Jefferson Street
ENGINEER OF WORK
VINCENT L. SAMPO - RCE 44,173
\
"CEIVEWD",
JUN 8Ol01
LAND DEVELOPMENT
PREPARED BY: ENGINEERING
SAMPO ENGINEERING, INC.
171 SAXONY ROAD, SUITE 213
ENCINITAS, CA 92024
760-436-0660
Hirschkoff Residence Sampo Engineering, Inc.
CDP 14-13/CDP 14-14 6/12/2015
Standard Development Project 1
TABLE OF CONTENTS
Criteria
Hydrology Introduction
Hydrology: Existing Basin 1
Hydrology: Existing Basin 2
5.. Existing Basin 1 & 2 Area Exhibit
Hydrology: Existing Basin 3 (Off Site)
. Existing Basin 3 (Off Site) Area Exhibit
Hydrology: Existing Basin 4 (Off Site)
Existing Basin 4 (Off Site) Area Exhibit
Hydrology: Proposed-Basin 1
Proposed Basin 1 Area Exhibit
Proposed Basin 1 Impervious Area Exhibit
Storm Drain Hydraulic Calculations
Curb Outlet Pipe Flow Velocity Calculations
Hirschkoff Residence Sampo Engineering, Inc.
CDP 14-13/CDP 14-14 6/12/2015
Standard Development Project 2
Hydrology Study For:
Hirschkoff Residence, APN: 155-180-28
Criteria:
Use the current County of San Diego Hydrology Manual "Rational Method".
Design for a 100-year frequency storm using the County of San Diego 6 hour and
24 hour precipitation isopluvials.
Runoff coefficients are based on soil type "D". "C" factors have been weighted
based on the individual "C" factors for different surfaces (i.e. concrete= 0.95), and
the areas of the individual surfaces.
Times of concentration (Tc) are determined from the urban overland flow
formula.
Refer to the attached drainage map for basin areas and locations.
Hydrology Introduction:
The subject property is approximately 0.28 1 gross acres and is located on the
northwesterly side of Jefferson Street adjacent to and south west of Interstate 5 in the
City of Carlsbad. The property has not been previously developed but there is an existing
graded pad. The entire lot currently sheet flows northwesterly to the Buena Vista Lagoon.
A small portion of property adjacent to and southwest of the subject property drains onto
the subject property. No storm water from Jefferson Street drains on-site.
The site contains 2 hydrologic basins: the upper portion (Basin 1) that contains the
building pad where all improvement will be located, and the lower sloped area (Basin 2).
Basin 1 (Existing. and Proposed) drain northwesterly from the adjacent property at an
approximate grade of 4% until reaching the top of a 2:1 slope above the graded pad.
Stormwater runoff continues northwesterly down said slope through the existing pad at
an approximate slope of 3.6% before reaching the rear top of slope. All improvements
and grading will be located within Basin 1. Basin 2 (Existing and Proposed) drain from
the top of slope in the rear yard to the northerly property line and ultimately to Buena
Vista Lagoon. No improvements or grading are proposed in Basin 2 therefore historical
drainage patterns will be maintained.
The owner proposes to construct a new single-family residence, a permeable paver
driveway, flatwork, landscaping, and associated improvements, etc all located within
Proposed Basin 1. The project anticipates an increase in runoff due to the increase in
impervious surface area from the building footprint. The Proposed Basin 1 storm water
runoff will be conveyed by pressure pipe from the lower pad to Jefferson Street via storm
drain, flow through planters, and a pump system to the existing curb and gutter in
Jefferson St. Hydrologic investigations were done for the northerly curb and gutter
capacity of Jefferson Street as well as storm drain capacity calculations for the
downstream 18" ACP public storm drain at the intersection on Jefferson St. and Las
Flores that discharges to Buena Vista Lagoon. Please see attached calculations for the
anticipated flows from the proposed development, storm drain sizing/hydraulic
calculations, and curb and gutter capacity calculations.
Hirschkoff Residence Sampo Engineering, Inc.
CDP 14-13/CDP 14-14 6/12/2015
Standard Development Project 3
DRAINAGE STUDY CALCULATOR
JN: 14-107
Hirschkoff
DATE: June 12, 2015
EXISTING BASIN # I
DESCRIPTION: Northeasterly portion of subject property from Jefferson Street to the rear top of slope.
Area = 9,420 SF = 0.216 AC
(Pervious)(C0% IMPER) + (lmpeMousXC_, IMPER) (8570 sf)(0.35) + (850 sfX0.95) = = = 0.4 Total Area 9420 sf
I = 1.8(1.1-C)(D)112 - 1.8(1.1.35&20)1 = 10.16 (S)"3 - (7.7) MIN
ho = 7.44 P8 DT,, -0.045 = 7.44(1.6)(10.16)° = 2.67 IN/HR
iso = 7.44 P8 = 7.44(2.1X10.16)5 = 3.50 IN/HR
1100 = 7.44 P6 DTc,° = 7.44(2.5X10.16)45 = 4.17 IN/HR
210 = CIA
Q50 = CIA
Qioo = CIA
* Per San Diego County Hydrology Manual 2003
= (0.40X2.67 INIHR)(0.216 AC) = 0.23 CFS
(0.40)(3.50 IN/HRXO.216 AC) = 0.30 CFS
= (0.40)(4.17 INIHRXO.216 AC) = 0.36 CFS
Hlrschkoff Residence
COP 14-13, CDP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/1212015
EXISTING BASIN #2
DESCRIPTION: Southwesterly portion of the subject property from top of slope to the rear property line
Area = 4,710 SF 0.108 AC
C = CI,,ER Natural - (Table 3-1, San Diego County Hydrology Manual) = 0.35
Li =
1.8(1.1-C)(D)" - 1.8(1.1-.35X53)1'3 =
- (66)13 2.43<5.00 MINIMUM (S)113
USE 5.00 MIN
110 = 7.44 P6 DT,, -0.845 = 7.44(1.6X5.00)0645 = 4.22 IN/HR
150 = p -0.645 7.44 6DTCI = 7.44(2.1X5.00)°645 = 5.53 IN/HR
!ioo = 7.44 P6 DT,, -0.645 = 7.44(2.5X5.00)4645 = 6.59 IN/HR
QIO = CIA = (0.35)(4.22 IN/HR)(0.IO8AC) = 0.16 CFS
5o = CIA . = (0.35X5.531N/HR)(0.IOBAC) = 0.21 CFS
Qloo = Cl A = (0.35X6.59 IN/HR)(0.I08AC) = 0.25 CFS
Hirschkoff Residence
COP 14-13, CDP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/12/2015
EXISTING BASIN #3 (OFF SITE)
DESCRIPTION: Portion of Jefferson St, the hillside to the east and a small portion west of Jefferson St.
tributary to the gutter north of the curb inlet at the northeast corner of Jefferson and Las
Flores Intersection
AREA = 78.410 SF = 1.800 AC
= C IMPER. M0R109 DLJIAC w/ Soil Type D (Table 3-1 of San Diego County Hydrology Manual) = 0.6
_C2 = CO%MER (Table 3-1, San Diego County Hydrology Manual) = 0.35
- 1.8(1.1 - C1)(D1)"2 -
1.8(1.1_.60)(100)1
7.14 MIN
-
- = (S1)113
- T2 - 1.8(1.1 -C2)(D2)112 - 1.8(1.1-.35X40)'
- = 2.92 MIN — lI3 (S2, (25)'
10.06 MIN TOTAL
Lw = 7.44 P6 D.r ° 645 = 7.44(1.6X10.06)°645 = 2.68 IN/HR
ho = -0.645 - 7.44P6 Di1 - 7.44(2.1X10.06).0645 = 3.52 IN/HR
1100 .0.645 oo = - 7.44 Pe DTCI - 7.44(2.5)(10.06)'0645 = 4.20 IN/HR
2 IO = C1 I A = (0.60X2.68 IN/HR)(1 .80 AC) 2.90 CFS
= C1 IA = (0.60X3.52lN/HR)(1.BOAC) 3.81 CFS
Q 10 = C1 I A = (0.60X4.20 IN/HR)(1 .80 AC) 4.53 CFS
Hirschkoff Residence
CDP 14-13, COP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/12/2015
EXISTING BASIN #4 (OFF SITE)
DESCRIPTION: Offsite area tributary to the two curb Inlets at the intersection of Jefferson Street and Las Flores
AREA = 164,221 SF = 3.77 AC
= C IMPER M0R109 DU!AC wl Soil Type D (Table 3-1 of San Diego County Hydrology Manual) = 0.6
_C2 = Co%I,ER (Table 3-1, San Diego County Hydrology Manual) = 0.35
Overland Flow
1.8(1.1 - C1XD1)1 -
1.8(1.1.60)(50)1 Id = (S1)113 - (1.0)113 = 6.36 MIN
1.8(1.1 - C2XD2)"2 - 1.8(1.1-.35)(30) - .1.2 = (S2)1'3 - (23) - 2.60 MIN
Gutter Flow
1.3 = 350 FT x 3.8 FT/S
1 MIN
60S/MIN = 1.50 MIN
10.46 MIN TOTAL
!io = .0.645 6 DTC1 = 7.44(1.6)(10.46)4.645 = 2.62 IN/HR
150 = 7.44 P6 DT,, -0.645 = 7.44(2.1X10.46).0645 = 3.44 IN/HR
!ioo = 7.44 P6 DT,, -0.645 = 7.44(2.5)(10.46).0645 = 4.09 IN/HR
10 = C1 I A = (0.60X2.62 IN/HR)(3.77 AC) = 5.92 CFS
50 = C1 I A = (0.60X3.44 IN/HR)(3.77 AC) = 7.77 CFS
ioo = C1 I A = (0.60X4.09 IN/HRX3.77 AC) = 9.26 CFS
Hirschkoff Residence
CDP 14-13, COP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/12/2015
EX/SIINGHYDROLOGYFOR
LU
1 "--60' =60' HIRSCHKOFF RESIDENCE
I VACANT PROPERTY ON JEFFERSON ST
0 30 60 120
PROPOSED BASIN #1
DESCRIPTION: Northeasterly portion of subject property from Jefferson Street to the rear top of slope.
AREA = 9,420 SF 0.216 AC
=(A, pmOJCO% IMPER) + (A1 ImpeMous)(C_1oo,6 IMPER)+ (A3 1mpe,vlojs)(C.3016 IMPER)
- Total Area
* - (3,102 SF)(0.35) + (3,326 SFXO.95) + (2,992 SF)(0.45) = 059 -
9,420 SF
T = 1.8(1.1 - C1)(D1)12
- 1.8(1.1-.35)(120)'12 - (Si)hhi - (4.2)' - 9.19 MIN
110 = ,s D LJ -0.645 = 7.44(1.6)(9.19)° = 2.85 IN/HR
Iso = -
645
- 7.44.6DTC1 7.44(2.1)(9.19)0645 = 3.74 IN/HR
1100 = 7.44 P6 D1 °645 = 7.44(2.5)(9.19)4 = 4.45 IN/HR
10 = CIA = (0.59X2.85 IN/HR)(0.216AC) = 0.36 CFS
50 = CIA = (0.59X3.74 IN/HR)(0.216AC) = 0.48 CFS
g10 = CIA = (0.59X4.45 lNIHR)(0.216AC) = 0.57 CFS
Determine gutter depth of flow on east side of Jefferson Street:
Q100 = 4.53 CFS (Existing Basin #3) + 0.57 CFS (Proposed Basin #1) = 5.10 CFS
From County of San Diego Gutter and Roadway Discharge-Velocity Chart
For gutter slope = 0.5% and Q5.10 CFS, Depth = 0.43 ft
From survey data of street cross sectons at 0.43 feet gutter depth the street will flood approximately 5 to 8 feet
west of the easterly curb line, which will allow for two lanes of traffic in the flooded condition and will not rise to
the crown elevation of the street in a 100 yr event (See attached chart).
Existing basins 2-4 are outside of this proposed project area or offsite. Therefore, the existing basins hydrology Is to remain in the same
existing condition.
Per San Diego County Hydrology Manual 2003
Hirschkoff Residence
CDP 14-13, CDP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/12/2015
STORM DRAIN HYDRAULIC CALCULATION
DESCRIPTION: MAXIMUM STORM DRAIN CAPACITY & HEIGHT CALCULATIONS FOR 18" ACP
PUBLIC STORM DRAIN AT THE INTERSECTION OF JEFFERSON STREET AND
LAS FLORES. THE PIPE DISCHARGES DIRECTLY TO BUENA VISTA LAGOON.
100 = 9.26(Q 100 Ex. Basin 4) + 0.57 (Q 100 Proposed) = 9.83 CFS
Maximum Storm Drain Slope = 3.6% (see attached As-Builts)
Maximum Capacity for 18" SD (ä 3.6%
QMAX = 1.49 ARmSIt2
.QMAX = 1.49 (1.77) (0.376) w (0.036)1,2 = 20.05 CFS
0.013
Q'oo<Qmax OKAY
Maximum Water Height in SDMH
Q CA /2 g (H - d/2 + Val2g)1'2
9.83 = (0. 62)(1. 77)i 2(32. 2)(H - 0.75)
8.96 = / 2(32.2) (H - 0.75)
1.12 = H-O.75
= 1.87 FT
Hirschkoff Residence
CDP 14-13, CDP 14-14 Sampo Engineering, Inc.
Standard Development Project • 6/12/2015
SAMPD
.° P4BINECRSNQ. INC.
I ...
PIPE FLOW VELOCITY CALCULATOR
Calculations show the anticipated velocity In the 4" and 6" stormdraln pipe that convey storm water from
the pressure/gravity cleanout to the existing curb and gutter In Jefferson Street. The exsiting curb and JN. 14-107
gutter in Jefferson Street is 0.63' high in the area of 40 storm drain curb outlet connection. Hirschkoff
DATE: June 12, 2015
6" PVC PIPE
= 0.57 CFS = 0.570 CFS
= 6.00 IN = 0.500 FT
= 1.00 % = 0.01
= 0.011 (Roughness Coefficient for PVC) = 0.011
K' - Q - (0.57)(0.011)
- 040 - - d S112 - (0.5)A8/3(0.01)1/2 -
For the K' value found above, the corresponding Did value can be found In Table 7-14 of King's Handbook
Did = 0.720 (Per Table 7-14)
D = (0.72)(0.5) = 0.360 FT
For the Did value found above, the corresponding Ca value can be found In Table 7-4 of King's Handbook
a = 0.605 (Per Table 7-4)
A Ca d2 = (0.605X0.5)A2 = 0.151 FT
V = Q = 0.57 = 3.77 FTiS - A 0.15
411 PVC PIPE (0.63' HIGH CURB IN JEFFERSON STREET)
= 0.5713 CFS = 0.190 CFS
= 4.00 IN = 0.33 FT
= 1.00 % = 0.01
n = 0.011 (Roughness Coefficient for PVC) = 0.011
- -
an - (0.19X0.011) - - 0.389 d°'3 S' - (0.334)8I3(0.01)A1/2
For the K' value found above, the corresponding Did value can be found In Table 7-14 of King's Handbook
Did = 0.710 (Per Table 7-14)
'I.
D = (0.71 )(0.334) = 0.237 FT
For the Did value found above, the corresponding Ca value can be found in Table 7-4 of King's Handbook
_Ca = 0.605 (Per Table 7-4
A = C.d2 = (0.605)(0.334)A2 = 0.067 FT
- a - 0.57/3
- - 2.82 F T iS
-. A - 0.07
Hirschkoft Residence
COP 14-13, COP 14-14 Sampo Engineering, Inc.
Standard Development Project 6/1212015
______________________________I(ViIiJ 1111111
I' 1iIJiiiiIiItijIIi1II:Iq;I///"///JII1;II;ffllj/,1;111111 11111 I IiIii!iil!IIi1;!uii:' iIIIIIIIII1IlIIIIIIIIIIIII!! _____
1IIIIRJi!iIIIiIII!IIIIiiillI/ll'iii///II!ii!Ifl!i!/1;/j;/:;;j!
Iowns RJI1111II1
RIuIIIRIuIIII1IIuJuJl;'I,IIIJII;I,III s;iii ii ii ii iii;:" iiisiwi !I i 1IIuIaIIIIIIIIJglIIIuIuI!!III;:'IjII,I,IIl,It:i1IrJIIIi:i ;iliI1ai'gIi;qhii:!!I 1IlIuIIIIIIIIIIlIIIIIHIJJl!!!IliiIIJ)j!IIIIIIJjIIII:III;:!iI,!III!1II:IIIo;!IJIj;:ci: :
Bill IIIIII1IIIuIIIIIIIIIIjiIl!IIIIIII III Iii:!'iiIiiiiii!iiii !I!lIIi;!ll1I;!qhij;!I IIlIlIII1IIIIIIIIIIIIlIIIIIllhhI1!llhllllllljll/JJ/jjJll!'/llllhIIiJf!fJIlj,';!iiIji;;:! s-----
=~~=Mczm" Mr- M11
IIIIIlIIIIIIIIIIIIIIIIIII!///Illh////IIIII!IIlIIIlllhIIIllhI// /iiii!IIIIiIIIIYhIIiiillll; ____DE
Ii i foist i ..i 2LL
oil
NE 11 mouggglai 1311111111 BEEN 1111111
-T7 ir7't r.; 'ugntsiuii. - --
. I • ''
! Will w" Cw owl Cm .0 n -w .0 .0 lsmssi istaill 'U•UiUIIlulIll.t, a-,-- BE wwwwolm noun WINNER ME 1912111111111
—
=OWNER.......................................................................................r
• 'illllllllllllllfflhjl H.Il..i..jii,iipiiii,1 - - • goal WINE .IMr!g!Ij,In, IIIiiIlIi1liIgij JIIIIIIIJHIHIJ
§wwJ1J11111 Mom RAN NAZI a 111111101; llwmIIIIIIIIInhJlHhIIIIJgII JUIIlIIxIIuI,i,I,,,iiiii I - lmmmmamnnm 1111H 11111111111111111111111 IlUIIIIIIIl,,Iji,iij1111F.1 - - - - - MNIIRI1IIIII!II Hflhliill :iiiiiiitiiiii HlIIIIIIJIIIflhI1ll III1IHIIIl IIXIIIHIIIflhlIj' - - - - - -
20
18
16
14
12
'C
k 1.5• )I
1
n m.0175
-
ONE SIDE I
EXAMPLE:
oivsn:Qn10 8u2.5%
Cheit gives: Depth a 0.4, Velocity m 4.4 t.p.s.
SOURCE: San Dieao County Deparent of Soocial District Services Deslon Manual
FIG U RI
Gutter and Roadway Discharge -Velocity Chart
b
ZD (0
1 —
I .
.•..:.
. .
County of San Diego
Hydrology Manual
Rainfall Isopluvials
33015• -------------
100 Year Rainfall Event —6 Hours
IsopIuvial (inches)
33°OO'
3
CD
..------
C-) 0
lb
32°45
11\v
GIS —41S
N
OR IMPLIED, INCLUDING, it's '&t' is onoo wmørr w*iwiiv OF Ally KIND. EITHER EXPRESS
Of MRRCNANTAllU1Y AND FITNESS FOR A PARTICULAR PURPOSE Copyl5lt SoflOtS Afl R9ls Reseoed.
This 0lln InIomI 11 on fr0 the SANDAG Re Io.be
* BUT NOT UNITED TO. THE IMPLIED WARRANTIES
lnfen,Son Sn, AlAN be repheANd WEAN the E
w,1tn poeeb.Ion Cl SNIDAD.
TEl. p'AllAl rri owftln ribm"m 010th hm beol rly'od.IAN with wroiIliongrlr0edbyTANeIl.thheIl lAlpu
32°3(y S
3 0 3MiIes
_ I
County of San Diego
Hydrology Manual
Rainfall Isopluvials
1 (0 (0
r .,-
100 Year Rainfall Event — 24 Hours
Isopluvial (inches)
DPW
GIS GIS
\Hj
N TuB MAP us PRCN1I]ED Wm-CUT WARRNITYOf ANY KIND. ND. OR IMPIJED, INCLUDING,BUT NOT UIITED TO, THE IMAIJED WARRANTIES
Of MERCtIANTANUTY AND FITNESS FOR A PARTICULAR PURPOSE. AJi RI5MA R.,vd
TPS podiKI Fnmbon fron Re SANDAG II E Info,,,on Seto,,, w$AG, ce,KIA be repoduo.d wAtn peeeBiOn I BANDAO
This p,odAN rWln Inbe,,I.RO, WNth hm beel rep,oSjoed ww, ge1od by TFO.,ee Bhee W.I.
S
3 0 3MiIes