HomeMy WebLinkAbout1950 CAMINO VIDA ROBLE; 100; CBC2021-0362; Recycle(City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.corlsbodca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questic;ins about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauljng. Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
l 1, f<.t\RT 1 Complete and s1~i.11r11t th•-; ~D;T. -. ... ,:::20 .. ,µpl)m~~ fo,, ,1 Brnlding 11 ':"•·rn;l /\,H.1t<?: Pe, q·::~'> ,i,J! D.:-2! D
___ WI th O \Jt d r._~!!' pleteE_S_<~ ~:_·-" !~1 '0_"'._~_c'._J_~ x-.i d_~:t ~--~-d {~ a g ~-ri::'..~~-1-~~~': ___________ -·· -----~---------
Applicant Information
Permit No. CBC2021-0362 Project Title
Project Address 1950 Camino Vida Roble #100
1950 Camino Vida Roble #100 -1st Floor Expansion
APN
Applicant Name SPW Construction (White Construction
Last First
Contractor
0
Applicant Address 2524 Gateway Road
Phone 1760 ) 931-1130 E-mailAddress leah@whiteconstructioninc.com
Applicant MailingAddress
(if different than project address)
Project Type
(check all that apply):
Residential □ Commercial
0 Public Buidins □ Brief Description 19,951 s.f. tEnant improvement ind!.lilng structlnl, mechanical, plumbing and electrical for a new corporate office and A&O !acllity, no slte work is part of this application.
Project Size 19 • 951 Estimated Cost of Project $_$_1_,5_0_0_,0_0_0_._0_0 _________ _
(square footage)
Please check the appropriate box:
0 I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
! t/ j I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Leah Norman. PC Signature ______ _ _____ Date
Page 1 of 3 Rev. 2.10.21
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. CBC2021-0362 Project Title 1950 Camino Vida Roble #100 -1,:,
Project Address._1_9_S_O_C_a_m_i_n_o_V_id_a_R_ob_l_e_#_1_0_0_, C_a_rls_b_a_d_, _C_A_9_2_0_0_8 __ APN
Applicant Name SPW Const rucit:>n (Whit EConst rudbn) Phone (760 )931-1130
Lost First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type Estimated
Waste Quantity
(tons)
Complete this line of the table only if
only using WASTE MANAGEMENT
roll~off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick / Masonry / Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that a
Car et
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap) s .6 :; ~~ .. ,
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Un ainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
TOTAL = 5.6325
SECTION C
To meet 65% Diversion Requirement (estimate I
A B C
Place a (u) check Place a (u) check next Place a (u) check next
next to items to be to items to be to items to be
reused or salvaged
□
□
□
□
________ x 0.65 =
Total Estimated Waste from above
recycled disposed at landfill
□
□
□
□
□
□
□
_____ tons
Minimum Required Diversion
Contractor/Owner Signature. ____ /_1,8~1.£-,:;...._S,_~ ___ · _______ Date
Ci
04/04/2022
Page 2 of 4 Rev. 11112/18
i
-_ _J
Column A Column B Column C
category Material Volume IonsLUnlt Il2lll
Mixed Debris Construction cy X 0.18 ;
Demolition cy X 1.19 ;
Asphalt/Concrete Asphalt (broken) cy X 0.70 ;
Concrete (broken) cy X 1.20 ;
Concrete (solid slab) cy X 1.30 ;
Brick/Masonry/Tile Brick (broken) cy X 0.70 ;
Brick (whole, palletized) cy X 1.51 ;
Masonry brick (broken) cy X 0.60 ;
Tile sq ft X 0.00175 ;
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 ;
Cardboard (flat) cy X 0.05 ;
Carpet By square foot sq ft X 0.0005 ;
By cubic yard cy X 0.30 ;
Carpet Padding/Foam sq ft X 0.000125 ;
Ceiling Tiles Whole (palletized) cy X 0.0003 ;
Loose cy X 0.09 ;
Drywall (new or used) 1/2" (by square foot) I'\ / a.,.~ sq ft X 0.0008 ; 1\ ; 0-
5/8" (by square foot)
,...;) ,..._,. ,~ ',), I"" r, sq ft X 0.00105 ; .i C 5-.(,3 ~-·-
Demo/used (by cu. yd.) cy X 0.25 ;
Landscape Debris (brush, trees, etc.) cy X 0.15 ;
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 ;
Unpainted Wood/Pallets By board foot bd ft X 0.001375 ;
By cubic yard cy X 0.15 ;
Trash/Garbage cy X 0.18 ;
Other (estimated weight) cy X estimate ;
cy X estimate ;
cy X estimate ;
cy X estimate ;
Total all ;
Page 3 of 3
Rov. 2.10.21
DATE
11/1/21
11/3/21
11/4/21
11/11/21
11/16/21
11/17/21
11/18/21
11/18/21
Date: April 1st 2022
Diver-ified Destruction Co.
Cutting I Coring I Demolition I Environmental I Restoration
CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG
Daily Log of Construction and Demolition (C&D) Materials removed or reused for this project
Customer: White Construction
Job No. 14998
Project Name: Atec 1st Floor Expansion
Address: 1950 Camino Vida Roble Carlsbad CA 92008
TICKET NO. DESTINATION LOCATION {TONS} (TONS) NET MATERIAL TYPE "RECYCLED
RECYCLED TRASH TONS
2322730 Palomar El Camino Real 0.00 6.23 0% 6.23 Trash
1119 EDCO S. Las Posas 7.44 1.75 81% 9.19 C&D
1981273 Sycamore Mast Blvd 0.00 4.45 0% 4.45 Trash
2327602 Palomar El Camino Real 0.00 2.38 0% 2.38 Trash
306453 Moody's Oceanside Blvd 10.00 0.00 100% 10 Concrete
306518 Moody's Oceanside Blvd 10.00 0.00 100% 10 Concrete
1666172469 Hanson Harris Plant Rd 12.00 0.00 100% 12 Metals
1666172529 Hanson Harris Plant Rd 12.00 0.00 100% 12 Metals
0.00 0.00 0%
0.00 0.00 0%
--0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
0.00 0.00 0%
51.44 14.81 66.25
Total Recycled 78%
license #980634 PH: 619-249-5286
P 0. BOX 713040 Santee, CA 92072
,PALOMAR TRANSFER
5.960 EL CAMINO REAL
CARLSBAD, CA 92008
(760) 603-0153
333370 -DIVERSIFIED DESTRUCTION INC DBA
10358 BUENA VISTA AVE.
SANTEE, CA 92071
Contract: INDUSTRIAL-GATE 2
GROSS 43,760 Scale In
TARE 31,300 Tare Out
NET 12,460
Tracking Qty: 0.00
Qty
6.23
Unit Description
TN MSW
. ~ r,,, Ticke f: 2322730
Weighmaster: cisneadl
In:
Out:
Vehicle:
Ref:
BOL:
INBOUND
INVOICE
November 01, 2021
November 01, 2021
a54656
Rate Extension
$83.04 $517 .34
Tax
$0.00
Origin: CARLSBAD 100%
RECijCLING LOO C®~
Signature:
Total
Paid
Change
8:36 am
8:36 am
Total
$517.34
$517.34
$0 .00
$0.00
E:::>CO WASTE· & R~CYCLINS SERVICES, INC
224 s . LAE PC·s .;s RD
SP..N f\l~~co ~ , c .~. 92 0 7 a
(7 6C•) 74,.-:.·1 c C
c~:.stomer: l::l71 Tic,~et : 1119
D3.te: 11/03/21
DIVERSIFIED CESTRUCTION
1 0 358 BUE1''F. VISTA AVE
ShNTEE, CJ.. 92071
Ccm~odic\· U~i ts Rate
In: 9: S.:.l
Out: 9:5-1
4 5 C & D J.1..::-: 9 .19 81 .00 per TON
H ;'/OICE
Truck: 1211/1211
Container:
Route: 08145
Origin: 081 ALL COUNT
[Gr o ss(In): ~6,420 . l~s s~:#1 Tare 28,040. lbs St0~ed
Extended
Charge
744.39
Net: 18,380 . lcs)
':'OTAL DUE 744.39
Const: uction & LJemc. ii..on Diversion Certificate --Diversion Percentage 81 %
This cartifies thtt t11e c . .-mpany list(;C above has utilized an EDCO facility to divert cons:rui.:-t on demolition materials in accordance
1A:1h L.:ED reqlJ r~1ne:,1i Th& diver-;;i Jn !o.rnage is based on an overall tonnage µercer ,ia·~l.l of the respective EDCO facility.
lA)i\J-J... G '} «h. n 0 v 1.,r) Dv ~.ob Lt.
C!{l Z )river
Rf C\JCLINB LOO COPY
)
)
MOODY'S -I\
EL CORAZON RECLAMATION _ 9 ffi l fl 0
PO BOX 969 y tt-l ~ BONSALL, CA 92003 .
(760) 433-3316 • FAX (760) 433-6691 i(O \ .~
P. DATE
CASH CHECK CHARGE COMMERCIAL RESIDENCE TIME
Ci'TYOFORIGIN
JOe LOCATION
PU !TRAILER IFLAT8ED B08TAIL 110-WHEEL
1
ENO DUMP
11
, T
MATERIAL
1 nAn r.nuNT
1 2 3 4 5 6 7 8 9 10
#LOADS X PRICE OTHER CHARGES
$
TOTAL
SIGNATURE
All bils due upon presentation unless otherwise
arranged in advance. Open accooots subject to
1 112% month, charge after 30 days unpaid
balance.
TRUCK#
MOODY'S Is not responsible tor damage to
vehicle while being loaded or unloaded In
yard.
JOB COPY 3') 45
CYCLING LOO COPV
cltv of' ORiaiN
JOB LOCATION
PU 'TRAILER
LOAD COUNT
1 2
#LOADS
SIGNATURE
-..... MvODY'S Y'I I~
EL CORAZON RECLAMATION ~m\.A.0
PO BOX 969
BONSALL, CA 92003 V vi.JA-
(760) 433-3316 • FAX (760) 433-6691 R_o bl \..L
I RESIDENCE ITIME
\l l 11
!FLATBED BOBTAIL
11
0-WHEEL
I
ENO DUMP r, T
MATERIAL
3 4 5 6 7 8 9 10
, I
I' I . l ' I
X PRICE OTHER CHARGES
$
TOTAL
Al bils due upon presentation unless othelwlse
arranged in advance. Open accounts aubjec:t to
1 1/Zi(, mona,, cha,ve aft.e, !30 days unpaid
balance.
TRUCK#
MOODY'S is not responsible for damage lo
Yahlcie whle being loaded Of unloaded in
yard.
JOB COPY
REC'dClIN8 LOO COP\4
-
Zone
CREDIT CAR *2021 DUMP C.CARO ONLY
WEIGHMASTER STATION
4075600 TruokType
TRAILER
Truok No. Vehicle or LQllte Plate No. Tl'llller or Ucense Plate No. Trailer or ~nte PlaN No.
OOOCOF 3 9229 Harris Plant Road
San Diego, CA 92145 Hauler/Carrier No. Onver'•N-Today'• Tonnage Load No. Cum. Prod. Qty.
507--0UMP FEES 2021 *** CREDIT CARO ONLY
CREDIT CARD ONLY
f 1 ' , ' ' 'I .' r ' ..
805PT Dump-Pickup w/Trailer -Concrete
Environmental Fee
Each 1. 00 12 .00 125.00
6.25
SCALE WEIGHT
WEIGHMASTER CERTIFICATE
GR068&TAAE Cartage
Groaa ____ _ Orlvena Always On nns IS TO CERTIFY thll the following delcribcd commodity WIS
Driver OIi D weipd. m........,d. or counlcd by • weichmlStcr, wbotc scna11re is Sales Tax 0.00 D D D on dis c:atiflCale, who is a rccoaniz,cd aidlocil)' of accuracy. IS
Tare_,
Net.
Seale 1 fl.cal• 2 Scale 3 iw-!bod by Cha,-7 (conwnencing widl Secdon 12700) orDivislon
X-,~...t,,,,...,..,..,--.~,.. 5 ofdle Calil'omia &11incs1 and Profcnlons Code, 1dmini11ered by the _________ , DcfM,t\ ~nd· L. Division of ~•anment Sllndanls of die California Department of Total
Received By Signature Print Name (Customer) No ono avalable to sign, customerwa!Ylt rtcelpt
signature. (Flrll dtlvlly licket Buytr/Conlracto,
Signature --IIUI be alpd.) D X
Arrive Job Start
Unloading
Finish
Unloading
MIRAMAR PLANT:
Aggregates, A 1 Solla, Recycle Materials:
9229 Harris Plant Rd.
San Diego, CA 92145
CHANNEL ROAD PLANT:
Clean FIii (Open Upon Request)
10322 Channel Rd.
Lakeside, CA 92040
HOLLISTER PLANT:
Recycle Materials
389 Hollister Street
San Diego, CA 92154
Standing
Time
SLAUGHTERHOUSE CANYON PLANT:
Aggregates, A 1 Solla, Recycle Materials:
12560 Hwy. 67
Lakeside, CA 92040
VIGILANTE PLANT:
~Et'aC\.l~:7
Lakeside, CA 92041
SANTEE PLANT:
Aggregates:
8514 Mast Blvd.
Santee, CA 92071
SITE SAFETY
Hard Hats
Must Be Worn
'C LASER RECYCLED (12/19)
Foot protection
Must Be Worn
High Visibility Vest
Must Be Worn
Eye protection
Must Be Worn
.00
WEIGHMASTER STATION zone
.CARD ONLY
4075600 Vehlcle °' Ucense Plate No. Traller or LJcense Plate No. Trailer Cl( l.lc:enle Plate No.
3 9229 Harris Plant Road
San Diego, CA 92145 Driver's Name Today's Tonnage LoadNo. Cum. Prod. Qty.
507--DUMP FEES 2021 *** CREDIT CARD ONLY
CREDI T CARD ONLY
~~~ 111111111111111111H
I ' I • I ' I ...
805PT Dump-Pickup w/Trailer-Concrete
Environmental Fee
Each 1. 00 12 .00 125 .00
6.25
SCALE WEIGHT
Gross. . ___ _
Tare _
GROSSI TARE
Drivers Always On
Driver Off D
D D D
Scele 1 ~ 2 SUie 3
WEIGHMASTER CERnFICATE
nus IS TO CERTIFY tha the followina delcribed commodity was
welpd, masvn,d, or count:d by a -iahm•lcr, whoee 1fgnnIn, is
on tli1 certlllc...,. who is a ROCoanm:d ailhority of acancy, •
piwcribed by 0.pter 7 (eommoncina with Section 12700) of Division s oflhe California aiaaeu end Prof•sions Codo. adminisccn:d by the
Cartage
Sales Tax 0.00
0 .00
X-mftli~ We/ghmJ&fiald L . Division of ~euurcmcnt Sllndards of 1ho California Dq>111mcnt of Total
No one avalable ID sign, cuSlome( warm r9Cllpt Received By Slgneture
signature. (Flr11 dehy ticket 8uyefi'Conlrlclor
Slgnalure releae mull bo aigned.) D X
Arrive Job Start
Unloading
Finish
Unloading
,.
MIRAMAR PLANT:
Aggregates, A 1 Solla, Recycle Materlala:
9229 Harris Plant Rd.
San Diego, CA 92146
CHANNEL ROAD PLANT:
Clean FIii (Open Upon Request)
10322 Channel Rd.
Lakeside, CA 92040
HOLLISTER PLANT:
Recycle Materials
389 Hollister Street
San Diego, CA 92154
X
Standing
Time
X
CUatomer's Initials
SLAUGHTERHOUSE CANYON PLANT:
Aggregates, A 1 Solla, Recycle Materials:
12580 Hwy. 87
Lakeside, CA 92040
VIGILANTE PLANT:
Aggregates:
12635 Hwy67
Lakeside, CA 92041
SANTEE PLANT:
Aggregates:
8514 Mast Blvd.
Santee, CA 92071
SITE SAFETY REC9CLINO LOO COPU
Hard Hats
Must Be Worn
C LASER RECYCLED (12/19)
Foot protection
Must Be Worn
High Visibility Vest
Must Be Worn
Eye protection
1
Must Be Worn
SYCAMORE LANDFILL
8514 MAST BLVD
SANTEE, CA 92071
()-
333355 -DIVERSIFIED DESTRUCTION
10358 BUENA VISTA AVENUE
SANTEE, CA 92071
Contract.: DIVERSIFIED DESTR
INC OBA
GROSS 19,780 Scale In
TARE 30,880 Tare Out
NET 8,900
Tr.c1cking Qty: 0.00
Qty Unit Description
1.45 TN MSW
Ticke· : 198127 3
Weighmaster: DOMINLO
In: November 04, ;, 0 '.'. l
Out: November 04, 2021
Vehicle: A54656/A40577
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$79.45 $353.55
Tax
$0.00
Or.Lgin: CARLSBAD 100%
l.00 ENVIRONMENTAL FEE 1
l . 00 FUEL RECOVERY FEE
$18.00 $18.00
8.28 $29.27
,•·. j
(
$0.00 so.no
Tolal
Paid
Chancre
'1:4:-; ,l[l\
'l'ul.dl
s·~:)··~. ~-\~,
::18.(11)
;·:;;;'<t. -·'.'/
\;fl.00
;,0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760) 603-0153
~ ',·, Tick( #: 2327602
Weighmaster: cisneadl
In: November 11, 2021
333370 -DIVERSIFIED DESTRUCTION INC OBA Out: November 11, 2021
10358 BUENA VISTA AVE.
SANTEE, CA 92071 Vehicle: a54656
Contract: INDUSTRIAL-GATE 2
GROSS 36,060 Scale In
TARE 31,300 Tare Out
NET 4,760
Tracking Qty: 0.00
Qty
2.38
Unit Description
TN MSW
Origin: CARLSBAD 100%
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$83.04 $197.64
Tax
$0.00
1:41 pm
1:41 pm
Total
$197.64
?[CIJCLINa Loa COPi,
Signature:
Total
Paid
Change
$197.64
$0.00
$0.00