HomeMy WebLinkAboutMS 01-13; CARRILLO CANYON VIEWS; PRELIMINARY DRAINAGE STUDY; 2001-07-17PRELIMINARY
DRAINAGE STUDY
FOR
CARRI.LL.O CANYON VIEWS
(TENTATIVE MAP NO. CT -)
CITY OF CARLSBAD
CIVCOM&ASSOCIATES
CONSULTING ENGINEERS • PLANNERS
O/3
PRELIMINARY DRAINAGE STUDY
FOR
CARRILLO CANYON VIEWS
CITY OF CARLSBAD
ckOF ESS,9,' JULY 171 2001
CO Job No. 1254 Uj NO. 51348
Exp: 631002 )
CIVIL
0 @ OF CA0&
R. BHATIA, M.S.
R.C.E. #051348
Exp. 6 - 30 - 02
Prepared By:
CIVCOM & ASSOCIATES
3665 RUFFIN ROAD, Suite 230, San Diego, California 92123
Phone: (619) 505 - 6800 Fax: (619) 505-8866
1254DS.PM5
vi:c • —.,'•. i.$: - - .'.. -
TABLE OF CONTENTS
Page
Introduction I
Vicinity Map 2
Hydrology Methodology 3
Hydrology Results 5
Hydraulic Methodology 9
References 10
Appendices
Maps
Offsite Hydrology Map - Existing Condition
100-year, six hour strom event
Onsite Hydrology Map - Existing Condition
100-year, six hour strom event
Onsite Hydrology Map - Proposed Condition
100-year, six hour strom event
.rr
INTRODUCTION
This report presents a preliminary drainage study for the Carrillo Canyon Views. The area is
located north of Unicornio Street and west of El Fuerte Street in the City of Carlsbad (see
Vicinity Map).
This drainage study includes a Hydrology Study for the basin 100. (see Hydrology Maps)
The basin 100 is located along the north side of Unicornio Street. In the pre-development
condition, this basin consists of approximately 0.42+ acres which currently contributes storm
runoff to a B-2 inlet in the Unicornio Street at station 55 + 76+ which has been sized to
receive this flow.
SE
q7 \\
JP1 / /
II-
d 0
LN.
\
S
BLACK RAIL
COURT
BATIQUITOS LAGOON
AE
V I C I NI TY MAR
NOT TO SCALE
OM AR
;-~~O R TRD.
EL FUERTE ST.
\ SITE \,
ALGA RD.
Hydrology Methodology for Onsite
The rational method (Q=CIA) is used to determine the onsite runoff.
Runoff coefficient, ("C") is:
Existing rural area 0.45
Single residential units 0.55
Impervious areas 0.90
A soils group of "D" is assumed.
100 year 6 hour precipitation:
- Time of concentration, Appendix "D" is derived from equation
Tc=(1 1.9 L3/H).315X 60 minutes.
For basins where time of concentration is less than 10 minutes, a minimum value of
10 minutes is used.
Travel time in pipes is calculated by equation L I (V*60).
Each sub area is calculated individually for time of concentration with longest aggregate
time being the total time for the site.
Intensity is derived from the equation in Intensity chart.
I = 7.44 P6D-645
-3-
Confluence Method
Let Q, T and I correspond to the tributary with the largest discharge.
Let q, t, and i correspond to the tributary with the smallest discharge.
Let Q, and T correspond to the discharge and the time of concentration when peak flow
occurs.
If 1> t, the peak discharge is corrected by the ratio of the intensities:
Q=Q+q(lli) and TT.
- If T < t, the peak discharge is corrected by the ratio of the times of concentration:
Q=Q+q(T/t) and T=T.
-4-
PROJECT: CARRILLO CANYON VIEWS
JOB No.: 1254
SHEET 1 OF 1
7/19/01
It'I1L?— 'i I!LWJ 1 LUIiTI!i LL!L!
MUM
OEM
I
4e1*1s1 j
PRE D EVELOPED CO 'III (.]
IkL! L!I!I!i J
1254ds.xls
CARRILLO CANYON VIEWS
LEGEND TENTATIVE PARCEL MAP NO. MS 01-
SUBDIVISION BOUNDARY ---------------- ------------------- CITY OF CARLSBAD
LOT BOUNDARY ------------------------
AREA Co. 1OAC
NODE NUMBER---------------------------1100
I
NO SCALE
I I,
HYDROLOGY MAP
POST DEVELOPMENT CONDITION
S. \CIVCO\ 1254 %INT(G-MS\ I254DSCX.OGN
CARRILLO CANYON VIEWS
TENTATIVE PARCEL MAP NO. MS 01-
LEGEND CITY OF CARLSBAD
SUBDIVISION BOUNDARY ----------------
LOT BOUNDARY------------------------
AREA -----------------------------------C O.1OA
NODE NUMBER---------------------------1100
I
I
SCALE
4
S.CIVCOMI254 \I I 2540SP0. OGN
HYDROLOGY MAP
PRE DEVELOPMENT CONDITION
-.,. r't ..ç V -
CONCLUSION:
The existing 24 inch storm drain in Unicornio Street was designed to accepted the pre-
development conditions. The post-development condition 100 year storm peak discharge is
approximately 1.2 cubic feet per second. Therefore, it is concluded that the post
development condition does not adversely affect the existing 24 inch storm drain (see
reference plans in the Appendices).
-9-
'4. :•* •,.
APPENDICES
RUNOFF COEFFICIENTS (RATIONAL METHOD)
DEVELOPED AREAS (URBAN)
Land Use
Residential:
Single Family
Multi-Units
Mobile Homes
Rural (lots greater than 1/2 acre)
Commercial
80% Impervious
Industrial "
90% Impervious
Coefficient, C
Soil Group
Q
.40 .45 .50 .55
.45 .50 .60 (3
.45 .50 .55 .65
.30 .35 .40 .45
70 .75 .80 .85
.80 .85 .90 .95
NOTES:
Soil Group maps are available at the offices or the Department of Public Works.
121 Where actual conditions deviate significantly from the tabulated imperviousness
values of 80% or 90%. the values given for coefficient C, may be revised by
multiplying 80% or 90% by the ratio of actual imperviousness to the tabulated
imperviousness. However, in no case shall the final coefficient be less than 0.50.
For example: Consider commercial property on D soil group.
Actual imperviousness = 50%
Tabulated imperviousness = 80%
Revised C = 50 x 0.85 = 0.53
80
IV-A-9
APPENDIX IX
Updated 4/93
*t• .4 ... 4 P. -'
1/
Af
EQ/,QT/OA/ .385
Tc A-we of co,en/i-zho,
I Lenq/h of wale.--.shed
D,cre,,ce in e/eva//an a/0n9
c//cc/ire s/one line (See 4opendi 1-8)
—30DO L
- iWi/es ,'è e Hatws J Al,rni/es
'9Do 2--120
- 700 - -
-oa\ -
—500
_IaO —70
-
-
•
—200 2
-
- —3D
-
—/00
-
- \ —2000
—30 NOTE =
--_-- -'
NATURAL WATERSHEDS —8 QFOR
ADD TEN MINUTES TO I' .-240 - /00' - 7
COMPUTED TIME OF CON- - 900 -800
—'
—saD
—Ia —500
— 100
—3 —300
—5 -
—200
H z
SAN DIEGO COUNTY NOMOGRAPH FOR DETERMINATION
DEPARTMENT OF SPECIAL DISTRICT SERVICES OF TIME OF CONCENTRATION (Ic)
FOR NATURAL WATERSHEDS
DESIGN MANUAL
APPROVED DATE APPENDIX X-A V-A-10 Rev. 5/81