HomeMy WebLinkAboutSDP 16-12; HARDING VETERANS HOUSING; RESPONSE TO REVIEW COMMENTS; 2020-06-05AA GEOTECHNICAL
MATERIALS
RECORD COPY
Initial Date
NOVA I SPECIAL INSPECTION DVBE • SBE • SDVOSB • SLBE
Affirmed Housing Group June 5, 2020
CIO Marie Men NOVA Project No. 3019097
13520 North Evening Creek Drive
San Diego, CA 92128
Attention: Ms. Allen (via email; marie@affirmedhousing.com)
Subject: Response to Review Comments
Proposed Three-Story Apartment Building R &-k— .. L 'F D3606-3618 & 3630 Harding Street, Carlsbad, California
JUN 1 5 2020
References: IAAtJD N !LOP,4E CWE 2016. Report of Preliminary Geotechnical Investigation, Affirmed Housing, 360643618&a36L3O, 1 T
Harding Street, Carlsbad, California, Christian Wheeler Engineering, June 2, 2016.
NOVA 2020a. Update Geotechnical Engineering Report, Proposed Three-Story Apartment Building,
3606-3618 & 3630, Carlsbad, California, NOVA Services, March 12, 2020.
KLE 2020. Grading Plans For Harding Veterans Housing, 3606, 3618, 3630 Harding Street, Kettler
Leweck Engineering, June 5, 2020.
NOVA 2020b. Response to Review Comments, Proposed Three-Stoiy Apartment Building, 3606-3618
Harding Street, Carlsbad, California, NOVA Services, April 28, 2020.
The intent of this letter is to respond to comments by the City of Carlsbad third-party review,
regarding its review of the above-referenced geotechnical report. The comments were prepared
by Hetherington Engineering, Inc. under cover Third-Party Geotechnical Review (Second), May
21, 2020 and are referenced herein as 'Hetherington 2020.'
NOVA Services, Inc. (NOVA) is retained by Affirmed Housing Group as Geotechnical Engineer-
of-Record (GEOR) for the project.
REVIEW COMMENTS AND RESPONSES
The following text reproduces comments in Hetherington 2020 regarding geotechnical-related
design for the above-referenced project. Comments from Hetherington 2020 are reproduced
below in italics, following which a response is provided by NOVA.
Comment 1. The 2019 California Building Code (CBC) and ASCE 7-16 are the governing
codes. The Consultant should confirm that the geotechnical recommendations are consistent
with these documents.
Response. NOVA understands that this project was initially submitted prior to January 1, 2020
and the initiation of the new governing codes. NOVA understands the project qualifies for 2016
CBC and ASCE 7-10.
4373 Viewridge Avenue, Suite B www.usa-nova.com 944 Calle Amanecer, Suite F
San Diego, CA 92123 San Clemente, CA 92673
P: 858.292.7575 P: 949.388.7710
A
ic
NOVA
Response to Review Comments
Proposed Three-Story Apartment Building
3606-3618 & 3630 Harding Street, Carlsbad, CA
NOVA Project No. 3019097
June 5, 2020
Comment 2. The Consultant should review the project grading and foundation plans, provide
any additional geotechnical recommendations considered necessary, and confirm that the plans
have been prepared in accordance with the geotechnical recommendations.
Response Acknowledged. NOVA has reviewed the referenced grading plan by Kettler Leweck.
The geotechnical recommendations have been properly implemented into the grading plan.
NOVA will review and sign/stamp additional plans or provide a plan review letter when
additional plans have been received.
Comment 3. The consultant should provide an updated geotechnical map/plot plan utilizing the
latest grading plan for the project to clearly show (at a minimum) a) existing site topography, b)
proposed structures/improvements, c) proposed finished grades, d) locations of the subsurface
exploration, e) geologic contacts, and f) remedial grading limits, etc.
Response. The requested geotechnical map has been revised to reflect the latest grading plan
and are attached hereto as Plate 1.
Comment 4. References 3 and 4 refer to a Christian Wheeler Engineering geotechnical
investigation report, dated June 2, 2016. The Christian Wheeler Engineering geotechnical
investigation reported submitted is dated August 4, 2016 (Reference 2). The consultant should
clarify which Christian Wheeler Engineering report is intended and confirm that the conclusions
and recommendations remain applicable.
Response. Noted. The content of the Christian Wheeler Engineering report dated April 20,
2016 was limited to providing preliminary recommendations. NOVA now understands that this
report was not submitted. NOVA will remove future references to the Christian Wheeler
Engineering report dated April 20, 2016.
Comment 5. Reference 4, dated March 12, 2020, included only pages 1 through 4 and no
Plates are attached. The consultant should submit a complete report.
Response. The Update Geotechnical Engineering Report, dated March 12, 2020 will be
resubmitted.
Comment 6. The consultant should address whether the site is considered a "near Fault Site" in
accordance with the 2019 CBC, Section 1803.5.12.
Response. The site is not considered a "near Fault Site" In accordance with 2019 CBC,
Section 1803.5.12. In accordance with 2019 CBC, Section 1803.5.12, the site Is not considered
subject to liquefaction and does not have retaining walls over 6 feet.
Response to Review Comments
Proposed Three-Story Apartment Building
3606-3618 & 3630 Harding Street, Carlsbad, CA
NOVA Project No. 3019097
June 5, 2020
Comment 7. The consultant should provide the site risk category and seismic design category
consistent with the 2019 CBC.
Response. NOVA understands that this project was initially submitted prior to January 1, 2020
and the initiation of the new governing codes. NOVA understands the project qualifies for 2016
CBC and ASCE 7-10. The site should be considered Risk Category II and Seismic Design
Category C.
Comment S. The consultant should provide a detailed description of proposed site grading,
structures/improvements, etc.
Response. A detailed description of proposed site grading, structures/improvements, etc. Is
detailed in the referenced geotechnical report (CWE 2016a) and remains valid unless amended
in the referenced update geotechnical engineering report (NOVA 2020a.).
Remedial grading recommendations are reiterated below:
"OBSERVATION OF GRADING: Continuous observation by the Geotechnical
Consultant is essential during the grading operation to confirm conditions anticipated by
our investigation, to allow adjustments in design criteria to reflect actual field conditions
exposed, and to determine that the grading proceeds in general accordance with the
recommendations contained herein.
CLEARING AND GRUBBING: Site preparation should begin with the demolition of
existing improvements. The resulting debris and any existing vegetation and other
deleterious materials in areas to receive proposed improvements or new fill soils should
be removed from the site.
SITE PREPARATION: It is recommended that existing potentially compressible artificial
fill/topsoil and weathered old paralic deposits underlying proposed structures, associated
improvements, and new fills should be removed in their entirety. Based on our findings,
the maximum anticipated removal depth is 5 feet below existing grade. Deeper removals
may be necessary in areas of the site not investigated or due to unforeseen conditions.
Lateral removals limits should extend at least 5 feet from the perimeter of the structures,
any settlement sensitive improvements, and new fills or equal to removal depth,
whichever is more. No removals are recommended beyond property lines. All excavated
areas should be approved by the geotechnical engineer or his representative prior to
replacing any of the excavated soils. The excavated materials can be replaced as
properly compacted fill in accordance with the recommendations presented in the
"Compaction and Method of Filling" section of this report.
PROCESSING OF FILL AREAS: Prior to placing any new fill soils or constructing any
new improvements in areas that have been cleaned out to receive fill, the exposed soils
should be scarified to a depth of 12 inches, watered thoroughly, and compacted to at
least 90 percent relative compaction.
A
'441.
NOVA
Response to Review Comments
Proposed Three-Story Apartment Building
3606-3618 & 3630 Harding Street, Carlsbad, CA
NOVA Project No. 3019097
June 5, 2020
COMPACTION AND METHOD OF FILLING: In general, all structural fill placed at the
site should be compacted to a relative compaction of at least 90 percent of its maximum
laboratory dry density as determined by ASTM Laboratory Test D1557. Fills should be
placed at or slightly above optimum moisture content, in lifts six to eight inches thick,
with each lift compacted by mechanical means. Fills should consist of approved earth
material, free of trash or debris, roots, vegetation, or other materials determined to be
unsuitable by the Geotechnical Consultant. Fill material should be free of rocks or lumps
of soil in excess of three inches in maximum dimension.
Utility trench backfill within five feet of the proposed structure and beneath all concrete
fiatwork or pavements should be compacted to a minimum of 90 percent of its maximum
dry density."
Comment 9. The consultant should provide grading and/or foundation recommendations for
property line fences.
Response. Remedial grading recommendations for property line fences should include the
removal of 2 feet of soil from proposed grade or I below the bottom of foundation design
elevation, whichever is deeper. Laterally, remedial grading should extend 2 feet outward or to
property lines. If the side wall excavations for the adjacent property are probed to be then
deeper excavations may be required and will be determined during construction.
Comment 10. The consultant should provide a statement regarding the impact of the proposed
grading and construction on adjacent properties and improvements.
Response. Based upon our review of the referenced project plans, it is NOVA's opinion that the
proposed improvements will not adversely impact adjoining sites or public improvements
provided the geotechnical recommendations are appropriately implemented.
Comment 11. The consultant should provide geotechnical recommendations for temporary
excavations.
Response. Based on our review of the referenced project plans, the proposed development can
be constructed utilizing the recommended temporary cut slope excavations consisting of a 4
feet vertical excavation with a 1:1 (horizontal:vertical) upper cut gradient.
Comment 12. The consultant should provide a list of recommended observation and testing
during site grading and construction.
Response. Anticipated Geotechnical Services During Site Development include, but are not
necessarily limited to:
Review of remedial grading excavations.
Observation and in-place soil density testing during fill placement.
Review of all foundation excavations.
Review of backcuts (if any).
Testing of utility trench backfill.
4
I Response to Review Comments
Proposed Three-Story Apartment Building
3606-3618 & 3630 Harding Street, Carlsbad, CA
NOVA NOVA Project No. 3019097
June 5, 2020
Review and/or testing of subgrade for hardscape.
Materials testing (concrete, steel, asphalt, wood, shear walls, etc.)
CLOSURE
NOVA appreciates the opportunity to be of continued service to Affirmed Housing Group for the
subject project. Should you have any questions regarding this letter or other matters, please
contact the undersigned at (949) 388-7710.
Sincerely,
NOVA Services,
Jesse D. Bearfield, RCE 84335
Attachments:
Plate 1. Subsurface Investigation Map
il "Response to Review Comments
Proposed Three-Story Apartment Building
3606-3618 & 3630 Harding Street, Carlsbad, CA
NOVA NOVA Project No. 3019097
June 5, 2020
ATTACHMENT I
SUBSURFACE INVESTIGATION MAP