HomeMy WebLinkAboutSDP 00-07; PIO PICO OFFICE BUILDING; Engineering Application0 0
CITY OF CARLSBAD - ENGINEERING DEPARTMENT
APPLICATION
FOR ENGINEERING PLAN CHECK OR PROCESSING
Complete all appropriate information. Write N/A when not applicable.
PROJECT NAME: via8co 0;:TtCe DATE: nef_____
PROJECT DESCRIPTION: X F 4 ce b.0LJ
.1/ cLp.t'rcvevr
PROJECTADDRESS: S?c opcc trtJ-t
LOT NO(S).: MAP NO.: APN(S).:
NO. OF DWELLING UNITS: LFMP ZONE: # LOTS: # ACRES:
OWNER: Coo&4 Miac. . APPLICANT:
Mailing Address: MAE LwerpOOL De * Mailing Address:
c.cc
Phone Number: rhO) Id5s L44P50 Phone Number:
I certify that I am the legal owner and that all the above
information is true and correct to the best of my knowledge
Signature -2-late*Signature Date
CIVIL ENGINEER: V SOILS ENGINEER: -ViArv. eofwet I
Firm: (A'ort. ) Firm: ec.c- a6ccrws.t.cA..
Mailing Address: Mailing Address:
Phone Number: ( ) Phone Number: (fB) 1`155-
State Registration Number: - 4.\ 0 22. State Registration Number 20 41
ADDITIONAL COMMENTS:
IMPROVEMENT VALUATION
What water district is the proposed project located in? (circle one)
flbd Municipal Water Dict Olivenhain Vallecitos
If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15%
contingency fee, for water and reclaimed water improvements (if applicable)? $
What is the total cost estimate, including the 15% contingency fee, for sewer (for Carlsbad
Municipal Water District only), street, public (median) landscape and irrigation, and
drainage improvements (if applicable)? $
What is the total cost of landscape and irrigation improvements on private property (if applicable)? $
GRADING QUANTITIES
cut cy fill cy remedial 45 cy import) 643 cy
H:WORD/DOCSJMISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING 'Zj7j JO a C)—C.1( I EV. 10106/99
FOR CITY USE ONLY
Plancheck Drawing Deposit/ Fees APPLICATION FOR:
(/ all that apply) Number Type Number Project I.D. Paid
C] Adjustment Plat ADJP
Li CertificW-of Compliance . COC
Li Dedication of Easement ... . .
DOE:
Type:
Type:
Li Encroachment Permit ENCROACH
Li Engineering Standards Variance ESV
Li Final Map FM -
Grading Plancheck , GRIC. . 3?(34 ' 1,3o0
C] Grading - GRADI NG
Li Improvement Plancheck IPC
-
Li Parcel Map P1 V
Li Quitclaim of Easement QUITC .
Type:
Type:
U Reversiôn td Acreage R1A
Li Street Vacation ....
SW
-
C] Tentative Parcel, Map MS
- Li Certificate of Correction CCOR
Li Covnant for Easement - COVE
Li Substantial ConforthanceExhibit SCE
APPLICATION ACCEPTED
MASTER PROJECT ID: REOBI LcD
RECEIPT NUMBER: SEP 132000
PRELIMINARY SIERRA SYSTEM INPUT INITIAL: ENGINEERING
SIERRA SYSTEM INPUT INITIAL: DEPARTMENT,-
R:BASE INPUT INITIAL:
MASTER FILE NUMBER: F -
Li OTHER: DATE STAMP
--
APPLICATION RECEIVED
DOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 10/06/99
0
PROJECT REVIEW COMPLETION
The following project has been reviewed and are recommended for approval:
Project Name: Pio Pico Office Building
Project No.: SDP 00-07
DocumeritNo.: DWG. 391-5A
Sheets No.: I Through: 5
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that 1 have exercised responsible charge over the review of this project
as defined in Section 6703 of the Business and Professions Code to determine that the
project is found to he in substantial compliance with applicable codes and standards.
Review of this project does not relieve the Land Surveyor or Engineer of Work of the
responsibilities with state and local ordinances.
Powell / PBS&J
175 Calle Magdalena
Encinitas, CA 92024
(760) 753-1120
Signed C41, Date 4__Q
Charles R. St. John, PE
Expiration Date: 12/31/01
(EXP.JQ1)
OF C mJ
II(OJECT REVIE\V coMILIrrloNdoe