HomeMy WebLinkAbout2502 SOMBROSA PL; ; CB162870; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-26-2016 Demolition Permit Permit No: CB162870
Job Address:
Permit Type:
Parcel No:
Occupancy Group:
PC#:
Building Inspection Request Line (760) 602-2725
2502 SOMBROSA PL CBAD
DEMO Full Demo: N Status:
2550840300 Lot #: 0 Applied:
Entered By:
Reference #: Plan Approved:
ISSUED
07/26/2016
RMA
07/26/2016
# Dwelling Units: 0 Structure Type: Issued: 07/26/2016
Bedrooms: 0 Bathrooms: 0 Inspect Area:
Project Title: SWONETZ RES-DEMOLIOSH POOL
FILL IN EXISTING POOL AREA-NO SOILS /COMPACTION
Applicant:
JAMES CONSTRUCTION CLEANUP INC
STE 123-381
6755 MIRA MESA BLVD
SAN DIEGO CA 92121
619-861-6700
Building Permit
Plumbing Fee
Other Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$65.00
$0.00
$65.00
Owner:
SWONETZ JESSE M&JOSI
2502 SOMBROSA PL
CARLSBAD CA 92009
Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due:
Inspector: /11. ~ Clearance:
$0.00
~CE Aeaseta<e ~CEthat,wuta cf l"-f f)tjed irdu;Jestre"lrrµstiai' ct fees, ciooa:ljcns, resa-vaioos, orclharexmicrshreaftera:ilecti'-"Y
refemed to as 'fees'~c:ns." Yru ha\<> 9J days frcmtre-ths ,amt Wffi iSSLe'.Jto prctest irrµs!im cf tt-eeefees'exmic:ns. If yru putest lrerT\ yru rrust
fdlo,vtre putest p,::arlres set fath in Coiemi-a1 Cooe Sedim llOOal(a), andfiletre prctest and .n;clhar req.ired irlormilmwth Ire Oty Mngerfor
prro,ssing in aoc:ormu,v.ith Calsbal Mridr,a Cooe Sedim 3.32.030. FalLretotirrelyfdlo,vthat ix-cxmrewll ta-.n;sut,,aµrt lega ajja, to attock.
re.Jie.v, set aside, \dd, a cJTlJ treir inµ:sitim.
Yru ere rerro, F\Rll-ER~RE!lthat I"-' rig,t to prctest Ire s,:ecifiedfees'exmic:ns DCES t-.OT APA-Ytov.<ter and se,.e: omnedm fees ard c,µdty
ch:rges, rrr plmirg, zairg, gairg a-cttH Snilcr ~icaim ~rg er savire fees in arnedim Wth tHs ptject. l'-[R IXES IT .APA... Y to ?nf
f exa:ticnsctv.hdl have cusl been aNOTICEsirrila-totns er to\.-\nditt"estci.utectlinitn::ns ·rus1
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-26-2016
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW160333
Job Address:
Permit Type:
2502 SOMBROSA PL CBAD
SWPPP Status:
Parcel No: 2550840300 Lot #: 0 Applied:
ISSUED
07/26/2016
RMA
07/26/2016
Reference#:
CB#: CB162870
Project Title: SWONETZ RES-DEMOLISH POOL
Applicant:
JAMES CONSTRUCTION CLEANUP INC
STE 123-381
6755 MIRA MESA BLVD
SAN DIEGO CA 92121
619-861-6700
Emergency Contact:
BILL
STULTS
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
SWONETZ JESSE M&JOSI
2502 SOMBROSA PL
CARLSBAD CA 92009
1
L
$0.00
$59.00
$0.00
$59.00
Total Fees: $59.00 Total Payments To Date: $59.00 Balance Due: $0.00
FINAL APPROVAL
DATE ott{erz./t b CLEARANCE. ___ _
SIGNATURE f'/1. ~,s
THE FO~LOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: [] PLANNING 0 ENGINEERING
C. I I Y O f
CARLSBAD
JOB ADDRESS
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca gov
www.carlsbadca.gov
2502 Sombrosa Pl.
SUITE#/SPACE#/UNI
··----
Est. Value
cr;PROJCcT> ____ JLorn IPHAs~~-# OF IJNITS # BEfiR00",1S # BATHROOMS -TENANT BUSINESS NAME
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)
[jHAZMAT/APCD
SWPPP
03 00
Demolish & bury (not remove) the existing swimming pool in the backyard of this SFR. This area will not be a "buildable" site,
and there will not be a soils inspection or engineering report.
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) I FIREPLACE
1
AIR CONDITIONING
I
F!RE SPRINKLERS
1 YES0, No□ YES □No □ YES□No□,
1 APPLICANT NAME (Primary Contact) James Construction APPLICANT NAME (Secondary Contact) Jennifer/Randy Cole ----------------··--------·------------------·-------------ADDRESS 1\DDRESS 6755 MIRA MESA BLVD #123-381 9880 Maqnolia Ave #119 -ciTY _____ -----STATE ZIP -1cir1--STATE ZIP San Dieqo CA 92121 Santee CA 92071
·-~
PHONE
I FAX :lHQNE --TAX
619-4o5-2648 I 619-330-4796 EMAIL CMAIL , jennifer@permitrunner.net
I PROPERTY OWNER NAME Jesse Swonetz CONTRACTOR BUS. NAME
James Construction
·-· ADDRESS ADDRESS
2502 Sombrosa Pl. 6755 MIRA MESA BLVD #123-381 i -----
!
CITY STATE ZIP CITY STATE ZIP Carlsbad CA 92009 SAN DIEGO CA 92121 PHONE IFAX PHONE -
IFAX
----
(619) 861-6700 '-------· ~-. EMAIL EMAIL . -----
j ,') , r .1'1 I A --ARCH/DESIGNER NAME & ADDRESS ,.
ISTAT[LIC II SlATE LIC.# I CLASS I CITY BUS, LIC.# I "'--I (7 ,7,f 802538 D63/C21 1236] 9:1-
(Sec. 7031.5 Business and Professions Code. Any City or Coun_ty which requires a permit to construct. alter, improve. demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a s1.E(ned statement that he 1s licensed pursuant to the prov1s1ons of the Contractor's License Law !Chapter 9. commending with Section 7000 of D1v1s1on 3 of the
Business and Professions Code} or that he 1s exempt therefrom, and the basis for the alleged exemption. Any v1olat1on of Section 031.5 by any applicant for a permit subJects the applicant to a c1v11 penalty of not more than five hundred dollars ($500)).
l;iitilttiWWJJiitiii·il "'""'"""" ,
1
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
B I have and will maintain a certificate of consent to self-insure 1or workers' compensation as provided by Section 3700 of the Labor Code, lor the performance of the work for which this permit is issued
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code. for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
number are. Insurance co Employee Seivice Group Policy No W101783200 Ewiration Date 41112017
~section need not be completed 1f the permit is for one hundred dollars ($100) or less
LJ Certificate of Exemption: I certify that 1n the performance of the work for which tnis permit is issued, I shall not employ any person in any manner 50 as to become subject to the Workers' Compensation Laws of
addition to the cost of compensation, damages as provided for i!,YS tio11 3706 of the Labor code, intarest and attorney's fees.
California WARNING: Failure to secure workeri;' compensatioz;cove. 311e is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
, ,gCONTRACTORSIGNATURE , I/ /OU.✓ (2]AGENT DATE 7125/16
I I hereby affirm that I am exempt from Contractor's License Law for the following reason
D
□
□
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure 1s not intended or offered for sale (Sec. 7044. Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or impro~es thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. 11, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code: The Contractor's License law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
I am exempt under Section _ B'lsiness and Professions Code for this reason
1. I personally plan to provide the major labor and materials for construction of the proposed property irnprovement. 0Yes 0No
2. I {have I have not) signed an application for a building permit for the proposed work,
3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number)
4 I plan to provide portions ol the work, but I have hired tr.e following person to coordinate, supervise and provide the major work (incli.Jde name I address I phone I contractors' license number)
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name l address/ phone I type of work}
--------------------------
~ PROPERTY OWNER SIGNATURE □AGENT DATE
I certify ttlat I have read the application and state that the above lnfo1TI1ation is correct and that the info1TT1ation on the plans Is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby auihoMze re~entative of the City of Ca~sbad to enter upon the above mentioned proi:;erty for insi:ectkJn purposes. I ALSO AGREE TO SAVE, INDEMNIFY ANO KEEP HARMLESS THE CITY Qi= CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUEAG/>JNST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA: Im OSHA permit is required for excavations over 5'0' deep and demolttion or construction of structures over 3 stores in height.
EXPIRATION Every perm1! issued by the Building Official under the proVls\Ons of th1§ Cpde shall expire by l1m1tat1on and become null and void 1f the bu1k:l1ng or 'M)rk authonzed by sudl perm! IS not rornmenced w,th1n
180 days from the date of such penn1t or 1f !tie bu1kl1ng o·v.ork authonzed tiy sl.!Ql#rm1\ 1s suspended or abandoned at any time after the v.ork 1s commenced for a period of 180days (Secl10n 1064 4 Unlfomi BwkJ1ng Code)
..ES' APPL1cANT's s10NA~u•, j1'fu /f-::lJ6!..✓ oATE 7/25/16
T/ \~./
Inspection List
Permit#: CB162870
Date Inspection Item
08/02/2016 19 Final Structural
08/02/2016 19 Final Structural
Type: DEMO
07/27/2016 51 Excav/Steel/Bonding/Fence
Inspector Act
RI
MC Fl
07/27/2016 51 Excav/Steel/Bonding/Fence MC
RI
AP
Wednesday, August 03, 2016
SWONETZ RES-DEMOLIOSH POOL
FILL IN EXISTING POOL AREA-NO SOILS
Comments
PM PLEASE
ALL EQUIPMENT REMOVED
PM PLEASE
BOTTOM OF POOL/COPING
REMEOVED. SEE CARD.
Page 1 of 1
PL
i
11 1
J
37 1 ~ a'i,:11/ i., < 5(,/ >
1'
I c/
{,
/1
North
«1~ ¥ CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
This form is required for all pools, retaining walls or whenever a building footprint is enlarged.
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
✓ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
OWNER(S)/0WNER'S AGENT NAME (PRINT)
0WNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE
E-29 a'
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
Site Address: 1186 Larksupr Ln CadsbadlCA
Assessor's Parcel Number: ______ _
ProjectlD ft(} f bO lli
Construction :ermit No.: ctf1:, ag ]'{)
Estimated Construction Start Date 2/15/ 16
Project Duration 3 -5 daysM~-
Emergency Contact:
Name: Bill Stults
24 hour Phone: ~19) 861-6700
Perceived Threat to Storm Water Quality
D Medium
l1i:J Low
lf medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By: _________ _
Date: _________ _
REV 4/30/10
Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs
C C C c c 0 0 0 "O u u a, ~ • "O • C C E C E "O 2 0 C C, C • 2 2 '6 a. • • 2 • "O ~ § a, ~ .E ·s • C, ffi -;;; 00 -;;; C IC C, 00 * :e C, c-a. • C c C ~ ~ " rr • • C • Best Management Practice C • • ·5. ·t: C 00 w C .Q "' :c 00 ~ "' -0 • 0 • * .e "' ~ • (BMP) Description ➔ 00 ~ C E ~ §1 • C (.) ~ (.) 00 "O w • c 2 ~ 00 £ . (/) -~ 00 C, "' -~ § C, C "O ~ C 00 :e • 00 • ~ B~ • c • '5 • ~ "E "Ow "O >-0 oo C _;; ! 0 ::, > 00 ~ r.! :e 0 u 0 "' C, D;;;;; ]~ •• <:_g • )J '" 2 e' • 0 i C • a: • ~i C, • ·5. ~ " • "O • E ~ w -~ .0 E2 '.'5 2 a. ~ C • "-u ffi > . ~ "O :a ~ C .!:: l ~ • u 0 0 t ·-a. '6 • e u C .0 • 2u .> ~ u =' "O N C • ~ "' ~ 0 "' • ~ .0 • • .s e • C, .!!lo ~£ • ~~ • s ·5. 0 • 0 (!) WO uj uj (/) (.) u:: " en ;2 (/) (/) a. -c (/) a: a. a. >O :e (/) (/) ( (/) J: () "'-
CASQA Designation ➔ .,. "1 ~ '7 ., "1 'f ... :i; 0 ;;;: ~ ;;; ~ a, ~ '7 ., "1 'f "1 0 w w ~ J, J, i (.) (.) w w w w w a: :e :e :e :e :e :e w w w (/) (/) (/) (/) (/) (/) (/) f--f--z z z z ~ ~ ~ ~ ~ ~ ~ Construction Activity w (/)
Gradina/Sofl Disturbance X X X
T renchinQ/Excavation
Stockoilina X 1( X
DrillinQIBorinq
Concrete/Asphalt Saw
cuttina
Concrete flatwork
Pavina
ConduiUPioe Installation
Stucco/Mortar Work
Waste Disoosal
Staqina/Lav Down Area 1( 1( 1(
Equipment Maintenance
and Fuelina
Hazardous Substance
Use/Storaae
Dewatering
Site Access Across Dirt
Other (list):
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example -If the project indudes site access across dirt, then check the box to the left of "Site Access Across Dirt''. Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the MSite Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10