HomeMy WebLinkAboutSDP 00-06; DAYBREAK COMMUNITY CHURCH; UPDATE OF COMPACTION REPORT FOR PROPOSED DAYBREAK COMMUNITY CHURCH SITE; 2000-06-07VINJE & MIDDLETON ENGINEERING, INC.
Job #00-248-F
2450 Vineyard Avenue, #102
Escondido, California 92029-1229
Phone (760) 743-1214
Fax (760) 739-0343
June 7, 2000
Daybreak Community Church
Attention: .Mr. William Fink, President Building Committee
5741 Palmer Way, Suite "A"
Carlsbad, California 92008
UPDATE OF COMPACTION REPORT FOR PROPOSED DAYBREAK COMMUNITY
CHURCH SITE, LOT #8, MAP # 13434, SW CORNER OF AMBROSIA AND POINSETTIA
LANES. CARLSBAD
In accordance with your request, this report is written to bring the foundation
recommendations put forth in that report into current standards, and to discuss remedial
grading that will be required prior to construction of the proposed church site.
I. REFERENCES
The following documents have been reviewed in order to provide this Update Report:
Unsigned grading plan prepared by Rick Hill Engineering, Inc., dated January 5,
2000.
"As-Graded Geotechnical Report, Aviara Phase II, Carlsbad, California" prepared
by Geotechnics Incorporated, dated June 25, 1998.
II. SITE INFORMATION
Grading observations and compaction testing were conducted periodically during
construction of this site from September 5, 1996 through June 30, 1998. A final as graded
compaction report with compaction results and limited foundation recommendations was
issued as indicated above.
A review of the "As-Graded Report" as it pertains to Lot #8 grading, indicates that the
grading of this "cut" lot was conducted in substantial conformance with the Grading
Ordinance for the City of Carlsbad. All inspections and testing were conducted under the
supervision of Geotechnics Incorporated. In our opinion, all excavations were constructed
in substantial conformance with the approved grading plan for the previous grading
operations, and are acceptable for their intended use.
Update Compaction Report
Proposed Church Site
June 7, 2000.
Page 2
A site inspection was made by a representative from this office on June 6, 2000, and found
the site to be visually the. same with respctto ad elevation, location of, and height of
slopes. Therefore, the building site remains substantially s reported in the subject report.
ic' ,4p ,j,t 7 4& It is our understanding that a proposed building consisting of a wood frame and stucco
structure supported on shallow stiff concrete footings with slab on grade is planned.
Ill. RECOMMENDATIONS
A. Remedial Grading
Remove all vegetation prior to the start of the grading operations.
Prior to placement of any fill, the upper 6 to 12 inches of the existing surface
shall be scarified, re-moisture conditioned to near optimum moisture content,
and recompacted to a minimum of 90% of ASTM Method D-1 557-91 under the
observation of the project geotechnical engineer. Field density testing shall be
conducted in order to confirm minimum compaction requirements.
A review of the grading plan indicates that there will be a daylight (cut/fill) line
crossing the westerly portion of the building. Therefore, provide a minimum of
3 feet of compacted fill beneath the building area plus a 10 foot perimeter, to
mitigate the potential for concrete cracking along the cut/fill line.
The westerly third of the lot may require deeper removals. Depths to be
determined by exploratory excavations dug and monitored by a representative
of the project geotechnical engineer during the beginning of the grading
operations.
The existing "desilting basin" will require removals of approximately 3 feet from
existing grades prior to backfilling under the direction of the *project geotechnical
engineer.
B. Foundations, Slab On Grade, Monolithic Pour System
The following minimum foundation recommendations for medium expansive
(Expansion Index less than 51) soils, classified using the "Unified Soil Classification
VINJE & MIDDLETON ENQINEERINQ, INC. 2450 V&novd Avenue, #102, Escondido, Califovnuz 92029.1229 • Phone (760) 743.1214 • Fax (760) 739.0343'
QEOTECHNICM. INVESTIGATIONS QRADINQ SUPERVISION PERC TESTINQ ENVIRONMENTAL INVESTIGATIONS
Update Compaction Report
Proposed Church Site
June 7,.2000
Page
System or USCS" as SM, should, be adhered to, and incorporated into the
foundation plans. It is suggested that the foundation plans be submitted to
our office for review and approval prior to construction. Please note (**) items
for revised recommendations since the issuance of Geotechnic's report dated June
25, 1998.
The following recommendations are to be confirmed by appropriate laboratory
testing at the completion of the grading operations. Changes to these
recommendations may be necessary and should be anticipated.
** 1. Continuous strip foundations should be a minimum of 24 inches deep measured
below the lowast adjacent ground surface not including the sand under the slab.
Continuous strip foundations should have a minimum width of 12 inches for one
story and 15 inches for two story structures. Spread pad footings should
be at least 24 inches by 24 inches wide and 18 inches deep, for one and
two story structures. Exterior continuous footings should enclose the entire
building perimeter.
2. Use four #4 reinforcing bars in all interior and exterior stud bearing wall footings.
Place tvm bars 3 inches below the top of the footing, and the other bars 3 inches
above the bottom of the footing. Reinforcement for isolated square footings
should be designed by the project structural engineer.
** 3. All interior slabs must be a minimum of 5 inches in thickness reinforced with #3
reinforcing bars spaced 18 inches on center each way, placed midheight in
the slab. Use 4 inches of clean sand (SE 30 or greater) beneath all slabs. A
six-mil plastic moisture barrier must be placed midheight in the sand.
** Provide re-entrant (±2700 corners) reinforcement for all interior slabs as
generally shown on the enclosed "Isolation Joints and Re-Entrant Corner
Reinforcement' detail. Re-entrant corners will depend on slab geometry and/or
interior column locations.
4. The minimum steel reinforcement provided herein is based on soil
characteristics only, and is not intended to be in lieu of reinforcement necessary
for structural considerations.
** 5. The clayey soil should not be allowed to dry before pouring the concrete. The
soil should be 3% to 5% above the optimum moisture content at 18 inches below
VINJE & MIDDL.ETON ENGINEERING, INC. 2450 Vinyard Avenue, p102, Escondido. California 92029.1229 • Phone (760) 743-1214 • Fax (760) 739-0343
QEOTECHNICAL INVESTIGATIONS GRADING SUPERVISION PERC TESTING ENVIRONMENTAL INVESTIGATIONS
Update Compaction Report
Proposed Church Site
June 7, 2000
Page
slab subgrade.. This office should be notified 72 hours prior to pouring the
footings and slab to inspect the footing trenches and to verify the moisture
conditions.
** 6. Provide "soft-cut" contraction/control joints consisting of sawcuts. spaced. 10 feet
on center maximum each way for all interior slabs. Cut as soon as the slab will
support the weight .of the saw, and operate without disturbing the final finish,
which is normally within 2 hours after final finish at each control joint location,
or when the compressive strength reaches 150 to 800 psi. The "soft-cur must
be a minimum of 1 inch in depth and must not exceed I 1h inch in depth or the
reinforcing may be damaged. Anti-ravel skid plates should be used and
replaced with each blade to avoid spalling and raveling. Avoid wheeled
equipment across cuts for at least 24 hours.
7. All underground utility trenches under slabs should be compacted to a minimum
of 90% of the maximum dry density of the soil. Care should be taken not to
crush the utilities or pipes during the compaction of the trench backfill.
8. Exterior Flatwork and Driveways:
Walkways, patios, etc. adjacent to the building must be a minimum of 4
inches in thickness reinforced with 6x6/1 Oxl 0 welded wire mesh placed two
inches below the top of the slab. Provide contraction joints consisting of
savuts spaced 10 feet on center (not to exceed 12 feet maximum) each way
within 24 hours of concrete pour. The sawcuts must be a minimum of 3/4 inch
in depth and must not exceed 11/4 inch in depth or the reinforcing may be
damaged.
Exterior slabs placed against the perimeter footings should be doweled to the
footing using #3 reinforcing bars spaced 18 inches on center, extending 20
inches into the slab at mid-height, and into the footing to the elevation of the
bottom reinforcing bar.
Pavement/concrete thickness and sub/basegrade recommendations will be
provided at the completion of the grading operations based on R-Value
testing.
9. This office is to be notified to inspect or test the following prior. to
foundation concrete pours:
VINJE & MIDDLETON ENQINEERZNQ, INC. 2450 Vineyard Avenue, #102, Escondido, California 92029.1229 • Phone (760).743-1214 • Fax (760) 739-0343
PERC TESTINQ ENVIRONMENTAL INVESTIQATIONS QEOTECHNICAL. INVESTIGATIONS QRADINQ SUPERVISION
Update Compaction Report
Proposed Church Site
June 7, 2000
Page
Inspect the plumbing trenches beneath slabs after the pipes are laid and
prior to backfilling.
Test the plumbing trenches beneath slabs for minimum compaction
requirements.
Inspect the footing trenches for proper width, depth, reinforcing size and
placement. Inspect the slabs for proper • thickness, reinforcing, size and
placement, sand thickness and moisture barrier placement.
10. The following allowable foundation and lateral pressures may be used for design
of foundations on certified soils for structures which have continuous footings
having a load of less than 2,000 plf and isolated footings with loads of less than
50,000 lbs.
a) Per tests and calculations by Geotechnics Inc. an allowable bearing capacity
of 2,000 psf for continuous and isolated footings embedded into properly
compacted fill soils may be used. The allowable soil bearing pressure
provided herein is for dead plus live loads and may be increased by one-third
for wind and seismic loading.
** b) An allowable lateral bearing pressure of 150 psf per foot of depth may also
be used for all structures except retaining walls. The lateral bearing earth
pressure may be increased by the amount of the The value for each
additional foot of depth to a maximum of 1,500 psf.
C. Retaining Walls, Lateral Load Parameters
1. The following earth pressures based on the anticipated finish grade soils, should
be used for design of retaining walls. These values will need to be confirmed
at the completion of the grading operations:
Use a coefficient of friction of 0.35 for concrete on soil.
Use an active pressure of 35 pcf equivalent fluid pressure for cantilever,
unrestrained walls with level backfill surface.
Use a active pressure of 45 pcf equivalent fluid pressure for cantilever walls
with a 2:1 (horizontal tovertical) backfill. .
VINJE'& MIDDL.ETON ENQINEERINQ, INC: 2450 Vineyard Avenue, #102, Escondido, California 92029.1229 • Phone (760) 743.1214 • Fax (760) 739.0343
QEOTECHNICAI. INVESTIQATIONS qRADINQ SUPERVISION PERC TESTING ENVIRONMENT/ti. INVESTIGATIONS
Update Compaction Report
Proposed Church Site
June 7, 2000
Page
i) Use an allowable bearing capacity of 2000psf as described above.
Expansive clayey soils should not be used for backfihling of any retaining walls.
Retaining walls should maintain at leasta 1:1 (horizontal.to vertical) wedge of
granular non-expansive soil backfill measured from the base of the wall footing
to the ground surface. All retaining walls should be provided with a drain along
the backside as generally shown on the enclosed "Retaining Wall Drain" detail.
Specific drainage provisions behind retaining wall structures must be
inspected by this office prior to backfilling the wall. All backfill soils must
be compacted to a minimum of 90% of the corresponding maximum dry
density, ASTM 1557-91.
NOte: Because large movements must take place before maximum passive
resistance can be developed, use a minimum safety factor of 2.0 for wall sliding
stability where structures or improvements are planned near or adjacent to the
top of the wall.
When combining passive and frictional resistance, the passive component
should be reduced by one-third.
The planting of large trees behind any retaining wall will adversely affect their
performance and should be avoided.
D. Seismic Coefficients
The following site specific seismic parameters for the above referenced project
were determined in accordance with the Uniform Building Code requirements. The
following parameters are consistent with the indicated project seismic environment
and may be utilized for project design work.
gpk
41 4y .tsi * isnic
151v .
Sc 4 0.4 B 1.0 1.0 1.0 0.40 0.58 0.580 0.116
According to Chapter 16, Division IV of the 1997 Uniform Building Code
VNJE & MIDDLETON ENQ1NEERINQ INC. 2450 Vincyard Avenue, #102, Escondido, California 92029.1229 .• Phone (760) 743.1214 • Fax (760) 739-0343
QEOTECHNICAL INVESTIGATIONS QRADINQ SUPERVISION PERC TESTINQ ENVIRONMENTAL INVESTIGATIONS
Update Compaction Report
Proposed Church Site
June 7, 2000
Page 7
E. Setbacks
Footings located on or adjacent to the top of slopes should be extended to a
sufficient depth to provide a minimum horizontal distance of 8 feet or one-third
of the slope height, whichever is greater (need not exceed 40 feet maximum)
between the bottom edge of the footing and face of slope.
The outer edge of all slopes experience "down slope creep", which may
'cause distress to structures. If any structures including buildings, patios,
sidewalks, swimming pools, spas etc, are placed within the setback,
FURTHER RECOMMENDATIONS WILL BE REQUIRED.
Expansive soils can cause structural damage to foundations, interior and exterior
slabs and walls. The economically feasible precautions that can be taken and
recommended herein will only minimize the potential of volumetric changes due to
changes in moisture content.
**A COPY OF THIS REPORT MUST BE PROVIDED TO THE PROJECT
ARCHITECT/STRUCTURAL ENGINEER TO ENSURE THE
THE ABOVE FOUNDATION RECOMMENDATIONS ARE INCLUDED IN
APPROPRIATE PLANS**
The concrete reinforcement recommendations provided herein should not be
considered to preclude the development of shrinkage related cracks, etc.; rather, these
recommendations are intended to minimize this potential. If shrinkage cracks do
develop, as is expected from concrete, reinforcements tend to limit the propagation of
these features. These recommendations are believed to be reasonable and in keeping
with the local standards of construction practice. Special attention should be given to
any "re-entrant" corners (±270 degree corners) and curing practices during and after
concrete pour in order to further minimize shrinkage cracks.
F. Slopes
All slopes should be landscaped with types of plants and planting that do not
require excessive irrigation. Excess watering of slopes should be avoided. Slopes
left unplanted will be subject to erosion. The irrigation system should be installed
in accordance with the governing agencies.
Water should not be allowed to flow over the slopes in an uncontrolled manner.
Until landscaping is fullyestablished, plastic sheeting should be kept accessible to
VINJE & MIDDLETON ENQINEERLNQ, INC. 2450 Vnyard Avenue, #102, Escondido, California 92029.1229 • Phone (760) 743.1214 • Fax (760) 739.0343
QEOTECHNICAL. INVESTIGATIONS QRADINQ SUPERVISION PERC TESTINQ ENVIRONMENTAL INVESTIQATIONS
Update Compaction Report
Proposed Church Site
June 7, 2000
Page 8
protect the slopes from periods of prolonged and/or heavy rainfall. Berms should
be constructed along the top edges of all fill slopes.
Brow ditches should be constructed along the top of all cut slopes sufficient to
guide runoff away from the building site and adjacent.fill slopes prior.to the project
being completed.
G. Drainage
The owner/developer is responsible to insure adequate measures are taken to
properly finish grade the building pad after the structures and other improvements
are in place so that the drainage waters from the improved site and adjacent
properties are directed away from proposed structures in accordance with the
designed drainage patterns shown on the approved plans.
A minimum of two percent gradient should be maintained away from all foundations.
Roof gutters and downspouts should be installed on the building, all discharge from
downspouts should be led away from the foundations and slab to a suitable
location. Installation of area drains in the yards should also be considered.
Planter areas adjacent to foundations should be provided with damp/water proofing,.
using an impermeable liner against the footings, and a subdrainage system within
the planter area.
It should be noted that shallow groundwater conditions may still develop in
areas where no such conditions existed prior to site development. This can
be contributed to by substantial increases of surface water infiltration
resulting from landscape irrigation which was not present before the
development of the site. It is almost impossible to absolutely prevent the
possibility of shallow groundwater on the entire site. Therefore, we
recommend that shallow groundwater conditions be remedied if and when
they develop.
The property owner should be made aware that altering drainage patterns,
landscaping, the addition of patios, planters, and other improvements, as well as
over irrigation and variations in seasonal rainfall, all affect subsurface moisture
conditions, which in turn affect structural performance. .
VINJE & MIDDLETON ENQINEERINQ, INC. 2450 Vineyard Avenue, #102, Escondido, California 92029.1229 • Phone (760) 7434214 • Fax (760) 739-0343
GEOTECHNICAL INVESTIGATIONS GRADING SUPERVISION . PERC TESTING ENVIRONMENTAL INVESTIGATION'S
Update Compaction Report
Proposed Church Site
June 7, 2000'
Page 9
LkeI1j L4J1i1•J !L11[.iRI
It should be noted that the characteristics of as-compacted fill may change due to post-
construction changes from cycles of drying and wetting,, water infiltration, applied loads,
environmental changes, etc. These changes can cause detrimental changes-in the fill
characteristics such as in strength behavior, compressibility, behavior, volume change
behavior, permeability, etc.. The owner/developer should be made aware of the possibility
of shrinkage cracks in concrete and stucco materials. The American Concrete Institute
indicates that most concrete shrinks about 1/8-inch in 20 feet. Separation between
construction and cold joints should also be expected.
The amount of shrinkage related cracks that occur in concrete slab-on-grades, flatwork
and driveways depend on many factors, the most important of which is the amount of water
in the concrete mix. The purpose of the slab reinforcement is to keep normal concrete
shrinkage cracks closed tightly. The amount of concrete shrinkage can be minimized by
reducing the amount of water in the mix. To keep shrinkage to a minimum, the following
should be considered:
Use the stiffest mix that can be handled and consolidated satisfactorily.
Use the largest maximum size of aggregate that is practical, for example concrete
made with /8 inch maximum size aggregate usually requires about 40. pounds
(nearly 5 gallons) more water per cubic yard than concrete with 1 inch aggregate.
Cure the concrete as long as practical.
The amount of slab reinforcement provided for conventional slab-on-grade construction
considers that good quality concrete materials, proportioning, craftsmanship, and control
tests where appropriate and applicable are provided.
This office is to be notified no later than 3 p.m. on the day before any of the following
operations begin to schedule appropriate testing and/or inspections.
A. Fill placed under any conditions 12 inches or more in depth, to include:
Building pads.
Street improvements, sidewalks, curbs and gutters.
VJNJE & MIDDLETON ENGINEERING, INC.-2450 Vineyard Avenue, #102, Escondido, California 92029.1229 • Phone (760) 743.1214 • Fax (760) 739.0343
QEOTECHNICAI. INVESTIQATIONS QRADINQ SUPERVISION PERC TESTINQ ENVIRONMENTAL INVESTIQATIONS
Update Compaction Report
Proposed Church Site
June 7, 2000
Page 10
Utility trench backfills.
Retaining wall backfills.
The spreading or placement of soil obtained from any excavation (footing or
pool, etc.).
Inspection and testing of subgrade and basegrade beneath driveways, patios,
sidewalks, etc., prior to placement of pavement or concrete.
Moisture testing.
Foundation inspections.
Any operation not included herein which requires our testing, observation, or
inspection for certification to the appropriate agencies.
V. LIMITATIONS
Our description of previous grading operations have been limited to those grading
operations performed during the period of September 5, 1996 through June 30, 1998. The
conclusions contained herein have been based upon our observations and testing as
noted. No representations are made as to the quality or extent of materials not observed
and tested.
This report should be considered valid for permit purposes for a period of six months and
is subject to review by our firm followng that time. IF ANY CHANGES ARE MADE -PAD
SIZE, BUILDING LOCATION, ELEVATIONS, ETC. - THIS REPORT WILL BECOME
INVALID AND FURTHER ENGINEERING AND RECOMMENDATIONS WILL BECOME
NECESSARY.
If you have any questions or need clarification, please do not hesitate to contact this office.
Reference to our Job #00-248-F will help to expedite our response to your inquiries.
VINJE & MIDDLETON ENQINEERINQ, INC. 2450 Vineyard Avenue, 0102, Escondido, California 92029.1229 • Phone (760) 743.1214 • Fax(760)739-0343
QEOTECHNICAI. INVESTIGATIONS GRADING SUPERVISION PERC TESTING ENVIRONMENTAL INVESTIGATIONS
Update Compaction Report
Proposed. Church Site
June 7, 2000
Page 11
We appreciate this opportunity to be of service to you.
VINJE & MIDDLETON ENGINEERING, INC.
00,
Ralph M. Vinje
GE #863
RMV/MS/mpr
S (
- JUJY12-31"'
OF C
- Mehd, Shariat
RCE #46174
Si
:n No. 461,4
EXP. I2-312
Distribution: Addressee (1)
Mr. Rick Hill, Rick Engineering (3)
Mr. David Frink, Schuss - Clark Architects (2)
OF c-\'
mprflhIcont-248-f.ur1
VZNJE & MIDDLETON ENQINEERThJQ. iNC. 2450 Vitwyard Avenue, #102, Escondido, California 92029.1229 • Phone (760) 743.1214 • Fax (760) 739-0343
QEOTECHNICM. INVESTIQATIONS QRADINQ SUPERVISION PERC TESTING ENVIRONMENTAL INVESTIGATIONS
RETAINING WALL DRAIN L PAIL
Typical - no scale
Waterproofing
Perforated drain pipe
drainage
Granular, non-expansive
backfill. Compacted.
.. :.
Filter Material. Crushed rock (wrapped in
filter fabric) or Class 2 Permeable Material
(see specifications below) . .. - Tfl
-ci
Competent, approved
soils or bedrock
CONSTRUCTION SPECIFICATIONS:
Provide granular, non-expansive backfill soil in 1:1 gradient wedge behind wall. Compact backfill to minimum 90% of laboratory
standard.
Provide back drainage for wall to prevent build-up of hydrostatic pressures. Use drainage openings along base of wall or back
drain system as outlined below.
Backdrain should consist of 4" diameter PVC pipe (Schedule 40 or equivalent) with perforations down. Drain to suitable outlet
at minimum 1%. Provide %" - 1W crushed gravel filter wrapped in filter fabric (Mirafi 140N or equivalent). Delete filter fabric
wrap if Cattrans Class 2 permeable material is used. Compact Class 2 material to minimum 90% of laboratory standard.
Seal back of wall with waterproofing in accordance with architects specifications.
Provide positive drainage to disallow ponding of water above wall. Uned drainage ditch to
minimum 2% flow away from wall is recommended.
* Use 1% cubic foot per foot with granular backfill soil and 4 cubic foot per foot if expansive backfill soil is used.
VINJ.E & MIDDLETON ENGINEERING, INC.
PLATE 01
ISOLATION JOINTS AND RE-ENTRANT CORNER REINFORCEMENT
Typical - no scale
(a) (b)
ISOLATION JOINTS
CONTRACTION JOINTS
(9)
RE-ENTRANT
CORNER CRACK
RE-ENTRANT CORNER -
REINFORCEMENT
NO.4 BARS PLACED 1.5"
BELOW TOP OF SLAB
NOTES: .
Isolation joints around the columns should be either circular as shown in (a) or diamond shaped as shown in (b).
If no isolation joints are used around columns, or if the corners of the isolation joints do not meet the contraction
joints, radial cracking as shown in (c)may occur (reference ACI).
In order to control cracking at the re-entrant corners (±270° corners), provide reinforcement as shown in (C).
Re-entrant corner reinforcement shown herein is provided as a general guideline only and is subject to verification
and changes by the project architect and/or structural engineer based upon slab geometry, location, and other
engineerirg and construction factors.
VINJE & MIDDLETON ENGINEERING, INC.
PLATE 82
T0PO map printed on 06/06/00 from "SanDiego.tpo' and Untitiec.tpg 1.
117°17'00"W WGS841171600W
7 ,PLATE 1. REGIONAL INDEX MAPL
/ - C aypit -
/ A - -
-- ( -
Well - -- \
/
—:r---
-- - —
-1
aIorrr - /
a U A H/E D LO N D A
-
-
---
-
z - ---
01
-
- - - - --- --
-
_J
0000 -
-
/
o - 9 - . •. . - :--'-.
-
II N
\\ - -- - /
\\ LA G 00 Ar /
BATIQUITOS
-- - -- . -•-.--- _ */ -
LA COS 7 - --
-.. *J;
-o o" 1170 1 71flil' W WGS4 117016'00" W
TN*!MN
1112 4 MU
1000 FT a Ma- 1000—
ptea ñx,m ToPO! 01 WThfx Puit (www top, coio)