Loading...
HomeMy WebLinkAbout2502 SOMBROSA PL; ; CB162870; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-26-2016 Demolition Permit Permit No: CB162870 Job Address: Permit Type: Parcel No: Occupancy Group: PC#: Building Inspection Request Line (760) 602-2725 2502 SOMBROSA PL CBAD DEMO Full Demo: N Status: 2550840300 Lot #: 0 Applied: Entered By: Reference #: Plan Approved: ISSUED 07/26/2016 RMA 07/26/2016 # Dwelling Units: 0 Structure Type: Issued: 07/26/2016 Bedrooms: 0 Bathrooms: 0 Inspect Area: Project Title: SWONETZ RES-DEMOLIOSH POOL FILL IN EXISTING POOL AREA-NO SOILS /COMPACTION Applicant: JAMES CONSTRUCTION CLEANUP INC STE 123-381 6755 MIRA MESA BLVD SAN DIEGO CA 92121 619-861-6700 Building Permit Plumbing Fee Other Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $65.00 $0.00 $65.00 Owner: SWONETZ JESSE M&JOSI 2502 SOMBROSA PL CARLSBAD CA 92009 Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due: Inspector: /11. ~ Clearance: $0.00 ~CE Aeaseta<e ~CEthat,wuta cf l"-f f)tjed irdu;Jestre"lrrµstiai' ct fees, ciooa:ljcns, resa-vaioos, orclharexmicrshreaftera:ilecti'-"Y refemed to as 'fees'~c:ns." Yru ha\<> 9J days frcmtre-ths ,amt Wffi iSSLe'.Jto prctest irrµs!im cf tt-eeefees'exmic:ns. If yru putest lrerT\ yru rrust fdlo,vtre putest p,::arlres set fath in Coiemi-a1 Cooe Sedim llOOal(a), andfiletre prctest and .n;clhar req.ired irlormilmwth Ire Oty Mngerfor prro,ssing in aoc:ormu,v.ith Calsbal Mridr,a Cooe Sedim 3.32.030. FalLretotirrelyfdlo,vthat ix-cxmrewll ta-.n;sut,,aµrt lega ajja, to attock. re.Jie.v, set aside, \dd, a cJTlJ treir inµ:sitim. Yru ere rerro, F\Rll-ER~RE!lthat I"-' rig,t to prctest Ire s,:ecifiedfees'exmic:ns DCES t-.OT APA-Ytov.<ter and se,.e: omnedm fees ard c,µdty ch:rges, rrr plmirg, zairg, gairg a-cttH Snilcr ~icaim ~rg er savire fees in arnedim Wth tHs ptject. l'-[R IXES IT .APA... Y to ?nf f exa:ticnsctv.hdl have cusl been aNOTICEsirrila-totns er to\.-\nditt"estci.utectlinitn::ns ·rus1 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-26-2016 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW160333 Job Address: Permit Type: 2502 SOMBROSA PL CBAD SWPPP Status: Parcel No: 2550840300 Lot #: 0 Applied: ISSUED 07/26/2016 RMA 07/26/2016 Reference#: CB#: CB162870 Project Title: SWONETZ RES-DEMOLISH POOL Applicant: JAMES CONSTRUCTION CLEANUP INC STE 123-381 6755 MIRA MESA BLVD SAN DIEGO CA 92121 619-861-6700 Emergency Contact: BILL STULTS SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Entered By: Issued: Inspect Area: Tier: Priority: Owner: SWONETZ JESSE M&JOSI 2502 SOMBROSA PL CARLSBAD CA 92009 1 L $0.00 $59.00 $0.00 $59.00 Total Fees: $59.00 Total Payments To Date: $59.00 Balance Due: $0.00 FINAL APPROVAL DATE ott{erz./t b CLEARANCE. ___ _ SIGNATURE f'/1. ~,s THE FO~LOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: [] PLANNING 0 ENGINEERING C. I I Y O f CARLSBAD JOB ADDRESS Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca gov www.carlsbadca.gov 2502 Sombrosa Pl. SUITE#/SPACE#/UNI ··---- Est. Value cr;PROJCcT> ____ JLorn IPHAs~~-# OF IJNITS # BEfiR00",1S # BATHROOMS -TENANT BUSINESS NAME DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) [jHAZMAT/APCD SWPPP 03 00 Demolish & bury (not remove) the existing swimming pool in the backyard of this SFR. This area will not be a "buildable" site, and there will not be a soils inspection or engineering report. EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) I FIREPLACE 1 AIR CONDITIONING I F!RE SPRINKLERS 1 YES0, No□ YES □No □ YES□No□, 1 APPLICANT NAME (Primary Contact) James Construction APPLICANT NAME (Secondary Contact) Jennifer/Randy Cole ----------------··--------·------------------·-------------ADDRESS 1\DDRESS 6755 MIRA MESA BLVD #123-381 9880 Maqnolia Ave #119 -ciTY _____ -----STATE ZIP -1cir1--STATE ZIP San Dieqo CA 92121 Santee CA 92071 ·-~ PHONE I FAX :lHQNE --TAX 619-4o5-2648 I 619-330-4796 EMAIL CMAIL , jennifer@permitrunner.net I PROPERTY OWNER NAME Jesse Swonetz CONTRACTOR BUS. NAME James Construction ·-· ADDRESS ADDRESS 2502 Sombrosa Pl. 6755 MIRA MESA BLVD #123-381 i ----- ! CITY STATE ZIP CITY STATE ZIP Carlsbad CA 92009 SAN DIEGO CA 92121 PHONE IFAX PHONE - IFAX ---- (619) 861-6700 '-------· ~-. EMAIL EMAIL . ----- j ,') , r .1'1 I A --ARCH/DESIGNER NAME & ADDRESS ,. ISTAT[LIC II SlATE LIC.# I CLASS I CITY BUS, LIC.# I "'--I (7 ,7,f 802538 D63/C21 1236] 9:1- (Sec. 7031.5 Business and Professions Code. Any City or Coun_ty which requires a permit to construct. alter, improve. demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a s1.E(ned statement that he 1s licensed pursuant to the prov1s1ons of the Contractor's License Law !Chapter 9. commending with Section 7000 of D1v1s1on 3 of the Business and Professions Code} or that he 1s exempt therefrom, and the basis for the alleged exemption. Any v1olat1on of Section 031.5 by any applicant for a permit subJects the applicant to a c1v11 penalty of not more than five hundred dollars ($500)). l;iitilttiWWJJiitiii·il "'""'"""" , 1 Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: B I have and will maintain a certificate of consent to self-insure 1or workers' compensation as provided by Section 3700 of the Labor Code, lor the performance of the work for which this permit is issued I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code. for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are. Insurance co Employee Seivice Group Policy No W101783200 Ewiration Date 41112017 ~section need not be completed 1f the permit is for one hundred dollars ($100) or less LJ Certificate of Exemption: I certify that 1n the performance of the work for which tnis permit is issued, I shall not employ any person in any manner 50 as to become subject to the Workers' Compensation Laws of addition to the cost of compensation, damages as provided for i!,YS tio11 3706 of the Labor code, intarest and attorney's fees. California WARNING: Failure to secure workeri;' compensatioz;cove. 311e is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in , ,gCONTRACTORSIGNATURE , I/ /OU.✓ (2]AGENT DATE 7125/16 I I hereby affirm that I am exempt from Contractor's License Law for the following reason D □ □ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure 1s not intended or offered for sale (Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or impro~es thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. 11, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code: The Contractor's License law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law) I am exempt under Section _ B'lsiness and Professions Code for this reason 1. I personally plan to provide the major labor and materials for construction of the proposed property irnprovement. 0Yes 0No 2. I {have I have not) signed an application for a building permit for the proposed work, 3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number) 4 I plan to provide portions ol the work, but I have hired tr.e following person to coordinate, supervise and provide the major work (incli.Jde name I address I phone I contractors' license number) 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name l address/ phone I type of work} -------------------------- ~ PROPERTY OWNER SIGNATURE □AGENT DATE I certify ttlat I have read the application and state that the above lnfo1TI1ation is correct and that the info1TT1ation on the plans Is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby auihoMze re~entative of the City of Ca~sbad to enter upon the above mentioned proi:;erty for insi:ectkJn purposes. I ALSO AGREE TO SAVE, INDEMNIFY ANO KEEP HARMLESS THE CITY Qi= CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUEAG/>JNST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA: Im OSHA permit is required for excavations over 5'0' deep and demolttion or construction of structures over 3 stores in height. EXPIRATION Every perm1! issued by the Building Official under the proVls\Ons of th1§ Cpde shall expire by l1m1tat1on and become null and void 1f the bu1k:l1ng or 'M)rk authonzed by sudl perm! IS not rornmenced w,th1n 180 days from the date of such penn1t or 1f !tie bu1kl1ng o·v.ork authonzed tiy sl.!Ql#rm1\ 1s suspended or abandoned at any time after the v.ork 1s commenced for a period of 180days (Secl10n 1064 4 Unlfomi BwkJ1ng Code) ..ES' APPL1cANT's s10NA~u•, j1'fu /f-::lJ6!..✓ oATE 7/25/16 T/ \~./ Inspection List Permit#: CB162870 Date Inspection Item 08/02/2016 19 Final Structural 08/02/2016 19 Final Structural Type: DEMO 07/27/2016 51 Excav/Steel/Bonding/Fence Inspector Act RI MC Fl 07/27/2016 51 Excav/Steel/Bonding/Fence MC RI AP Wednesday, August 03, 2016 SWONETZ RES-DEMOLIOSH POOL FILL IN EXISTING POOL AREA-NO SOILS Comments PM PLEASE ALL EQUIPMENT REMOVED PM PLEASE BOTTOM OF POOL/COPING REMEOVED. SEE CARD. Page 1 of 1 PL i 11 1 J 37 1 ~ a'i,:11/ i., < 5(,/ > 1' I c/ {, /1 North «1~ ¥ CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 This form is required for all pools, retaining walls or whenever a building footprint is enlarged. STORM WATER COMPLIANCE CERTIFICATE ✓ My project is not in a category of permit types exempt from the Construction SWPPP requirements ✓ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). ✓ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ✓ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. OWNER(S)/0WNER'S AGENT NAME (PRINT) 0WNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE E-29 a' STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION Site Address: 1186 Larksupr Ln CadsbadlCA Assessor's Parcel Number: ______ _ ProjectlD ft(} f bO lli Construction :ermit No.: ctf1:, ag ]'{) Estimated Construction Start Date 2/15/ 16 Project Duration 3 -5 daysM~- Emergency Contact: Name: Bill Stults 24 hour Phone: ~19) 861-6700 Perceived Threat to Storm Water Quality D Medium l1i:J Low lf medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: _________ _ Date: _________ _ REV 4/30/10 Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs C C C c c 0 0 0 "O u u a, ~ • "O • C C E C E "O 2 0 C C, C • 2 2 '6 a. • • 2 • "O ~ § a, ~ .E ·s • C, ffi -;;; 00 -;;; C IC C, 00 * :e C, c-a. • C c C ~ ~ " rr • • C • Best Management Practice C • • ·5. ·t: C 00 w C .Q "' :c 00 ~ "' -0 • 0 • * .e "' ~ • (BMP) Description ➔ 00 ~ C E ~ §1 • C (.) ~ (.) 00 "O w • c 2 ~ 00 £ . (/) -~ 00 C, "' -~ § C, C "O ~ C 00 :e • 00 • ~ B~ • c • '5 • ~ "E "Ow "O >-0 oo C _;; ! 0 ::, > 00 ~ r.! :e 0 u 0 "' C, D;;;;; ]~ •• <:_g • )J '" 2 e' • 0 i C • a: • ~i C, • ·5. ~ " • "O • E ~ w -~ .0 E2 '.'5 2 a. ~ C • "-u ffi > . ~ "O :a ~ C .!:: l ~ • u 0 0 t ·-a. '6 • e u C .0 • 2u .> ~ u =' "O N C • ~ "' ~ 0 "' • ~ .0 • • .s e • C, .!!lo ~£ • ~~ • s ·5. 0 • 0 (!) WO uj uj (/) (.) u:: " en ;2 (/) (/) a. -c (/) a: a. a. >O :e (/) (/) ( (/) J: () "'- CASQA Designation ➔ .,. "1 ~ '7 ., "1 'f ... :i; 0 ;;;: ~ ;;; ~ a, ~ '7 ., "1 'f "1 0 w w ~ J, J, i (.) (.) w w w w w a: :e :e :e :e :e :e w w w (/) (/) (/) (/) (/) (/) (/) f--f--z z z z ~ ~ ~ ~ ~ ~ ~ Construction Activity w (/) Gradina/Sofl Disturbance X X X T renchinQ/Excavation Stockoilina X 1( X DrillinQIBorinq Concrete/Asphalt Saw cuttina Concrete flatwork Pavina ConduiUPioe Installation Stucco/Mortar Work Waste Disoosal Staqina/Lav Down Area 1( 1( 1( Equipment Maintenance and Fuelina Hazardous Substance Use/Storaae Dewatering Site Access Across Dirt Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project indudes site access across dirt, then check the box to the left of "Site Access Across Dirt''. Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the MSite Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10