HomeMy WebLinkAboutSDP 15-20; QUARRY CREEK R-4; UPDATE REPORT; 2015-07-10UPDATE REPORT
QUARRY CREEK R4
CARLSBAD, CALIFORNIA
PREPARED FOR
CORNERSTONE COMMUNITIES
SAN DIEGO, CALIFORNIA
RECEIVED
MAY 03 2016
LAND DEVELOPMENT
ENGINEERING
JULY 10, 2015
PROJECT NO. 07135-42-05
,j7p 15/A
GEOCON
INCORPORATED
GEOTECHNICAL • ENVIRONMENTAL MATERIALS
Project No. 07135-42-05
July 10, 2015
Cornerstone Communities
4365 Executive Drive, Suite 600
San Diego, California 92121
Attention: Mr. Jack Robson
Subject: UPDATE REPORT
QUARRY CREEK R-4
CARLSBAD, CALIFORNIA
References: 1. Update Geotechnical Investigation, Quarry Creek, Carlsbad/Oceanside, California,
prepared by Geocon Incorporated, dated February 24, 2015 (Project No. 07135-
42-05).
2. Site Plan for Quarry Creek; Planning Area R-4 East and West, prepared by SB&O,
Inc., plot date June 28, 2015.
Dear Mr. Robson:
In accordance with the request of SB&O, we have reviewed the above-referenced site plan which
includes proposed building pad locations and pad elevations for the R-4 area at the subject site. The
purpose of our review was to evaluate if the recommendations in Reference 1 remain applicable for
the proposed grading and building locations shown in Reference 2. Area R-4 is located at the
southwest corner of the Quarry Creek property.
Review of Reference 2 indicates that fine grading will consist of cuts and fills of approximately 6 feet
or less from proposed sheet grade elevations to construct 56 single-family detached lots, 29 duplex
lots, and 29 triplex lots. Based on pad grades shown on Reference 2, at the completion of mass
grading, the site will be underlain by both native terrace deposits and compacted fill. Figure 1 shows
the pre-grading site geology using Reference 2 as the base map. At the completion of mass grading,
an updated geologic map should be prepared based on actual graded conditions.
Based on our review of Reference 2, it is the opinion of Geocon Incorporated that the
recommendations contained in Reference 1 remain applicable to the proposed project. However, an
6960 Flanders Drive • Son Diego, California 92121-2974 U Telephone 858.558.6900 U Fax 858.558.659
0. -
update geotechnical report should be prepared for the site once mass grading is completed. The
update report will provide recommendations for fme grading, including undercutting of cut to fill
transition lots, based on actual as-graded conditions.
If you have any questions regarding this letter, or if we may be of further service, please contact the
undersigned at your convenience.
Very truly yours,
GEOCON INCORPORATED
'~7'Kc_ - '
Rodney C. XyesqevU~~~
GE253
RCM:dmc
(1) Addressee
(e-mail) SB&O, Inc.
Attention: Mr. Aaron Parker
Project No. 07135-42-05 -2- July 10, 2015