Loading...
HomeMy WebLinkAboutCP 94-02; POINSETTIA SHORES; DRAINAGE STUDY; 1997-03-28DRAINAGE STUDY FOR POINSETTIA SHORES AREA B-2 MARCH 28, 1997 J.N. 96-1034 1 ki7- NJ55381 x i 'SQF CMS&' Prepared by O'Day Consultants, Inc. 7220 Avenida Encinas, Suite 204 Carlsbad, CA 92009 (760) 931-7700 CT 94-02 TABLE OF CONTENTS Rational Method Basin "A ................................................... 1-8 Rational Method Basin "B .................................................. 9-19 Rational Method Basin "C ................................................ 20-29 Rational Method Basin "D ................................................ 30-31 Curb Outlet Capacity ............................................................... 32 Grate Inlet Capacity .............................................................. .33 Street Depth Chart ............................................... . ................. 34 Curb Inlet Chart.....................................................................35 100-Year 6-Hour Isopluvial Map..........................................36 100-Year 24-Hour Isopluvial Map ......................................... 37 Intensity Duration Design Chart ............................................. 38 SoilGroup Map ..................................................................... 39 Runoff Coefficient Table......................................................40 Hydraulic Calculation.............................................41 Drainage Map........................................................Map Pocket San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 1993 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 1985 hydrology manual Rational Hydrology Study Date: 03/28/97 POINSETTIA SHORES AREA B-2, BASIN "A" March 28, 1997 FILE: F:\ACCTS\921016\B2A2..RSD BY: E.G.W. Hydrology Study Control Information ********** ------------------------------------------------------------------------ O'Day Consultants, San Deigo, California - SIN 10125 -------------------------------------------------------------------- Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.500 24 hour precipitation(inches) = 4.000 Adjusted 6 hour precipitation (inches) = 2.500 P6/P24 = 62.5's San Diego hydrology manual 'C' values used Runoff coefficients by rational method Process from Point/Station 100.000 to Point/Station 100.000 **** INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 20.00 (Ft.) Highest elevation = 63.30(Ft.) Lowest elevation = 63.10(Ft.) Elevation difference = 0.20(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.22 mm. TC = [1.8*(1.1_C)*distanceA.5)./(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(20.00A.5)/( 1.00A(1/3)1= 3.22 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.046(CFS) Total initial stream area = 0.010(Ac.) Process from Point/Station 100.000 to Point/Station 102.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 61.60(Ft.) Downstream point/station elevation = 61.10(Ft.) Pipe length = 20.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.046(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.046(CFS) Normal flow depth in pipe = 0.85(In.) Flow top width inside pipe = 4.18(In.) Critical Depth = 1.26(In.) Pipe flow velocity = 2.66(Ft/s) Travel time through pipe = 0.13 mm. Time of concentration (TC) = 5.13 mm. Process from Point/Station 102.000 to Point/Station 102.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.13 mm. Rainfall intensity = 6.483(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0 .318 (CFS) for 0 .070 (Ac.) Total runoff = 0.364(CFS) Total area = 0.08 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 104.000 *** PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 61.10 (Ft.) Downstream point/station elevation = 56.45 (Ft.) Pipe length = 67.80 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.364(CFS) Given pipe size = 6.00 (In.) Calculated individual pipe flow = 0.364(CFS) Normal flow depth in pipe = 1.86(In.) Flow top width inside pipe = 5.55(In.) Critical Depth = 3.68(In.) Pipe flow velocity = 6.99(Ft/s) Travel time through pipe = 0.16 mm. Time of concentration (TC) = 5.29 mm. Process from Point/Station 104.000 to Point/Station 104.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.080 (Ac.) Runoff from this stream = 0.364(CFS) Time of concentration = 5.29 mm. Rainfall intensity = 6.354(In/Hr) +++++++++++++++++++++++-4-++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 106.000 to Point/Station 106.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 62.50(Ft.) Lowest elevation = 62.30 (Ft.) Elevation difference = 0.20(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 4.51 mm. 2 TC = (1.8*(1.1-C)*distance A .5)/(k slope A(l/3)] TC= [1.8*(1.1_0.7000)*(30.ocY.5)/( 0.67A(1/3))= 4.51 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.092(CFS) Total initial stream area = 0.020(Ac.) Process from Point/Station 106.000 to Point/Station 108.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 60.80 (Ft.) Downstream point/station elevation = 60.15 (Ft.) Pipe length = 20.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.092(CFS) Given pipe size = 6.00(m.) Calculated individual pipe flow = 0.092(CFS) Normal flow depth in pipe = 1.13 (In.) Flow top width inside pipe = 4.69(In.) Critical Depth = 1.80(In.) Pipe flow velocity = 3.61(Ft/s) Travel time through pipe = 0.09 mm. Time of concentration (TC) = 5.09 mm. + + + + + + + + + + + + +,+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + . + + + + + + + + + + + + + + + + + + Process from Point/Station 108.000 to Point/Station 108.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.09 mm. Rainfall intensity = 6.510(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.273(CFS) for 0.060 (Ac.) Total runoff = 0.366(CFS) Total area = 0.08 (Ac.) ++++++++++.+++++++++++++++++++.+.+++++++++++++++++.+++++++++++++++++++ Process from Point/Station 108.000 to Point/Station 104.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 60.70 (Ft.) Downstream point/station elevation = 56.45(Ft.) Pipe length = 56.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.366(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.366(CFS) Normal flow depth in pipe = 1.83 (In.) Flow top width inside pipe = 5.52(In.) Critical Depth = 3.68 (In.) Pipe flow velocity = 7.25(Ft/s) Travel time through pipe = 0.13 mm. Time of concentration (TC) = 5.22 mm. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.++++ Process from Point/Station 104.000 to Point/Station 104.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream numbe'r 2 Stream flow area = 0.080 (Ac.) Runoff from this stream = 0.366(CFS) Time of concentration = 5.22 mm. Rainfall intensity = 6.405(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 0.364 5.29 6.354 2 0.366 5.22 6.405 Qmnax(1) = 1.000 * 1.000 * 0.364) + 0.992 * 1.000 * 0.366) + = 0.726 Qmax(2) = 1.000 * 0.988 * 0.364) + 1.000 * 1.000 * 0.366) + = 0.725 Total of 2 streams to confluence: Flow rates before confluence point: 0.364 0.366 Maximum flow rates at confluence using above data: 0.726 0.725 Area of streams before confluence: 0.080 0.080 Results of confluence: Total flow rate = 0.726(CFS) Time of concentration = 5.287 mm. Effective stream area after confluence = 0.160 (Ac.) Process from Point/Station 104.000 to Point/Station 104.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.700 given for subarea Time of concentration = 5.29 mm. Rainfall intensity = 6.354(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.445(CFS) for 0.100 (Ac.) Total runoff = 1.171(CFS) Total area = 0.26 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 110.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 56.45 (Ft.) Downstream point/station elevation = 55.35(Ft.) Pipe length = 21.90 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow Given pipe size = 6.00(In.) Calculated individual pipe flow = 1.171(CFS) Normal flow depth in pipe = 4.01(In.) Flow top width inside pipe = 5.65(In.) Critical depth could not be calculated. Pipe flow velocity = 8.39(Ft/s) Travel time through pipe = 0.04 mm. Time of concentration (TC) = 5.33 mm. Process from Point/Station 110.000 to Point/Station 110.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.700 given for subarea Time of concentration = 5.33 mm. Rainfall intensity = 6.321(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.133(CFS) for 0.030(Ac.) Total runoff = 1.304(CFS) Total area = 0.29 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 110.000 to Point/Station 112.000 1r PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 55.25(Ft.) Downstream point/station elevation = 54.55 (Ft.) Pipe length = 27.60 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.304(CFS) Given pipe size = 8.00 (In.) Calculated individual pipe flow = 1.304(CFS) Normal flow depth in pipe = 4.34(In.) Flow top width inside pipe = 7.97(In.) Critical Depth = 6.47(m.) Pipe flow velocity = 6.74(Ft/s) Travel time through pipe = 0.07 mm. Time of concentration (TC) = 5.40 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++-f+++++++ Process from Point/Station 112.000 to Point/Station 112.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.290 (Ac.) Runoff from this stream = 1.304(CFS) Time of concentration = 5.40 mm. Rainfall intensity = 6.269(In/Hr) +++++++++++++++++++++++.++++++++++++++++++++++++++++++++++.+++++++++.+ Process from Point/Station 114.000 to Point/Station 114.000 **** INITIAL AREA EVALUATION **** User specified 'C' value of 0.450 given for subarea Initial subarea flow distance = 10.00(Ft.) Highest elevation = 73.20 (Ft.) Lowest elevation = 70.30 (Ft.) Elevation difference = 2.90(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 1.20 mm. TC = [1.8*(1.1_C)*distanceA.5)/( slopeA(1/3)] TC = [1.8*(1.1_0.4500)*( 10.00A .5)/( 29.00A(1/3)1= 1.20 Rainfall intensity (I) = 16.499 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.450 Subarea runoff = 0.037(CFS) Total initial stream area = 0.005(Ac.) Process from Point/Station 114.000 to Point/Station 116.000 IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 70.80(Ft.) Downstream point elevation = 62.00 (Ft.) Channel length thru subarea = 250.00 (Ft.) Channel base width = 0.000 (Ft.) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 0.204(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.500 (Ft.) Flow(q) thru subarea = 0.204(CFS) Depth of flow = 0.239(Ft.), Average velocity = 3.578(Ft/s) Channel flow top width = 0.478 (Ft.) Flow Velocity = 3.58 (Ft/s) Travel time = 1.16 mm. Time of concentration = 2.37 mm. Critical depth = 0.305(Ft.) Adding area flow to channel User specified 'C' value of 0.450 given for subarea Rainfall intensity = 10.664(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.450 Subarea runoff = 0.216 (CFS) for 0.045 (Ac.) Total runoff = 0.253(CFS) Total area = 0.05(Ac.) Process from Point/Station 116.000 to Point/Station 118.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 60.50(Ft.) Downstream point/station elevation = 58.10 (Ft.) Pipe length = 26.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.253(CFS) Given pipe size = 6.00 (In.) Calculated individual pipe flow = 0.253(CFS) Normal flow depth in pipe = 1.43 (In.) Flow top width inside pipe = 5.12 (In.) Critical Depth = 3.04(In.) Pipe flow velocity = 7.01(Ft/s) Travel time through pipe = 0.06 mm. Time of concentration (TC) = 2.43 mm. + + + + + + + + + + + + + + + +.+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Process from Point/Station 118.000 to Point/Station 118.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 2.43 mm. Rainfall intensity = 10.489(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational rnethod,Q=KCIA, C = 0.700 Subarea runoff = 0.367 (CFS) for 0.050 (Ac.) Total runoff = 0.620(CFS) Total area = 0.10 (Ac.) Process from Point/Station 118.000 to Point/Station 112.000 PIPEFLOW TRAVEL TIME (User specified size) *** Upstream point/station elevation = 58.10(Ft.) Downstream point/station elevation = 54.70 (Ft.) Pipe length = 37.00 (Ft.) Manning's N = 0.011 No. of pipes = ]. Required pipe flow = 0.620(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.620(CFS) Normal flow depth in pipe = 2.29(In.) Flow top width inside pipe = 5.83 (In.) Critical Depth = 4.80 (In.) Pipe flow velocity = 9.02 (Ft/s) Travel time through pipe = 0.07 mm. Time of concentration (TC) = 2.50 mm. Process from Point/Station 112.000 to Point/Station 112.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.100(Ac.) Runoff from this stream = 0.620(CFS) Time of concentration = 2.50 mm. Rainfall intensity = 10.303(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 1.304 5.40 6.269 2 0.620 2.50 10.303 Qmax(1) = 1.000 * 1.000 * 1.304) + 0.608 * 1.000 * 0.620) + = 1.681 Qmax(2) = 1.000 * 0.463 * 1.304) + 1.000 * 1.000 * 0.620) + = 1.224 Total of 2 streams to confluence: Flow rates before confluence point: 1.304 0.620 Maximum flow rates at confluence using above data: 1.681 1.224 Area of streams before confluence: 0.290 0.100 Results of confluence: Total flow rate = 1.681(CFS) Time of concentration = 5.399 mm. Effective, stream area after confluence = 0.390 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 112.000 to Point/Station 112.000 SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.40 mm. Rainfall intensity = 6.269(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.044(CFS) for 0.010 (Ac.) Total runoff = 1.725(CFS) Total area = 0.40 (Ac.) Process from Point/Station 112.000 to Point/Station 120.000. PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 54.54 (Ft.) Downstream point/station elevation = 52.00 (Ft.) Pipe length = 10.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.725(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.725(CFS) Normal flow depth in pipe = 2.67(In.) Flow top width inside pipe = 7.54(In.) Critical Depth = 7.22(m.) Pipe flow velocity = 16.94 (Ft/s) Travel time through pipe = 0.01 mm. Time of concentration (TC) = 5.41 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 120.000 to Point/Station 120.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.41 mm. Rainfall intensity = 6.262(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.175(CFS) for 0.040(Ac.) Total runoff = 1.901(CFS) Total area = 0.44(Ac.) Process from Point/Station 120.000 to Point/Station 122.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 52.00(Ft.) Downstream point/station elevation = 50.94 (Ft.) Pipe length = 29.10 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.901(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.901(CFS) Normal flow depth in pipe = 4.92(In.) Flow top width inside pipe = 7.78(In.) Critical Depth = 7.43(In.) Pipe flow velocity = 8.44(Ft/s) Travel time through pipe = 0.06 mm. Time of concentration (TC) = 5.47 mm. End of computations, total study area. = 0.44 (Ac.) San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 1993 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 1985 hydrology manual Rational ,Hydrology Study Date: 03/28/97 POINSETTIA SHORES AREA B-2, BASIN "B" March 28, 1997 FILE: F:\ACCTS\921016\B2B2 .RSD BY: E.G.W. ********* Hydrology Study Control Information ******** ------------------------------------------------------------------------ O'Day Consultants, San Deigo, California - SIN 10125 ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.500 24 hour precipitation(inches) = 4.000 Adjusted 6 hour precipitation (inches) = 2.500 P6/P24 = 62.5's San Diego hydrology manual 'C' values used Runoff coefficients by rational method Process from Point/Station 200.000 to Point/Station 200.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 50.00 (Ft.) Highest elevation = 69.80(Ft.) Lowest elevation = 68.90(Ft.) Elevation difference = 0.90 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 4.19 mm. TC = [1.8*(1.1_C)*distanceA.5)/( slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(50.00A.5)/( 1.80A(1/3)1= 4.19 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.323(CFS) Total initial stream area = 0.070(Ac.) Process from Point/Station 200.000 to Point/Station 202.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 67.40 (Ft.) Downstream point/station elevation = 65.10 (Ft.) Pipe length = 75.30 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0..323(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.323(CFS) Normal flow depth in pipe = 2.17(In.) Flow top width inside pipe = 5.76(In.) Critical Depth = 3.45(In.) Pipe flow velocity = 5.06(Ft/s) Travel time through pipe = 0.25 mm. Time of concentration (TC) = 5.25 mm. Process from Point/Station 202.000 to Point/Station 202.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.700 given for subarea Time of concentration = 5.25 mm. Rainfall intensity = 6.384(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.447 (CFS) for 0.100 (Ac.) Total runoff = 0.770(CFS) Total area = 0.17(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 202.000 to Point/Station 202.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.170(Ac.) Runoff from this stream = 0.770(CFS) Time of concentration = 5.25 mm. Rainfall intensity = 6.384(In/Hr) Process from Point/Station 204.000 to Point/Station 204.000 INITIAL AREA.EVALUATION User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 50.00 (Ft.) Highest elevation = 69.00 (Ft.) Lowest elevation = 67.90(Ft.) Elevation difference = 1.10 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.91 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(50.00A.5)/( 2.20A(1/3)1= 3.91 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.231(CFS) Total initial stream area = 0.050 (Ac.) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +.+ Process from Point/Station 204.000 to Point/Station 202.000 PIPEFLOW TRAVEL TIME (User specified size) 1'' Upstream point/station elevation = 66.40(Ft.) Downstream point/station elevation = 65.10(Ft.) Pipe length = 48.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.231(CFS) Given pipe size = 6.00(In.) I0 Calculated individual pipe flow = 0.231(CFS) Normal flow depth in pipe = 1.87(m.) Flow top width inside pipe = 5.56(m.) Critical Depth = 2.89(In.) Pipe flow velocity = 4.40(Ft/s) Travel time through pipe = 0.18 mm. Time of concentration (TC) = 5.18 mm. Process from Point/Station 202.000 to Point/Station 202.000. **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.050(Ac.) Runoff from this stream = 0.231(CFS) Time of concentration = 5.18 mm. Rainfall intensity = 6.437(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 0.770 5.25 6.384 2 0.231 5.18 6.437 Qrnax(1) = 1.000 * 1.000 * 0.770) + 0.992 * 1.000 * 0.231) + = 0.998 Qmax(2) = 1.000 * 0.987 * 0.770) + 1.000 * 1.000 * 0.231) + = 0.990 Total of 2 streams to confluence: Flow rates before confluence point: 0.770 0.231 Maximum flow rates at confluence using above data: 0.998 0.990 Area of streams before confluence: 0.170 0.050 Results of confluence: Total flow rate = 0.998(CFS) Time of concentration = 5.248 mm. Effective stream area after confluence = 0.220 (Ac.) Process from Point/Station 202.000 to Point/Station 206.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 65.00(Ft.) Downstream point/station elevation = 64.30(Ft.) Pipe length = 50.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.998(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 0.998(CFS) Normal flow depth in pipe = 4.44(In.) Flow top width inside pipe = 7.95(In.) Critical Depth = 5.69(m.) Pipe flow velocity = 5.02 (Ft/s) Travel time through pipe = 0.17 mm. Time of concentration (TC) = 5.42 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 206.000 to Point/Station 206.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.220(Ac.) Runoff from this stream = 0.998(CFS) Time of concentration = 5.42 mm. Rainfall intensity = 6.256(In/Hr) Process from Point/Station 208.000 to Point/Station 208.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 20.00(Ft.) Highest elevation = 68.20(Ft.) Lowest elevation = 68.00 (Ft.) Elevation difference = 0.20 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.22 mm. TC = (1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)1 TC= [1.8*(1.1_0.7000)*(20.00A.5)/( 1.00A(1/3)1= 3.22 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.046(CFS) Total initial stream area = 0.010(Ac.) Process from Point/Station 208.000 to Point/Station 210.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 66.50(Ft.) Downstream point/station elevation = 66.00 (Ft.) Pipe length = 20.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.046(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.046(CFS) Normal flow depth in pipe = 0.85(In.) Flow top width inside pipe = 4.18 (In.) Critical Depth = 1.26(In.) Pipe flow velocity = 2.66 (Ft/s) Travel time through pipe = 0.13 mm. Time of concentration (TC) = 5.13 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 210.000 to Point/Station 210.000 SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.13 mm. Rainfall intensity = 6.483(In/Hr) for a 100.0 year storm 110 Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.182(CFS) for 0.040 (Ac.) Total runoff = 0.228(CFS) Total area = 0.05 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 210.000 to Point/Station 206.000 1c PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 66.00 (Ft.) Downstream point/station elevation = 64.40 (Ft.) Pipe length = 72.30 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.228(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.228(CFS) Normal flow depth in pipe = 1.96 (In.) Flow top width inside pipe = 5.63 (In.) Critical Depth = 2.87(In.) Pipe flow velocity = 4.09(Ft/s) Travel time through pipe = 0.29 min. Time of concentration (TC) = 5.42 mm. Process from Point/Station 206.000 to Point/Station 206.000 **** CONFLUENCE OF, MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 • Stream flow area = 0.050(Ac.) Runoff from this stream = 0.228(CFS) Time of concentration = 5.42 mm. Rainfall intensity = 6.253(In/Hr) Process from Point/Station 212.000 to Point/Station 212.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 20.00 (Ft.) Highest elevation = 67.40 (Ft.) Lowest elevation = 67.20 (Ft.) Elevation difference = 0.20(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.22 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(20.00A.5)/( 1.00A(1/3)1= 3.22 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.046(CFS) Total initial stream area = 0.010(Ac.) Process from Point/Station 212.000 to Point/Station 214.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 65.70 (Ft.) Downstream point/station elevation = 65.50 (Ft.) Pipe length = 20.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.046(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.046(CFS) Normal flow depth in pipe = 1.07(In.) Flow top width inside pipe = 4.60(In.) Critical Depth = 1.26 (In.) Pipe flow velocity = 1.94(Ft/s) Travel time through pipe = 0.17 mm. Time of concentration (TC) = 5.17 mm. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + . + + + + + + + + + + +.+ + + + + + + + + + + + + + + Process from Point/Station 214.000 to Point/Station 214.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.700 given for subarea Time of concentration = 5.17 mm. Rainfall intensity = 6.445(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.135(CFS) for 0.030 (Ac.) Total runoff = 0.181(CFS) Total area = 0.04 (Ac.) Process from Point/Station 214.000 to Point/Station 206.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 65.50 (Ft.) Downstream point/station elevation = 64.40 (Ft.) Pipe length = 47.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.181(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.181(CFS) Normal flow depth in pipe = 1.72(In.) Flow top width inside pipe = 5.42(In.) Critical Depth = 2.55(In.) Pipe flow velocity = 3.91(Ft/s) Travel time through pipe = 0.20 mm. Time of concentration (TC) = 5.37 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 206.000 to Point/Station 206.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 3 Stream flow area = 0.040 (Ac.) Runoff from this stream = 0.181(CFS) Time of concentration = 5.37 mm. Rainfall intensity = 6.289(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 0.998 5.42 6.256 2 0.228 5.42 6.253 3 0.181 5.37 6.289 14 Qmax(1) = Qmax(2) = Qmax(3) = 1.000 * 1.000 * 0.998) + 1.000 * 0.999 * 0.228) + 0.995 * 1.000 * 0.181) + = 1.406 0.999 * 1.000 * 0.998) + 1.000 * 1.000 * 0.228) + 0.994 * 1.000 * 0.181) + = 1.406 1.000 * 0.992 * 0.998) + 1.000 * 0.991 * 0.228) + 1.000 * 1.000 * 0.181) + = 1.397 Total of 3 streams to confluence: Flow rates before confluence point: 0.998 0.228 0.181 Maximum flow rates at confluence using above data: 1.406 1.406 1.397 Area of streams before confluence: 0.220 0.050 0.040 Results of confluence: Total flow rate = 1.406(CFS) Time of concentration = 5.416 mm. Effective stream area after confluence = 0.310 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 206.000 to Point/Station 206.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.42 mm. Rainfall intensity = 6.256(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.394(CFS) for 0.090 (Ac.) Total runoff = 1.800(CFS) Total area = 0.40 (Ac.) Process from Point/Station 206.000 to Point/Station 216.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 64.30 (Ft.) Downstream point/station elevation = 63.95(Ft.) Pipe length = 22.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.800(CFS) Given pipe size = 8.00 (In.) Calculated individual pipe flow = 1.800(CFS) Normal flow depth in pipe = 8.00(In.) Flow top width inside pipe = 0.00 (In.) Critical Depth = 7.32(In.) Pipe flow velocity = 5.16(Ft/s) Travel time through pipe = 0.07 mm. Time of concentration (TC) = 5.49 mm. Process from Point/Station 216.000 to Point/Station 216.000 **** SUBAREA FLOW ADDITION **** 145 User specified 'C' value of 0.700 given for subarea Time of concentration = 5.49 mm. Rainfall intensity = 6.204(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.130(CFS) for 0.030 (Ac.) Total runoff = 1.931(CFS) Total area = 0.43 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 216.000 to Point/Station 218.000 PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 63.95 (Ft.) Downstream point/station elevation = 63.50 (Ft.) Pipe length = 27.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.931(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.931(CFS) Normal flow depth in pipe = 8.00(In.) Flow top width inside pipe = 0.00(In.) Critical Depth = 7.46(In.) Pipe flow velocity = 5.23(Ft/s) Travel time through pipe = 0.09 mm. Time of concentration (TC) = 5.57 mm. Process from Point/Station 218.000 to Point/Station 218.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.430(Ac.) Runoff from this stream = 1.931(CFS) Time of concentration = 5.57 mm. Rainfall intensity = 6.141(In/Hr) +++++++++++++++++++++++++++++.++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 220.000 to Point/Station 220.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 68.20 (Ft.) Lowest elevation = 67.90(Ft.) Elevation difference = 0.30 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.94 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(30.00A.5)/( 1.00A(1/3)1= 3.94 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.184(CFS) Total initial stream area = 0.040(Ac.) +++++++++++++++++++++++++++++++++++++-l-++++++++++++++++++++++++++++++++ Process from Point/Station 220.000 to Point/Station 218.000 **** PIPEFLOW TRAVEL TIME (User specified size) It; Upstream point/station elevation = 66.40(Ft.) Downstream point/station elevation = 63.65(Ft.) Pipe length = 45.80 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.184(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.184(CFS) Normal flow depth in pipe = 1.36 (In.) Flow top width inside pipe = 5.03 (In.) Critical Depth = 2.57(In.) Pipe flow velocity = 5.49(Ft/s) Travel time through pipe = 0.14 mm. Time of concentration (TC) = 5.14 mm. Process from Point/Station 218.000 to Point/Station 218.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number. 2 Stream flow area = 0.040(Ac.) Runoff from this stream = 0.184(CFS) Time of concentration = 5.14 mm. Rainfall intensity = 6.471(In/Hr) +++++++++++++++++++.+++++..+++++.++++++++++++++++++++++.++++++++++++++ Process from Point/Station 222.000 to Point/Station 222.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 67.40(Ft.) Lowest elevation 67.10 (Ft.) Elevation difference = 0.30(Ft.) Time of concentration calculated by the urban areas overland flow method (AppX-C) = 3.94 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*( 30.00A.5)/( 1.00A (1/3)1= 394 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.138(CFS) Total initial stream area = 0.030 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++.+.+++++++ Process from Point/Station 222.000 to Point/Station 218.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 65.60 (Ft.) Downstream point/station elevation = 63.65 (Ft.) Pipe length = 35.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.138(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.138(CFS) Normal flow depth in pipe = 1.21(In.) Flow top width inside pipe = 4.81(In.) Critical Depth = 2.22(In.) Pipe flow velocity = 4.92(Ft/s) 11 Travel time through pipe = 0.12 mm. Time of concentration (TC) = 5.12 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 218.000 to Point/Station 218.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 3 Stream flow area = 0.030(Ac.) Runoff from this stream = 0.138(CFS) Time of concentration = 5.12 mm. Rainfall intensity = 6.488(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) •(min) (In/Hr) 1 1.931 5.57 6.141 2 0.184 5.14 6.471 3 0.138 5.12 6.488 Qmax(1) = 1.000 * 1.000 * 1.931) + 0.949 * 1.000 * 0.184) + 0.946 * 1.000 * 0.138) + = 2.237 Qmax(2) = 1.000 * 0.922 * 1.931) + 1.000 * 1.000 * 0.184) + 0.997 * 1.000 * 0.138) + = 2.102 Qmax(3) = 1.000 * 0.918 * 1.931) + 1.000 * 0.996 * 0.184) + 1.000 • 1.000 * 0.138) + = 2.095 Total of 3 streams to confluence: Flow rates before confluence point: 1.931 0.184 0.138 Maximum flow rates at confluence using above data: 2.237 2.102 2.095 Area of streams before confluence: 0.430 0.040 0.030 Results of confluence: Total flow rate = 2.237(CFS) Time of concentration = 5.574 mm. Effective stream area after confluence = 0.500(Ac.) Process from Point/Station 218.000 to Point/Station 218.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.57 mm. Rainfall intensity = 6.141(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.043 (CFS) for 0.010 (Ac.) Total runoff = 2.280(CFS) Total area = 0.51 (Ac.) Process from Point/Station 218.000 to Point/Station 224.000 PIPEFLOW TRAVEL TIME (User specified size) *** Upstream point/station elevation = 63.40 (Ft.) Downstream point/station elevation = 63.15 (Ft.) Pipe length = 8.20 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 2.280(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 2.280(CFS) Normal flow depth in pipe = 6.01(In.) Flow top width inside pipe = 6.92(In.) Critical depth could not be calculated. Pipe flow velocity = 8.10(Ft/s) Travel time through pipe = 0.02 mm. Time of concentration (TC) = 5.59 mm. End of computations, total study area = 0.51 (Ac.) /1 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESiGN Engineering Software, (c) 1993 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 1985 hydrology manual Rational Hydrology Study Date: 03/28/97 POINSETTIA SHORES AREA B-2, BASIN "C" March 28, 1997 FILE: F:\ACCTS\921016\B2C2 .RSD BY: E.G.W. ********* Hydrology Study Control Information ******* ------------------------------------------------------------------------ O'Day Consultants, San Deigo, California - SIN 10125 ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.500 24 hour precipitation(inches) 4.000 Adjusted 6 hour precipitation (inches) = 2.500 P6/P24 = 62.5% San Diego hydrology manual 'C' values used Runoff coefficients by rationa: method Process from Point/Station 300.000 to Point/Station 300.000 * * * * INITIAL AREA EVALUATION * * * * User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 74.80(Ft.) Lowest elevation = 74.20 (Ft.) Elevation difference = 0.60 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.13 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(30.00A.5)/( 2.00A(1/3)1= 3.13 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.415(CFS) Total initial stream area = 0.090 (Ac.) Process from Point/Station 300.000 to Point/Station 302.000 PIPEFLOW TRAVEL TIME (User specified size) 1r Upstream point/station elevation = 72.70 (Ft.) Downstream point/station elevation = 68.85 (Ft.) Pipe length = 82.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.415(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.415(CFS) 20 Normal flow depth in pipe = 2.21(In.) Flow top width inside pipe = 5.79(In.) Critical Depth = 3.93 (In.) Pipe flow velocity = 6.32(Ft/s) Travel time through pipe = 0.22 mm. Time of concentration (TC) = 5.22 mm. Process from Point/Station 302.000 to Point/Station 302.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.090 (Ac.) Runoff from this stream = 0.415(CFS) Time of concentration = 5.22 mm. Rainfall intensity = 6.408(In/Hr) Process from Point/Station 304.000 to Point/Station 304.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 45.00 (Ft.) Highest elevation = 74.20(Ft.) Lowest elevation = 73.30 (Ft.) Elevation difference = 0.90 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.83 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slope"(1/3)) TC= [1.8*(1.1_0.7000)*(45.00#.5)/( 2.00A(1/3)1= 3.83 Setting time of concentration to 5 minutes Rainfall intensity. (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.277(CFS) Total initial stream area = 0.060 (Ac.) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +.+ +_+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + Process from Point/Station 304.000 to Point/Station 302.000 PIPEFLOW TRAVEL TIME (User, specified size) Upstream point/station elevation = 71.80(Ft.) Downstream point/station elevation = 68.85(Ft.) Pipe length = 60.90 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.277(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.277(CFS) Normal flow depth in pipe = 1.77(In.) Flow top width inside pipe = 5.47(In.) Critical Depth= 3.18(In.) Pipe flow velocity = 5.71(Ft/s) Travel time through pipe = 0.18 mm. Time of concentration (TC) = 5.18 mm. Process from Point/Station 302.000 to Point/Station 302.000 **** CONFLUENCE OF MINOR STREAMS **** 21 Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.060 (Ac.) Runoff from this stream = 0.277(CFS) Time of concentration = 5.18 mm. Rainfall intensity =. 6.440(In/Hr) Summary of stream data: Stream Flow rate TC No. (CFS) (mm) Rainfall Intensity (In/Hr) 1 0.415 5.22 6.408 2 0.277 5.18 6.440 Qmax(l) = 1.000 * 1.000 * 0.415) + 0.995 * 1.000 * 0.277) + = 0.690 Qmax(2) = 1.000 * 0.992 * 0.415) + 1.000 * 1.000 * 0.277) + = 0.688 Total of 2 streams to confluence: Flow rates before confluence point: 0.415 0.277 Maximum flow rates at confluence using above data: 0.690 0.688 Area of streams before confluence: 0.090 0.060 Results of confluence: Total flow rate = 0.690(CFS) Time of concentration = 5.218 mm. Effective stream area after confluence = 0.150 (Ac.) Process from Point/Station 302.000 to Point/Station 302.000 **** SUBAREA FLOW ADDITION ****. User specified 'C' value of 0.700 given for subarea Time of concentration = 5.22 mm. Rainfall intensity = 6.408(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.449(CFS) for 0.100 (Ac.) Total runoff = 1.139(CFS) Total area = 0.25 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++.+++++++++++++++ Process from Point/Station 302.000 to Point/Station 306.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 68.75(Ft.) Downstream point/station elevation = 68.00(Ft.) Pipe length = 50.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 1.139(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.139(CFS) Normal flow depth in pipe = 4.72(In.) Flow top width inside pipe = 7.87(In.) Critical Depth = 6.07(In.) Pipe flow velocity = 5.32(Ft/s) 22 Travel time through pipe = 0.16 mm. Time of concentration (TC) = 5.38 mm. Process from Point/Station 306.000 to Point/Station 306.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.250(Ac.) Runoff from this stream = 1.139(CFS) Time of concentration = 5.38 mm. Rainfall intensity = 6.286(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 308.000 to Point/Station 308.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 74.10(Ft.) Lowest elevation = 73.10(Ft.) Elevation difference = 1.00(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 2.64 mm. TC = [l.8*(l.l_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(30.00A.5)/( 3.33A(1/3)]= 2.64 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.415(CFS) Total initial stream area = 0.090(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 308.000 to Point/Station 306.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 71.60(Ft.) Downstream point/station elevation = 68.10 (Ft.) Pipe length = 82.50 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.415(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.415(CFS) Normal flow depth in pipe = 2.27(In.) Flow top width inside pipe = 5.82(In.) Critical Depth = 3.93(In.) Pipe flow velocity = 6.10(Ft/s) Travel time through pipe = 0.23 mm. Time of concentration (TC) = 5.23 mm. Process from Point/Station 306.000 to Point/Station 306.000 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.090(Ac.) Runoff from this stream = 0.415(CFS) 23 Time of concentration = 5.23 mm. Rainfall intensity = 6.402(In/Hr) Process from Point/Station 310.000 to Point/Station 310.000 INITIAL AREA EVALUATION User specified 'C' value of 0.700 given for subarea Initial subarea flow distance. = 30.. 00 (Ft.) Highest elevation = 73.20(Ft.) Lowest elevation = 72.40 (Ft.) Elevation difference = 0.80 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 2.84 mm. TC = [1.8*(1.1_C)*distance A.5)/(% slopeA(1/3)) TC= [1.8*(1.1_0.7000)*( 30.00A.5)/( 2.67A(1/3)1= 2.84 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.184(CFS) Total initial stream area = 0.040 (Ac.) Process from Point/Station 310.000 to Point/Station 30.6.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 70.90(Ft.) Downstream point/station elevation = 68.10 (Ft.) Pipe length = 54.70 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.184(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.184(CFS) Normal flow depth in pipe = 1.42 (In.) Flow top width inside pipe = 5.10(In.) Critical Depth = 2.57(In.) Pipe flow velocity = 5.19(Ft/s) Travel time through pipe = 0.18 mm. Time of concentration (TC) = 5.18 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 306.000 to Point/Station 306.000 CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 3 Stream flow area = 0.040(Ac.) Runoff from this stream = 0.184(CFS) Time of concentration = 5.18 mm. Rainfall intensity = 6.442(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 1.139 5.38 6.286 - 2 0.415 5.23 6.402 3 0.184 5.18 6.442 24 Qmax(l) = Qmax(2) = Qrnax(3) = 1.000 * 1.000 * 1.139) + 0.982 * 1.000 * 0.415) + 0.976 * 1.000 * 0.184) + = 1.726 1.000 * 0.972 * 1.139) + 1.000 * 1.000 * 0.415) + 0.994 * 1.000 * 0.184) + = 1.705 1.000 * 0.963 * 1.139) + 1.000 * 0.990 * 0.415) + 1.000 * 1.000 * 0.184) + = 1.692 Total of 3 streams to confluence: Flow rates before confluence point: 1.139 0.415 0.184 Maximum flow rates at confluence using above data: 1.726 1.705 1.692 Area of streams before confluence: 0.250 0.090 0.040 Results of confluence: Total flow rate = 1.726(CFS) Time of concentration = 5.376 mm. Effective stream area after confluence = 0.380 (Ac.) Process from Point/Station 306.000 to Point/Station 306.000 **** SUBAREA FLOW ADDITION User specified 'C' value of 0.700 given for subarea Time of concentration = 5.38 mm. Rainfall intensity = 6.286(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.440(CFS) for 0.100 (Ac.) Total runoff = 2.166(CFS) Total area = 0.48 (Ac.) Process from Point/Station 306.000 to Point/Station 312.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 68.00(Ft.) Downstream point/station elevation = 67.55 (Ft.) Pipe length = 22.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 2.166(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 2.166(CFS) Normal flow depth in pipe = 8.00 (In.) Flow top width inside pipe = 0.00 (In.) Critical depth could not be calculated. Pipe flow velocity = 5.85(Ft/s) Travel time through pipe = 0.06 mm. Time of concentration (TC) = 5.44 mm. +++++.++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 312.000 to Point/Station 312.000 - **** SUBAREA FLOW ADDITION **** 25, User specified 'C' value of 0.700 given for subarea Time of concentration = 5.44 mm. Rainfall intensity = 6.239(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.175(CFS) for 0.040 (Ac.) Total runoff = 2.341(CFS) Total area = 0.52 (Ac.) Process from Point/Station 312.000 to Point/Station 314.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 67.55(Ft.) Downstream point/station elevation = 66.70 (Ft.) Pipe length = 26.70 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 2.341(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 2.341(CFS) Normal flow depth in pipe = 6.04(In.) Flow top width inside pipe = 6.88(In.) Critical depth could not be calculated. Pipe flow velocity = 8.28(Ft/s) Travel time through pipe = 0.05 mm. Time of concentration (TC) = 5.49 mm. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 314.000 to Point/Station 314.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.520(Ac.) Runoff from this stream = 2.341(CFS) Time of concentration = 5.49 mm. Rainfall intensity = 6.200(In/Hr) Process from Point/Station 316.000 to Point/Station 316.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00 (Ft.) Highest elevation = 73.20(Ft.) Lowest elevation = 72.90 (Ft.) Elevation difference = 0.30 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.94 mm. TC = [1.8*(1.1_C)*distance'.5)/( slopeA(1/3)] TC= [1.8*(1.1_0.7000)*(30.00A.5)/( 1.00A(1/3)1= 3.94 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.277(CFS) Total initial stream area = 0.060(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 316.000 to Point/Station 314.000 PIPEFLOW TRAVEL TIME (User specified size) -Z (0 Upstream point/station elevation = 71.40(Ft.) Downstream point/station elevation = 66.85 (Ft.) Pipe length = 67.40 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.277(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.277(CFS) Normal flow depth in pipe = 1.63 (In.) Flow top width inside pipe = 5.34(In.) Critical Depth = 3.18(In.) Pipe flow velocity = 6.44(Ft/s) Travel time through pipe = 0.17 mm. Time of concentration (TC) = 5.17 mm. Process from Point/Station 314.000 to Point/Station 314.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.060 (Ac.) Runoff from this stream = 0.277(CFS) Time of concentration = 5.17 mm. Rainfall intensity = 6.443(In/Hr) Process from Point/Station 318.000 to Point/Station 318.000 **** INITIAL AREA EVALUATION **** User specified 'C' value of 0.700 given for subarea Initial subarea flow distance = 30.00(Ft.) Highest elevation = 72.50 (Ft.) Lowest elevation= 72.20(Ft.) Elevation difference = 0.30(Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 3.94 mm. TC = (1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC= [1.8*(1.1_0.7000)*( 30.00.5)/( 1.00A (1/3)1= 394 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.700 Subarea runoff = 0.184(CFS) Total initial stream area = 0.040 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 318.000 to Point/Station 314.000 PIPEFLOW TRAVEL TIME (User specified size) ** Upstream point/station elevation = 70.70(Ft.) Downstream point/station elevation = 66.85(Ft.) Pipe length = 53.80 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 0.184(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.184(CFS) Normal flow depth in pipe = 1.31(In.) Flow top width inside pipe = 4.95(In.) Critical Depth = 2.57(In.) Pipe flow velocity = 5.84(Ft/s) 27 Travel time through pipe = 0.15 mm. Time of concentration (TC) = 5.15 mm. +++ + +++++ ++ ++ ++++++ +++ ++++++++++++++++++++++++++++ + + ++ ++ Process from Point/Station 314.000 to Point/Station 314.000 **** CONFLUENCE OF MINOR STREAMS Along Main Stream number: 1 in normal stream number 3 Stream flow area = 0.040(Ac.) Runoff from this stream = 0.184(CFS) Time of concentration = 5.15 mm. Rainfall intensity = 6.460(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (mm) (In/Hr) 1 2.341 5.49 6.200 2 0.277 5.17 6.443 3 0.184 5.15 6.460 Qmax(1) = 1.000 * 1.000 * 2.341) + 0.962 * 1.000 * 0.277) + 0.960 * 1.000 * 0.184) + = 2.784 Qmax(2) = 1.000 * 0.942 * 2.341) + 1.000 * 1.000 * 0.277) + 0.997 * 1.000 * 0.184) + = 2.666 Qmax(3) = 1.000 * 0.938 * 2.341) + 1.000 * 0.996 * 0.277) + 1.000 1.000 * 0.184) + = 2.657 Total of 3 streams to confluence: Flow rates before confluence point: 2.341 0.277 0.184 Maximum flow rates at confluence using above data: 2.784 2.666 2.657 Area of streams before confluence: 0.520 0.060 0.040 Results of confluence: Total flow rate = 2.784(CFS) Time of concentration = 5.492 mm. Effective stream area after confluence = 0.620 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 314.000 to Point/Station 314.000 **** SUBAREA FLOW ADDITION **** User specified 'C' value of 0.700 given for subarea Time of concentration = 5.49 mm. Rainfall intensity = 6.200(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 0.043 (CFS) for 0.010 (Ac.) Total runoff = 2.828(CFS) Total area = 0.63 (Ac.) ai Process from Point/Station 314.000 to Point/Station 320.000 PIPEFLOW TRAVEL TIME (User specified size) Upstream point/station elevation = 66.60 (Ft.) Downstream point/station elevation = 65.90 (Ft.) Pipe length = 15.00 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 2.828(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 2.828(CFS) Normal flow depth in pipe = 6.03 (In.) Flow top width inside pipe = 6.89 (In.) Critical depth could not be calculated. Pipe flow velocity = 10.02(Ft/s) Travel time through pipe = 0.02 mm. Time of concentration (TC)= 5.52 mm. End of computations, total study area = 0.63 (Ac.) 21 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 1993 Version 3.2 Rational method hydrology program based on San Diego County Flood Control Division 1985 hydrology manual Rational Hydrology Study Date: 03/28/97 ------------------------------------------------------------------------ POINSETTIA SHORES AREA B-2, BASIN "D" March 28, 1997 FILE: F:\ACCTS\921016\B2D2.RSD BY: E.G.W. ********* Hydrology Study Control Information ********* ------------------------------------------------------------------------ O'Day Consultants, San Deigo, California - SIN 10125 ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0 Map data precipitation entered: 6 hour, precipitation(inches) = 2.500 24 hour precipitation(inches) = 4.000 Adjusted 6 hour precipitation (inches) = 2.500 P6/P24 = 62.5% San Diego hydrology manual 'C' values used Runoff coefficients by rational method ++++++++++++++++++++++++++++++++++++++++++++++++++++++++-f-+++++++++++++ Process from Point/Station 400.000 to Point/Station 402.000 INITIAL AREA EVALUATION **** User specified 'C' value of 0.850 given for subarea Initial subarea flow distance = 90.00 (Ft.) Highest elevation = 83.80 (Ft.) Lowest elevation = 76.65 (Ft.) Elevation difference = 7.15 (Ft.) Time of concentration calculated by the urban areas overland flow method (App X-C) = 2.14 mm. TC = [1.8*(1.1_C)*distanceA.5)/(% slopeA(1/3)] TC = [1.8*(1.1_0.8500)*( 90.00A.5) 1( 7.94A(1/3)]= 2.14 Setting time of concentration to 5 minutes Rainfall intensity (I) = 6.587 for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.448(CFS) Total initial stream area = 0.080 (Ac.) Process from Point/Station 402.000 to Point/Station 404.000. **** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION **** Top of street segment elevation = 76.650 (Ft.) End of street segment elevation = 63.600 (Ft.) Length of street segment = 370.000 (Ft.) Height of curb above gutter flowline = 6.0(In.) Width of half Street (curb to crown) = 32.000(Ft.) Distance from crown to crossfall grade break = 16.000(Ft.) Slope from gutter to grade break (v/hz) = 0.020 Slope from grade break to crown (v/hz) = 0.020 Street flow is on [1) side(s) of the Street Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.020 Gutter width = 1.500 (Ft.) Gutter hike from flowline = 1.500(In.) Manning's N in gutter = 0.0150 Manning's N from gutter to grade break = 0.0150 Manning's N from grade break to crown = 0.0150 Estimated mean flow rate at midpoint of Street = 0.593(CFS) Depth of flow = 0.173(Ft.), Average velocity = 2.679(Ft/s) Streetf low hydraulics at midpoint of street travel: Halfstreet flow width = 3.877(Ft.) Flow velocity = 2.68(Ft/s) Travel time = 2.30 mm. TC = 7.30 mm. Adding area flow to street User specified 'C' value of 0.700 given for subarea. Rainfall intensity = 5.159(In/Hr) for a 100.0 year storm Runoff coefficient used for sub-area, Rational method,Q=KCIA, C = 0.700 Subarea runoff = 2.347(CFS) for 0.650 (Ac.) Total runoff = 2.795(CFS) Total area = 0.73(Ac.) Street flow at end of Street = 2.795(CFS) Half Street flow at end of street = 2.795(CFS) Depth of flow = 0.261(Ft.), Average velocity = 3.696(Ft/s) Flow width (from curb towards crown)= 8.277 (Ft.) Process from Point/Station 404.000 to Point/Station 406.000 PIPEFLOW TRAVEL TIME (User specified size) ** Upstream point/station elevation = 61.80(Ft.) Downstream point/station elevation = 61.35 (Ft.) Pipe length = 44.40 (Ft.) Manning's N = 0.011 No. of pipes = 1 Required pipe flow = 2.795(CFS) Given pipe size = 12.00(In.) Calculated individual pipe flow = 2.795(CFS) Normal flow depth in pipe = 7.11(In.) Flow top width inside pipe = 11.79 (In.) Critical Depth = 8.60(In.) Pipe flow velocity = 5.76 (Ft/s) Travel time through pipe = 0.13 mm. Time of concentration (TC) = 7.43 mm. End of computations, total study area = 0.73 (Ac.) 3' TYPE "A" CURB OUTLET CAPACITY CALCULATION BY 0 'DAY CONSULTANTS 7220 Avenida Encinas, Suite 204 Carlsbad, California 92009 (619) 931-7700 (619) 931-8680 FEB. 1, 1997. ( 3.00') ---------- ** *** ** *** * * ** * *AWater Surface ( 0.201 )AAA* * ** ** ** ** * * ** * ***** **** * ** ***** ** ***** *** ***** * ** Rectangular Open Channel Flowrate ..................3.052 CFS Velocity ..................5.087 fps Depth of Flow .............0.200 feet Critical Depth 0.318 feet Total Depth ...............0.200 feet Base Width ................3.000 feet Slope of Channel 2.000 It X-Sectional Area 0.600 sq. ft. Wetted Perimeter 3.400 feet AR (2/3) ..................0.189 Mannings 'n' ..............0.013 Based on a standard 3' wide by 3" high SDRSD D-25 at a slope of 2 percent. The actual slope is greater than 2 percent. BASIN FLOW (cfs) 2.28 cfs < 3.05 cfs 2.83 cfs < 3.05 cfs 2.80 cfs < 3.05 cfs o. k. o. k. o. k. FILE: F:\ACCTS\921016\B2B25.OUT GRATE INLET CAPACITIES TRAFFIC GRATE: Qi = CwP&5 where P = perimeter of grate (ft) Cw = coeffleicent of weir = 3.0 d = depth (ft) Qi = flow of inlet (cfs) Let d = 0.2', assuming grate is 50% clogged Try 12"x12" grate, P=1' x4=4',4' x50%=•2 Therefore Qi = 3.0(2)(.2)' = 0.5 cfs Max Q to grate inlet = 0.45 cfs therefore-OK (formula from U.S. Dept. of Trans. Drainage of Hwy. Pvmts) 53 CHART 1-104.12 FIGURE 27.3 L a. i5 Dev- rrlcrT Vic OC .T HIL in la do ,L JFZ _____i ..r.1' ' - 1::::::iz I —. ____ IA LZ ____I — 'I_'k / i_'• — LL CL3 .• JILLLL ___ LLv I / __- ___ I I I 11111 I I I I Q= is 4~ 4 20 30 40 30 SiLcZ 51 • t4h = (16' ONE SICE CXAE : Char v$: Depth a QL4 Vtry S 4•4 t.i. 4.-. REV. CITY OF SAN DIEGO — DESIGN GUIDE . NO. GUTTER AND ROADWAY DISCHARGE -VELOCITY CHART 111-27.7 FIGURE 27.5 DEPTH OF FLOW-y-FEET .01 02 03 04 03 06 ce IC .2 3 =z.s _a) DISCHARGE PER FOOT OF -=T- LENGTH OF CURB OPENING INLETS WHEN INTERCEPTING - ---}--1007. OF GUTTER FLOW ---••----! -1 r I I Ii /yi, •-1• . . - -' zi-- _ ••ft •. / 'I I I i 2 act La :O.24 .10 .oa .03 04 03 02 .0I t T 111-27.9 £uvif %'IQ. C( r DEPARTMENT OF SANITATION I_ I rT n FLOOD CONTROL I JU I U - I &L '20.-' ISOPI.UVIIILS OF 100-YEAR 6-1OUR pEc.criTi1]Q' IN ET S OF AH ICU 115 1 ii; jj (( ............L -\ LAG A - -\\•• (\\O\ / - — \\ — 20 TNJ d. 30' IlI(J 1 :'' : I, 1 SAN CL [ 15' NIL 3u 5 45 : 2 25 5\ ' 330 ME 30 5'AON J\ 45 T 0 40 20\ 5' 1.. N -. 6 e?- -9 115 Ljiluu 5' 20 repn J by — - . • U.S. DEPARTMC\ t OF COMMERCE NATIONAL OCEANIC AND AT OSIIEHlC ADMINISTRATION ) _l._,.. •1 IACU \ 6PZCIAL STUDIES BRANCH, OFFICE OF It L)ROLOUY. NATIONAL. WEAThER SERVICE • flu 301 — 20 113jujuj"l I" j 118' 45' 30' 15' 117 115 1 30' 15' 116 11 5 1 30' '5' 1 1, COUNTY OF SAN DIEGO DEPARTMENT OF SANITATION & 1Oh1VL1\U 24-HOtU pnrCU1ThTIO FLOOD CONTROL rnn ',i iintin '211..-" I SIH'LU tIIttL t - I uti -1 uut IflEGIPITu\TLUfi RI E1iTIIS OF AN INCH T-1 JQ ( IA 11 At. 16, SA L M IL U cc 45 C ':- I /\ (IOO "Nh iu'\ so 330 rICP J by U.S.[)EPAWfME1' I' OF COMMERCE NATIONAL oc,:ANIC AND Al I'lllHIC ADMINISTRATION SICIAL. $TUL)I1-S IthANCIl. Of lICE OF II VlOLt)GY, NATIONAL. ¶WLATIIEI SERVICE b-I 30' - 1W 1,51 30' T I- 16' 1170 0' 15' 1164 30 40 50 •) no it, TI.. IJUPT .il P. UIV irjTiflfjrnI.i-I I.n4uT1h1rnhI.sI,,,1;rn,r .. . I1I.II ut ii ngghn I I Equation: I 7,44 P6 D •' 645 I n I Intensity (n./Hr.) ! - P6 6 Hr. Precipitation (In.) I : I f ill Duration (Mm.) 111111111: Eiiii i 4.i:':iUJ 1 • 1!; I h'.I:i".iI Ji'' ' • - l:...J::jl::.j.$i1IIjI if 1 I11 (It..ti i: ' iTJ fj ': jI UI rt 3.0 th 4.JJ.JiII.1!,[IJuIjj112 .0 i.fltR[tf iii k1;Il jfJ: i(f 1 .5 Z AI 1. '1lI o 11 1141JUI Hours 0 t•112 t-4 • II < '-'-t-i-•I-I •j -J-jl-( I "1 1J I iv 15 20 Minutes Directions for Application: From precipitation naps determine 6 hr. and 24 hr. amounts for the selected frequency. These maps are printed In the County Hydrol t-ianual. (10, 5f) 1ind 100 yr. maps included In Design and Procedure Manual). Adjust 6 hr. precipitation (if necessary) s that It is within the range of 45% to 65% 01 the 24 hr. precipitation. (Hot applicable to Desert) Plot 6 hr. precipitation on the right side of the chart. Draw a line through the point parallel to tt plotted lines. This line Is the Intensity-duration curve fc the location being analyzed. Application Form: 0) Selected Frequency (OOyr. P6 = * Lf1 P Adjusted *5_ vi . t mm. 1 in/hr. *Not Applicable to Desert Region APPENDIX XI IV-A-14 Revised 1/85 TABLE 2 RUNOFF COEFFICIENTS (RATIONAL METHOD) DEVELOPED AREAS (URBAN) Coefficient, C Soil Group (1) Land Use Residential: Single Family Multi-Units Mobile homes Rural (lots greater than 1/2 acre) Coninercial(2) 80% Impervious Industrial (2) 90% Impervious .40 .1+5 .50 .55 .45 .50 .60 .45 .50 .55 .65 .30 .35 .70 .75 .80 .85 .80 .85 .90 .95 NOTES: Soil Group mars are available at the Qffices of the Department of Public Works. (2)Where actual conditions deviate significantly from the tabulated impervious- ness values of 80% or 90%, the values given for coefficient C, may be revised by multiplying 80% or 907. by the ratio of actual imperviousness to the tabulated imperviousness. However, in no case shall the final coefficient be less than 0.50. For example: Consider commercial property on D soil rgrOup. Actual imperviousness = 50% Tabulated imperviousness 805/. Revised C .Q x 0.85 = 0.53 80 IV-A-9 APPENDIX IX-8 Rev. 5/81 ;W HYDRAULIC CALCULATIONS FOR OUTLET PIPES SE SF"S AREA B-2 1(-iôA MA#74m CF5 5ZOP9 07 PlAg P/A. L&N7// r VLtX'T ''"- 1-V. '-'"m i7bPrhf #VL Pztc F1Ftrk"J 1OP1'Z) //AP 10556 1/PSrZ64A4 FelertoAl A4.,IV094 m6ld A FJZ,ZO 00 6A at I i'/ ,r,iZ42s2 s" øA5i'I'' 7, /& "."° Z.03 .447 8•• /5 0.0 jO. -i . ;; ra Pr, ZD8O !OI 444 '5.8 61.35 p.5 " /0! 0,4 LA 1 iA,*/ÔF incs AD 1NZE1 tj 41 ¼# I ,J 'J L... 1 11 t J V L-. ____________ lU RLOPJ JiPiiL 1ñ1\(\ LLI LJ1JI 7220 Avenida Enemas civil Ligineering ENGINEER OF WORK: r CENTERLINE or NORTH SOUND CARLSBA Suite 204 Planning p 'r I l ( D('IT/ J( A7Q') I J Li , iL I IL/V -) Il. Carlsbad, California 92009 619-931--7700 Procrssin Surveying - -f -- - - - - - FV WPM C() -'' ((- Fox619-931-8680 ( DATE RMO1}IY 0 CARRCLL ROE 55381 I DATE i \1"T( O Xrefs 961FCRU 6 9PSTR H'D9 / ,CULim /I -: - Cl 913l9'D