicants seek the vesting and processing benefits offered under SB 330. Participation in the SB 330 streamline process would occur first, followed by the formal development application process required under Government Code (Gov. Code) §§ 65940, 65941, 65941.5, and Carlsbad Municipal Code (CMC) § 21.42.050. Acceptance by the city of a complete SB 330 Streamline Application (Form P-32) and fee will vest the project for 180 days in accordance with the ordinances, policies and standards in effect at the time the SB 330 Application is accepted. The city's SB-330 information bulletin can be found online at: https://www.carlsbadca.gov/home/showpublisheddocument/8l66/637725763890630000 6. Landscaping. Prior to a formal submittal of the project, conceptual landscape exhibits shall be prepared in accordance with the General Requirements listed in Section 3 of the City of Carlsbad Landscape Manual. All relevant information pertaining to the landscaping requirements and physical barriers such as walls or fences must be plotted, labeled, and provide dimension and material details within the exhibits. The Landscape Manual may be obtained at the Planning Division front counter or found on line at: https:llwww.carlsbadca.gov/home/showdocument?id=7032 7. Stakeholder Outreach. The project is subject to City Council Policy No. 84, Development Project Public Involvement. A notice sign is required to be posted onsite by the applicant and an early public notice is required to be prepared by the applicant and mailed to all owners within a 600-foot radius of the property. In addition, enhanced stakeholder outreach and a follow-up summary report are required. The policy and guidelines can be found online at: PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Pa e 3 City Council Policy No. 84: https:ljwww.carlsbadca.gov/home/showpublisheddocument/266/637425976535170000 Guidelines for Project Public Involvement: https:ljwww.carlsbadca.gov/home/showpublisheddocument/452/637843403622900000 8. Climate Action Plan (CAP). New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division. 9. R-23/Planned Development. Attached multi-family residential dwelling units designed as airspace condominiums require the approval of a Planned Development (PUD), pursuant to CMC Chapter 21.45, Planned Development Ordinance. Specifically, the proposed project shall comply with Table C -General Development Standards and Table E -Condominium Projects. Please see comment no. 10 below for staff analysis of the project's consistency with the Planned Development ordinance. The preliminary plans provided do not provide adequate detail to complete a full analysis; however, the comments are provided as guidance in the design of the project for a formal application submittal. 10. lnclusionary Housing. All residential development projects proposing seven or more housing units are required to provide at least 15% of the total units to be restricted for low-income households. As an alternative to onsite low-income housing being provided, projects proposing more than seven, but no more than 50 residential units are eligible to purchase affordable housing credits to satisfy their inclusionary housing requirements. Applicants must pay the credit price of available credits from the oldest established inclusionary housing bank that is located within the same city quadrant in which the market-rate units are located, or if none are available, sites which are contiguous to the quadrant in which the units are proposed. For projects that proposed seven to 20 units, the amount of credits to be purchased shall be based on a ratio of one credit for each inclusionary housing unit required. Please see the city's inclusionary housing program information bulletin (IB-157) which is available on the city's website at the following address: PRE 2022-0036 (DEV 2022-0126)-VIEJO CASTILLO HOMES August 16, 2022 Page 4 https://www.carlsbadca.gov/home/showpublisheddocument/9634/637897580094270000 11. Retaining Walls. No fence, wall, or hedge over forty-two inches in height shall be permitted in any required front yard setback, and a wall or fence not more than six feet in height may be located anywhere to the rear of the required front yard. Please confirm all retaining walls and all wall/fence combined heights do not exceed the six-foot limit. 12. Planned Development Ordinance. Please be aware of the following requirements. The comments provided below are not inclusive of all requirements per CMC Chapter 21.45, Planned Development Ordinance. Please refer to CMC Chapter 21.45 for all requirements. Table C-General Development Standards a. Drive-aisles: The plans show the drive-aisle is designed to be used for vehicle back- up/maneuvering and shall require a minimum 24-foot width. The plans meet this requirement; however, additional width may be required for emergency vehicle maneuvering. In addition, it is required that drive-aisles be enhanced with decorative paving. Plans submitted for a formal review must identify areas of the required decorative paving. b. Lighting: Lighting for adequate pedestrian and vehicular safety shall be provided. Plans submitted for a formal review must identify the location of lighting provided onsite. Table E -Condominium Projects a. Livable Neighborhood Policy: The project is required to comply with City Council Policy No. 66 -Livable Neighborhoods pursuant to CMC Chapter 21.45 -Planned Developments. For detailed information regarding the requirements, the policies may be found online at: i. City Council Policy No. 66: 637425976532030000 (carlsbadca.gov) b. Architectural Requirements: The project is required to comply with the architectural requirements specified in Table E (E.2). c. Maximum Coverage: The project is subject to a maximum lot coverage of 60 percent of the net developable acreage. Plans submitted with a formal application will require lot coverage calculations. Land Development Engineering 1. Please, complete a Stormwater Standards Questionnaire prior to submitting for entitlements. This questionnaire will guide you and the City in determining what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality requirements. The questionnaire can be printed from the following website link: PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Pa e 5 https://www.carlsbadca.gov/home/showpublisheddocument/604/637426047018270000 Preliminary analysis suggests that the project is a Priority Development Project and is therefore subject to designing and installing numerically sized water quality basins via a Storm Water Quality Management Plan (SWQMP) per Chapter 5 of the Carlsbad BMP Design Manual in addition to installing trash capture, site design and source control best management practices (BMP) per Chapter 4 of the Carlsbad BMP Design Manual. Worksheets in the manual shall be used to size the proposed BMP shown on the site plan. The project appears to be subject to flow control {Chapter 6 Hydromodification) as well. However, critical course sediment yield areas do not exist on the property per the WMAA Potential Critical Course Sediment Yield Area map for Carlsbad so mitigation requirements will not be required for Critical course sediment. 2. Please design new sidewalk fronting the property to be non-contiguous with the curb. Please design sidewalk to be six feet wide. Please, add pollutant control BMP to treat runoff from sidewalk and driveway approach in ROW or equivalent amount of runoff from the street. Consider adding modular wetland system or tree well to provide required treatment. 3. Plans submitted for entitlements shall show clean outs at storm drain intersections. 4. Plans submitted for entitlements shall plot dimensioned street section for Viejo Castillo Way frontage. 5. Viejo Castillo street paving was overlaid _on 8/29/2019 and subject to a moratorium for trenching until 8/29/2024. Trenching may be permitted, however, if full asphalt concreate replacement is completed along project street frontage, subject to the City Engineer's discretion. As proposed, the project will require a street grind and overlay of two inches per City Standard DWG GS-28 for half the street along entire project frontage to restore the recently paved street. 6. Plans submitted for entitlements shall address narrow drainage pathway between Units 6, 12 and 18 and the retaining wall at the rear property line. Add cross section with specified positive drainage slope provided from the building to the drainage swale and include support for design from soils engineer. 7. Plans submitted for entitlements shall specify pavement type used for the on-site driveways. Specify if impervious or pervious pavement is proposed. If pervious pavement is proposed, please provide details and provide design recommendations from a soils engineer. 8. Plans submitted for entitlements shall show drainage directed from the swale along the south property line to an appropriate discharge (i.e. curb outlet). 9. Please be aware a grading permit and improvement plans will be required with your construction drawings. Conditions will be added to the discretionary permits requiring such permits. 10. Plans submitted for entitlements shall plot any proposed street trees and any existing trees/shrubs to be removed. PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Page 6 11. Plans submitted for entitlements shall include a traffic generation table on the site plan. 12. Before submitting your application for discretionary permits through the Planning Division, please contact the Traffic Division, a division of the Public Works Department, to determine if a Scoping Agreement is required. Scoping Agreements are used to determine if a Local Mobility Analysis is required and the scope of analysis. With your application submittal, submit one or the other 1) an approved Scoping Agreement, or 2) correspondence from the Traffic Division indicating one is not required. If a Local Mobility Analysis is required, refer to the Transportation Impact Analysis Guidelines at: https://www .ca rlsbadca .gov /home/showpubl isheddocument/328/637 425982502330000 Also, depending on the CEQA determination, which is determined after the application for discretionary permits is submitted, a Vehicle Miles Traveled (VMT) analysis may be required per the Vehicles Miles Traveled Analysis Guidelines available at: https://www.carlsbadca.gov/home/showdocument?id=312 Fire Department 1. Please be aware drive aisle widths are shown at 20 feet wide. Fire access roads are required to be 24 feet wide minimum by local amendment. Plans submitted for entitlements shall show compliant access. 2. NFPA 13D Residential fire sprinklers are required throughout all structures. Applicant Questions followed by Staff Responses: 1. Please confirm if location and dimensions of required visitor parking is acceptable. Location of visitor parking identified on the adjacent street is compliant and acceptable to meet the visitor parking requirement for five vehicles pursuant to CMC 21.45.060, Table C. 2. A building section has been provided for our most challenging grade situation. Please confirm this building meets the height limit of 35' (with allowable architectural protrusions,. As shown on plans, building height is compliant with 35-foot-maximum-height standard. Protrusions shown on plans, including stairway "penthouse" and parapet walls, are also compliant with zoning regulation requirements (CMC 21.46.020). 3. We are assuming the project will require 150 sf /unit of community recreation space. This would total 2,700 sf As you can see, we are showing this 2,700 sf in between our buildings. However, we would like to get feedback as to whether the city would be agreeable to either reducing or eliminating the community rec space at this project. We are providing significant private rec space (over 500 sf) per unit. Far greater than the 60 sf /unit required. The city has worked with us to eliminate the community PRE 2022-0036 (DEV 2022-0126)-VIEJO CASTILLO HOMES August 16, 2022 Pa e 7 rec space on past projects when we have gone above and beyond with private rec space. Reducing or eliminating the community rec space would allow us to have the option to bring some visitor parking on site and would also open us the ability to use the space for future utility easements. Plans show compliance with community recreational space as required for Planned Developments (CMC 21.45.060, Table C). Although other similar developments have received some relief from strict compliance of community recreational space requirements, staff has evaluated this project site and has determined that the specific site characteristics do not warrant the same relief other projects have received. Providing private recreation space above and beyond the minimum requirement will not reduce or eliminate the community recreation space requirement of 2,700 square feet for the project. 4. Please confirm we do NOT need to comply with Policy 44. Policy 44 does not apply to the project as currently proposed. Policy 44 does not apply to triplex structures. 5. We will be providing a Level I Traffic Analysis, Noise Study and Cultural Recourses Study with our application. Are there any other technical reports the city will require to deem the project Categorically Exempt for CEQA~ In addition to a Level 1 Traffic Analysis, Noise Study, and Cultural Resources Study, the California Environmental Quality Act (CEQA) review of the project will also require, at the least, a Biological Resources Study. 6. Please note, it is our intention to purchase three Housing Credits from the Cassia project (Alternative Means and Methods) to satisfy our inclusionary housing requirement. We understand from Mandy Mills there are over 30 credits currently available from that project. Staff has confirmed that inclusionary housing credits are currently available from the Cassia Housing project that can be purchased to meet the inclusionary requirement. 7. FIRE -We are currently showing 20' clear to sky drive aisles. Please confirm this is acceptable Fire access roads are required to be 24 feet wide minimum by local amendment. 8. FIRE -Please confirm our hose pull is acceptable. A response was not provided by the reviewer. Please reach out to Fire Division Chief, Randy Metz. 9. FIRE -We are currently showing Unit 6, 12 and 18 having 3 feet of clearance from the rear retaining wall. Please confirm this is acceptable. Beyond the wall will be 2:1 slope which can easily be accessed if needed as the wall is very low for most of the run~ A response was not provided by the reviewer. Please reach out to Fire Division Chief, Randy Metz. PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Page 8 10. LANDSCAPE -Please explain any possible street tree requirements and if required, how we account for street tree placement in the NE frontage where our BMP's are located. Pursuant to Section 6 (B) of the city's Landscape Manual, a minimum of one tree for every 40 feet of street frontage shall be provided. Trees may be planted on center or grouped. For projects that are subject to Planned Development requirements, street trees may be located within the public right-of-way. Please see additional information on pages 47 and 48 of the Landscape Manual, available on the city's website at the following address: https://www.carlsbadca.gov/home/showpublisheddocument/234/637425974086270000F 11. ENGINEERING -Please confirm if a single domestic water service and meter are acceptable for this project. Applicant will propose a private sub-meter off the main domestic service for each unit. The water service shall be provided by a single service with a master meter and backflow device. Private submeters shall be installed for individual units. 12. ENGINEERING -Applicant wishes to install a shared private sewer lateral down each proposed driveway to serve the proposed units. The Leucadia Wastewater District will serve sewer facilities for this project. A letter from LWD will be required with your application for discretionary permits. LWD's signature will be required on the construction grading plans that will later be required for the project. Water facilities are within the Carlsbad Municipal Water District. 13. ENGINEERING -Please confirm a single fire service and backflow is acceptable to serve the development. Fire Service appears to serve Units 1 through 12 by extending a service line along the fronting driveways but not units 13 through 18. Plans submitted for entitlement will need to clarify. The fire department will need to determine whether a single fire service can serve all 18 units. Static and dynamic volumes and pressure will need to be evaluated through a separate plan check process with the fire department. 14. ENGINEERING -is the project site located within an HMP exempt area/stretch within the City. The project site does not appear to be subject to Habitat Management Plan requirements. 15. ENGINEERING -please confirm if the preliminary proposed location for the transformer is acceptable. Preliminary location of the transformer appears to be acceptable as it is located outside the public right-of-way. PRE 2022-0036 (DEV 2022-0126) -VIEJO CASTILLO HOMES August 16, 2022 Pa e 9 If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Kyle Van Leeuwen at the number below. You may also contact each department individually as follows: • Planning Division: Kyle Van Leeuwen, Associate Planner, at {442) 339-2611 • Land Development Engineering: David Rick, Associate Engineer, at {442) 339-2781 • Building Division: Jason Pasiut, Building Official, at {442) 339-2788 • Fire Department: Randy Metz, Fire Inspections, at {442) 339-2661 Sincerely, UU1.~ ERIC LARDY, AICP City Planner EL:KVL:JC c: David Rick, Project Engineer Laserfiche/File Copy Data Entry Attachments: A-Engineering Redline Plans