Loading...
HomeMy WebLinkAbout2444 TORREJON PL; 2; CBR2021-0303; PermitPERMIT REPORT Residential Permit Print Date: 03/24/2022 Job Address: 2444 TORREJON PL, # 2, CARLSBAD, CA 92009-8033 Permit Type: BLDG-Residential Work Class: Parcel#: 2162401102 Track#: Valuation: $115,599.00 Lot#: Occupancy Group: #of Dwelling Units: 1 Bedrooms: Bathrooms: Project Title: Description: LASTRES: 682 SF ATTACHED ADU Applicant: DI EGO M LASTRES DIEGO LASTRES Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check#: Property Owner: SPICENEX INC DIEGO LASTRES 2444 TORREJON PL, 12444 TORREJON PL PL, 2444 TORREJON PL # 1 CARLSBAD, CA 92009 CARLSBAD, CA 92009 (760) 701-2570 (760) 701-2570 FEE BUILDING PLAN CHECK FEE (BLDG) GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION SWPPP INSPECTION FEE TIER 1 -Medium BLDG SB1473 GREEN BUILDING STATE STANDARDS FEE SWPPP PLAN REVIEW FEE TIER 1-MEDIUM ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL STRONG MOTION-RESIDENTIAL BUILDING PERMIT FEE ($2000+) Second Dwelling Unit Total Fees: $1,996.79 Total Payments To Date: $1,996.79 (city of Carlsbad Permit No: CBR2021-0303 Status: Closed -Fina led Applied: 02/03/2021 Issued: 04/20/2021 Finaled Close Out: 03/24/2022 Inspector: Final Inspection: Balance Due: TAlva 01/10/2022 AMOUNT $477.96 $175.00 $246.00 $5.00 $55.00 $66.00 $182.00 $92.00 $15.03 $682.80 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning1 zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad Job Address 2444 Torrejon Pl RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan Check Ct96'(ilo;}.( _ 6303 Est. Value :(if l5.$<;C, no PC Deposit Date c9/3/.;21 • Suite: ____ .APN: 2162401102 CT/Project #: __________________ ,Lot #:. ____ Year Built: _1_9_7_4 _______ _ Fire Sprinklers: QYES(!) No Air Conditioning:{!) YES Q NO Electrical Panel Upgrade: (!)YEsO NO BRIEF DESCRIPTION OF WORK: Addition of an attached Accessory dwelling unit to main single family unit. Iii Addition/New: Additionq.,;f New O Living SF, -bei2 Deck SF,_0 ___ Patio SF, a Garage SF _0 __ Is this to create an Accessory Dwelling Unit? 0Y ON New Fireplace? OY 0 N, if yes how many? __ 0Remodel: SF of affected area Is the area a conversion or change of use? OY 0 N 0 Pool/Spa: _____ .SF Additional Gas or Electrical Features? ___________ _ QSolar: ___ KW, ___ Modules, Mounted:0Roof 0Ground, Tilt: 0 YON, RMA: OY ON, Battery:OY ON, Panel Upgrade: OY ON 0 Re roof:. _________________________________ _ 0 Plumbing/Mechanical/Electrical 0 Only: Other: This permit is to be issued in the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the owner or contractor. The person listed as the Applicant below wi/1 be the main point of contact throughout the permit process. APPLICANT II] PROPERTY OWNERS AUTHORIZED AGENT APPLICANT 0 Name: DieQo Lastres Address: __________________ _ PROPERTY OWNER Name: Diego Lastres Address: 2444 torrejon Pl City: Carlsbad State:_c_A __ ,Zip: 92009 City: __________ State: ___ ,Zip: ____ _ Phone: 7607012570 Phone: __________________ _ Email: diegolas3@gmail.com Email: ___________________ _ APPLICANT Ii] CONTRACTOR OF RECORD APPLICANT 1S(' Name: __________________ _ Address: _________________ _ DESIGN PROFESSIONAL Name: Diego Lastres Address: 2444 torrejon pl City: Carlsbad State:_cA __ .Zip:92009 City: _______ .State: ___ ,Zip: ______ _ Phone: 7607012570 Email: diegolas3@gmail.com Architect State License: c32222 ----------- Phone: __________________ _ Email: __________________ _ State License/class: ______ ,Bus. License: ___ _ 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov REV. 08120 IDENTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW: (OPTION A): LICENSED CONTRACTOR DECLARATION: I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations: DI have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. Policy No. ______________________________________ _ 0 I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: ____________________ _ Policy No .. ____________________________ Expiration Date: _______________ _ 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: _____________________ ,Lender's Address: ____________________ _ CONTRACTOR PRINT: _________ SIGN: _________ ,DATE: (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: (II I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 01 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: (IJ"Owner Builder acknowledgement and verification form" has been filled out, signed and attached to this application. 0 Owners "Authorized Agent Form" has been filled out, signed and attached to this application giving the agent authority to obtain the permit on the owner's behalf. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors. I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the fol/owin~ Web site: http://www.leginfo.co.gov/ca/aw.html. ~---. .. f . OWNER ••INTa □,ego ,~"" SIGN, t.,-, ~ DAm 12.22.2020 APPLICANT CERTIFICATION: SIGNATURE REQUIRED AT THE Tl~~ o; suBl1 L By my signature below, I certify that: I am the property owner or State of California Licensed Contractor or authorized to act on the property owner or contractor's behalf. I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad ta enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL UABIUTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA· An OSHA permit is reqwred for excavations over 5'0' deep and demoi,t1on or construction of structures over 3 stones ,n height. ~ APPLICANT PRINT: Diego Lastres SIGN: ~ DATE: 12.22.2020 C 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 08120 ( City of Carlsbad OWNER-BUILDER ACKNOWLEDGEMENT FORM B-61 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov OWNER-BUILDER ACKNOWLEDGMENT FORM Pursuant to State of California Health and Safety Code Section 19825--19829 To: Property Owner An application for construction permit(s) has been submitted in your name listing you as the owner-builder of the property located at: Site Address 2444 Torrejon Place The City of Carlsbad ("City") is providing you with this Owner-Builder Acknowledgment and Verification form to inform you of the responsibilities and the possible risks associated with typical construction activities issued in your name as the Owner-Builder. The City will not issue a construction permit until you have read and initialed your understanding of each provision in the Property Owner Acknowledgment section below and sign the form. An agent of the owner cannot execute this notice unless you, the property owner, complete the Owner's Authorized Agent form and it is accepted by the City of Carlsbad. INSTRUCTIONS: Please read and initial each statement below to acknowledge your understanding and verification of this information by signature at the bottom of the form. These are very important construction related acknowledgments designed to inform the property owner of his/her obligations related to the requested permit activities. I. ~I understand a frequent practice of unlicensed contractors is to have the property owner obtain an "Owner Builder" building permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed contractor and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner-Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. II. ~I understand building permits are not required to be signed by property owners unless they are responsible for the construction and are not hiring a licensed contractor to assume this responsibility. Ill. ~I understand as an "Owner-Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own. IV. ~I understand contractors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. V. ..9.!__1 understand if I employ or otherwise engage any persons, other than California licensed contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an 11employer" under state and federal law. 1 REV. 08/20 Owner-Builder Acknowledgement Continued VI. ~I understand if I am considered an "employer" under state and federal law, I must register with the state and federal government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial risk. V1I. ~ I understand under California Contractors' State license law, an Owner-Builder who builds single-family residential structures cannot legally build them with the intent to offer them for sale, unless all work is performed by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed under contract with a licensed general building contractor. VIII. ~ I understand as an Owner-Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal injuries sustained by any subsequent owner(s) which result from any latent construction defects in the workmanship or materials. IX. ~ I understand I may obtain more information regarding my obligations as an "employer" from the Internal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) at 1-.S00-321-CSLB (2752) or www.cslb.ca.gov for more information about licensed contractors. X, ~l am aware of and consent to an Owner-Builder building permit applied for in my name, and understand that I am the party legally and financially responsible for proposed construction activity at the following address: XI. ~I agree that, as the party legally and financially responsible forth is proposed construction activity, I will abide by all applicable laws and requirements that govern Owner-Builders as well as employers. XII. ~I agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license, the Contractor's State License Board may be unable to assist you with any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner- Builder and wish to hire contractors, you will be responsible for verifying whether or not those contractors are properly licensed and the status of their workers' compensation coverage. Before a building permit can be issued, this form must be completed, signed by the property owner and returned to the City of Carlsbad Building Division. I declare under penalty of perjury that I have read and understand all of the information provided on this form and that my responses, including my authority to sign this form, is true and correct. I am aware that I have the option to consult with legal counsel prior to signing this form, and I have either (1) consulted with legal counsel prior to signing this form or (2) have waived this right in signing this form without the advice of legal counsel. Diego Lastres Property Owner Name (PRINT) ~\k ______ _ ~wner Signature 2 12.22.2020 Date REV. 08/20 PERMIT INSPECTION HISTORY for (CBR2021-0303) Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Status: Closed -Finaled Application Date: 02/03/2021 Issue Date: 04/20/2021 Expiration Date: 03/21/2022 IVR Number: 31345 Owner: SPICENEX INC Subdivision: PARCEL MAP NO 14874 Address: 2444 TORREJON PL, # 2 CARLSBAD, CA 92009-8033 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Reinspection Inspection BLDG-17 Interior Lath/Drywall Checklist Item 16707 4-2021 COMMENTS Status Passed Tony Alvarado BLDG-Building Deficiency September 22, 2021: (Virtual Inspection). 1. Installation of new gypsum board/drywall; type, size, and method of attachment anchoring, per structural plans and table schedule specifications for new ADU-approved. 01/10/2022 01/10/2022 BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Thursday, March 24, 2022 2. Virtual Inspection was conducted on Monday September 20, 2021. 174198-2022 COMMENTS Passed Tony Alvarado Passed Yes Passed Yes Yes Yes Yes Complete Complete Page 5 of 5 PERMIT INSPECTION HISTORY for (CBR2021-0303) Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Status: Closed -Finaled Application Date: 02/03/2021 Issue Date: 04/20/2021 Expiration Date: 03/21/2022 IVR Number: 31345 Owner: SPICENEX INC Subdivision: PARCEL MAP NO 14874 Address: 2444 TORREJON PL, # 2 CARLSBAD, CA 92009-8033 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 08/13/2021 09/22/2021 Checklist Item BLDG-13 Shear Panels-HD (ok to wrap) BLDG-15 Roof Sheathing-Reroof COMMENTS August 10, 2021: 1. Exterior and plywood shear-wall and plywood roof sheathing; type, size, and method of attachment anchoring system, per structural plans and detail specifi ca tions-ap proved. 2. All metal connector hardware installed per structure engineers plans and detail specifications-approved. August 10, 2021: 1. Exterior and plywood shear-wall and plywood roof sheathing; type, size, and method of attachment anchoring system, per structural plans and detail specifications-approved. 2. All metal connector hardware installed per structure engineers plans and detail specifications-approved. 08/13/2021 BLDG-84 Rough Combo(14,24,34,44) 164202-2021 Passed Tony Alvarado Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS August 13, 2021: 1. Rough combination inspection, electrical, plumbing, mechanical, and framing, scope of work-approved For structural engineer's plans. August 13, 2021: 1. Rough combination inspection, electrical, plumbing, mechanical, and framing, scope of work-approved For structural engineer's plans. August 13, 2021: 1. Rough combination inspection, electrical, plumbing, mechanical, and framing, scope of work-approved For structural engineer's plans. August 13, 2021: 1. Rough combination inspection, electrical, plumbing, mechanical, and framing, scope of work-approved For structural engineer's plans. 09/22/2021 BLDG-16 Insulation Checklist Item 167075-2021 COMMENTS Passed Tony Alvarado BLDG-Building Deficiency September 22, 2021: (Virtua! Inspection). 1 Energy efficient, thermal insulation installed throughout new ADU-approved. 2. Virtual Inspection was conducted earlier in the month of September. Thursday, March 24, 2022 Passed Yes Yes Complete Passed Yes Yes Yes Yes Complete Passed Yes Page 4 of 5 PERMIT INSPECTION HISTORY for (CBR2021-0303) Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Application Date: 02/03/2021 Issue Date: 04/20/2021 Owner: SPICENEX INC Subdivision: PARCEL MAP NO 14874 Address: 2444 TORREJON PL, # 2 Status: Closed -Finaled Expiration Date: 03/21/2022 IVR Number: 31345 CARLSBAD, CA 92009-8033 Scheduled Date 07/16/2021 08/10/2021 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Checklist Item BLDG-Building Deficiency COMMENTS July 15, 2021: 1. Exterior stucco wire lath-not approved. 2. Exterior plywood shear wall; type, size, method of attachment anchoring, not inspected~ not approved. 3. Pending: a) exterior plywood sheathing inspection required, prior to exterior stucco wire lath Inspection. 4. Informed owner/builder contractor Alvin. 07/16/2021 BLDG-13 Shear Panels/HD (ok to wrap) 162079-2021 Failed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS June 16, 2021: (Failed). 1. Shearwalf nailing deficiencies and structural metal connector straps missing. 2. Structural engineer plans, she S-2, does not reflect as builUon-site framing/shearwall conditions. 3. (3);New windows added at side yard building elevation. Structural framing plan does not reflect (3) -new window openings -with no structural framing Metal connector components. 4. Front and rear elevations, at upper window, top plate Connection to header beams, at exterior shearwalJ plywood nailing areas, missing horizontal metal connector-Simpson MSTA-21 straps (typical), Per structural engineered framing plan, sheet S -2. 08/10/2021 BLOG-83 Roof $heating, 163928-2021 Exterior Shear (13, 15) Passed Tony Alvarado Thursday, March 24, 2022 Reinspection Inspection Passed No Reinspection Incomplete Passed No Complete Page 3 of 5 PERMIT INSPECTION HISTORY for (CBR2021-0303) Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Status: Closed -Finaled Application Date: 02/03/2021 Issue Date: 04/2012021 Expiration Date: 0312112022 IVR Number: 31345 Owner: SPICENEX INC Subdivision: PARCEL MAP NO 14874 Address: 2444 TORREJON PL, # 2 CARLSBAD, CA 92009-8033 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 05125/2021 05/25/2021 BLDG-11 158161-2021 Passed Tony Alvarado Complete Foundation/Ftg/Piers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency May 25, 2021: Yes 1. No footing/foundation steel reinforcement-Building Deficiencies 2. Foundation, footings, slab reinforcement steel rebar, per engineers detail on sheet SD-1, grade beam steel reinforcement layout, and sheet S-1 footing foundation steel reinforcement details-approved. 3. 3rd. party, epoxied steel reinforcement dowels, per deputy inspectors report-approved. 06/16/2021 06/16/2021 BLDG-83 Roof Sheating, 159821-2021 Passed Tony Alvarado Complete Exterior Shear (13, 15) Checklist Item COMMENTS Passed BLDG-Building Deficiency June 16, 2020: Yes 1. No building new roof sheathing nailing/addition Deficiencies. 2. New plywood type, size, and nailing pattern, scope of work for structural plans and table detail specifications-approved. 3. New CMLI block retaining wall with level backfill, drain pipe system verified per structural and architectural plans and detail specifications-approved . BLDG-15 Roof June 16, 2020: Yes Sheathing-Reroof 1. No building new roof sheathing nailing/addition Deficiencies. 2. New plywood type, size, and nailing pattern, scope of work for structural plans and table detail specifications-approved. 3. New CMLI block retaining wall with level backfill, drain pipe system verified per structural and architectural plans and detail speclfi cations-approved . 07/15/2021 07/15/2021 BLDG-18 Exterior 162068-2021 Failed Tony Alvarado Reinspection Incomplete Lath/Drywall Thursday, March 24, 2022 Page 2 of 5 Building Permit Inspection History Finaled (city of Carlsbad PERMIT INSPECTION HISTORY for (CBR2021-0303) Permit Type: BLDG-Residential Work Class: Second Dwelling Unit Status: Closed -Finaled Application Date: 02/03/2021 Issue Date: 04/20/2021 Expiration Date: 03/21/2022 IVR Number: 31345 Owner: SPICENEX INC Subdivision: PARCEL MAP NO 14874 Address: 2444 TORREJON PL, # 2 CARLSBAD, CA 92009-8033 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Inspection Date Start Date 04/23/2021 04/23/2021 BLDG-SW-Pre-Con Checklist Item 155862-2021 COMMENTS Passed Tony Alvarado BLDG-Building Deficiency April 23, 2021: (phone call/virtual inspeclton). No building deficiencies. 1. Inform pool contractor Alvin, regarding the following: 2. Temporary toilet faciHties require pan under toilet Temporary toilet facilities require pan under toilet I need to be located outside public right-of-way and on owners property. 3. Dirt spolls/stockpiling, requires be covered and protected, dust and runoff containment, with straw waddle or gravel/sandbags. 4. Contain all soil erosion and sediment erosion on property, keep any soil or debris away from storm water inlet, adjacent property owners, and public-right-of-way sidewalk areas (typical). 5. Final as-built plan revisions need to be approved prior to final inspection, for historical purposes and city records management maintaining latest and greatest current plans on file. 6. Security perimeter fencing and gates Installed at all times during the construction process till final clearances and sign offs from all agencies/depts. 7. Hours of construction observed., a. Federal holidays observed and no construction work allowed. 9. Additional preconstruction requirements may follow. 05/19/2021 05/19/2021 BLDG-21 157626-2021 Passed Tony Alvarado Thursday, March 24, 2022 Underground/Under1Io or Plumbing Checklist Item BLDG-Building Deficiency COMMENTS May 19, 2021: 1. No underground plumbing and rough plumbing/building deficiencies. 2. Underground plumbing, under 10'ft. head pressure-water leak test, size and type the plumbing lines, per plans-approved. Complete Passed Yes Complete Passed Yes Page 1 of 5 DATE: 4-7-2021 JURISDICTION: Carlsbad PLAN CHECK#.: CBR2021-0303.RC1 ✓• EsG1I SET II PROJECT ADDRESS: 2444 Torrejon Place PROJECT NAME: New attached ADU (682 sq ft) □ APPLICANT □ JURIS. ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: Email: Mail Telephone Fax In Person 0 REMARKS By: S.C. Enclosures: EsGil 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 , DATE: 2-19-2021 JURISDICTION: Carlsbad PLAN CHECK#.: CBR2021-0303 ✓• EsG1I A SAff;:bwl! Comp,111y SETI PROJECT ADDRESS: 2444 Torrejon Place PROJECT NAME: New attached ADU (682 sq ft) □ APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ~ The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil staff did not advise the applicant that the plan check has been completed. ~ EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Diego Lastres Telephone#: (760) 701-2570 Date contacted: (by: ) Email: diegolas3@gmail.com Mail Telephone Fax In Person 0 REMARKS: By: Enclosures: EsGil 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 Carlsbad CBR2021-0303 2-19-2021 . PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK#.: CBR2021-0303 JURISDICTION: Carlsbad PROJECT ADDRESS: 2444 Torrejon Place FLOOR AREA: Addition 682 sq ft (R-3) REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 2-19-2021 FOREWORD (PLEASE READ): STORIES: 1 HEIGHT: DATE PLANS RECEIVED BY ESGIL CORPORATION: - PLAN REVIEWER: Soon Cho This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2019 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2018 IRC, 2018 IBC, 2018 UPC, 2018 UMC and 2017 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section. etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad CBR2021-0303 2-19-2021 Please make all corrections, as requested in the correction list. Submit THREE sets of plans for residential projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. PLANS 1. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). Signatures on the final sets of plans will be verified before they are approved. 2. Incorporate 2019 Cal Green mandatory measures on the plan. 3. Exterior walls of dwellings closer than 5 ft. to the property line shall be 1-hour fire-resistance-rated construction. Table R302.1 (1) and (2). Provide wall assembly detail on the plan 4. Provide 1-hour fire resistive rated construction between units. 5. Provide sound transmission rating (STC 50) between units. 6. Trellis requires 5' setback from the property line. 7. Provide floor plan of main house. Show window information in reference to light and ventilation requirements will not undermined due to addition of ADU next to exterior wall. 8. Provide EERO information for the guest room in the main house. FIRE PROTECTION 9. Note on the plans that the required smoke alarms and carbon monoxide alarms will be field verified by the City Building Inspector. PLUMBING/MECHANICAL/ELECTRICAL ( Carlsbad CBR2021-0303 2-19-2021 10. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8 GPM, lavatories are limited to 1.2 GPM, and showerheads may not exceed 1.8 GPM of flow. CPC Sections 407, 408, 411, 412. 11. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. 12. Specify shower to have not less than 22" clearance when shower door is open. CPC 408.5. 13. Rooms containing bathtubs, showers and similar fixtures shall be provided with an exhaust fan with humidity control sensor having a minimum capacity of 50 CFM ducted to terminate outside the building. (CRC R303.3, Cal Green 4.506.1, CBC 1202.5.2.1, CMC 402.5) 14. Provide heating facilities per CRC R303.10 and show location on the floor plan. 15. Provide a drain behind retaining wall. ENERGY CONSERVATION 16. Specify method of compliance and provide energy calculations. Provide Certificate of Compliance (CF-1 R) forms on plans. CF-1 R form is to be signed by designer and documentation author. 17. For Performance approach, use one of the following certified programs: a. Energy Pro Version 8.0 b. CBECC-Res 2019.1.2 c. Right-Energy Title 24 2019.1.1 Visit the following link for the latest CEC approved software: https:llwww.enerqy.ca.qovlproqrams-and-topicslproqrams/buildinq-enerqy- efficiency-standardsl2019-buildinq-enerqy-efficiency-2 Carlsbad CBR2021-0303 2-19-2021 18. Proposed scope of work requires HERS verification. All energy documentation forms must be registered with one of the following HERS provider: a. California Energy Registry (formerly CHEERS): https:llwww.calenerqy.org b. California Certified Energy Rating & Testing Services (CalCERTS): http://www.calcerts.com 19. Provide an itemized list of all fenestrations in energy documentation. Identify exterior doors and windows with method similar to window schedules. 20. Specify U-factors and Solar Heat Gain Coefficient (SHGC) values for all fenestrations on window and door schedules. Add note to schedules: "Fenestrations must have temporary and permanent labels." 21. Provide a whole-building mechanical ventilation system in accordance with the Fan Ventilation Rate or Total Ventilation Rate Method. Include ventilation system sizing calculations on the plans. a. Fan Ventilation Rate Method (ASH RAE Section 4.1.1 ): 1. Minimum required fan flow rate, Qfan, (cfm) = 1 cfm per 100 sf of floor area+ 7.5 cfm per occupant 11. Number of occupants = number of bedrooms + 1 b. Total Ventilation Rate Method (ASHRAE Section 4.1.2): i. Minimum required Mechanical Ventilation Rate, Qfan (cfm) = Qtot - Qinf 11. Total required ventilation rate, Qtot (cfm) = 3 cfm per 100 sf of floor area+ 7.5 cfm per occupant. iii. Number of occupants = number of bedrooms + 1 iv. Effective Annual Average Infiltration Rate, Qinf (cfm), determined in accordance with ASHRAE Std 62.2 equation 4.6a. Whole-building ventilation shall be provided by exhaust air, supply air, or combined exhaust and supply air system. Natural ventilation through doors/windows or continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are not a permissible method of providing whole- building ventilation. BEES 150(0), Exe. 5 to 150.2(a) & ASHRAE Std. 62.2 STRUCTURAL 22. Shoring is required to build new retaining wall. Provide soils report for recommendations of shoring. Provide shoring plan and engineering design. 23. Remove detail 22/SD-1. Shoring plan is required. 24. S-1: Provide exterior wall footing details in lieu of 13/SD1. Carlsbad CBR2021-0303 2-19-2021 25. Provide trellis framing detail including footings. Show lateral force resisting element. MISCELLANEOUS 26. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 27. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes □ No □ 28. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Soon Cho at EsGil. Thank you. Carlsbad CBR2021-0303 2-19-2021 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: Soon Cho PLAN CHECK#.: CBR2021-0303 DATE: 2-19-2021 BUILDING ADDRESS: 2444 Torrejon Place BUILDING OCCUPANCY: R-3 BUILDING AREA PORTION (Sq.Ft.) newadu 682 Air Condilioring Fire Sprinklers TOTAL VALUE Jurisdiction Gode cb I 1997 UBC Building Ptrmit F•• i:J I n1 ;;-,Jo: I 1997 UBC Plan Chock F•• I t°l,.I ~J:: Valuation Mllipler 152.19 By Ordinance Type of Review: w Complete Review Reg. VALUE Mod. r Structural Only r Repeltive Fee ,. 1 ...,1 Repeats r Other r Hourly &Gil Fee ,. ~Hrs.@• ($) 103,794 103,794 , , $416.171 Sheet 1 of 1 1 of 46 JOSE VENTOCILLA, PE CIVIL ENGINEER TEL: 949-910-0942 24636 CRESTA COURT, LAGUNA HILLS, CA 92653 CBR2021-0303 2444 TORREJON PL LASTRES: 682 SF ATTACHED ADU Lastres Residence 2444 Torrejon Place Carlsbad, CA 92009 New ADU Prepared for: Mr. & Mrs. Lastres 2444 Torrejon Place Carlsbad, CA 92009 Tel:160-701-2570 March 10, 2021 #2 2162401102 3/15/2021 CBR2021-0303 Expiration Date 12/31/2021 Electronically Signed on 03/10/2021 at 8:30 am ~✓~ PROJECT JOSE VENTOCILLA, PE CIVIL ENGINEER 24636 CRESTA COURT, LAGUNA HILLS, CA 92653 TEL: 949-910-0942 DESIGN LOADS 2444 Torrejon Pl., Carlsbad, CA 2019 CBC, ASCE 7-16, 2018 NOS, 2018 IBC, and City of Carlsbad Requirements. ROOF: Asphalt Shingles 5.0 psf Sheathing (1 /2" plywood) 1.5 Roof Rafters 1.5 Insulation 1.0 Ceiling Joists 1.5 Ceiling Board 2.5 Miscellaneous .1.Q DEAD LOAD ..................................................... 14 LIVE LOAD ....................................................... 20 FLOOR: (no concrete) 34psf Dead load finished floor 5.0 psf Sheathing 1.5 Floor Joists 3.0 Drywall 2.5 DEAD LOAD ... .. . .. . . .. . ........ ...... ... ... ... ... ... ... ..... 12 LIVE LOAD .................................................... 40 52 psf INTERIOR WALLS: 10 psf 14 psf EXTERIOR WALLS: CEILING: Drywall 2.5 psf Joists 2.0 Misce. 0.5 DEAD LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 psf LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 psf TIMBER: Parallam 2.0E Fb=2,900 psi ; Fv=290 psi ICC-ER 1387 E=2,000 ksi; Fc=650 psi Douglas Fir -Larch No 1 Fb=1,200 psi ; Fc=1 ,000 psi E=1 ,600 ksi PAGES JOB No DATE Douglas Fir -Larch No 2 Fb=875 psi ; Fv=95 psi ; E=1,600 ksi GluLam 24F-V4 OF Plywood APA rated sheathing 32/16 15/32" sized for spacing Exposure I NER-QA397 PRP-108 Adhesive MACCO liquid nails METAL CONNECTORS: Simpson connectors ICC-ER 5708 Lag Screws 2005 NOS table 11 K Wood Screws 2005 NOS table 11 J CONCRETE:fc=3,000 psi ; Fy=40,000 psi STEEL: Fy=36 ksi ; E=29,000 ksi 2 of 46 ASCE. AMEl!JCAN SOCIETY OF CM ENGINEffiS Address: 2444 Torrejon Pl Carlsbad, California 92009 https://asce7hazardtool.online/ 3 of 46 ASCE 7 Hazards Report Standard: ASCE/SEI 7-16 Risk Category: 11 Soil Class: D -Default (see Section 11 .4.3) Page 1 of 3 Elevation: 182.15 ft (NAVO 88) Latitude: 33.086295 Longitude: -117.259706 .r -;f , ,- ~ Po,11ay ,-. --i,,;,~•"rKA(" Wed Jan 27 2021 ASCE. AMERICAN SOCIETY OF CM. ENGINEfRS Seismic Site Soil Class: Results: D -Default (see Section 11 .4.3) 1.003 S01 0.364 TL : NIA 8 1.2 PGA: Fa 0.44 N/A PGA M: Fv 0.528 SMs 1.203 FPGA 1.2 SM1 N/A 1. : 1 Sos 0.802 Cv : 1.301 Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Data Accessed: Wed Jan 27 2021 Date Source: USG$ Seismic Design Maps https ://asce 7hazardtool. on line/ Page 2of 3 4 of46 Wed Jan 27 2021 ASCE. AMERICAN SOCIETY OF CM. ENGINEERS The ASCE 7 Hazard Tool is provided for your convenience, for informational purposes only, and is provided ·as is' and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE 7 standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool. https://asce7hazardtool.online/ Page 3 of 3 Wed Jan 27 2021 5 of 46 Jose Ventocilla, PE PE Lie. 47942 Project Title: Lastres Residence 6 of 46 Laguna Hills, CA 92653 0 0 0 Engineer: JV Project ID: Project Descr :New ADU Printed. 27 JAN 2021, 7·40PM ASCE Seismic Base Shear Software copyright ENERCALC, INC. 1983·2020, Build:12.20.8.24 DESCRIPTIO Seism ic Analysis Seismic Analysis -------Risk Category _____________ Calculations per ASCE 7-16 Risk Category of Building or Other Structure : "II": All Buildings and other structures except those listed as Category P,CE 7-16, Page 4, Table 1-5•1 Ill, and IV Seismic Importance Factor 1 ASCE 7-16, Page 5, Table 1.5-2 USER DEFINED Ground Motion ASCE 7-16 11.4.2 Max. Ground Motions, 5% Damping Ss 1.003 g, 0.2 sec response S 1 0.3640 g, 1.0 sec response Conforms to ASCE 7 Section 12.8.1.3: Regular structure with period of 0.5 s or less, SDS limited to max of 0.7'SDS or 1.0 for calculatior Site Class, Site Coeff. and Design Cate o Site Classificatio'tO" : Shear Wave Velocity 600 to 1,200 fVsec Site Coefficients Fa & Fv (using straight-line interpolation from table val Maximum Considered Earthquake Accelerat Design Spectral Acceleration Seismic Design Category Resisting System ------- Fa Fv SMS =Fa. Ss SM1 =Fv'Sl sos= sMs. 2/3 s 0,=SM1 ·213 = D (By Default per 11 .4.3) 1.20 1.96 1.204 0.715 0.802 0.477 D ASCE 7-16 Table 20.3· 1 ASCE 7-16 Table 11.4-1 & 11.4-2 ASCE 7-16 Eq. 11.4-1 ASCE 7-16 Eq. 11.4·2 ASCE 7-16 Eq. 11.4-3 ASCE7-16Eq. 11.4-4 E 7-16 Table 11.6-1 & -2 ASCE 7-16 Table 12.2-1 Basic Seismic Force Resisting System J3.e.aring Wall Systems 15.Light-frame (wood) walls sheathed w/wood structural panels rated for shear resistance. Response Modification Coefficient " I 6.50 Building height Limits : System Overstrength Factor "Wo" 2.50 Category "A & B" Limit: Category "C" Limit: Deflection Amplification Factor "Cd' 4.00 Category "D" Limit: NOTE/ See ASCE 7-16 for all applicable footnc Category "E" Limit: Category "F" Limit: No Limit No Limit Limit= 65 Limit= 65 Limit= 65 Lateral Force Procedure ASCE 7-16 Section 12.8.2 ----- Equivalent Lateral Force Procedure The "Equivalent Lateral Force Procedure" is being used according to the provisions of ASCE 7-1612.8 Determine Building Peri~ Use ASCE 12.8-7 Structure Type for Building Period CalculcAII Other Structural Systems "Ct" value 0.020 "hn": Height from base to highest leve "x" value 0.75 "Ta" Approximate fundemental period using Eq. 12.8·7 : Ta= Ct · (hn ~ x) "TL": Long-period transition period per ASCE 7·16 Maps 22·14 -> 22·17 11.0 ft 0.121 sec 8.000 sec 11 Cs II ResJJonse Coefficient = 0.121 sec ASCE 7-16 Section 12.8. 1.1 s05 : Short Period Design Spectral Response " R " : Response Modification Factor " I " : Seismic Importance Factor = = 0.802 6.50 From Eq. 12.8-2, Preliminary Cs = From Eq. 12.8·3 & 12.8-4 , Cs need not exceE = From Eq. 12.8·5 & 12.8·6, Cs not be less than= User has selected ASCE 12.8.1.3 : Regular structure, Cs: Seismic Response Coefficient = Less than 5 Stories and with T <<= 0.5 sec, SO Ss <= 1.5 for Cs calcul 0.123 0.607 0.035 0.1234 0Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 Project Title: Lastres Residence Engineer: JV Project ID: Project Descr: New ADU 7 of46 0 Printed: 27 JAN 2021, 7:40PM -----------ASCE Seismic Base Shear So ltw are copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 ,., ·. DESCRIPTIO Seismic Analysis Seismic Base Shear Cs= 0.1234 from 12.8.1.1 Vertical Distribution of Seismic Forces : hx exponent ase on a = Table of building Weights by Floor Level ... Level # Wi : Weight Hi : Height 14.30 9.00 W ( see Sum Wi below ) = Seismic Base Shear V = Cs • W = (Wi • Hi"k) Cvx Fx=Cvx • V 128.71 1.0000 1.77 ASCE 7-16 Section 12.8.1 14.30 k 1.77 k ASCE 7-16 Section 12.8.3 Sum Story Shear Sum Story Moment 1.77 0.00 SumWi = 14.30 k Sum Wi • Hi = 128.71 k-tt Total Base Shear= 1.77 k Base Moment = 15.9k-ft Dia hra m Forces : Seismic Design Catego 118 11 to "F" Level# Wi Fi Sum Fi Sum Wi Fpx: Calcd Fpx: Min Fpx: Max 14.30 1.77 1.77 14.30 1.77 2.30 4.59 Wpx . . . . . . . . . . . . . . . . . . . . Weight at level of diaphragm and other structure elements attached to it. Fi . . . . . . . . . . . . . . . . . . . . . . Design Lateral Force applied at the level. Sum Fi . . . . . . . . . . . . . . . . . . Sum of "Lat. Force" of current level plus all levels above MIN Req'd Force @ Level . . . 0.20 • Sos • I ' Wpx MAX Req'd Force @ Level ... 0.40 • SOS • I • Wpx Fpx : Design Force @ Level . Wpx • SUM(x->n) Fi / SUM(x->n) wi, x = Current level, n = Top Level ASCE 7-16 12.10. 1.1 Fpx Dsgn. Force 2.30 2.30 PROJECT : Seismic Analysis ADU PAGE: Jose Ventocil/a, PE CLIENT : Lastres Residence -Carlsbad, CA DESIGN BY : JV JOB NO.: DATE: 1/26/2021 REVIEW BY : One Story Seismic Analysis Based on 2015 IBC / 2016 CBC & ASCE 7-16 Determine Base Shear (Derived from ASCE 7 Sec. 12.8) V = MAX{ MIN [ S01 I / (RT) , Sos I / R] , MAX(0.044S051 , 0.01) , 0.5S1 I / R} W = MAX{MIN(0.71W , 0.12W], 0.04W , 0.00W} ~ ,.. = 0.12 W, (SD) IJ!?r S1 ~ 0.6 g only) = 0.09 W, (ASD) = 1e26 kips, (5.6 kN) Where Sos= 0.802 (ASCE 7 Sec 11.4) So1 = 0.477 (ASCE 7 Sec 11.4) S1 = 0.364 (ASCE 7 Sec 11.4) R = 6.5 (ASCE7Tab12.2-1) I= 1 (2015 1BC Tab1604.5&ASCE7 Tab11.5-1) C1 = 0.02 (ASCE 7 Tab 12.8-2) hn = 9.0 ft, (2.14 m) x = 0. 75 (ASCE 7 Tab 12.8-2) 0.104 sec, (ASCE 7 Sec 12.8.2.1) Calculate Vertical Distribution of Forces & Allowable Elastic Drift (ASCE 7, Sec 12.8.3 & 12.8.6) Level Roof Wx 14.3 14.3 k k hx Wxhx Fx ,ASD (12.8-11 ) 9.0 129 1.3 (0.09Wx) 129 1.3 ( 1 ft = 0.305 m , 1 in = 25.4 mm , 1 kips= 4.448 kN , 1 ft-k = 1.356 kN-m) axe.allowable, ASD 0.4 8 of 46 Where k = 1 for T <= 0.5 ~e.allowable, ASD = t.a I / (1.4 Cd), (ASCE 7 Sec 12.8.6) Cd= 4 ,(ASCE7Tab1 2.2-1) k = 0.5 T + 0.75 k = 2 for T @ (0.5 , 2.5) for T >= 2.5 t.a = 0.02 hsx, (ASCE 7 Tab 12.12-1) Calculate Diaphragm Forces (ASCE 7, Sec 12.10.1 .1) Level Roof Where Wx 14.3 14.3 r..w x 14.3 Fx 1.3 1.3 Fmin = 0.2 Sos I W x / 1.5 , ASD F max= 0.4 Sos I W x / 1.5 , ASD r..Fx 1.3 Fpx , ASD, (12.10-1) 1 .5 ( 0. 11 Wx ) Jose Ventocil/a, PE PROJECT: CLIENT: ADU Wind Analysis Lastres Residence, Carlsbad, CA JOB NO.: DATE : 01/26121 Wind Anal sis for Low-rise Buildin , Based on ASCE 7-16 INPUT DATA Exposure category (B, c or o, ASCE 7-16 26.7.3) C Importance factor (ASCE 7-16 Table 1.5-2) lw = 1.00 for all Category Basic wind speed (ASCE 7-16 26.5.1 or 2015 IBC) V = 110 mph, (177.03 kph) Topographic factor (ASCE 7-16 26.8 & Table 26.8·1) K,. = 1 Flat Building height to eave he = 9 It, (2.74 m) Building height to ridge h, = tt ft, (3.35 m) Building length L 56 ft, (17.07 m) Building width B 14 ft, (4.27 m) Effective area of components (or Solar Panel area) A 3 f12, <•• Overhang? (Yes or No) 0.28 m' DESIGN SUMMARY PAGE: DESIGN BY : JV REVIEW BY: No Max horizontal force normal to building length, L, face Max horizontal force normal to building length, B, face Max total horizontal torsional load 9.89 kips, (44 kN), SO level (LRFO level), Typ. 2.61 kips, (12 kN) Max total u ward force ANALYSIS Velocity pressure q. = 0.00256 K, KZI Ko K. v' 67.12 ft-kips, (91 kN-m) 13.70 ki s 61 kN 22.38 psi where: q0 = velocity pressure at mean roof height, h. (Eq. 26.10-1 page 268) K, = velocity pressure exposure coefficient evaluated at height, h, (Tab. 26.10-1. pg 268) Ko= wind directionality factor. (Tab. 26.6-1, for building, page 266) h = mean roof hei hi __ _,,._ ______________ ~ 0.85 0.85 10.00 ft K.. ground elevation factor. ( 1.0 per Sec. 26.9, page 268) < 60 ft, [Satisfactory] ~---<_M_i_n~L~, B), [Satisfactory] (ASCE 7-16 26.2.1) (ASCE 7-16 26.2.2) Design pressures for MWFRS p = q0 [(G c., )-(G c.,. )I where: p = pressure in appropriate zone. (Eq. 28.3-1, page 31 t). Pmin • 16 psi (ASCE 7-16 28.3.4) G c., -product of gust effect factor and external pressure coefficient, see table below. (Fig. 28.3-1, page 312 & 313) G c.1 • product of gust effect factor and internal pressure coetticient.(Tab. 26.13-1, Enclosed Building, page 271) = 0.18 or -0.18 a= width of edge strips, Fig 28.3· 1, page 312, MAX[ MIN(0.18, 0.1 L, 0.4h), MIN(0.04B, 0.04L), 3] = 3.00 ft Net Pressures (psi), Basic Load Cases Net Pressures (Psll, Torsional Load C ases Roof angle 8 • 15.95 Roof angle 8 • 0.00 Roof an ile 8 = 15.95 Surtace Net Pressure with Net Pressure with GCpt (+GC.,) (-GC.,) GCp, (+GC01) (-GC01) Surtace Net Pressure with oc., (+GC01) (-GC01) t 0.49 7.05 15.10 -0.45 -14.10 -6.04 1T 0.49 1.76 3.78 2 -0.69 -19.47 -11.41 -0.69 -19.47 -1 t.41 2T -0.69 -4.87 -2.85 3 -0.45 ·14.11 -6.05 -0.37 -12.31 -4.25 3T -0.45 -3.53 -1.51 4 -0.39 -12.80 ·4.75 -0.45 ·14.10 -6.04 4T -0.39 -3.20 -1.19 5 0.40 4.92 12.98 Roof an ile 8 = 0.00 6 -0.29 -10.52 -2.46 1E 0.75 12.73 20.78 -0.48 -14.77 -6.71 Surface GCp1 Net Pressure with (+GC01) (·GC01) 2E -1.07 -27.98 -19.92 ·1.07 -27.98 -19.92 5T 0.40 1.23 3.25 3E -0.65 -18.50 -10.45 -0.53 -t5.89 -7.83 6T -0.29 -2.63 -0.62 4E -0.58 -17.08 -9.02 -0.48 -14.77 -6.71 SE 0.61 9.62 17.68 6E -0.43 -13.65 -5.60 occ Cose A (·,c~sverse) I ocd Case 1 ( o-~i·-dina) oac Ccse A (·ra,sve'se) cood Cose B (Longi·uci~o') ;las·c ,ocd Cases 9 of46 10 of 46 Basic Load Case A Transverse Direction) Basic Load Case B (Lon<1itudinal Direction) Area Prossure tk\ with Area Pressure (kl with Surtace (It') (+GC01) (-GC01) Surface (ft') (+GC0 i) (-GC01) 1 450 3.17 6.60 2 364 -7.09 -4.15 2 364 -7.09 -4.15 3 364 -4.46 -1.55 3 364 -5.13 -2.20 5 83 0.41 1.08 4 450 -5.76 -2.14 6 63 -0.66 -0.21 1E 54 0.69 1.12 2E 44 -1.22 -0.67 2E 44 -1.22 -0.87 3E 44 -0.69 -0.34 3E 44 -0.81 -0.46 SE 57 0.54 1.00 4E 54 -0.92 -0.49 6E 57 -0.77 -0.32 E Horiz. 9.89 9.89 E Horiz. 2.61 2.61 Vert. -13.70 -7.39 Vert. -11.34 -4.83 Min. wind Horiz. 8.96 8.96 Min. wind Horiz. 2.24 2.24 28.4.4 Vert. -12.54 -12.54 28.4.4 Vert. -12.54 -12.54 Torsional Load Case A (Transverse Direction) Torsional Load Case B (LonQitudlnal Direction) Area Pressure (k\ with Torsion Ut-k\ Area Pressure (kl with Torsion Ht-kl Surtace (ft') (+GC0i) (-GC01) (+GC0,) (-GC01) Surface (It') (+GC01) (-GC01) (+GC01) (-GC0 1) 1 198 1.40 2.99 17 37 2 364 -7.09 -4.15 -3 -2 2 160 -3.12 -1.83 -11 -6 3 364 -4.48 -1.55 2 1 3 160 -2.26 -0.97 8 3 5 13 0.07 0.17 0 0 4 198 -2.54 -0.94 32 12 6 13 -0.1 4 -0.03 0 0 1E 54 0.69 1.12 17 28 2E 44 -1.22 -0.87 9 6 2E 44 -1.22 -0.87 -8 -6 3E 44 -0.69 -0.34 -5 -2 3E 44 -0.81 -0.46 6 3 SE 57 0.54 1.00 3 5 4E 54 -0.92 -0.49 23 12 6E 57 -0.77 -0.32 4 2 1T 252 0.44 0.95 -6 -13 ST 70 0.09 0.23 0 -1 2T 204 -0.99 -0.58 4 2 6T 70 -0.18 -0.04 -1 0 3T 204 -0.72 -0.31 -3 -1 To1al Horiz. Torsional Load, Mr 9.5 9.5 4T 252 -0.81 -0.30 -11 -4 To1al Horiz. Torsional Load, Mr 67 67 Design eressures for comeonents and cladding ----~-'-~ ,, ) .. p = q"[ (G c0J -(G c0,)] -I ·-n / 0 ,.. -where: p = pressure on component (Eq. 30.3-1, pg 334) "-' . . ) 2 ,. 16.00 psi (ASCE 7-16 30.2.2) -~ ~ ~ Pmin • -~ G C0 • external pressure coefficient ~',• -1 I , ' 6• .I< )a ~· ,, 2 ,, ' see table below. (ASCE 7-16 30.3.2) We s 8= 15.95 0 Roof .,,. Roof 8>7· Effeclfvo Zone 1 Zone 1· Zone 2 Zone 2e Zone 2n Zone 2r Area (tt') Ge, -Ge0 Ge0 -Ge0 Ge0 -Ge0 Ge0 -Ge, Ge, -Ge, Ge, -Ge, Comp. 3 0.66 -2.00 0.66 -2.00 0.66 -3.00 0.66 -3.00 Effective Zone3 Zone 3e Zone 3r Zone 4 Zone 5 Area (ft') Ge. -Ge0 Ge, -Ge, Ge0 -Ge, Ge0 -Ge, Ge, -Ge, 3 0.66 -3.00 0.66 I -3.60 1.00 -1.10 1.00 I -1.40 Zone 1 Zone1' Zone 2 Zone 2e Zone 2n Zone 2r Comp. & Cladding ,,.,.,.. -.,,,,,. Pos#fw "'-•five Posit,.. I --,,w Pos/f/W -•tiw PwlfM I --,1w _,.. I -..,,.... Pressure 16.77 -48.79 I 16.77 -48.79 18.77 I -71.17 18.77 I -71.17 ( psf) Zone3 Zone 3e Zone Jr Zone4 Zones Positlvt N«l•tlv• Positive NMi•tlv• Po$1tlw ~,tv. Potltlvt ,_.r,.. Po,ltlw N,,gatlllt (The Max Pressure 18.77 -71.17 18.77 -84.60 26.41 -28.65 26.41 -35.36 84.60 psi) J \I t "// Pf PROJECT : Seismic vs. Wind ADU OSe ven OC/ a, CLIENT : Lastres Residence -Calsbad, CA PAGE : DESIGN BY : JV JOB NO. : DATE : 1/26/2021 REVIEW BY: One Story Comparison of Seismic and Wind Based on 2015 IBC / 2016 CBC INPUT DATA & DESIGN SUMMARY L = 56 ft, (17.07 m), Building Length (perpendicular, not shown) B = 14 ft, (4.27 m), Building Width (as shown) H,= 2 ft, (0.61 m) W1 = 14.3 kips, (63.6 kN) H1= 9 ft, (2.74 m) ( 12.8-12, half perpendicular wall) Seismic Sos= 0.802 (ASCE 7 Sec 11.4) S01 = 0.477 (ASCE 7 Sec 11.4) S1 = 0.364 (ASCE 7 Sec 11.4) Wind Exposure (B, C or D) C , (ASCE 7-16/1026.7.3) Wind Speed V = 110 mph, (177.03 kph) (ASCE 7-16/10 26.5.1) Base Shear (kips) Vb Lateral Force (kips) F1 Seismic, ASD Wind, ASD Determine Seismic Factors R = 6.5 I = 1 C1= 0.02 hn = 9.0 X= 0.75 Determine Wind Factors Kzt = 1 Kd = 0.85 1.3 (0.09W) 7.1 (ASCE 7 Tab 12.2-1) 1.3 ( 0.09 Wx) 2.9 (2015 IBC Tab 1604.5 & ASCE 7 11 .5) (ASCE 7 Tab 12.8-2) ft (ASCE 7 Tab 12.8-2) 0.104 sec, (ASCE 7 Sec 12.8.2.1) (ASCE 7-16/10 26.8 & Table 26.8-1) (ASCE 7-16/10 Tab. 26.6-1, for building) ·~ I --I Overturning (ft-kips) Mo 11 .3 107.4 G Cp ;= 0.18 or -0.18 (ASCE 7-16/10 Tab. 26.11-1, Enclosed Building) Pmin = 16 psf (ASCE 7-16/10 28.4.4) a = 3.00 fl (ASCE 7-16 Fig 28.3-1) Kh = 0.85 (ASCE 7-16 26.10-1, pg 268) qh = 22.38 psf (ASCE 7-16 Eq. 26.10-1 page 268) 11 of 46 r----------------------------------....i...:;~..:,6 PROJECT : Roof Diaphragm ADU PAGE: Jose Ventocil/a, PE CLIENT : JOB NO.: Lastres Residence -Carlsbad, CA DATE : ####### DESIGN BY : JV REVIEW BY : n Based on NOS 2015 INPUT DATA LATERAL FORCE ALONG L SIDE: WL,WIND-= 52 plf,ASD WL, SEISMIC = 41 plf,ASD LATERAL FORCE ALONG B SIDE: WB,WIND = 207 plf,ASD Wa. SEISMIC = 164 plf,ASD 33 ft , B = 13 ft ,,__ ,T=LJ Z 7 7.7 / T .r-rz / / / DIMENSIONS: L = B,= 0 ft, B,= 0 ft ____,. - PANEL GRADE ( 0 or 1} 1 <= Sheathing and Single-Floor MINIMUM NOMINAL FRAMING WITH ( 2 or 3) = 2 in MINIMUM NOMINAL PANEL THICKNESS 1/2 in COMMON NAIL SIZE ( 0=6d, 1=8d, 2=10d ) SPECIFIC GRAVITY OF FRAMING MEMBERS FRAMING OF Douglas-Fir-Larch OR Southern Pine ? 2 10d DESIGN SUMMARY A1: A2: A3: (1) · 33.00 ft X 13 ft 0.5 Yes UNBLOCKED 15/32 SHEATHING WITH 10d COMMON NAILS @ 6" O.C. ALL EDGES/ 12"O.CFIELD. THE CHORD FORCES: T, = C, = 0.54 k , THE DRAG STRUT FORCES: F, = 0.95 k , THE MAXIMUM DIAPHRAGM DEFLECTION: ANALYSIS -, , l'<_.:z 7.77 7z.L.=z LJ--2 7,, rz, . I 1 -I 1 1 1 1 , , l • 1 , .xI.:><:,/~1 ,X ~-< '. :se · Ta=C8 = 0.13 k F2 = 0.00 k 6 = 1.27 in r / / THE DIAPHRAGM IS CONSIDER FLEXIBLE IF ITS MAXIMUM LATERAL DEFORMATION IS MORE THAN TWO TIMES THE AVERAGE SHEAR WALL DEFLECTION OF THE ASSOCIATED STORY. WITHOUT FURTHER CALCULATIONS, ASSUME A FLEXIBLE DIAPHRAGM HERE. FROM THE TABLE 3.1 IN ASD MANUAL SUPP 01, PAGE SP-12, THE PANEL BENDING STRENGTH CAPACITY IS 390 in-lbs/ft, THAT IS THE DIAPHRAGM CAN RESISTS 65 psf GRAVITY LOADS (DL+LL) AT 2'-0" o.c. SPACING SUPPORTS. THE MAX DIAPHRAGM DIMENSION RATIO THE MAX SHEAR FORCE ALONG 8 SIDE L/ B = 2.5 < 3, [satisfactory] v, = 66 pit, ( Boundary Spacing = 6 in, Edges ReqD = THE MAX SHEAR FORCE ALONG L SIDE Ve= 41 THE ALLOWABLE SHEAR FORCE FOR CASE 1 @ 6 in NAIL SPACING THE MAX ALLOWABLE UNBLOCKED SHEAR FORCE FOR CASE 1 pit, ( Required Boundary/Edges Nail Spacing for Case 3 = v1 = 290 pit, L1 = 16.5 ft v1 • 255 pit, L2 • 16.5 ft THE SHEAR CAPACITIES PER IBC Table 2306.2.1 / SDPWS-15 Table 4.2A with ASD reduction factor 2.0: Min. Min. Member 6 6 Panel Gracie Common Penetration Thickness Blocked Nail Spacing Unblocked Wid1h Boundary/ O1hcr Edges Nail (in) (in) (in) 6/6 I 4/6 I 2.514 I 2/3 Case I l O1hers Sheathing and Single-Floor 10d 1 5/8 15/32 2 290 I 385 I 575 I 655 255 l 190 Note: The indicated shear numbers have reduced by specific gravity fac1or per SDPWS-15 Table 4.2A note 2. THE CHORD FORCES: 0.54 k 0.13 k in ) in) THE DRAG STRUT FORCES: F, = 0.5 (B-2B,) MAX( v,. w1No, !lov1,se1SM1cl = F2= B2 MAX( v,.w1No, !lc,v,.seiSM1c) = 0.95 k 0.00 k !lo= 2.8 (ASCE 7-05 Table 12.2-1) THE MAXIMUM DIAPHRAGM DEFLECTION: (IBC 2305.2.2 , I SDPWS-15 4.2.2) 5vLL3 vLL L(Dcx) I',,= l',,0,,.1;,,~ + /',,51,,0, + /',,N<>il .,n,, + /',,c1.-,n1 spUce slq, = SEAB + 4 Gt + 0. J 88Le,, + 2 B 1.272 in, ASD Where: VL = 66 pit L = 33 ft E = 1.7E+06 A = 21.75 in~ B = 13 ft G= 9.0E+04 I = 0.298 in,(UBC97 Page3-420) e, = 0.003 in, SD l:(D.x) = 45.00 in,SD psi psi,(UBC97 Page3-421) C.,= 1.0 Note: The deflection, 6, above is based on completely blocked. For unblocked diaphragm, 2.46 should be used. JOSE VENTOCILLA, PE CIVIL ENGINEER 24636 CRESTA COURT, LAGUNA HILLS, CA 92653 TEL: 949-910-0942 PAGES JOB No 13 of 46 6 ROJECT JOSE VENTOCILLA, PE CIVIL ENGINEER '4s \ ,) ,., ?~ 24636 CRESTA COURT, LAGUNA HILLS, CA 92653 I -;; (Jk[\ \~rt .... , ( "'· TEL: 949-910-0942 PAGES JOB No 14 of 46 DATE\-2.b • 7 ..... -{ 15 of 46 Jose Ventocilla, PE PROJECT: Perforated Shearwall Type 13 Line 1 PAGE: CLIENT: Lastres Residence -Carlsbad, CA DESIGN BY : JV JOB NO.: DATE: 1/26/2021 REVIEW BY: Perforated Shear Wall Design Based on 2015 IBC / 2016 CBC I NDS 2015 INPUT DATA ' --------LATERAL FORCE ON DIAPHRAGM (SERVICE LOADS): 171 vdia,WINO = 85 plf,for w;nd, ASD ' Vdia, SEISM~ i= 89 plf,for seismic, ASD ··-:-7--i NUMBER OF OPENINGS n . 1 DIMENSIONS: L• 12 ft ~ XT1 r H = 8.75 ft > h• 7 ft, (the highest opening) i L ,· HtoL1 ratio ' ' 1 3.5 ft 2.50 ok ..._,. 2 2.66 ft 3.29 ok / l / / I / / / <== 0 <== 0 / / <== 0 KING STUD SECTION <== 0 1 pcs, b • 2 in, h • 6 in SPECIES (1 • DFL, 2 • SP) 1 DOUGLAS FIR·LARCH GRADE ( 1, 2, 3, 4, 5, or 6 ) 4 No. 2 I: 6.16 ft EDGE STUD SECTION 1 pcs, b • 2 in. h • 6 in SPECIES ( 1 • DFL, 2 • SP) 1 DOUGLAS FIR·LARCH PANEL GRADE ( 0 or 1) . 1 <• Shealhing and Single-Floor GRADE ( 1, 2, 3, 4, 5, or 6 ) 4 No. 2 MINIMUM NOMINAL PANEL THICKNESS -3/8 in COMMON NAIL SIZE ( 0•6d, 1•8d, 2=10d) 1 8d THE SHEAR WALL DESIGN IS ADEQUATE. SPECIFIC GRAVITY OF FRAMING MEMBERS 0.5 STORY OPTION ( I •ground level, 2•upper level) 1 ground DESIGN SUMMARY BLOCKED 3/8 SHEATHING WITH 8d COMMON NAILS @ 2 in O.C. BOUNDARY & ALL EDGES/ 12 in 0.C. FIELD, 518 in DIA. x 10 in LONG ANCHOR BOLTS@ 38 in 0.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 26 in 0.C.) HOLD-DOWN FORCES: T, • 2.54 k ' T •• 2.54 k (USE HDU2·1/4x2.5 SIMPSON HOLD-DOWN) MAX STRAP FORCE: Fa 1.02 k (USE SIMPSON CS\8 OVER WALL SHEATHING WITH FLAT BLOCKING) KING STUD: 1 • 2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. EDGE STUD: 1 • 2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. SHEAR WALL DEFLECTION: ,I. -0.37 in ANALYSIS CHECK MAX SHEAR WALL DIMENSION RATIO h/w • 3.3 < 3.5 [Satisfactory) DETERMINE SHEAR RESISTANCE ADJUSTMENT FACTOR, C0 Percen1age ol Full-Height Sheathing -51% , (SDPWS-15 4.3.3.5) Maximum Opening Height . 0.80 H c. . 0.597 , (SDPWS-15 Table 4.3.3.5) DETERMINE REQUIRED CAPACITY (SDPWS-15 4.3.3.5) vb • Vl (C0 i:L z'J• 290 pl!, ( 1 Side Panel Required, the Max. Nail Spacing a 2 in) < 870 pl!, (SDPWS-15 4.3.5.3.3) 1sa1lstactory] THE SHEAR CAPACITIES PER IBC Table 2306.3 / SOPWS-15 Table 4.3A with ASD reduction factor 2.0) Min. Min. Blocked Nail Spacing Panel Grade Common Pcnctratior Thickness Boundary & All Edges Nail (in) (in) 6 4 I 3 2 Sheathing and Single-Floor 8d 1 1/2 3/8 134 I 195 I 249 322 Note: The indicated shear numbers have reduced by specific gravity factor per IBC note a. DETERMINE MAX SPACING OF 518" DIA (or t/2" DIA) ANCHOR BOLT (NOS 20t5, Tab.1 f E) 518 in DIA. x 10 in LONG ANCHOR BOLTS@ 38 in O.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 26 in O.C.) THE HOLD-DOWN FORCES: Velia Wall Seismic Overturning Resisting Salety Net Uplift Holddown (pll) at mid-story (lbs) Moments (11-lbs) Moments (ft-lbs) Factors (lbs) SIMPSON SEISMIC 89 168 9345 Lefi 0 0.9 T, • 2539 n,'? Riehl 0 0.9 T•· 2539 ~b-"'t- Lefl 0 2/3 T, • 2425 !\; WIND 85 8925 ,)"' Right 0 2/3 T.~ 2425 -<' (T, & TR values should include upper level UPLIFT forces if applicable) (conl'd) CHECK MAXIMUM SHEAR WALL DEFLECTION: ( IBC Section 2305.3 / SDPWS-15 4.3.2) 8vbh3 v.h hd • 6 = 6 1Joidl,11( +t:.sNar+ A NaiJ sl;,,+ 6 c1,n,r1 splirt' J/(p =---+-+0.15he11+--£AL,. Gt Lw 0.365 in, ASD < 3-xo,allowable, ASD • 0.375 in Where: v, -290 pll, ASD L.. • 6.16 II E • l.7E+06 psi G • 9.0E+04 psi [Satlslactory) (ASCE 7-10 12.8.6) A • 16.50 in" h = 8.75 II c,. 4 1. 1 t • 0.221 in e, • 0.002 in, SD d, • 0.15 in, SD ,(ASCE 7-10 Tab 12.2-1 & Tab 11.5-1) CM · 1.0 (NOS 4.1.4) ~= v,I, +0.15/te. tOOOG. G, A•• 0.02 hu: , (ASCE 7-10 Tab 12.12-1) CHECK KING STUD CAPACITY (SDPWS-15 4.3.6.1.2) P max • 1.98 kips Fe• 1350 psi Ca• 1.60 c.. 0.47 A• 8.25 in2 E • 1600 ksi CF• 1.10 CHECK EDGE STUD CAPACITY (SDPWS-15 4.3.6.1.2) F.'• 1112 psi > [Sa11sfactory] Pmax • 2.54 kips, (this value should include uppe, level DOWNWARD loads if applicable) fc • 240 psi Fe • 1350 psi C0 • 1.60 Cp • 0.47 A ■ 8.25 in2 E • 1600 ksi CF• 1.10 Fe·• 1112 psi > fc• 308 psi [Sa11sfactory] 16 of 46 17 of 46 Jose Ventoci/la, PE PROJECT: ADU Shearwall Type 7 Line 4 PAGE : CLIENT: Lastres Residence -Carlsbad, CA DESIGN BY: JV JOB NO.: DATE : 1/26/2021 REVIEW BY: S hear Wall Design Based on 2015 IBC / 2016 CBC / NOS 2015 INPUT DATA I I LATERAL FORCE ON DIAPHRAGM: Vdia,WIND = 143 pll,lo, Wlfld, ASD V dia, SEISMIC = 135 pll,lor seismic, ASO I I l I I l I I I I I ' I GRAVITY LOADS ON THE ROOF: Wol = 28 pll,IO< dead load \ Wll = 40 pl! ,for live load ,---\ --DIMENSIONS: Lw= 7 It, h • 9 It L • 7 ft , hp= 0 ft PANEL GRADE ( 0 or 1) . 1 <• Sheathing and Single-Floor MINIMUM NOMINAL PANEL THICKNESS . 318 in COMMON NAIL SIZE ( o.6d, 1•8d, 2•10d) 1 8d SPECIFIC GRAVITY OF FRAMING MEMBERS 0.5 ---... ----\ EDGE STUD SECTION 1 pcs, b • 2 int h • 6 In SPECIES (1 • OFL, 2 • SP) 1 DOUGLAS FIR-LARCH I I GRADE ( 1, 2, 3, 4, 5, Of 6 ) 4 No.2 STORY OPTION ( 1 •ground level, 2•upper level) 1 ground level shear wall Tl --I I ----· -. ---·--· DESIGN SUMMARY BLOCKED 318 SHEATHING WITH 8d COMMON NAILS @ 6 in 0.C. BOUNDARY & ALL EDGES/ 12 in O.C. FIELD, 518 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 In 0.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in O.C.) HOLD-DOWN FORCES: T, = 1.05 k ' T• = 1.05 k (USE HOU2-l/4x2.5 SIMPSON HOLD-DOWN) DRAG STRUT FORCES: F= 0.00 k EDGE STUD: 1 -2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. SHEAR WALL DEFLECTION: <I = 0.25 in ANALYSIS CHECK MAX SHEAR WALL DIMENSION RATIO LIB• 1.3 < 3.5 (Satisfactory) DETERMINE REQUIRED CAPACITY Vb= 143 pll, ( 1 Side Diaphragm Required, 1he Max. Nall Spacing • 6 in) THE SHEAR CAPACITIES PER IBC Table 2306.3 / SOPWS-15 Table 4.3A w,th ASO reduction fac10, 2.0) Min. Min. Blocked Nail Spacing Panel Grade Common PcnctrJ1ion Thicknes,~ Boundary & All Edges Nail (in) (in) 6 I 4 I 3 I 2 Sheathino and Single-Floo< 8d 1 1/2 318 220 I 320 I 410 I 530 Note: 1. The indicated shear numbers have reduced by specific gravily factor per IBC note a. 2. Since the wall is blocked, SOPW-15 Table 4.3.3.2 does not apply. DETERMINE DRAG STRUT FORCE: F = (L-l,.,) MAX( Vd;.,w1NO• f2ovdia,SEISM1cl = 0.00 k < no = 2.5 ) (Sec. 1633.2.6) DETERMINE MAX SPACING OF 5/8" DIA (or 112" DIA) ANCHOR BOLT (NOS 2015, Tab.11E) 5/8 In DIA. x 10 In LONG ANCHOR BOLTS@48 In 0.C. (o, 1I2 In DIA. x 10 in LONG ANCHOR BOLTS@ 48 In O.C.) THE HOLD-DOWN FORCES: vdia Wall Seismic Overturning Resisling Safety Net Uplilt Holddown (pll) at mid-story (lbsl Moments (II-lbs) Moments (II-lbs) Factors (lbs) SIMPSON Len 2450 0.9 T, = 965 SEISMIC 135 101 8959 ~'? Right 2450 0.9 T• = 965 .. ~ Len 2450 213 T, = 1054 X ~..:, WINO 143 9009 ~ Right 2450 213 To= 1054 (T, & T0 values should include upper level UPLIFT forces if applicable) CHECK MAXIMUM SHEAR WALL DEFLECTION: ( IBC Section 2305.3 / SDPWS-15 4.3.2) 8v.h 3 v,,11 hd n .6 = fl.,,,,,tling + Lis ..... a,+ 6.Nr,il .rlip + tlc1,o,u ,fplitv ,dip =---+-+0.75he,, +--= 0.250 in, ASO < EALw Gt Lw g,•·•--.ASD= 0.617 in Where: Yb= 143 pit, ASO Lw = 7 ft E · 1.7E+06 psi (Satisfactory] (ASCE 7-10 12.8.6) A • 16.50 . 2 ,n h • 9 II G • 9.0E+04 psi Cd= 2.5 I = 1 t• 0.221 in 8n = 0.009 in, SD da = 0.15 in,SD ,(ASCE 7-10 Tab 12.2-t & Tab 11.5-1) _d:_= vJ• +0.15he, CM= 1.0 t.,= 0.02 h., I 000G, Gt (NOS 4.1.4) , (ASCE 7-10 Tab 12.12-1) CHECK EDGE STUD CAPACITY PmH= 1.09 kips, (this value should include upper level DOWNWARD loads ii applicable) Fe= 1350 psi Co= 1.60 Cp= 0.45 A• 8.25 . 2 ,n E -1600 ksl CF= 1.10 Fe= 1064 psi > ,, = 132 psi (Satisfactory) 18 of 46 Jose Ventocil/a, PE PROJECT : Perforated Shearwall Type 9 Line 6 PAGE: CLIENT : Lastres Residence -Carlsbad, CA DESIGN BY: JV JOB NO.: DATE: 1/2612021 REVIEW BY: Perforated Shear Wall Desian Based on 2015 IBC / 201 6 CBC/ NOS 2015 INPUT DATA ' --------LATERAL FORCE ON DIAPHRAGM (SERVICE LOADS): I tt-~--Vdia,WINO = 85 plf,for wind, ASD -v~--\ ' Vdia,SEISMIC = 58 pll,lor seismic, ASD NUMBER OF OPENINGS n• 1 DIMENSIONS: L ■ 13.5 ft 1\ti-L-H■ 8.75 II h ■ 7 ft, (the hiahest opening) i L , HtoL ,-ratio ' A ' 1 4.5 It 1.94 ok 2 2.75 It 3.18 ok <== 0 / / / / / / <== 0 / / <== 0 KING STUD SECTION <== 0 1 pcs. b = 2 in, h = 6 in SPECIES (1 • DFL, 2 = SP) 1 DOUGLAS FIR-LARCH GRADE ( 1, 2. 3. 4, 5, or 6 ) 4 Na. 2 r 7.25 ft EDGE STUD SECTION 1 pcs, b • 2 in I h • 6 in SPECIES (1 • DFL, 2 = SP) 1 DOUGLAS FIR-LARCH PANEL GRADE ( 0 or 1) . 1 <• Sheathing and Single-Floor GRADE ( 1. 2, 3, 4, 5, or 6 ) 4 No. 2 MINIMUM NOMINAL PANEL THICKNESS = 318 in COMMON NAIL SIZE ( 0=6d, 1•8d, 2•10d) 1 8d THE SHEAR WALL DESIGN IS ADEQUATE. SPECIFIC GRAVITY OF FRAMING MEMBERS 0.5 STORY OPTION ( 1,ground level, 2•upper level) I ground DESIGN SUMMARY BLOCKED 318 SHEATHING WITH 8d COMMON NAILS @ 4 in O.C. BOUNDARY & ALL EDGES/ t 2 in O.C. FIELD, 5/8 in DIA. x 10 in LONG ANCHOR BOLTS@ 42 in O.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 28 in O.C.) HOLD-DOWN FORCES: T, • 2.27 k • Ta• 2.27 k (USE HDU2-1/4x2.5 SIMPSON HOLD-DOWN) MAX STRAP FORCE: F . 1.17 k (USE SIMPSON CS18 OVER WALL SHEATHING WITH FLAT BLOCKING) KING STUD: 1 • 2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. EDGE STUD: 1 • 2'" x 6"" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. SHEAR WALL DEFLECTION: <I.. 0.32 in ANALYSIS CHECK MAX SHEAR WALL DIMENSION RATIO h/w • 3.2 < 3.5 [Satisfactory] DETERMINE SHEAR RESISTANCE ADJUSTMENT FACTOR. C0 Percentage of Full-Height Sheathing . 54% , (SDPWS-15 4.3.3.5) Maximum Opening Height = 0.80 H c. . 0.611 • (SDPWS-15 Table 4.3.3.5) DETERMINE REQUIRED CAPACITY (SDPWS-15 4.3.3.5) Vo• Vl{C0 EL i )• 259 pll, ( 1 Side Panel Required, the Max. Nail Spacing • 4 in) < 870 pit, (SDPWS-15 4.3.5.3.3) [Satlstactory] THE SHEAR CAPACITIES PER IBC Table 2306.3 / SDPWS-15 Table 4.3Awith ASD reduction factor 2.0) Min. Min. Blocked Nail Spacing Panel Grade Common Pcnctratior Thickness Boundary & All tdges Nail (in) (in) 6 I 4 I 3 I 2 Sheathino and Single-Floor 8d 1 1/2 318 220 320 I 410 I 530 Note: The indicated shear numbers have reduced by specific gravity factor per IBC note a. DETERMINE MAX SPACING OF 5/8" DIA (or 112" DIA) ANCHOR BOLT (NDS 2015, Tab.11 E) 5/8 in DIA. x 10 in LONG ANCHOR BOLTS@ 42 in O.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS @ 28 in O.C.) THE HOLD-DOWN FORCES: Vc11 Wall Seismic Overtuming Resisting Safety Net Uplift HOlddo'M'l (pll) at mid-story (lbs) Moments (It-lbs) Moments (ft-lbs) Faclors (lbs) SIMPSON SEISMIC 58 189 6851 Left 0 0.9 T, = 1547 ri,'? RiJ!ht 0 0.9 T •• 1547 ·l' ' Lcfl 0 2/3 T, • 2268 n; WIND 85 10041 !O"" Righi 0 2/3 T• -2268 x' (T, & T • values should include upper level UPLIFT forces if applicable) (cont'd) CHECK MAXIMUM SHEAR WALL DEFLECTION: ( /BC Section 2305.3 / SDPWS-15 4.3.2) 8v,,h3 v.h hd 0 11 = 11&,Kli11g + 11sNo,+ LlN,,;1 slip+ ll.c1,o,r1 .fp/irr slif> = ---+-+0.75he,, +--EAL., Gt L,., 0.322 in, ASD < &xe,allowablc, ASO .. 0.375 in Where: v, -259 plf, ASD L,. -7.25 It E = 1.7E+06 psi A • 16.50 in.! h = 8.75 It G= 9.0E+04 psi [Satisfactory] (ASCE 7-10 12.8.6) C, = 4 I• 1 ,_ 0.221 in e, • 0.003 in, SD d, • 0.15 in, SD ,(ASCE 7-10 Tab 12.2·1 & Tab 11.5-1) _.d!..._= v,/1 +0.15'1e,, CM= t.O IOOOG.. G1 (NDS 4.1.4) Aa • 0.02 hi.I( , (ASCE 7-10 Tab 12.12-1) CHECK KING STUD CAPACITY (SDPWS-15 4.3.6.1.2) Pmax • 2.17 kips F, • 1350 psi Cp • 0.47 A =-8.25 in2 E= 1600 ksi f,'. 1112 psi > le z 263 psi (Satisfactory] CHECK EDGE STUD CAPACITY (SDPWS-15 4.3.6. t.2) Pmax • F, • E- 2.27 1350 1600 kips, (this value should include uppe, level DOWNWARD loads if applicable) psi C0 • 1.60 Cp. 0.47 A• 8.25 in2 ksi c,= 1.10 F,'-1112 psi > le• 275 psi [Satisfactory) 19 of 46 20 of 46 Jose Ventocil/a, PE PROJECT: ADU Shearwall Type 7 Line A PAGE: CLIENT: Lastres Residence • Carlsbad, CA DESIGN BY: JV JOB NO.: DATE : 1/26/2021 REVIEW BY : Shear Wall Design Based on 2015 IBC / 2016 CBC/ NOS 2015 INPUT DATA I I LATERAL FORCE ON DIAPHRAGM: vdia, WINO= 143 plf,for wind, ASD " V dia, SEISMIC = 98 pll,lor seismic, ASO I L J_ l I J l l J__J_ I .l I GRAVITY LOADS ON THE ROOF: Wol: 98 pll,lor dead load ' 280 . ------' WLL= pl! ,for live load --DIMENSIONS: L,. = 10 ft, h • 9 It L . 10 ft , hp= 0 ft PANEL GRADE ( 0 or 1) . 1 <• Sheathing and Single-Floor MINIMUM NOMINAL PANEL THICKNESS -318 in COMMON NAIL SIZE ( 0•6d, 1•8d, 2•10d) 1 8d SPECIFIC GRAVITY OF FRAMING MEMBERS 0.5 . --------. ~--' EDGE STUD SECTION 1 pcs, b • 2 in, h • 6 In I SPECIES (1 • DFL, 2 • SP) 1 DOUGLAS FIR-LARCH ' ' GRADE ( 1, 2, 3, 4, 5, or 6 ) 4 No. 2 STORY OPTION ( 1.ground level, 2aupper level) 1 ground level shear wall '.', TL _____ I I ... ---------•-·--·-. ------. ---- DESIGN SUMMARY BLOCKED 318 SHEATHING WITH 8d COMMON NAILS @ 6 in O.C. BOUNDARY & ALL EDGES/ 12 in 0.C. FIELD, 5/8 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in 0.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in 0.C.) HOLD-DOWN FORCES: T, = 0.72 k ' T• = 0.72 k (USE HDU2-1/4x2.5 SIMPSON HOLD-DOWN) DRAG STRUT FORCES: F= 0.00 k EDGE STUD: 1 -2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. SHEAR WALL DEFLECTION: 6 = 0.21 in ANALYSIS CHECK MAX SHEAR WALL DIMENSION RATIO LIB • 0.9 < 3.5 [Satisfactory] DETERMINE REQUIRED CAPACITY vb = 143 pll, ( 1 Side Diaphragm Required, the Max. Nail Spacing • 6 in) THE SHEAR CAPACITIES PEA IBC Table 2306.3 / SDPWS-15 Table 4.3A with ASD reduclion factor 2.0) Min. Min. Blocked Nail Spacing Panel Grade Common Pcnclration Thickness Boundary & All Edges Nail (in) (in) 6 I 4 I 3 2 Sheathing and Single-Floor 8d 1 1/2 318 220 I 320 I 410 530 Note: 1. The indicated shear numbers have reduced by specific gravity factor per IBC note a. 2. Since the wall is blocked, SDPW-15 Table 4.3.3.2 does not apply. DETERMINE DRAG STRUT FORCE: F = (L·lw) MAX( Vo;,, WINO• l1oVdia, SEISMIC) = 0.00 k ( no = 2.5 ) (Sec. 1633.2.6) DETERMINE MAX SPACING OF 5/8" DIA (or 1/2" DIA) ANCHOR BOLT (NDS 2015, Tab.1 tE) 5/8 in DIA. x 10 In LONG ANCHOR BOLTS@ 48 in O.C. (or 1/2 in DIA. x IO in LONG ANCHOR BOLTS@ 48 in O.C.) THE HOLQ-DOWN FORCES: vdia Wall Seismic Overturning Resisting Salely Net Uplift Holddown (plf) at mid-story (lbs) Moments (It-lbs) Moments (It-lbs) Factors (lbs) SIMPSON Len 8500 0.9 T, = 182 SEISMIC 98 144 9468 r.,"' Righ1 8500 0.9 T• = 182 ~t;,.+ Lcfl 8500 2/3 T, = 720 a; 9v WIND 143 12870 x' Right 8500 213 T• = 720 (T, & T• values should include upper level UPLIFT forces if applicable) CHECK MAXIMUM SHEAR WALL DEFLECTION: ( IBC Section 2305.3 / SDPWS-15 4.3.2) 8v.h3 v,,h hd a fl= tl&,di,,g +tls1wnr+ 6Nail slip+ fl.c1tnnl Jp/iu .d;,, =---+--+0.75he,,+--= 0.208 in, ASD < EAL.. Gr L.. &xe,anowable, ASO = 0.617 in Where: Vb = 143 plf, ASD L,. = 10 ft E-1.7E+06 psi [Satisfactory) (ASCE 7-10 12.8.6) A • 16.50 • 2 ,n h • 9 It G• 9.0E+04 psi Cd= 2.5 I= 1 t• 0.221 in en= 0.009 in, SO da = 0.15 in, SD ,(ASCE 7-10 Tab 12.2-1 & Tab 11.5-1) _d:_= v,I, +0.15he, CM= 1.0 t., = 0.02 h,, IOOOG, Gt (NDS 4.1.4) , (ASCE 7-10 Tab 12.12-1) CHECK EDGE STUD CAPACITY Pma•:; 1.42 kips, (this value should include upper level DOWNWARD loads ii applicable) F, = 1350 psi Co= 1.60 Cp= 0.45 A • 8.25 . l ,n E• 1600 ksi c, = 1.10 F = C 1064 psi > le= 173 psi [Satisfactory] 21 of 46 Jose Ventocilla, PE PROJECT: ADU Shearwall Type 7 Line 2 PAGE : CLIENT : Lastres Residence -Carlsbad, CA DESIGN BY: JV JOB NO.: DATE : 1/2612021 REVIEW BY: Shear Wall Design Based on 2015 IBC / 2016 CBC / NDS 2015 INPUT DATA / / LATERAL FORCE ON DIAPHRAGM: vdia, WIND= 143 pl! ,for wind, ASD vdia, SEISMIC = 147 plf,lor seismic, ASD r I I l I I I J I ' ' ' J J GRAVITY LOADS ON THE ROOF: Wot = 310 plf ,lor dead load ' Wtt= 280 pll,lor live load -----------' -DIMENSIONS: Lw = 9.5 11 , h • 9 ,, L • 9.5 11 , hp= 0 ,, PANEL GRADE ( 0 or 1) . 1 <• Sheathing and Single-Floor MINIMUM NOMINAL PANEL THICKNESS . 3/B in COMMON NAIL SIZE ( 0•6d, 1 •Bd, 2• I 0d ) 1 Bd SPECIFIC GRAVITY OF FRAMING MEMBERS 0.5 ------------,.,_ ... ' EDGE STUD SECTION 1 pcs, b • 2 in, h • 6 in SPECIES (1 • DFL, 2 • SP) 1 DOUGLAS FIR-LARCH ' ' GRADE ( 1, 2, 3, 4, 5, or 6 ) 4 No. 2 STORY OPTION ( 1-ground level, 2-upper level) 1 ground level shear wall Tl __ -/ / -··· ... ·-----. ---.. -. ·---· --DESIGN SUMMARY BLOCKED 3/8 SHEATHING WITH 8d COMMON NAILS @ 6 in O.C. BOUNDARY & ALL EDGES/ 12 in O.C. FIELD, 5/8 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in O.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 4B in O.C.) HOLD-DOWN FORCES: Tl= 0.08 k ' TR = 0.08 k (USE HDU2-1/4x2.5 SIMPSON HOLD-DOWN) DRAG STRUT FORCES: F= o.oo k EDGE STUD: 1 • 2" x 6" DOUGLAS FIR-LARCH No. 2, CONTINUOUS FULL HEIGHT. SHEAR WALL DEFLECTION: "= 0.22 in ANALYSIS CHECK MAX SHEAR WALL DIMENSION RATIO LIB = 0.9 < 3.5 1sat1sfac1ory] DETERMINE REQUIRED CAPACITY Vb= 147 pit, ( 1 Side Diaphragm Required, lhe Max. Nail Spacing • 6 in) THE SHEAR CAPACITIES PER IBC Table 2306.3 / SDPWS-15 Table 4.3A with ASD reduc1ion fac1or 2.0) Min. Min. Blocked Nail Spacing Panel Grade Common Pcnctrntion Thickncs..~ Boundary & All Edges Nail (in) (in) 6 I 4 I ) I 2 Shealhing and Single-Floor Bd 1 112 3/8 220 I 320 I 410 I 530 Nole: 1. The indicated shear numbers have reduced by specific gravi1y factor per IBC note a. 2. Since the wall is blocked, SDPW-15 Table 4.3.3.2 does not apply. DETERMINE DRAG STRUT FORCE: F = (L-'-w) MAX( vdi,, WINO, novdio, SEISMIC) = 0.00 k (no = 2.5 ) (Sec. 1633.2.6) DETERMINE MAX SPACING OF 518" DIA (or 1/2" DIA) ANCHOR BOLT (NOS 2015, Tab.11 E) 518 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in O.C. (or 1/2 in DIA. x 10 in LONG ANCHOR BOLTS@ 48 in O.C.) THE HOLD-DOWN FORCES: vdia Wall Seismic Overturning Resisting Safety Net Uplift Holddown (pit) at mid-story (lbs) Moments (ft-lbs) Moments (ft-lbs) Factors (lbs) SIMPSON Left 17238 0.9 Tl= 0 SEISMIC 147 137 13184 fl,"? Righi 17238 0.9 T• = 0 ~b,.+ Left 17238 2/3 Tl= 77 a: 0'° WIND 143 12227 x' Righi 17238 2/3 T• = n (T, & T. values should include upper level UPLIFT forces if applicable) CHECK MAXIMUM SHEAR WALL DEFLECTION: ( IBC Sec1;on 2305.3 / SDPWS-15 4.3.2) d = tl.&~ing + ~Slwar+ tl.Nt1il Jlip + tl.c1,orn J/Jlitv Bv.h3 v,J, O?Sf hdo dip =---+--+ · len+--= 0.217 in,ASD < . EALw Gr L., 6xe.aHowable, ASO = 0.617 in Where: vb= 147 pit, ASD L,. = 10 ft E• 1.7E+06 psi [Sat1sfac1ory] (ASCE 7-10 12.8.6) A. 16.50 . 2 In h • 9 ft G• 9.0E+04 psi Cd= 2.5 I = 1 1-0.221 in en= 0.009 in, SD da = 0.15 in.SD ,(ASCE 7-10 Tab 12.2-1 & Tab 11.5·1) __!!/;__= v,/• +0.15he, CM= 1.0 t., = 0.02 h., IOOOG, Gr (NOS 4.1.4) . (ASCE 7-10 Tab 12.12-1) CHECK EDGE STUD CAPACITY Pmax = 2.13 kips, (lhis value should include upper level DOWNWARD loads if applicable) F, = 1350 psi Co= 1.60 c, = 0.45 A • 8.25 . 2 In E • 1600 ksi c, = 1.10 Fe = 1064 psi > t, = 259 psi !Satisfactory] Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 Project Title: Lastres Residence Engineer: JV Project ID: Project Descr:New ADU 22 of 46 0 0 Printed: 4 MAR 2021, 5:10PM Wood Beam Software copyright ENERCALC, INC. 1983·2020, Build:12.20.8.24 ..... DESCRIPTIO (N) ADU Roof Rafter 2x10 DFL N2 @ 16" oc. CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: ASCE 7-16 Material Pro erties Analysis MethoQ\llowable Stress Design Load CombinatiA.SCE 7-16 Fb + Fb - 900.0psi 900.0psi E : Modulus of Elasti Ebend-xx 1,600.0ksi Fe -Prll Fe -Perp Fv 1,350.0 psi 625.0psi 180.0psi 575.0psi Eminbend -x 580.0ksi Wood Species Douglas Fir-Larch Wood Grade No.2 Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling f 0(0 01862~ Lr(0.0266) f 2x10 Span = 14.0 ft Density 31.210pcf 1 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Uniform Load : D = 0.0140, Lr= 0.020 ksf, Tributary Width = 1.330 ft, (roof) DES./Gf'!_$L!.MMARY _ Maximum Bending Stress Ratio = 0.536: 1 Maximum Shear Stress Ratio Section used for this span 2x1 o Section used for this span fb: Actual = 662.85psi fv: Actual = Fb: Allowable = 1,237.50psi Fv: Allowable = Load Combination Load Combination Location of maximum on span = Span # where maximum occurs +D+Lr 7.000ft Span If 1 Location of maximum on span Span# where maximum occurs = Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.146 in Ratio = 0.000 in Ratio = 0.265 in Ratio= 0.000 in Ratio = Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Segment Length Span# M V Cd CFN Ci Cr Cm D Only Length = 14.0 ft 0.334 0.090 0.90 1.100 1.00 1.00 1.00 +D+Lr 1.100 1.00 1.00 1.00 Length = 14.0 ft 0.536 0.144 1.25 1.100 1.00 1.00 1.00 +D+0.750Lr 1.100 1.00 1.00 1.00 Length = 14.0 ft 0.462 0.125 1.25 1.100 1.00 1.00 1.00 +0.60D 1.100 1.00 1.00 1.00 Length = 14.0 ft 0.1 13 0.030 1.60 1.100 1.00 1.00 1.00 +1.112D 1.100 1.00 1.00 1.00 Length = 14.0 ft 0.209 0.056 1.60 1.100 1.00 1.00 1.00 +1.0840 1.100 1.00 1.00 1.00 Length = 14.0 ft 0.203 0.055 1.60 1.100 1.00 1.00 1.00 +0.4877D 1.100 1.00 1.00 1.00 1149>=360 0<360 634>=180 0<180 Ct CL 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Moment Values M lb F'b 0.00 0.53 297.25 891.00 0.00 1.18 662.85 1237.50 0.00 1.02 571.45 1237.50 0.00 0.32 178.35 1584.00 0.00 0.59 330.63 1584.00 0.00 0.57 322.28 1584.00 0.00 Design OK 0.144: 1 2x10 32.50 psi 225.00 psi +D+Lr 13.234 ft Span If 1 Shear Values V Iv F'v 0.00 0.00 0.00 0.13 14.57 162.00 0.00 0.00 0.00 0.30 32.50 225.00 0.00 0.00 0.00 0.26 28.02 225.00 0.00 0.00 0.00 0.08 8.74 288.00 0.00 0.00 0.00 0.15 16.21 288.00 0.00 0.00 0.00 0.15 15.80 288.00 0.00 0.00 0.00 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Wood Beam ,., .. Project Title: Lastres Residence Engineer: JV Project ID: Project Descr:New ADU 23 of 46 Printed: 4 MAR 2021, 5:10PM DESCRIPTIO (N) ADU Roof Rafter 2x10 DFL N2 @ 16" oc. Load Combination Max Stress Ratios Moment Values Shear Values Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb F'b V fv F'v Length = 14.0 ft 1 0.092 0.025 1.60 1.100 1.00 1.00 1.00 1.00 1.00 0.26 144.98 1584.00 0.07 7.11 288.00 Overall Maximum Deflections Load Combination +D+Lr Span 1 Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span Vertical Reactions Load Combination Overall MAXimum Overall MINimum D Only +D+Lr +D+0.750Lr +0.600 Lr Only o.2649 7_05·~1------0.0000 0.000 Support notation : Far left is#· Values in KIPS --------------- Support 1 Support 2 0.338 0.338 0.186 0.186 0.151 0.151 0.338 0.338 0.291 0.291 0.091 0.091 0.186 0.186 Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011 963 License To: Default User, KW-06011963 Criteria Retained Height Wall height above soil Slope Behind Wall Height of Soil over Toe Water height over heel Load Factors Building Code Dead Load Live Load Earth,H Wind,W Seismic, E Project Name/Number : 24 of 46 Title ADU !Nall Foundation Page: 1 Date: 3 MAR 2021 Dsgnr: Description .... Cantilevered Retaining Wall 3.50 ft 0.50 ft 0.00 0.00 in 0.0ft IBC 2018,ACI 1.200 1.600 1.600 1.000 1.000 Code: IBC 2018,ACI 318-14,TMS 402-16 Soil Data and Lateral Earth Pressure Allow Soil Bearing Equivalent Fluid Pressure Method Active Heel Pressure Passive Pressure Surcharge Loads Surcharge Over Heel Used To Resist Sliding & Overturning Axial Load Applied to Stem Axial Dead Load Axial Live Load Lateral Load Applied to Stem Lateral Load ... Height to Top ... Height to Bottom Load Type Wind on Exposed Stem Wind on Exposed Stem (Service Level) Adjacent Footing Load Adjacent Footing Load Footing Width Eccentricity Wall to Fig CL Dist 1,500.0 psi 35.0 psf/ft 250.0 psi/ft 0.0 psi 56.0 lbs 0.0 lbs 0.0 #/ft 0.00 ft 0.00ft Wind(W) (::;erv1ce Level) o.o psi 0.0 lbs 0.00ft 0.00 in 0.00 ft Soil Density, Heel Soil Density, Toe FootingllSoil Friction Soil height to ignore for passive pressure Surcharge Over Toe Used for Sliding & Overturning Axial Load Eccentricity Footing Type Base Above/Below Soil at Back of Wall Poisson's Ratio 110.00 pct 0.00 pct 0.400 12.00 in 0.0 psi Line Load 0.0 in 0.0 ft 0.300 Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 License To: Default User KW-06011963 Earth Pressure Seismic Load Method : Uniform Multiplier Used (Multiplier used on soil density) Project Name/Number : Title ADU 'Nall Foundation 25 of 46 Page : 2 Dsgnr: Description .... Cantilevered Retaining Wall 0.200 Uniform Seismic Force Total Seismic Force Date: 3 MAR 2021 Code: IBC 2018,ACI 318-14,TMS 402-16 0.950 4.513 Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Project Name/Number : Title ADU ~all Foundation Dsgnr: Description .... 26 of 46 Page : 3 Date: 3 MAR 2021 Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 License To: Default User, KW-06011963 Wall Design Summary Stability Ratios Overturning Slab Resists All Sliding ! Soil Bearing Total Bearing Load ... resultant ecc. Soil Pressure @ Toe Soil Pressure @ Heel Allowable Soil Pressure Less Than Allowable ACI Factored @ Toe ACI Factored @ Heel Footing Shear@ Toe Footing Shear @ Heel Allowable Overturning Resisting Moments 1.76 OK 8741bs 5.39 in 1,057 psi OK 0 psi OK 1,500 psi 1,480 psi O psi 5.9 psi OK 0.0 psi OK 100.6 psi Resisting Moments Force Distance Soil Over Heel (above water table, if any) Soil Over Heel (below water table, if any) Water Table Soil Over Heel Sloped Soil Over Heel Surcharge Over Heel Adjacent Footing Load Axial Dead Load on Stem Axial Live Load on Stem Soil Over Toe Surcharge Over Toe Stem Weight(s) Earth @ Stem Transitions Footing Weight Key Weight Vert. Component 0.0 lbs 0.0 0.0 0.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 323.5 119.2 375.0 0.0 0.0 Total Vertical Loads 873.7 lbs Resisting Moment Eccentricity 2.00 1.50 1.35 1.83 1.00 0.50 ft Moment ft-# 84.0 436.5 218.5 375.0 1 114.0 ft-# -5.4 in • Axial live load NOT included in total displayed, or used for overturning or sliding resistance, but is included for soil pressure calculations. Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Project Name/Number : Title ADU 'Nall Foundation Dsgnr: Description .... 27 of 46 Page: 4 Date: 3 MAR 2021 Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 License To : Default User, KW-06011963 Overturning Overturning Moments Overturning Moments Force Distance Moment Heel Active Pressure (above water table, if any) 394.8 lbs 1.58 ft 625.2 ft-# Heel Active Pressure (below water table, if any) 0.0 Hydrostatic Force 0.0 Buoyant Force 0.0 Surcharge over Heel 0.0 Adjacent Footing 0.0 Surcharge Over Toe 0.0 Load @ Stem Above Soil 0.0 Added Lateral Load 0.0 Seismic Load 3.2 2.38 7.5 Seismic-Self-weight 0.0 Totals= 398.0 lbs Overturning Moment 632.7 ft-# Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 License To: Default User KW-06011963 Stem Design Summary Design Height Above Ftg Wall Material Above "Ht" Design Method Thickness Rebar Size Rebar Spacing Rebar Placed at Design Data lb/FB + fa/Fa Total Force @ Section Service Level Strength Level Moment. ... Actual Service Level Strength Leve Moment. .... Allowable Shear ..... Actual Service Level Strength Leve Shear. .... Allowable Anet Rebar Depth 'd' Masonry Data I'm Fs Solid Grouting Modular Ratio 'n' Wall Weight Short Term Factor Equiv. Solid Thick. Masonry Block Type Masonry Design Method Concrete Data f'c Fy ft lbs lbs It·# It·# ft•# psi psi psi in2 in psi psi psi in psi psi Project Name/Number : 28 of 46 Title ADU 'Nall Foundation Dsgnr: Page : 5 Date: 3 MAR 2021 Description .... Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 2nd Bottom Stern OK Stern OK 0.25 0.00 Masonry Masonry ASD ASD LRFD 8.00 12.00 # 5 # 5 32.00 16.00 Edge Edge 0.148 0.074 187.9 217.7 205.3 255.9 1,494.8 3,820.4 2.1 1.6 44.7 44.4 91.50 139.50 5.25 9.00 1,500 1,500 32,000 24,000 Yes Yes 21.48 21.48 78.0 124.0 1.000 1.000 7.60 11.60 Medium Weight ASD Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Project Name/Number : Title ADU Wall Foundation Dsgnr: Description .... 29 of 46 Page : 6 Date: 3 MAR 2021 Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 License To : Default User KW-06011963 Footing Data Toe Width Heel Width 1.00 ft f'c 1.00 Fy Total Footing Width 2.00 ft Footing Concrete Density Footing Thickness Key Width 15.00 in Min. As % 12.00 in Rebar Cover Key Depth 0.00 in Key Distance from Toe 0.00 ft Footing Design Results Toe Heel Factored Pressure 1,480 0 psi Mu': Upward 7,090 0 ft-# Mu' : Downward 2,025 0 ft-# Mu: Design 422 0 ft-# Actual 1-Way Shear 5.85 0.00 psi Allow 1-Way Shear 100.62 53.67 psi Toe Reinforcing # 6 @ 16.29 in Heel Reinforcing None Spec'd Key Reinforcing None Spec'd Other Acceptable Sizes & Spacings Toe: #4@ 7.40 in, #5@ 11.48 in, #6@ 16.29 in, #7@ 22.22 in, #8@ 29.25 in, #9@ 37 Heel: phiMn = phi'5'1ambda'sqrt(fc)'Sm Key: No key defined Min footing T&S reinf Area 0.65 in2 M in footing T&S reinf Area per fa 0.32 in2 tit If one layer of horizontal bars: If two layers of horizontal bars: #4@ 14.81 in #4@ 7.41 in #5@ 11.48 in #6@ 16.30 in #5@ 22.96 in #6@ 32.59 in Footing Torsion, Tu 0.00 ft-lbs 0.00 ft-lbs Footing Allow. Torsion, phi Tu Tilt If torsion exceeds allowable, provide supplemental design for footing torsion. Horizontal Deflection at Top of Wall due to settlement of soil (Deflection due to wall bending not considered) Soil Spring Reaction Modulus Horizontal Dell @ Top of Wall (approximate only) 250.0 pci 0.059 in The above calculation is not valid if the heel soil bearing pressure exceeds that of the toe. because the wall would then tend to rotate into the retained soil. @Top @ Bottom 4,500 psi 60,000 psi 150.00 pct 0.0018 2.00 in 3.00 in Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 License To : Default User KW-06011963 s~w/#5@3? so:lid Grout 1Z-wl#5@16" SO-lid Grout· #6@J6.29in @Toe Project Name/Number : Title ADU Wall Foundation Dsgnr: · Description .... 30 of 46 Page : 7 Date: 3 MAR 2021 Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 . 4'-0" ,3'-6" Restrain · Arkin-Horowitz Residence Newport Beach, CA This Wall in File: Enercalc EARTH (c) 1987-2019, Build 11.20.03.31 License : KW-06011963 License To : Default User KW-06011963 DL=56 ,LL=O#, Ecc=O" ,Restraint Project Name/Number : Title ADU Wall Foundation Dsgnr: · 31 of 46 Page : 8 Date: 3 MAR 2021 Description .... Cantilevered Retaining Wall Code: IBC 2018,ACI 318-14,TMS 402-16 3fl5#. ·3# ■ Hydrgstc!tiC Force ■ Laterai. earth pres§tir~ clu~ to:the soil ~EL ow· w.ater ~.able ■ Seismic lateral earth pressure Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 Project Title: Lastres Residence Engineer: JV Project ID: Project Descr: New ADU 32 of 46 0 0 Printed: 4 MAR 2021, 6:18PM [ Beam on Elastic Foundation Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 DESCRIPTIO ADU Wall on Elastic Foundation Line A CODE REFERENCES 15"x24" w/3#6 Top & Bottom w/#3 Ties@ 12" oc. Calculations per ACI 318-14, IBC 2018, CBC 2019 , ASCE 7-16 Load Combinations Used : ASCE 7-16 Material Properties f'c tr= t·b12 7.50 'I' Density A Lt Wt Factor = Elastic Modulus = 3.0 ksi 410.792 psi 145.0 pct 1.0 3,122.0 ksi <b Phi Values Flexure : 0.90 Shear : 0.750 0.850 Soil Subgrade Modulus Load CombinaMSCE 7-16 = 100.0 psi/ (inch deflection) fy • Main Rebar E -Main Rebar = 60.0 ksi 29,000.0 ksi Fy -Stirrups E -Stirrups Stirrup Bar Size Number of Resisting Legs Per Stirrup Beam is supported on an elastic foundation. = 40.0 ksi :29,000.0 ksi = # 3 2 24"w x 15"h Span=13.0 ft • • • • • • Cross Section & Reinforcing Details -~Rectangular Section, Width = 24.0 in, Height= 15.0 in Span #1 Reinforcing .... 3-#6 at 3.0 in from Bottom, from 0.0 to 13.0 ft in this span Ap lied Loads 3-#6 at 3.0 in from Top, from 0.0 to 13.0 ft in this span Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Load for Span Number 1 Moment: E = 7.20 k-ft, Location= 10.50 ft from left end of this span Uniform Load : D = 1.0 ksf, Tributary Width = 1.0 ft, (wall -roof-slab) Moment : E = 7.20 k-ft, Location = 2.250 ft from left end of this span, (wall -roof-slab) DESIGN SUMMARY Maximum Bending Stress Ratio Section used for this span 0.175: 1 Typical Section -12.519 k-ft 71.416 k-ft + 1 .3600-2.1 OE 2.294 ft Span# 1 Maximum Deflection ••-•-····-·-··-··-··· Mu : Applied Mn • Phi : Allowable Load Combination Location of maximum on span Span # where maximum occurs Maximum Soil Pressure = Allowable Soil Pressure = Shear Stirru Re uirements 0.871 ksf 1.0 ksf Max Downward L+Lr+S Deflection Max Upward L+Lr+S Deflection Max Downward Total Deflection Max Upward Total Deflection at 0.00 ft LdComb: +D-0.70E OK Entire Beam Span Length : Vu < PhiVc/2, Req'd Vs = Not Reqd, use stirrups spaced at 0.000 in Maximum Forces & Stresses for Load Combinati Load Combination Location (ft) Segment Length Span # in Span 3ending Stress Results ( k-ft Mu: Max Phi•Mnx Stress Ratic MAXimum Bending Envelope Span# 1 1 12.847 -0.01 71.42 0.00 +1.40D 0.000 in 0.000 in 0.061 in -0.006 in Design OK Jose Ventocilla, PE Project Title: Lastres Residence 33 of 46 PE Lie. 47942 Engineer: JV Laguna Hills, CA 92653 Project ID: 0 Project Descr: New ADU 0 0 Printed: 4 MAR 2021, 6·18PM I Beam on Elastic Foundation Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 ,., •, DESCRIPTIO ADU Wall on Elastic Foundation Line A 15"x24" w/3#6 Top & Bottom w/#3 Ties @ 12" oc. Load Combination Location (ft) lending Stress Results ( k-ft Segment Length Span# in Span Mu : Max Phi'Mnx Stress Ratic Span 111 1 12.847 -0.00 71.42 0.00 +1.200 Span 111 12.847 -0.00 71.42 0.00 +0.900 Span 111 12.847 -0.00 71.42 0.00 + 1.3600+2. 1 OE Span 111 2.294 12.52 71.42 0.18 + 1.3600-2. 1 OE Span 111 10.400 11.88 71.42 0.17 +O. 73960+2.1 OE Span /11 2.294 12.52 71 .42 0.18 +0.73960·2.10E Span /11 1 10.400 11.88 71.42 0.17 Overall Maximum Deflections -Unfactored L Load Combination Span Max. "·" Dell Location in Span Load Combination Max. "+" Dell Location in Span Span 1 0. ~ 0.000 ---0.0000 0.000- Detailed Shear Information ---Phi.Vs Spacing (in) Span Distance 'd' Vu (k) Mu d•Vu/Mu Phi•Vc Comment Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) Req'd Suggest + 1.360D-2. 1 OE 0.00 12.00 0.22 0.22 0.00 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 0.15 12.00 0.39 0.39 0.01 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 0.31 12.00 0.55 0.55 0.05 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600·2. 1 OE 0.46 12.00 0.71 0.71 0.12 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 0.61 12.00 0.87 0.87 0.21 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600·2.1 OE 0.76 12.00 1.02 1.02 0.32 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600·2. 1 OE 0.92 12.00 1.17 1.17 0.46 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 1.07 12.00 1.31 1.31 0.61 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2. 1 OE 1.22 12.00 1.45 1.45 0.79 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2. 1 OE 1.38 12.00 1.58 1.58 1.00 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 1.53 12.00 1.71 1.71 1.22 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 1.68 12.00 1.83 1.83 1.46 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2.10E 1.84 12.00 1.95 1.95 1.72 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 1.99 12.00 2.06 2.06 1.99 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 2.14 12.00 2.17 2.17 2.29 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 2.29 12.00 2.27 2.27 12.52 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 2.45 12.00 2.37 2.37 12.19 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 2.60 12.00 2.46 2.46 11.85 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 2.75 12.00 2.55 2.55 11.49 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. lOE 2.91 12.00 2.64 2.64 11.12 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2. l OE 3.06 12.00 2.72 2.72 10.74 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.360D-2. 1 OE 3.21 12.00 2.80 2.80 10.34 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.3600-2.1 OE 3.36 12.00 2.87 2.87 9.94 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 3.52 12.00 2.94 2.94 9.52 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 3.67 12.00 3.00 3.00 9.09 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 3.82 12.00 3.06 3.06 8.65 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 3.98 12.00 3.12 3.12 8.20 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2. l OE 4.13 12.00 3.17 3.17 7.75 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 4.28 12.00 3.22 3.22 7.28 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.360D-2.10E 4.44 12.00 3.26 3.26 6.81 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 4.59 12.00 3.31 3.31 6.33 1.00 27.43 Vu < PhiVc/2 NotReqd 0.00 0.00 + 1.3600 -2.1 OE 4.74 12.00 3.34 3.34 5.84 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 4.89 12.00 3.38 3.38 5.35 1.00 27.43 Vu < PhiVc/2 Nol Reqd 0.00 0.00 + 1.3600-2. 1 OE 5.05 12.00 3.41 3.41 4.86 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 5.20 12.00 3.44 3.44 4.35 1.00 27.43 Vu< PhiVc/2 Nol Reqd 0.00 0.00 + 1 .3600-2. 1 OE 5.35 12.00 3.46 3.46 3.85 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 5.51 12.00 3.48 3.48 3.34 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 5.66 12.00 3.50 3.50 2.83 1.00 27.43 Vu< PhlVc/2 NotReqd 0.00 0.00 Jose· V entocilla, PE Project Title: Lastres Residence 34 of 46 PE Lie. 47942 Engineer: JV Laguna Hills, CA 92653 Project ID: 0 Project Descr: New ADU 0 0 Printed: 4 MAR 2021, 6:18PM Beam on Elastic Foundation Software copyright ENERCALC, INC. 1983-2020, Build:12 20.8.24 ,., DESCRIPTIO ADU Wall on E lastic Foundation Line A 15"x24" w/3#6 T op & Bottom w/#3 Ties @ 12" oc. Detailed Shear Information Span Distance 'd' Vu (k) Mu ct·vu/Mu Phi•vc Comment Phi.Vs Spacing (in) Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) Req'd Suggest + 1.3600-2.1 OE 5.81 12.00 3.52 3.52 2.31 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 5.96 12.00 3.53 3.53 1.79 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 6.12 12.00 3.53 3.53 1.28 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 6.27 12.00 3.54 3.54 0.76 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 6.42 12.00 3.54 3.54 0.23 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2.1 OE 6.58 12.00 3.54 3.54 0.29 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2.10E 6.73 12.00 3.53 3.53 0.81 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 6.88 12.00 3.52 3.52 1.33 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.3600-2.1 OE 7.04 12.00 3.51 3.51 1.85 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.3600-2.10E 7.19 12.00 3.50 3.50 2.36 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 7.34 12.00 3.48 3.48 2.88 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. t OE 7.49 12.00 3.46 3.46 3.39 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2.1 OE 7.65 12.00 3.43 3.43 3.90 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1 .3600-2.10E 7.80 12.00 3.41 3.41 4.41 1.00 27.43 Vu < PhiVc/2 NotReqd 0.00 0.00 + 1.360D-2.10E 7.95 12.00 3.37 3.37 4.91 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.3600 -2.1 OE 8.11 12.00 3.34 3.34 5.40 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2.10E 8.26 12.00 3.30 3.30 5.89 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 +1 .3600-2.10E 8.41 12.00 3.26 3.26 6.38 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 8.56 12.00 3.21 3.21 6.86 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 8.72 12.00 3.16 3.16 7.33 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2.1 OE 8.87 12.00 3.11 3.11 7.79 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2.10E 9.02 12.00 3.05 3.05 8.25 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 9.18 12.00 2.99 2.99 8.69 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.3600-2.1 OE 9.33 12.00 2.93 2.93 9.13 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 9.48 12.00 2.86 2.86 9.56 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 9.64 12.00 2.79 2.79 9.97 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1 .3600-2.10E 9.79 12.00 2.71 2.71 10.38 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1 .3600-2.10E 9.94 12.00 2.63 2.63 10.77 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 +1 .3600-2.10E 10.09 12.00 2.54 2.54 11.16 1.00 27.43 Vu < PhiVc/2 NotReqd 0.00 0.00 + 1.3600-2.1 OE 10.25 12.00 2.45 2.45 11.52 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 10.40 12.00 2.36 2.36 11 .88 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 10.55 12.00 2.26 2.26 2.90 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 10.71 12.00 2.15 2.15 2.58 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 10.86 12.00 2.04 2.04 2.27 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 11.01 12.00 1.93 1.93 1.97 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600 -2.10E 11 .16 12.00 1.81 1.81 1.70 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .3600-2. 1 OE 11.32 12.00 1.69 1.69 1.44 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 + 1.360D-2.1 OE 11.47 12.00 1.56 1.56 1.20 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 11.62 12.00 1.43 1.43 0.98 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1 .360D-2.1 OE 11.78 12.00 1.30 1.30 0.78 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2. 1 OE 11.93 12.00 1.16 1.16 0.61 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 12.08 12.00 1.01 1.01 0.45 1.00 27.43 Vu < PhiVc/2 Not Reqd 0.00 0.00 +1.360D-2.10E 12.24 12.00 0.86 0.86 0.32 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 +1.3600-2.10E 12.39 12.00 0.71 0.71 0.20 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 12.54 12.00 0.55 0.55 0.12 1.00 27.43 Vu< PhiVc/2 NotReqd 0.00 0.00 +1.3600-2.10E 12.69 12.00 0.39 0.39 0.05 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 + 1.3600-2.1 OE 12.85 12.00 0.22 0.22 0.01 1.00 27.43 Vu< PhiVc/2 Not Reqd 0.00 0.00 Jose Ventocilla, PE 24636 Cresta Ct. Laguna Hills, CA 92653 I (949) 910-0942 35 of 46 Lastres Residence 2444 Torrejon Place Carlsbad, California 92009 21 Grade Beam Calculation --------~-------------' W= I= la= lb= b= d= deflective= fy= f'c= f'c= f3,= Es= £,= 4>= Mu=Wl2/8= Bending Analysis 975 lbs/ft Abars= 13 ft 1 ft P=Abar.f(b*d)= 1 ft Pmax=.85f3, (f'/fy)(EjEu+. 004 )= 24 in a=Aba,sf/85f'0b= 15 in 12 in Mn=Aba,sfy( d-a/2)= 60 kips/in< 3 kips/in< C=a/f3 1= 3000 psi 0.85 E1=Eu(d-c)/C= 29000000 psi. 0.005 <l>Mn= 0.9 Pmax= 20596.875 ft.lbs. Pmin= 20.596875 ft.kips. 247.1625 in.kips. :. USE 6# 5 BARS FOR A 15"x24" GRADE BEAM TO WITHSTAND BENDING 3.53 in< 0.012257 > 0.0033 0.015482 < 0.0206 3.460784 in. 2539.96 in.kips. 4.07 0.01 >.005 :.4>=0.90 2285.96 in.kips. 0.0206 0.0033 36 of 46 Jose Ventocilla, PE Lastres Residence 24636 Cresta Ct. 2444 Torrejon Place Laguna Hills, CA 92653 I (949) 910-0942 Carlsbad, California 92009 -----------~---------~----------21 Grade Beam Calculation -------------____________ ___. Deflection Analysis Cover=d-deuective= 3.00 in. Y= Ec=57000(f'c)" .5= 3.12E+06 psi. le,= n=E5/Ec= 9 Mc,= f,lgf((d-c)12000)= f,= 7.5(f'c)".5 4.11 E+02 psi. M3=Wl2/12 C= 7.50 in. Mc/Ma= lg= 6750.00 in.• l.=(Mc/Ma)\+(1-(Mc/M3)3)Ic,= 0.18 in. < 1/360= 15" x 24" GRADE BEAM ADEQUATE FOR DEFLECTION V=wl/2 6337.5 lbs. 6.3375 kips. Vu=1/2<l>(2(f'c"·5)bwd)= 561.184462 kips. bwd=V/(.75(f'c"·5))= 154.275187 in.' Shear Analysis bdeffective= 360 > 154 O.K. 3.99 • 4 2608.81 in. 30.8 ft-kips 1056.25 ft-kips 0.029 2608.91 in.• 0.43 O.K. :. USE 6 #6 BARS W/ #3 TIES@ 12" O.C. TO WITHSTAND SHEAR Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Project Title: Lastres Residence Engineer: JV 37 of 46 Project ID: Project Descr:New ADU Printed: 10 MAR 2021, 3:53AM Wood Beam Software copyright ENERCALC, INC. 1983·2020, Build:12.20.8.24 ..... DESCRIPTIO (N) ADU Trellis Roof Rafter 2x4 DFL N2 @ 5.5'' oc. CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: ASCE 7-16 Material Pro erties Analysis MethocAllowable Stress Design Load CombinatiASCE 7-16 Fb + Fb - 900.0psi 900.0 psi E : Modulus of Elasti Ebend-xx 1,600.0ksi Fe -Prll 1,350.0psi 625.0psi 180.0 psi 575.0 psi Eminbend -x 580.0ksi Wood Species Douglas Fir-Larch Wood Grade No.2 Fe -Perp Fv Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling • p(o.0025i Lr(0.005~ v v 0(0.0025 ~ Lr(0.005) 2x4 ~ 2x4 Span = 3. 750 ft Span= 8.750 ft Density 31.210pcf v ~ ~ A lied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Load for Span Number 1 Uniform Load: D = 0.0050, Lr= 0.010 ksf, Tributary Width= 0.50 ft, (roof) Load for Span Number 2 Uniform Load : D = 0.0050, Lr = 0.01 O ksf, Tributary Width = 0.50 ft, (trellis) DESIGN SUMMARY Maximum Bending Stress Ratio 0.141: 1 Maximum Shear Stress Ratio Section used for this span 2x4 Section used for this span fb: Actual 237.98psi fv: Actual Fb: Allowable = 1.687.50psi Fv: Allowable Load Combination +D+Lr Load Combination Location of maximum on span = 3.750ft Location of maximum on span = = Span # where maximum occurs = Span # 1 Span # where maximum occurs = Maximum Deflection Max Downward Transient Deflection 0.044 in Ratio= 2401 >=360 Max Upward Transient Deflection -0.005 in Ratio = 17596>=360 Max Downward Total Deflection 0.076 in Ratio = 1389>=180 Max Upward Total Deflection -0.009 in Ratio= 10186>=180 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Moment Values Segment Length Span# M V Cd CFN Ci Cr Cm c t CL M lb F'b D Only ----0.00 Length = 3. 750 ft 1 0.082 0.032 0.90 1.500 1.00 1.00 1.00 1.00 1.00 0.03 100.23 1215.00 Length = 8. 750 ft 2 0.082 0.032 0.90 1.500 1.00 1.00 1.00 1.00 1.00 0.03 100.23 1215.00 +D+Lr 1.500 1.00 1.00 1.00 1.00 1.00 0.00 Length = 3. 750 ft 1 0.141 0.054 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0.06 237.98 1687.50 Length = 8. 750 ft 2 0.141 0.054 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0.06 237.98 1687.50 +D+0.750Lr 1.500 1.00 1.00 1.00 1.00 1.00 0.00 Length = 3. 750 ft 1 0.121 0.046 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0.05 203.54 1687.50 Length = 8. 750 ft 2 0.121 0.046 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0.05 203.54 1687.50 +0.60D 1.500 1.00 1.00 1.00 1.00 1.00 0.00 Design OK 0.054 : 1 2x4 12.18 psi 225.00 psi +D+Lr 3.750ft Span# 1 Shear Values V Iv F'v 0.00 0.00 0.00 0.02 5.13 162.00 0.02 5.13 162.00 0.00 0.00 0.00 0.04 12.18 225.00 0.04 12.18 225.00 0.00 0.00 0.00 0.04 10.42 225.00 0.04 10.42 225.00 0.00 0.00 0.00 Jose'ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Wood Beam ... '• Project Title: Lastres Residence Engineer: JV Project ID: 38 of 46 Project Descr: New ADU Printed: 10 MAR 2021, 3:53AM Sottware copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 DESCRIPTIO (N) ADU Trellis Roof Rafter 2x4 DFL N2 @ 5.5" oc. Load Combination Max Stress Ratios Moment Values Shear Values Segment Length Span# M V Cd CFN Ci Cr Cm c t CL M Length = 3. 750 ft 1 0.028 0.011 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.02 Length= 8.750 ft 2 0.028 0.011 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.02 +1.112D 1.500 1.00 1.00 1.00 1.00 1.00 Length = 3. 750 ft 1 0.052 0.020 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.03 Length = 8. 750 ft 2 0.052 0.020 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.03 +1.084D 1.500 1.00 1.00 1.00 1.00 1.00 Length = 3. 750 ft 1 0.050 0.019 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.03 Length = 8. 750 ft 2 0.050 0.019 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.03 +0.48770 1.500 1.00 1.00 1.00 1.00 1.00 Length = 3. 750 ft 0.023 0.009 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.01 Length = 8. 750 ft 2 0.023 0.009 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.01 Overall Maximum Deflections Load Combination Span Max. "-" Dell Location in Span Load Combination +D+Lr Vertical Reactions Load Combination Overall MAXimum Overall MINimum DOnly +D+Lr +D+0.750Lr +0.60D Lr Only 1 2 0.0000 0.0755 0.000 4.791 +D+Lr Support notation : Far left is #· Support 1 Support 2 Support 3 0.077 0.031 0.045 0.018 0.032 0.013 0.077 0.031 0.066 0.026 0.019 0.008 0.045 0.018 lb 60.14 60.14 111.48 111 .48 108.67 108.67 48.88 48.88 F'b V Iv F'v 2160.00 0.01 3.08 288.00 2160.00 0.01 3.08 288.00 0.00 0.00 0.00 0.00 2160.00 0.02 5.70 288.00 2160.00 0.02 5.70 288.00 0.00 0.00 0.00 0.00 2160.00 0.02 5.56 288.00 2160.00 0.02 5.56 288.00 0.00 0.00 0.00 0.00 2160.00 0.01 2.50 288.00 2160.00 0.01 2.50 288.00 Max. "+" Dell Location in Span -0,0088 0.0000 Values in KIPS 2.032 2.032 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 Project Title: Lastres Residence Engineer: JV 39 of 46 Project ID: Project Descr: New ADU 0 Printed: 9 MAR 2021, 8:04PM ~----------------------------------------------, Wood Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 DESCRIPTIO (N) ADUTrellis Main Beam 4x8 DFL N2 CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: ASCE 7-16 Material Pro erties Analysis Metho<Allowable Stress Design Load CombinaM.SCE 7-16 Fb + Fb - 900.0psi 900.0psi E : Modulus of Elasti Ebend-xx 1,600.0ksi Fe -Prll 1,350.0psi 625.0 psi 180.0 psi 575.0psi Eminbend -x 580.0ksi Wood Species Douglas Fir-Larch Fe -Perp W~Gra~ ~.2 ~ Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling ~ 0(0.0325~ Lr(0.065) ~ 4x8 Span = 13.0 ft Density 31.21 Opet f ~ A lied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Uniform Load : D = 0.0050, Lr = 0.01 O ksf, Tributary Width = 6.50 ft, (trellis) DESIGN $UMMARY Design OK Maximum Bending Stress Ratio = 0.582 1 Maximum Shear Stress Ratio 0.160 : 1 Section used for this span 4x8 Section used for this span 4x8 fb: Actual = 851.57psi fv: Actual = 36.11 psi Fb: Allowable = 1,462.50psi Fv: Allowable = 225.00 psi Load Combination +D+Lr Load Combination +D+Lr Location of maximum on span = 6.500ft Location of maximum on span 12.431 ft Span # where maximum occurs Span# 1 Span # where maximum occurs = Span# 1 Maximum Deflection Max Downward Transient Deflection 0.236 in Ratio = 660>=360 Max Upward Transient Deflection 0.000 in Ratio = 0<360 Max Downward Total Deflection 0.374 in Ratio = 416>=180 Max Upward Total Deflection 0.000 in Ratio= 0<180 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Moment Values Shear Values Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M lb F'b V fv F'v D Only 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.298 0.082 0.90 1.300 1.00 1.00 1.00 1.00 1.00 0.80 314.17 1053.00 0.23 13.32 162.00 +D+Lr 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.582 0.160 1.25 1.300 1.00 1.00 1.00 1.00 1.00 2.18 851.57 1462.50 0.61 36.11 225.00 +D+0.750Lr 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.490 0.135 1.25 1.300 1.00 1.00 1.00 1.00 1.00 1.83 717.22 1462.50 0.51 30.41 225.00 +0.600 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.101 0.028 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.48 188.50 1872.00 0.14 7.99 288.00 +1.1120 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.187 0.051 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.89 349.45 1872.00 0.25 14.82 288.00 +1.0840 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 13.0 ft 0.182 0.050 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.87 340.63 1872.00 0.24 14.44 288.00 +0.48770 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Wood Beam ,., .. DESCRIPTIO (N) ADUTrellis Main Beam 4x8 DFL N2 Load Combination Max Stress Ratios Project Title: Lastres Residence Engineer: JV Project ID: 40 of 46 Project Descr: New ADU Printed: 9 MAR 2021 , 8:04PM Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 Moment Values Shear Values Segment Length Span # ~ V Cd C FN Ci Cr Cm Ct CL ----M fb F'b ----v Iv F'v Length = 13.0 ft 1 0.082 0.023 1.60 1.300 Overall Maximum Deflections 1.00 1.00 1.00 1.00 1.00 0.39 .'l 153.23 1872.00 0.11 6.50 288.00 Load Combination +D+Lr Vertical Reactions Load Combination veral imum Overall MINimum D Only +D+Lr +D+0.750Lr +0.600 Lr Only Span Max. "·" Dell Location in Span Load Combination 0.3744 6.547 Support notation : Far left is #· ---Support 1 Support 2 0.669 0.669 0.423 0.423 0.247 0.247 0.669 0.669 0.564 0.564 0.148 0.148 0.423 0.423 Max. "+" Dell Location in Span 0.0000 Values in KIPS 0.000 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 Project Title: Lastres Residence Engineer: JV Project ID: Project Descr:New ADU 41 of 46 0 Printed: 9 MAR 2021, 8:09PM Wood Beam Software copyright ENERCALC, INC. 1983-2020, 8uild:12.20.8.24 ..... DESCRIPTIO (N) ADU Trellis Side Beam 4x8 DFL N2 CODE REFERENCES Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: ASCE 7-16 Material Pro erties Analysis MethocAllowable Stress Design Load CombinaMSCE 7-16 Fb+ Fb • 900.0 psi 900.0 psi E : Modulus of Elasti Ebend-xx 1,600.0ksi Fe -Prll Fe -Perp Fv 1,350.0 psi 625.0psi 180.0psi 575.0psi Eminbend -x 580.0ksi Wood Species Douglas Fir-Larch Wood Grade No.2 Ft Beam Bracing Beam is Fully Braced against lateral-torsional buckling • D(0.oo5iLr(o.01 l • • 4x8 ~ Span= 3.916 ft Density 31.21 Opet 0(0.0325) Lr(0.065) • 4x8 1 Span = 8.660 ft A lied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Load for Span Number 1 Uniform Load : D = 0.0050, Lr= 0.01 0 ksf, Tributary Width= 1.0 ft, (trellis) Load for Span Number 2 Uniform Load : D = 0.0050, Lr= 0.010 ksf, Tributary Width = 6.50 ft, (trellis) DESIGN SUMMARY Maximum Bending Stress Ratio 0.238 1 Maximum Shear Stress Ratio Section used for this span 4x8 Section used for this span fb: Actual = 347.76psi fv: Actual Fb: Allowable = 1,462.50psi Fv: Allowable Load Combination +O+Lr Load Combination 4.499ft Location of maximum on span = = Location of maximum on span Span # where maximum occurs = Span# 2 Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection 0.043 in Ratio = 2409>=360 Max Upward Transient Deflection -0.056 in Ratio= 1688>=360 Max Downward Total Deflection 0.067 in Ratio= 1557>=180 Max Upward Total Deflection -0.083 in Ratio= 1132>=180 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Moment Values Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb F'b DOnly 0.00 Length = 3. 916 ft 1 0.030 0.055 0.90 1.300 1.00 1.00 1.00 1.00 1.00 0.08 31.51 1053.00 Length= 8.660 ft 2 0.118 0.055 0.90 1.300 1.00 1.00 1.00 1.00 1.00 0.32 124.10 1053.00 +D+Lr 1.300 1.00 1.00 1.00 1.00 1.00 0.00 Length= 3.916 ft 1 0.042 0.106 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.16 61 .52 1462.50 Length = 8.660 ft 2 0.238 0.106 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.89 347.76 1462.50 +D+0.750Lr 1.300 1.00 1.00 1.00 1.00 1.00 0.00 Length = 3.916 ft 1 0.037 0.090 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.14 54.01 1462.50 Length= 8.660 ft 2 0.200 0.090 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.75 291.84 1462.50 +0.60D 1.300 1.00 1.00 1.00 1.00 1.00 0.00 Design OK 0.106 : 1 4x8 23.90 psi 225.00 psi +D+Lr 3.916 ft Span# 1 Shear Values V fv F'v 0.00 0.00 0.00 0.15 8.97 162.00 0.15 8.97 162.00 0.00 0.00 0.00 0.40 23.90 225.00 0.40 23.90 225.00 0.00 0.00 0.00 0.34 20.17 225.00 0.34 20.17 225.00 0.00 0.00 0.00 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 [ Wood Beam 1.1 •• Project Title: Lastres Residence Engineer: JV Project ID: 42 of 46 Project Descr: New ADU Printed: 9 MAR 2021, 8:09PM Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 DESCRIPTIO (N) ADU Trellis Side Beam 4x8 DFL N2 Load Combination Max Stress Ratios Moment Values Segment Length Span# M V Length= 3.916 ft 1 0.010 0.019 Length = 8.660 ft 2 0.040 0.019 +1 .1120 Length= 3.916 ft 1 0.019 0.035 Length = 8.660 ft 2 0.074 0.035 +1 .0840 Length = 3.916 ft 1 O.Q18 0.034 Length = 8.660 ft 2 0.072 0.034 +0.48770 Length = 3.916 ft 0.008 0.015 Length = 8.660 ft 2 0.032 0.015 Overall Maximum Deflections Load Combination +D+Lr Vertical Reactions Load Combination Overall MAXimum Overall MINimum D Only +D+Lr +D+0.750Lr +0.600 Lr Only Span 1 2 Cd CFN Ci Cr Cm Ct CL M fb 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.05 18.90 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.19 74.46 1.300 1.00 1.00 1.00 1.00 1.00 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.09 35.05 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.35 138.04 1.300 1.00 1.00 1.00 1.00 1.00 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.09 34.16 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.34 134.55 1.300 1.00 1.00 1.00 1.00 1.00 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.04 15.37 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.15 60.53 Max. "-" Dell Location in Span Load Combination 0.0000 0.000 +D+Lr 0.0667 4.403 Support notation : Far left is #" Support 1 Support 2 Support 3 0.544 0.428 0.329 0.273 0.215 0.155 0.544 0.428 0.462 0.360 0.129 0.093 0.329 0.273 Shear Values F'b V fv F'v 1872.00 0.09 5.38 288.00 1872.00 0.09 5.38 288.00 0.00 0.00 0.00 0.00 1872.00 0.17 9.98 288.00 1872.00 0.17 9.98 288.00 0.00 0.00 0.00 0.00 1872.00 0.16 9.73 288.00 1872.00 0.16 9.73 288.00 0.00 0.00 0.00 0.00 1872.00 0.07 4.38 288.00 1872.00 0.07 4.38 288.00 Max. "+" Oefl Location in Span -0.0829 0.0000 Values in KIPS 0.000 0.000 Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Wood Column t,t •, DESCRIPTIO (N) ADU Trellis Column 4x4 DFL N2 Code References Project Title: Lastres Residence Engineer: JV Project ID: 43 of 46 Project Descr: New ADU Printed: 9 MAR 2021, 8:12PM Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : ASCE 7-10 General Information Analysis Methe Allowable Stress Design End Fixities Top & Bottom Pinned Overall Column Heigh ( Used for non-slender calculations ) Wood Specie Wood Grade Fb + 1,500.0 psi Fb -1,500.0 psi Fe -Prll 1,000.0 psi Fe -Perp 1,000.0 psi Fv Ft Density 9 ft 150.0 psi 1,000.0 psi 33.0 pcf Wood Section Name 4x4 Wood Grading/Manuf. Wood Member Type Graded Lumber Sawn Exact Width Exact Depth Area Ix ly 3.50 in Allow Stress Modification Factors 3.50 in Cf or Cv for Bending 1.0 12.250 in'2 Cf or Cv for Compressio1 1.0 12.505 in'4 Cf or Cv for Tension 1.0 12.505 in'4 Cm : Wet Use Factor 1.0 Ct: Temperature Facl 1.0 E : Modulus of Elasticity ... x-x Bending y-y Bending Cfu : Flat Use Factor 1.0 Axial Kt : Built-up columns 1.0 NOS 15.3.2 No Basic 1,400.0 1,400.0 Minimum 1,400.0 1,400.0 1,400.0 ksi Use Cr : Repetitive Brace condition for deflection (buckling) along columns : X-X (width) axis Unbraced Length for buckling ABOUT Y-Y Axis= 9 Y-Y (depth) axis Unbraced Length for buckling ABOUT X-X Axis= 9 Applied Loads Service loads entered. Load Factors will be applied for calculations. Column self weight included : 25.266 lbs• Dead Load Factor AXIAL LOADS ... beams: Axial Load at 9.0 ft, D = 0.410, Lr= 0.750 k DESIGN SUMMARY Bending & Shear Check Results PASS Max. Axial+Bending Stress Ratio = Load Combination 0.1209: 1 +D+Lr+H Comp Only, fc/Fc' 0.0ft Governing NOS Forumla Location of max.above base At maximum location values are . Applied Axial Applied Mx Applied My Fe : Allowable 1.185 k 0.0 k-ft 0.0 k-ft 800.13 psi PASS Maximum Shear Stress Ratio= 0.0 : 1 Load Combination +0.60D+0.70E+0.60H Location of max.above base 9.0 ft Applied Design Shear 0.0 psi Allowable Shear 240.0 psi Load Combination Results Maximum SERVICE Lateral Load Reactions .. Top along Y-'I 0.0 k Bottom along Y-Y 0.0 k Top along X-)< 0.0 k Bottom along X-X 0.0 k Maximum SERVICE Load Lateral Deflections ... Along Y-Y 0.0 in at 0.0 ft above base for load combination : n/a Along X-X 0.0 in at 0.0 ft above base for load combination : n/a Other Factors used to calculate allowable stresses ... Bending Compression Tension Load Combination Co 0.900 1.000 1.250 1.150 1.250 1.150 1.600 1.600 1.600 1.600 1.600 1.600 Cp 0.751 0.718 0.640 0.670 0.640 0.670 0.546 0.546 0.546 0.546 0.546 0.546 Maximum Axial + Bending Stress Ratios Stress Ratio Status Location Maximum Shear Ratios Stress Ratio Status Location +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0. 750L+H +D+0.750L+0.750S+H +D+0.60W+H +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H +D+0.750L+0.750S+0.450W+H +D+0.750L+0.750S+0.5250E+H +0.60D+0.60W+0.60H 0.05255 PASS 0.0 ft 0.0 PASS 9.0 ft 0.04946 PASS 0.0ft 0.0 PASS 9.0 ft 0.1209 PASS 0.0ft 0.0 PASS 9.0 ft 0.04608 PASS 0.0ft 0.0 PASS 9.0 ft 0.1018 PASS 0.0ft 0.0 PASS 9.0 ft 0.04608 PASS 0.0ft 0.0 PASS 9.0 ft 0.04065 PASS 0.0ft 0.0 PASS 9.0 ft 0.04065 PASS 0.0ft 0.0 PASS 9.0 ft 0.09317 PASS 0.0ft 0.0 PASS 9.0 ft 0.04065 PASS 0.0ft 0.0 PASS 9.0 ft 0.04065 PASS 0.0ft 0.0 PASS 9.0 ft 0.02439 PASS 0.0ft 0.0 PASS 9.0 ft Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 [ Wood Column ... •. Project Title: Lastres Residence Engineer: JV Project ID: Project Descr:New ADU 44 of 46 Printed: 9 MAR 2021, 8:12PM Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.24 DESCRIPTIO (N) ADU Trellis Column 4x4 DFL N2 Load Combination Results Load Combination +0.60D+0. 70E+0.60H Maximum Reactions Load Combination +D+H +D+L+H +D+Lr+H +D+S+H +D+0. 750Lr+O. 750L+H +D+0. 750L+O. 750S+H +D+0.60W+H +D+0.70E+H +D+0.750Lr+0. 750L+0.450W+H +D+0.750L+0.750S+0.450W+H +D+0. 750L+0. 750S+0.5250E+H +0.60D+0.60W+0.60H +0.60D+0. 70E+0.60H D Only Lr Only LOnly S Only WOnly E Only H Only Co Cp 1.600 0.546 X-X Axis Reaction @ Base @ Top Maximum Axial + Bending Stress Ratios Stress Ratio Status Location Maximum Shear Ratios Stress Ratio Status Location 0.02439 PASS 0.0 ft k Y-Y Axis Reaction @ Base @Top Axial Reaction @ Base 0.435 0.435 1.185 0.435 0.998 0.435 0.435 0.435 0.998 0.435 0.435 0.261 0.261 0.435 0.750 0.0 PASS 9.0 ft Note: Only non-zero reactions are listed. My -End Moments k-ft Mx -End Moments @ Base @ Top @ Base @ Top Maximum Deflections for Load Combinations Load Combination Max. X-X Deflection Distance Max. Y-Y Deflection Distance +D+H O.000Oin 0.000ft 0.0000in 0.000ft +D+L+H 0.0000in 0.000ft 0.0000in 0.000ft +D+Lr+H 0.0000in 0.000ft 0.0000in 0.000ft +D+S+H 0.0000in 0.000ft 0.00O0in 0.000ft +D+0. 750Lr+0. 750L+H 0.O0O0in 0.000ft 0.00O0in 0.000ft +D+0. 750L+0. 750S+H 0.O000in 0.000ft 0.0000in 0.000ft +D+0.60W+H 0.000Oin 0.000ft O.0000in 0.000ft +D+0.70E+H 0.0O0Oin 0.000ft 0.0000in 0.000ft +D+0. 750Lr+0. 750L+0.450W+H 0.000Oin 0.000ft 0.0000in 0.000ft +D+0. 750L+0. 750S+0.450W +H 0.000Oin 0.000ft 0.0000in 0.000ft +D+0. 750L+0. 750S+0.5250E+H O.000Oin 0.000ft 0.0000in 0.000ft +0.60D+0.60W+0.60H O.000Oin 0.000ft 0.0000in 0.000ft +0.60D+0. 70E+0.60H 0.O00Oin 0.000ft 0.00O0in 0.000ft D Only 0.0000in 0.000ft 0.0O00in 0.000ft Lr Only 0.0OOOin 0.000ft 0.0000in 0.000ft LOnly 0.000Oin 0.000ft 0.0000in 0.000ft S Only 0.O00Oin 0.000ft 0.0000in 0.000ft WOnly 0.O00Oin 0.000ft 0.0000in 0.000ft E Only 0.000Oin 0.000ft 0.0000in 0.000ft H Only 0.000Oin 0.000ft 0.0000in 0.000ft Jose Ventocilla, PE PE Lie. 47942 Laguna Hills, CA 92653 0 0 0 Wood Column ,., •, DESCRIPTIO (N) ADU Trellis Column 4x4 DFL N2 Sketches C 0 Li) M 3.50-in-- Project Title: Lastres Residence Engineer: JV 45 of 46 Project ID: Project Descr: New ADU Printed: 9 MAR 2021, 8:12PM Software copyright ENERCALC, INC. 1983·2020, Build:12.20.8.24 +X 46 of 46 Jose Ventocilla, PE PROJECT Pilaster Embedment -ADU Trellis PAGE CLIENT Lastres Residence -Carlsbad, CA DESIGN BY JV JOB NO. DA TE : 3/9/2021 REVIEW BY Ftaooote Footino Desion Based on Chapter 18 of IBC & CBC INPUT DATA & DESIGN SUMMARY IS FOOTING RESTRAINED @ GRADE LEVEL ? (l=YES,0=NO) 1 yes p LATERAL FORCE@ TOP OF POLE P = 0.5 k HEIGHT OF POLE ABOVE GRADE h = 8 ft DIAMETER OF POLE FOOTING b = 0.66 ft h LATERAL SOIL BEARING CAPACITY S = 2 ksf / ft ISOLATED POLE FACTOR (2015 IBC 1806.3.4) F= 4 FIRST TRIAL DEPTH ===> d = 2 It / r, ---~ ~I'---,/- Use 0.66 ft dia x 1.48 ft deep footing restrained@ ground level d ANALYSIS LATERAL BEARING@ BOTTOM : S,=FS Mi11(d , 12') LATERAL BEARING@ d/3: S,=FS ( d Mu, 3 . 12·) 2.34P A =--bS1 ,_/1H~l , FOR NONCONSTRAINED REOUIRD DEPTH : 4.25Ph , FOR CONSTRAINED . bS3 NONCONSTRAINED CONSTRAINED LATERAL FORCE@TOP OF POLE p => 0.50 k 0.50 k HEIGHT OF POLE ABOVE GRADE h => 8.0 ft 8.0 It DIAMETER OF POLE FOOTING b => 0.66 It 0.66 ft LATERAL SOIL BEARING CAPACITY FS => 8.00 ksf / ft 8.00 ksf / ft 1STTRIAL TRYd1 => 2.00 ft 2.00 ft LAT SOIL BEARING@ t/3 d s, => 5.33 ksf 5.33 ksf LAT SOIL BEARING@ 1.0 d s, => 16.00 ksf 16.00 ksf CONSTANT 2.34P/(bS1) A => 0.33 . REOD FOOTING DEPTH RORDd => 1.88 ft 1.27 ft 2NDTRIAL: TRY d2=> 1.94 It 1.63 ft LAT SOIL BEARING@ 1/3 d s, => 5.17 ksf 4.36 ksf LAT SOIL BEARING @ 1.0 d s, => 15.51 ksf 13.08 ksf CONSTANT 2.34P/(bS1) A => 0.34 REQD FOOTING DEPTH ROAD d => 1.91 ft 1.40 ft 3RDTRIAL : TRY d3=> 1.92 ft 1.52 It LAT SOIL BEARING@ 1/3 d s, => 5.13 ksf 4.05 ksf LAT SOIL BEARING@ 1.0 d s, => 15.39 ksf 12.15 ksf CONSTANT 2.34P/(bS,) A => 0.35 . . REOD FOOTING DEPTH RQRDd => 1.92 ft 1.46 ft 4TH TRIAL : TRY d,=> 1.92 ft 1.49 ft LAT SOIL BEARING@ 1/3 d s, => 5.12 ksf 3.97 ksf LAT SOIL BEARING@ 1.0 d s, => 15.36 ksf 11.90 ksf CONSTANT 2.34P/(bS1) A => 0.35 REOD FOOTING DEPTH ROAD d => 1.92 ft 1.47 ft 5TH TRIAL: TRY ds=> 1.92 ft 1.48 It LAT SOIL BEARING@ 1/3 d s, => 5.12 ksf 3.94 ksf LAT SOIL BEARING@ 1.0 d s, => 15.36 ksf 11.83 ksf CONSTANT 2.34P/(bS,) A => 0.35 . REOD FOOTING DEPTH RORDd => 1.92 ft 1.48 ft CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project# & Name: Permit#: Project Address: Assessor's Parcel #: Project Applicant: (Owner Name) CBR2021-0303 2444 TORREJON PL 2 2162401102 DIEGO LASTRES Residential Square Feet: New/Additions: Second Dwelling Unit: §~-~----__ Commercial Square Feet: New/Additions: City Certification:Oty ofCarlsbad Building Division_ Date: 02/05/2021 _ _ Certification of ApplicanUOwners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration is authorized to sign on behalf of the Owner. D Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331-5000 [ZJ Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 -z , {i _,,-~·-one: (760) 944-4300 x'r166 f ✓ I n Diegulto Union H.S. District 84 Requeza Dr. ~-Encinitas, CA 92024 Phone: (760) 753-6491 Ext 5514 (By Appl. Only) D San Marcos Unified Sch. District 255 Pico Ave Ste. 100 San Marcos, CA 92069 Phone: (760) 290-2649 Contact: Katherine Marcelja (By Appl.only) D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 Phone: (760) 726-2170 x2222 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. Signature of Authorized School District Official: John Addleir,.:,,c Title: D>\.'.ch.~r of r:i:_wr'. ,.,· !(, --~·-"-·-------------·---------. Fui;i.n,;i:.d '.·.J1:rna::1:;,,,c;1t san Dieguito union High School District Name of School District: Community & Economic Development -Building Division 1635 Faraday Avenue i Carlsbad, CA 92008 I 760-602-2719 I 760-602-8558 fax I Date: ... 1-/ /1 ')_ /;Z. / Phone: _iJ& 11 __ ']'5.3 .~f.'f 'JI building@carlsbadca.gov APR 2 0 2021 ( City of Carlsbad CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project# & Name: Permit#: CBR2021-0303 . -.. "·~----- Project Address: 2444 TORREJON PL 2 Assessor's Parcel #: 2162401102 -----··- Project Applicant: DIEGO LASTRES (Owner Name) Residential Square Feet: New/Additions: Second Dwelling Unit: 68] ~ I• qij :=-~I 1~,;{!). [)'8 . Commercial Square Feet: New/Additions: City Certification:City_of~arl_stia9.Buildir:,g [)ivisio~ .. Date: 02/05/2021_ Certification of ApplicanUOwners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration is authorized to sign on behalf of the Owner. D Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331-5000 [Z] E~li~:fa~~nion School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 Phone: (760) 944-4300 x1166 . /~ ,. .,..:·~ [Z] San Dieguit~ Union H.S. District 684 Requeza Dr. Encinitas, CA 92024 Phone: (760) 753-6491 Ext 5514 (By Appl. Only) D San Marcos Unified Sch. District 255 Pico Ave Ste. 100 San Marcos, CA 92069 Phone: (760) 290-2649 Contact: Katherine Marcelja (By Appl.only) D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 Phone: (760) 726-2170 x2222 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s}) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. ,.---,--· Slgmaru;•ot A,lhoM;ed School ~l,tccl O ,1.1, ~c c± -) ),_)4_ '7 7 _ _ _ _ _ TIiie~~;,£~ ,,.i__ _ ___ __ _ _ __ Date '//J,:J_~/ Name of School District: UJ~Jnf tl/JA,_~b~iJJJ;btPhone: 1/J_O)CJ..tJ1d'-2_l)_ 0 )( o~~ Community & Economic Development -Building Division 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-2719 I 760-602-8558 fax I build i ng@carlsbadca.gov {cicyof ~ 1.,1131 Carlsbad CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to Issuing a building permit, The City will not Issue any building permit without a completed school fee form. Project # & Name: Permit#: CBR2021-0303 Project Address: 2444 TORREJON PL 2 Assessor's Parcel #: 2162401102 ----------------- Project Applicant DIEGO LASTRES (Owner Name) Rasldentlal Square Feet: New/Additions: ----------------- Second Dwelling Unit 682 ----------------- Comm e rc I a I Square Feet: New/Additions: '·' City Certification:City of Carlsbad Building Division Oat~: 02/05/2021 ~ ' Certification of Applica~t/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the Information provided abo~ is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended oertlflcatlon of payment and pay the additlonal fee If Owner requests an increase In the .number of dwelling units or square footage after the building permit Is Issued Ol' If the initial determination of units or square footage is found to be Incorrect, and that (2) the Owner Is the owner/developer of the above described project(s), or that the person executing thfs declaration is authorized to sign on behalf of the Owner. □ Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331-5000 E2J Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 2 11 {I one: (760) 944-4300 xY166 ( '✓ ! n Dlegulto Union H.S. District 84 Requeza Dr. Encinitas, CA 92024 · Phone: (760) 753-6491 Ext 5514 . {By Appt. Only) LJ San Marcos Unified Sch. District 255 Pico Ave Ste. ,100 San Marcos, CA 92069 I Phone: (760) 29()..2649 Contact: Katherine Marcelja (By Appt.only) D Vista Unified School District 1234 Arcadia Drive ·• Vista CA 92083 · , Phone: (760) 726-2170 x2222 ' f SCHOOL .DISTRICT SCHOOL FEE CERTIFICATION . (To be completed by the·school distrl,ct(s)) . t THIS FORM INDICATES THAT.THE SCHO,OL.DlSTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR V{ILL BE SATISFIED. I • , . . The undersigned, ,being duly authorized by the applicable SChool District, certifies that the developer, builder, or owner has satisfied the obligation.for school facllltlu. This Is to certify that the applicant listed on page 1 has paid all amounts or completed 'other applicable school mitigation determined by the School District, The City may Issue bulldlng permits for this project. . ' O ~-Lf_/~ ~--'- Signature of Authorized ·school District Official: / · ,_,,,_.,:~-- Title: John Addleman ------------'----1-.-,-- Director of Planning & Date: 1//J g /~ / Financial Management san 0IeguIto union High SCho'ol District • Name of School Distri9l: . , • ,Phore: ?ltf)-'722 -b'tt:// . , Community & Econo~lc Development.-Building Division . 1635 Faraday Avenue I carlsbad, CA 92008 I 760-602-2719 I 760-602-8S58 fax I buildlng@carlsbadca.gov \ SEWER DISTRICT CERTIFICATION [Z] Leucadia Wastewater District 1960 La Costa Ave. Carlsbad, CA 92009 (760) 753-0155 D Vallecitos Water District 201 Vallecitos de Oro San Marcos, CA 92069 (760) 744-0460 The following project has been submitted for building permits: Plan Check #: Permit #: CBR2021-0303 Property Owner: Diego Lastres Project Address: 2444 TORREJON PL, # 2 Assessor's Parcel #: 2162401102 Project Description: LASTRES: 682 SF ATTACHED ADU City Certification: City of Carlsbad Building Division Date: February 05, 2021 --'-----------=~------ Please indicate in the space below that the owner has entered into an agreement to have your agency provide public sewer service to the premises, and/or if the existing service is adequate for this project and all required conditions have been satisfied. Permits will not be issued until this form is completed and returned to our office. ~-----------------------------------------···········-------------------------------------------------------·--·----------------- This space to be completed by District Personnel I certify the district requirements for sewer service have been satisfied. So,ro~d "'' ryl/D..,1.,{1 /,. R,w , 0.ec ~'i / 11 { Z-1 Title: 4 2 !:1, l NJ Sr1ZA:r:, • , ( -----------------------------------------------------------------------------------------------------········--------------------- Community & Economic Development -Building Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov STORM WATER POLLUTION PREVENTION NOTES \. AU. NECESSARY EOOIPMENT ANO MATERIALS SHAU. BE AVAILABL£ ON SITE TO FAOUTATE RAPID INSTAU.ATION ~ EROSION ANO SEDIMENT CONTROL BMPs \\\lEN RAIN IS EMINENT. 2. lHE Ol'INER/CONTRACTOR SHAU. RESTORE AU. EROSION CONTROL 0£\'\CES TO WOfll(ING ORDER TO lHE SATISFACTION ~ lHE OTY INSPECTOR AFTER EACli RUN-Off PROOUONG RAINFALL 3. 1HE Ol'INER/CONTRACTOR SHAU. INSTAil. ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REOOIRED BY lHE OTY INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR UNFORESEEN ORCUMSTANCES \\\llCli MAY ARISE. 4. AU. REMOVASlE PROTECTIVE OIEl1CES SHAU. BE IN Pl.ACE AT lHE ENO ~ EACli WORKING DAY \\\lEN lHE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT ( ~-SILT ANO Olli ER DIEBRIS SHAU. BE REMOVED AFTER EACli RAINFALL 5. AU. GRAVEL BAGS SHAU. CONTAIN 3/4 INCli MINIMUM AGGREGATE. 6. AOIEOOATE EROSION ANO SEDIMENT CONTROL ANO PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED ANO MAINTAINED. 7. lHE OTY INSPECTOR SHAU. HAVE lHE AUlHORITY TO ALTER lHIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEOIEO TO ENSURE COMPLIANCE YlllH OTY STOR\M WATER Cl(JAUTY REGULATIONS. OWNER'S CERTIFICATE: I UNOERSTANO ANO ACKNOYUDCC THAT I MUST: (1) IMPUMEMT BEST MANAGOIENT PRACTIC[S (BMPS) DURING CONSl!IUCTION ACTil1TIES TO THE MAXIMUM EXTENT PRACTICA8LE TO AWE THE M08UZATION OF POIJ.UTANTS SUOi AS SEDIMENT ANO TO AWE THE EXPOSURE OF STORM WATER TO CONSlRUCTION RELATED POU.UTANTS; ANO (2) AOHERE TO, ANO AT ALI. TIMES, COMPLY Y,ITH THS QTY APPRO~ TIER 1 CONSlRUCTION S'lffP THROUQ<OUT THE OUffATION OF THE CONSlRUCTION ACTil111ES UNTIL THE CONSTR\JCTION WOR1C IS COMPLETE ANO APPROVED BY THE QTY OF CARIS8AD. Diego Lastres DWNER(S)/OHR'S ACO<T NAME (PRINT) -~ Oiid(S)/Oiti:R s AGENT NAME (SIGNA. TURE) E-29 04/14/2021 ----imr- STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP CB ____ _ E 29 -SW BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE EroelonContal Sedlmn Conrrol lWPI T--w ... WnteManagemertandM;lterWs """ """""'""" Mar\lglmenl BMPt PolAoll Control BMPs s I j ti l ll .:, l j f S..1 Managomenl Practice' : f 11 ! ! .r i I !! -... i' (BMP) Description ➔ ; .. j': j i -§ ! .[ ,~ ., jj ji s· i l ~ ~ ,. i n i ,. ; I J i] I ~] ~= ,J rf i ~j HI ,II .!::g ;j J ~j §. l ! H h ! :;.~ .:: "' & OS .:..!: ~ .. .l.!I Ji J ivi j ="""""""➔ ~ ,. ~ 7 . ,n ~ ~ ,. 0 ' N ~ ~ ~ ~ ' 1 j ~ ,n ~ ~ ' I I I I ' I I ::l ll! ll! ll! ll! ll! ll! ll! ll! l!c l!c i i 11~·~~ X cowllon X O<lna Concrete "t Sawcutt•a X Cona-ete Flotworit P ..... , X Condull :11n, lnttdlaUon Stucco/I crtar Work X Wost• UI ~...i X X Stooln11 nv Down Ateo X E tn Morltenon~ md Fuell\o Hoz<rdou, Sub.tone• U111::itoroo, Otwotwlno Site Accea Actoq Dirt ou,., (llott, lntlrucllona: 1. 0..edc the box to the teft of di opplle-ob4e conatn.,ction octlvlty (f'nt colu1M) expected to occur durlnQ conttructlon. 2. ~~ i:;,i ~ 1:f.:J t• u:p ;;,~• !.:U:1! r:'!.• ~thll;r• 6'~"ft:d~! ~:c:,~, S~°':':1~~1:~ ~ ~~J ~=n~umbe". Ol00le one J. Ref« to lht CASOA construction hondbook for lnformotion and 6etols of the choser1 BMP, ond how to apply thn to the projacl SHOW THE LOCATIONS OF ALL CHOSEN BMPs ABOVE ON THE PROJECTS SITE PLAN/EROSION CONTROL PLAN. SEE THE REVERSE SIDE OF THIS SHEET FOR A SAMPLE EROSION CONTROL PLAN. PROJECT INFORMATION Site Ada'ess: 2444 Torrejon Place AsNnor', Poree! Numb.-: o,ego Lastres Em«9fflCY Contoc:t: Nrmc o,eao I astras 24 Haur Phan« 760.701.2570 Construction Threat to Storm Wot.-~c:iily (0.ed< Bo,) 0 MEDIUM IX) LOW t ti j,. 'f i ~l j ., i Page 1 of 1 REV 02/16 . ----... -··--·----__________ .. , ·•-:."":;¥..::.,.-:1,.~-=.-t·:-r.;;;; ... .;:;:..:.:.-·::-· ------·--·-·--·· --· -t.=1:"-~~=-··------· ..:.=-------_,. ........ ___ .. ---....... ---.------·-·--t..--:::$:LV..·-~---x-s-~~-.. ~::---· __ .. _______________ _ ~=✓..:... .. -:..::.:~==--=:-.=:.::": :,.:,_ ----:.t---":t::::--·-----... -t::::----• .. ----------... ·---- _____ J i.::sr=-:::::::·-~ ·------·-· =-~~·-::.:.:-=~=--- .:.~ ~ . ._:.. .. :--:.::-..:.::.-; .. ~ ... LOT INFORMATION ~-.==....,.....::-------·--· ~-==-·-~i..:::.--.. --:....=c;..r_ .. ,., _______ _ ----;.c-+~........,_--:r=··.:::,,:--·-----.:"---····------_______ ........ ---------·-· -----=-·7 -='=-~z=a~£:-::. ,t; __ .==:-::::;;.a-'1'==-,•--;..•. cr:::7:.::...1..::i.:...7 .. ..:.:::::i---·--~---...:.,0.:::---""'=-'..::::::;..~=-=-·--·---.. -:::::::.:.:..=·-----,.- • .:;:;::::.::.=.-.....:: ~~:,:.,:=::::-:~=-:.:::::.-=-.:-···:::.."":':·--:::.-'"'•--·· ..,,. __ ..-:=:::..~...:..--------------:"""..::...~~-":.:.-,.;...::.~...=-:..~'!C' ....... C-. _:-:~"'\-:'=::.O ::::-.•.::::::-::n......::-..~ •z;._ ---· _, ...... ....:--:-...:.::=::-.::-:.:..--:::=-~-=-~1,:_•..;.---~ 04.15.2021 ... < ~ 0 C: 0 :::, < Ill en 1/) C: ..J ~ < Q) () a, :t ..Jo Q. 0 C zN 0 a, ~ -, w 0 ~ In ~ 0 In I-Cl) 3 (.) (.) N < A101 ( City of Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 De 11_elopn11?_n tServiccs Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool .ii If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. A Details on CAP ordinance requirements are available on the city's website . .,. A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. Project Name/Building Permit No.: 2444 Torrejon Pl ADU Property Address/APN: 2162401102 ----------------------------- App Ii cant Name/Co.: Diego Lastres ----='-------------------------------- App Ii cant Address: 2444 Torrejon Pl Contact Phone: 760. 701.2570 Contact Email: diegolas3@gmail.com Contact information of person completing this checklist (if different than above): Name: Company name/address: Diego Applicant Signature: __ B-50 Contact Phone: 7607012570 Contact Email: diegolas3@gmail.com ~ · ____ Date: 12.22.2020 Page 1 of 6 Revised 06/18 City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet:$,.,,._ ~~l ~ /J/ lo, ~<j 9 -- Construction Type j Complete Sactlon(s) j Notes: [!] Residential D New construction [!] Additions and alterations: [!] BPV < $60,000 □ BPV " $60,000 D Electrical service panel upgrade only □ BPV " $200,000 A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use N/A N/A All residential additions and alterations 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages only 'Multi-family dwellings only where interior finishes are removed 1A, 4A' 18, 4A' and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed AJ --=0=--N_o_nr_es_id_en_ti_al _________________ -,--_______________ _ D New construction 1 B, 2B, 3B, 4B and 5 D Alterations: D BPV 2: $200,000 or additions 2: 1,000 18,5 square feet □ BPV" $1,000,000 1B, 2B, 5 Building alterations of" 75% existing gross floor area □ "2,000 sq. ft. new roof addition 2B,5 1B also applies if BPV" $200,000 Checklist Item Check the appropriate boxes, explain al not applicable and exception items, and provide suppo1lng calculations and documentation as necessary. 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for more information when completing this section. A D Residential addition or alteration ~ $60,000 building permit valuation. 0 N/A Building Valuation< 60,000$ See CMC section 18.30.190. D Exception: Home energy score" 7 (attach certification) Year Built Single-family Requirements Multi-family Requirements 13 Before 1978 Select one: □ Duct sealina [I Attic insulation Meool roof 13 Attic insulation □ 1978 and later Select one: It lighting package □ Water heating Package □ Between 1978 and 1991 Select one: □ Duct sealina EIAttic insulation ~Cool roof □ 1992 and later Select one: □Lighting package □Water heating package M 1 ~ B. D Nonresidential' new construction or alterations" $200,000 building pennit valuation, !" or additions " 1,000 square feet. □ N/A Updated 8/15/2019 2 City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CALGreen Appendix AS, Division A5.2 -Energy Efficiency. AS.203.1.1 Choose one: a .1 Outdoor lighting □.2 Warehouse dock seal doors □ .3 Restaurant service water heating (oomply with California Energy Code section 140.5, as amended) □ N/A ________ _ □ .4 Daylight design PAfs □.S Exhaust air heat recovery A5.203.1.2.1 Choose one as applicable: 095 Energy budget 0.90 Energy budget □ NIA AS.211.1" D On-site renewable energy □ NIA A5.211.3" D Green power (if offered by local utility provider, 50% minimum renewable sources) □ NIA AS.212.1 D Elevators and escalators □ NIA AS.213.1 D Steel framing □ NIA • Includes hotels/motels and high-nse residential buildings "For alterations~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMG 18.30.130 instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California A. I l:v-Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic · V\-1 requirement (28 below) instead. 2) If project includes Installation of an elecbic heat pump water heater pursuant to CMC 18.30.150(8) (high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc' sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) 'Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ kWdc Nonresidential new construction or alterations ~$1,000,000 BPVand affecting ;,75% existing floor area, or addition that increases roof area by ~,000 square feet. Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: □ Gross Floor Area (GFA) Metihod GFA: Olf < 10,000s.f. Enter: 5 kWdc Min. System Size: □If;, 10,000s.f. calculate: 15 kWdc x (GFA/10,000) .. kWdc .. Round building size factor to nearest tenth, and round system size to nearest whole number. D Time-Dependent Valuation Method Updated 8/15/2019 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:••• ______ x .80= Min. system size: _____ kWdc ... Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating D Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section. D For systems serving individual dwelling units choose one: D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Exception: D For systems serving multiple dwelling units. install a central water-heating system with all of the following: D Gas or propane water heating system D Recirculation system per CMG 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) D Solar water heating system that is either: D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recovery D Exception: B. 0 Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. D Water heating system derives at least 40% of its energy from one of the following (attach documentation): D Solar-thermal D Photovoltaics D Recovered energy □Water heating system is (choose one): D Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction D Exception: Updated 8115/2019 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. Electric Vehicle Charging A [!l Residential New construction and major alterations* Please refer to Carlsbad Ordinance CMC section 18.21.140 when com '--""·-=0~n,e and two-family residential dwelling or townhouse with attached garage: One EVSE Ready parking space required Jll Exception : OMulti-family residential· D Exception· Total Parking Spaces EVSE Snaces Proposed Carn>ble Readv Installed Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number) EVSE Installed= Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other-Total EVSE spaces -EVSE Installed (EVSE other may be "Capable," "Ready" or "Installed.") I Total I •Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or inciude an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (includes hotels/motels) D Exception · Total Parking Spaces EVSE Soaces Proposed Caoable I Readv I Installed I Total I I I Calculation· Refer to the table below· Total Number of Parkinq Snaces provided Number of required EV Spaces Number of ronuired EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 n 101-150 12 6 n 151-200 17 9 17 201 and over 10 percent of total 50 norcent of Reouired EV Soaces Updated 8/15/2019 5 City of Carlsbad Climate Action Plan Consistency Checklist 5. D Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TDM plan. If TDM is applicable to your permit, staff will contact the applicant to develop a site-specific TDM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use Office (all)2 Restaurant Retail, Industrial Manufacturing Warehousin EmpADTfor first 1,000 s.f. 20 11 8 4 4 4 EmpADTI 1000 s.f., 13 11 4.5 3.5 3 1 1 Unless otherwise noted, rates estimated from !TE Trip Generation Manual, 10'"Edilion 2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to calculate employee ADT , Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee AOT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TDM plan and understa~ that an approved TDM plan is a condition of permit issuance. Applicant Signature: --~---·· · 7 ...__ - ,. O?. Zo·> DateQ\. · CI Person other than Applicant to be contacted for TOM compliance (if applicable): Name(Pnnted): _________________ _ Phone Number: _____ _ Email Address: __________________ _ Updated 8/15/2019 6 (city of Carlsbad CLIMATE ACTION PIAN ICAP) COMPLIANCE CAP Building Plan Template B-55 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov The following demonstrates project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. The followin certificate shall be included on the title sheet of all buildin ermits: 1. ENERGY EFFICIENCY APPLICABLE: YES/NO Complies with CMC 18.30.190 & 18.21.155 Existing Structure, year built: ,,,.e Prepared Energy Audit? Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: YES/NO Yes/N/A Yes/No Complies with CMC section 18.30.130 and 2019 California Energy Code section 150.l(c)14 Yes /N/A Required Provided Size of PV system (kWdc): Sizing PV by load calculations Yes/No If by Load Calculations: Total calculated electrical load: 80% of load: Hardship Requested Hardship Approved Yes/No Yes/No 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: Complies with CMC sections 18.30.150 and 18.30.1707 Alternative Source: □ Electric □ Passive Solar Hardship Requested Hardship Approved Yes/No Yes/No 4. ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: YES/NO Complies with CMC section 18.21.140? Panel Upgrade? Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved Yes/ N/A Yes/No Required Provided Yes/No Yes/No S. TRAFFIC DEMAND MANAGEMENT APPLICABLE: YES/NO Yes I no Yes I no Compliant? TDM Report on file with city? YES/NO PERMIT REPORT Revision Permit Print Date: 03/24/2022 Job Address: 2444 TORREJON PL, # 2, CARLSBAD, CA 92009-8033 {city of Carlsbad Permit No: PREV2021-0099 Status: Closed -Fina led Permit Type: BLDG-Permit Revision 2162401102 Work Class: Residential Permit Revish Parcel#: Valuation: $0.00 Occupancy Group: #of Dwelling Units: O Bedrooms: Bathrooms: Project Title: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: CBR2021-0303 Plan Check#: Description: LASTRES: REVISED STRUCTURAL PAGES TO REFLECT EXISTING CONDITIONS Applicant: DIEGO M LASTRES DIEGO LASTRES 2444 TORREJON PL, 1 2444 TORREJON PL PL, #1 CARLSBAD, CA 92009 (760) 701-2570 FEE MANUAL BLDG PLAN CHECK FEE BUILDING PLAN CHECK REVISION ADMIN FEE Property Owner: SPICENEX INC DIEGO LASTRES 2444 TORREJON PL CARLSBAD, CA 92009 (760) 701-2570 Total Fees: $297.50 Total Payments To Date: $297.50 Applied: 07/20/2021 Issued: 08/09/2021 Fina led Close Out: 03/24/2022 Inspector: TAlva Final Inspection: Balance Due: AMOUNT $262.50 $35.00 $0.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov