Subject: Report of Soils Investigation for property
located at 952 Pine Avenue, Carlsbad,
California, known as APN 204-111-14.
Dear Mr. Weber:
The following report has been prepared to present the
results of the investigation of soil conditions for the
subject property.
PROJECT DESCRIPTION AND SCOPE OF WORK
This investigation was undertaken at your request to
determine the supporting capacities and engineering charac-
teristics of the existing bearing soils and to provide infor-
mation for site preparation and subsequent foundation designs
for your proposed residential buildings with wood-frame and
slab-on-grade construction.
The subject property has 90 feet fronting on Pine Avenue
and a depth of 200 feet. The ground slopes 2% to the south-
west. The site contains an existing wood frame residence and
detached garage and several small Avocado and fruit trees.
GEOLOGY AND SEISMICITY
The earth materials immediately underlying the site are
poorly cemented, medium to finely grained sands. Lithologi-
cally, they resemble the Pleistocene Linda Vista Formation
which crops out to the south near San Diego. No recent
faulting or major earthquake epicenters (greater than Richter
5.0 M) have been reported in the immediate area. Seismic
risks for the site stem principally from the Elsinore Fault
Zone, located approximately forty miles to the northeast, and
the postulated off-shore projection of the Rose Canyon Fault
(Legg and Kennedy, 1979) situated about six miles west of
Oceanside. Both faults are considered active or potentially
active. From empirical correlations (Housner, 1970) and the
seismic history of these zones, it is considered that a
335 OLIVE AVENUE e VISTA. CALIFORNIA 92083 a (619) 758-2220
M) a'f-01
Jim Weber Page 2
February 8, 1988 wp - 2704
maximum probable earthquake of 6.0 to 6.5 should be anti c.i'-
pated for planning and design purposes.
SITE INVESTIGATION
Three trenches were excavated on February 5, 1988 tô
provide access for examination of subsurface conditions and
sampling of the underlying soils for testing. Representa-
tive samples of the soils encountered were -classified in the
field and tested in the laboratory to determine selected
engineering properties.
In order to provide more direct correlation between
field and laboratory testing and to aid in evaluating allow-
able bearing values, in-place density tests and dynamic cone
penetration tests were made at representative locations in
the trenches and boring. Results of these tests and field
descriptions are shown on the attached boring logs.
LABORATORY TESTING
The on-site soils were determined to be nonexpansive.
Moisture-density curves were prepared on representative
samples of the soil types encountered in accordance with ASTM
D-1557-78 with the following results:
n
SOIL
TYPE DESCRIPTION
OPTIMUM
MOISTURE
MAXIMUM
DRY DENSITY
I Brown, silty, fine to medium .SAND 8.1% 128.2 PCF
II Tan-orange, silty, fine to medium SAIM 8.6% 129.6 PCF
1
FINDINGS AND RECOMMENDATIONS
The following summarized findings and recommendations
are based on analysis of all the data and information obtain-
ed from our soil investigation conducted on this site. This
includes our visual inspections of the site, field investiga-
tion (including the trench excavations and the boring ad-
vanced throughout this site), review of published soils and
geological data, and our general knowledge, and experience
with the area and the encountered soil types.
There were no obvious geologic hazards or unusual soil
conditions detected during the investigation which would
preclude the development of the site as described herein.
Jim Weber Page 3
February 8, 1988 WP - 2704
It is our opinion that the site is suitable for develop-
ment with respect to soil conditions, provided the recomrn•ñ-
dations contained in this report are incorporated into tb
project planning, design, and grading considerations.
General Soil Conditions and Site Preparation
The relatively uniform soil profile for the
site shows approximately three feet of. loose,
brown, silty SAND (SM) over a dense tan-orange
silty SAND. These sands are angular and lightly
cemented to the depths of.our investigation.
These soils are not detrimentally expansive
and, therefore, no special consideration need be
given this aspect of the foundation design or
construction.
The loose surficial soils (to a depth of
approximately three feet) having an in-situ rela-
tive compaction of less than 83% are potentially
subject to large rapid settlement upon wetting.
These soils, therefore, require recompaction. The
surface soils located under proposed structures and
for a distance of nine feet beyond, in plan view,
should be removed and recompacted to a relative
compaction of at least 90% ASTM D-1557-78. The
depth to which the recompaction operation will be
taken will depend on the depth at which the dense
Soil Type II is encountered. This depth is
expeätd to be between 2.5 and 3.5 feet below the
existing surface.
Fill soils and an old septic tank were encoun-
tered in the western end of Trench No. 2. Past
experience in this area indicates the possibility
of a vertical seepage pit being located in the
general vicinity of the septic tank. Care should
be taken during recompaction operations to locate,
and if found, properly backfill any such pit en-
countered.
All grading, clearing, and recompaction opera-
tions should be performed in accordance with the
applicable grading specifications appended to this
report and the City of Carlsbad Grading Ordinance
and should be observed by a qualified soils engi-
fleer at the time the work is performed.
Jim Weber Page 4
February 8, 1988 WP - 2704
Foundations
Conventional concentrically loaded spread
footings are recommended forfoundation support.
All footings should extend a minimum of 12 inches
into the dense natural marine sands or properly
compacted on-site marine sands. Building code
standards may require greater footing depths.
Continuous and square footings should have
minimum widths of 12 and 24 inches, respectively.
Actual footing dimensions will, of course, depend
on the structural characteristics of the building
program.
Bearing Capacity
Footings founded in the properly recompacted
surf icial sands or underlying dense sands may be
designed for vertical bearing pressures of 2,000
pounds per square foot.
Lateral Resistance
Soil passive pressure and/or coefficient of
friction of concrete to soil may be used to resist
horizontal movement. The allowable passive pres-
sure may be assumed to be equivalent to a fluid
weighing 300 pounds per cubic foot. The coeffici-
ent of friction of concrete to soil may be assumed
to be 0.40. These values may be increased one-
third for wind or seismic loading. They have been
computed assuming no surcharge and assuming adja-
cent grade is level. If these assumptions are
incorrect, we should be contacted for new values to
reflect the true conditions.
Foundation Reinforcement
Foundation reinforcement should be determined
by the project structural engineer. However,
minimal reinforcement should consist of at least
one No. 4 bar at the top and bottom of all continu-
ous footings. The steel should be positioned to
provide the maximum depth of reinforced concrete
acting as a continuous beam.
Slab-on-grade
Slab thickness and reinforcement will depend
upon anticipated loads. Slabs should be at least
3.5 inches thick. Where moisture migration through
Jim Weber Page 5
February 8, 1988 WP - 2704
slabs is undesirable, a visqueen moisture barrier
should be placed beneath them.
.
Drainage . .
Adequate measures should be undertaken to
properly finish-grade each building pad after the
structural and other improvements are in place so
that the drainage waters from the improved site and
the adjacent properties will be directed away from
the foundations, footings, and floor slabs via
surface swales and/or subsurface drains toward the
street or the natural drainage direction for this
area. Proper drainage will ensure that no waters
will seek the level of the bearing soils under the
foundations, footings, and floor slabs which could
result in undermining and differential settlement
or uplift to the structures and other improvements.
FINAL COMMENT
Because of the presence of loose surf icial soils present
on. the site, grading and recornpaction work will be necessary
to provide a suitable surface to receive the anticipated
slab-on-grade foundations. Procedures for this have been
addressed in this report. Arrangements for compaction test-
ing should be made with a qualified soil testing company
prior to preparation of native surfaces or placement of
fill.
Additional tests will be required on any imported fill
and on any soils encountered during grading other than those
described in this report.
In order for our engineers to evaluate the finished
graded site, all earthwork and compaction operations must be
performed under the observation of our soils engineer so that
he may have sufficient information for preparation of a
report which will include his opinion regarding conformance
of the completed earthwork to the recommended grading speci-
fications and compaction requirements found in this report.
LIMITATIONS
The recommendations of this report pertain only to the
site investigated and are based on the assumption that the
soil conditions do not deviate from those disclosed in the
borings.
If any variations or undesirable conditions are encoun-
tered during construction or if the proposed construction
Jim Weber Page 6
February 8, 1988 WP - 2704
will differ from that planned at the present time, TRI CITY
ENGINEERS should be notified so that supplemental recornme1da-
tions can be given.
The findings of this report are valid as of the prëént
date. However, changes in the conditions of a propertycan
occur with the passage of time. In addition, changes in
engineering or construction standards may occur as a result-.
of legislation or broadened knowledge. Accordingly, the
findings of this report may be invalidated wholly or in party
by changes outside our control. Therefore, this report
should be reviewed after a period of one year to verify
whether our recommendations remain applicable to the site.
This report is issued with the understanding that it is
the responsibility of the owner, or of his representative, to
ensure that the information and recommendations contained
herein are brought to the attention of the architect and
engineer for ..the project and are incorporated into the plans
and that the necessary steps are taken to see that the con-
tractor and subcontractors carry out such recommendations in
the field.
We appreciate this opportunity to be of service to you.
Respectfully,
ThI
ENGINEERS
L
Alexander W. Urquhart
P. E. No. C 30958.
P. E. No. GE 848
AWU/dip
ends
270SOIL.RSI
TYPE OF EXOIPMET: BACKHOE SURFACE ELEVATION: - - - LOGGED BY: DLP
1)ET1O GROUNDWATER:' NONE ENCOUNTERED THENCE WIDTH: TWO FEET (2') DATE: February 5, 1988
DESCRIPTION AND CLASSIFICATION
___
TION
p.ataicA -
WATER .RI
RELATIVE
(X)KPAC- COHESION PENETRO-
(TORVANE) METER qu SOIL DEFIH SAMPLE RfIS- (DNTENI I)ERSITY flOW
DESCRIPTION AND REMARKS SYMBOL (1SF) (1SF) TYPE (FEET) TYPE lANCE * () ;(p(7) ()
BROWN, MOIST, LOOSE, SILTY SAND SM I
(TOPSOIL)
B 2 7.7 101.7 79.4
TAN-ORANGE, DRY, LOOSE, SILTY SAND SM II
- 2 B 7 5.0 100.3 77.4
3 45 4.7 106.6 82.3
TAN-ORANGE, DRY, DENSE TO VERY SM II
- 4 50 3.3 121.3 93.6
DENSE SILTY SAND
-5—
BOTTOM OF TRENCH
B=Bag Sample
Number of blows required to drive
a 2-inch cone 4 inches using a 35-
pound hammer falling 24 inches. . .
K X PLO RAT OR! LOG
TRI CITY ENGINEERS
JAMES WEBER
335 OLIVE AVENUE 952 PINE AVENUE, CARLSBAD, CALIFORNIA
VISTA, CALIFORNIA 92083
(619) 758-2220 PROJECT NO.: WP -2704 DATE: FEBRUARY 8, 1988 ITRENCH NO.: 1
TYPE OF U]B4ENT: BACKHOE SURFACE ELEVATION: - LOGGED BY: DL?
DEPTH TO OUNEMAIER: NONE ENCOUNTERED 'TRENCH WIDTH: TWO FEET (2') DATE: FEBRUARY 5,1988
DESCRIPTION AND CLASSIFICATION
PA-
lION WATER 1. ;)RY
'RELATIVE
(X)MPAC- COHESION PENETRO J
(ToRvANE) METER qu SOIL DEPTH . SAMPLE RESIS- (X)NIENT DENSITY lION
DESCRIPTION AND REMARKS SYMBOL (1SF) (1SF) TYPE (FEU) TYPE IA14CE t () .. (pep) ()
BROWN, MOIST, LOOSE, SILTY SAND SM I S
(TOPSOIL & FILL) -1
-2
2 9.1 102.8 80.2
-3
TAN-ORANGE, MOIST, LOOSE, SILTY SM II
SAND (FILL?)
- 4 4 8.4 102.8 79.3
5
TAN-ORANGE, MOIST, DENSE, SILTY SM II
SAND 18
BOTTOM OF TRENCH S
B=Bag Sample
Number of blows required to drive
a 2-inch cone 4 inches using a 35-
pound hammer falling 24 inches.
EXPLORATORY LOG
TEl CITY ENGINEERS
JAMES WEBER
335 OLIVE AVENUE 952 PINE AVENUE, CARLSBAD, CALIFORNIA
VISTA, CALIFORNIA 92083
(619) 758-2220 PROJECT NO.: WP - 2.04 l Th: FEBRUARY 8, 1988 ]TRENCH NO.: 2
TYPE OF X?UThENT: BACKHOE SURFACEELEVATION: - LOGGED BY: DLP
pj' IYJ JNwEER: NONE ENCOUNTERED THENCH WIDTH: TWO FEET (2 1 ) DATE: FEBRUARY 5, 1988
DESCRIPTION AND CLASSIFICATION
I I
PRA-
lION WATER DRY
IRJ
(X)MPAC- COHESION PENETRO-
(TORVANE) METER Qu SOIL
rr
DEPTH SAMPLE REElS- (X)NIERY DENSITY lION
DESCRIPTION AND RERARKS SYMBOL (TSP) (TSP) (FEET) TYPE TANCE
BROWN, MOIST, LOOSE, SILTY SAND SM I
(TOPSOIL) -1
IAN-ORANGE, DRY, LOOSE, SILTY SM II - 2
SAND (NAT.) 5 4.5 101.3 78.2
-3-
45 3.0 118.5 91.4
TAN-ORANGE, DRY, DENSE TO VERY SM II
DENSE,. SILTY SAND - 4
--5—
BOTTOM OF TRENCH
B=Bag Sample
* Number of blows required to drive
a 2-inch cone 4 inches using a 35-
pound hammer falling 24 inches.
EXPLORATORY LOG
TRI CITY ENGINEERS JAMES WEBER
335 OLIVE AVENUE 952 PINE AVENUE, CARLSBAD, CALIFORNIA
VISTA, CALIFORNIA 9208.3
PROJECT NO.: WP - 2704 1m: FEBRUARY 8, 1988 TRENCH NO.: 3 (619) 758-2220
VVP —27Oc
64/s T'4'C
57'c
piNg ViA/UG