Loading...
HomeMy WebLinkAboutCDP 03-12; ADAMS STREET SFR (NORTH); FINAL SOILS REPORT; 2022-07-27~ VINJE & MIDDLETON ENGINEERING, I NC. Ref Job# 19-118-F July 27, 2022 Mr. Jim Chambers Costacasa@gmail.com 2450 Auto Park War E.<cond1do, California 92029-1229 Phone (760) 743-1214 Fax (760) 739-0343 FINAL AS GRADED COMPACTION REPORT FOR SINGLE FAMILY RESIDENCE AT 4575 PARK DRIYE. CARI SBAD CAI IECRNIA GRADING PERMIT NO GR 2019-0030 Pursuant to your authorization, and in accordance with the requirements for the City of Carlsbad, this compaction report for the remedial grading and wall backfill has been prepared for the above referenced site. We have completed engineering observation and testing services in conjunction with the removal and re-compact grading operations which consisted of a 2-foot deep removal and re-compact of the existing soils within the garage area and 3-foot deep removal and recompact at the upper pad as well as wall backfill testing. This report summarizes the results of our tests and observations of compacted fill which was placed periodically from December 20, 2019 through January 31, 2020. Actual dates are shown on the enclosed compaction test result sheet. Laboratory compaction tests were performed to determine the maximum dry density and optimum moisture for each soil type in accordance with ASTM D-1557 which was brought forward from our Update Compaction Report dated March 25, 2019. Fill was placed in lifts of appropriate thickness based on type of construction equipment utilized for compaction. Field density tests were performed in accordance with ASTM D- 6938 nuclear gauge as the fill was placed. The moisture content for each density sample was also determined. The approximate locations of the field density tests are shown on the enclosed compaction test result sheet. In our opinion the compacted fills are suitable for the support of the intended structure and meet the recommendations of our referenced report. The locations of the tests were placed to provide the best possible coverage. Areas of low compaction, as indicated by the field density tests, were brought to the attention of the contractor. These areas were reworked by the contractor and retested. The test locations are plotted on the included Plate 1. Field density test results are summarized on the compaction test result table. Depths and locations of field density tests were determined by hand level and pacing/tape measure relative to field staking done by others, and top of retaining wall. Maximum Dry Density/Optimum Moisture Content, ASTM 1557: Soil Type: 4 Brown silty clayey fine to medium sand Maximum Dry Density: 133.5 pcf Optimum Moisture: 9.5% Soil Type: 5 Dark Brown clayey sand Maximum Dry Density: 128.2 pcf Optimum Moisture: 10.9% Soil Type: 3 Red Brown silty sand tr. Clay Maximum Dry Density : 131.4 pcf Optimum Moisture : I 0.3 % Soil Type: I Brown silty sand tr. Clay Maximum Dry Density : 132.3 Optimum Moisture : 11 .3 % JOB NO: 19-118-F NAME: Jim Chambers LOCATION:4588 Adams Street, Carlsbad Field Density Tests Results: Test Date No. Location 2019 10/19 I Upper Building Pad 10/19 2 Upper Building Pad 10/19 3 Upper Building Pad 10/20 4 Upper Building Pad 10/29 5 Garage Pad 10/29 6 Garage Pad 11/1 7 Garage Pad 11/1 8 Garage Pad 11/1 9 Garage Pad 11/1 10 Garage Pad 11/2 11 Garage Pad 11/2 12 Garage Pad 12/20 13 South Basement Wall 12/20 14 West Basement Wall 12/27 15 Basement Wall 12/30 16 Basement Wall 2020 1/2 17 Basement Wall 1/3 18 Basement Wall 1/3 19 Basemen! Wall Approx. Test depth/ Elev, (ft) 2019 76 76.0 77.3 77.5 67 68.5 67 67 68 68 68 69 -9 -6.5 -7 -9 2020 -7 -5.5 -5.5 % Field Dry Max Dry % Field Density Density Relative Comments Moisture Pcf Pcf Comp. 2019 12 116.9 128.2 91.2 JO 118.6 131.4 90.3 11 115. 1 131.4 88 FG, Test Failed 10 121.5 131.4 93 FG. Relest # 3 7 127.4 133.5 95 8 121.7 133.5 91 8 123.1 133.5 92 10 121.0 133.5 91 8 120.4 133.5 91 10 119.0 1:n.5 89 Test Failed 7 125.6 133.5 94 Re1es1 # 10 8 126.5 133.5 95 F.G. 12 I I I.I 128.2 87 11 118.4 128.2 92 11 I 15.4 128.2 90 9 114.0 125.5 91 2020 8 117.2 125.5 93 11 121.6 128.2 92 11 119.8 128.2 94 Test Approx. % Field Dry Max Dry % Date No. Location Test depth/ Field Density Density Relative Comments Elev. (rt) Moisture Per Per Comp. 1/3 20 Basement Wall .5 10 123.9 128.2 97 1/3 21 Basement Wall .5 9 119.1 128.2 93 1/6 22 Basement Wall .4 7 116.4 128.2 91 1/6 23 Basement Wall -3.5 8 116.9 128.2 91 1/8 24 Basemen, Wall -3 8 124.8 131.4 95 1/8 25 Basement Wall -3 12 121.8 131.4 93 1/8 26 Basement Wall -1.5 11 117.7 128.2 92 1/8 27 Basemen! Wall -3.5 10 110.6 125.5 88 Test Failed 1/9 28 Basement Wall -3.5 9 115.9 125.5 92 Re-Test #27 1/9 29 -I 10 123.5 125.5 98 1/9 30 Basement Wall -.5 JO 119.3 131.4 91 FG 1/9 31 Basement Wall -1.5 I I 111.4 121.0 92 1/23 32 Basement Wall -8.5 12 120.0 128.2 94 1/27 33 Basement Wall -6.5 11 118.8 131.4 90 1/28 34 Basement Wall -5 9 124.8 132.3 94 1/29 35 Basement Wall -3 10 122.0 131.4 93 1/30 36 Basement Wall -1.5 9 120.1 132.3 91 1/31 37 Basement Wall -.5 11 122.5 132.3 93 FG 1/31 38 Driveway SG II 129.5 132.3 98 1/31 39 Driveway SG 9 122.3 132.3 92 I/JI 40 Driveway SG 10 125.1 132.3 95