HomeMy WebLinkAboutCT 2018-0006; LAGUNA DRIVE SUBDIVISION; FINAL SOILS REPORT; 2022-02-22@ COAST GEOTECH, INC. I CONSULTING ENGINEERS AND GEOLOGISTS
February 22, 2022 (Revised from December 24, 2021)
Brett Farrow
Brett Farrow Architect
125 Mozart A venue
Cardiff, CA 92007
Subject: FINAL GEOTECHNICAL REPORT
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
References: See Page 6
Dear Mr. Farrow:
W.O. 686218
In response to your request, enclosed is our Final Geotechnical Report on the above referenced
property. This report presents a summary of our geotechnical observations during the grading and
construction phases.
PROPOSED DEVELOPMENT
Grading plans for site development were prepared by Pasco Laret Suiter and Associates. The project
included the construction of twelve (12) residential condominium structures. The residences are
supported on continuous wall footings with slab-on-grade floors. Grading on the site consisted of
fills ranging from 3.0 to 8.5 feet.
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 2 of 8
GEOTECHNICAL CONDITIONS
The subject property is located in the Coastal Plains Physiographic Province of San Diego. The
property is underlain at relatively shallow depths by Pleistocene Old Paralic Deposits. The Old
Paralic Deposits are underlain at depth by Eocene-age sedimentary rocks commonly correlated with
the Santiago Formation on published geological maps. The Old Paralic Deposits are covered by
relatively thin soil deposits. Unweathered dense Old Paralic Deposits are considered dense and
competent, which makes it suitable for the support of foundation and fill deposits. The Old Paralic
Deposits are composed of tan reddish-brown fine to medium grained sand.
CONSTRUCTION PHASE
1) Rough grading for the development was performed by Pacific Coast Grading from August 27
through September 23, 2020. The remedial grading was observed and or tested by this firm on
August 28, 2020, August 31 through September 4, 2020, September 8 through 11, 2020,
September 14, 2020, September 17 through 18, 2020 and September 21 through 23, 2020.
2) The continuous wall and column pad footing excavations for Units 1 through 6 of the
development were observed by this firm on October 27, 2020. Units 7 through 9 were observed
on November 25, 2020 and December 3, 2020. Units 10 through 11 were observed on January
4, 2021. Units 12 through 13 were observed on January 13, 2021.
3) The continuous wall and column pad footing excavations were founded into compacted fill
deposits. The footing excavations were approved by this firm provided all loose deposits were
removed from the base of the excavations prior to pouring concrete. The footing excavations
were not reviewed for compliance with structural plans and location.
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 3 of 8
4) Based on visual classification and previous laboratory testing, the mixture of soils utilized as
compacted fill reflect an expansion potential in the very low range.
5) Utility line backfill for Units 1 through 6 were not observed/tested as the sand blanket and
Visqueen were already in place at the time of footing excavation observation. The utility line
backfill within the building perimeter for Units 7 through 13 were observed by this firm on
December 3, 2020, January 4, 2021 and January 13, 2021. The utility trench backfill consisted
of on-site materials and was compacted with hand operated compaction equipment (whacker).
6) The sewer main backfill on Laguna Drive was observed and tested by this firm on August 27,
2021, August 30, 2021 and September 1, 2021.
7) The water line backfill on Laguna Drive was observed and tested by this firm on November 17
through 18, 2021, November 23, 2021 and December 13, 2021
8) The storm drain backfill on Laguna Drive was observed and tested by this firm on December 10
through 11, 2021.
9) The subgrade and Class 2 base for the City of Carlsbad sidewalk, curb and gutter was observed
and tested by this firm on December 16, 2021 and December 20 through 21, 2021. We did not
observe or test portions of the sidewalk within the project property limits.
10) We did not observed the installation of cut off walls or driveway construction. It is our
understanding that observation of these areas was under the supervision of the Civil Engineer.
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 4 of 8
CONCLUSIONS
The geotechnical conditions encountered on the site were in substantial conformance with those
conditions anticipated in the Preliminary Geotechnical Investigation Report. The grading and
construction phases were in substantial conformance with the recommendations of the geotechnical
reports.
Footings and slabs on grade should be protected from root and/or moisture migration. Undermining
and pressure from roots and/or saturated soil conditions from infiltration can adversely affect
foundations and slabs on grade. Irrigation should be limited to that amount necessary to sustain plant
life. Over zealous irrigation can result in slope instability and settlement of foundations and concrete
flatwork.
LIMITATIONS
This office assumes no responsibility for any alterations made without our knowledge and written
approval, subsequent to the issuance of this report. All areas of disturbance which require the
placement of compacted fill to restore them to the original condition will not be reviewed unless
such backfilling operations are performed under our observation and tested for required compaction.
It should be noted that density (compaction) testing is conducted on a very small volume of the fill.
The intent is to provide an opinion, based on selective testing and observation during fill placement.
Coast Geotech, Inc. cannot be responsible for areas not reviewed for soil compliance during
construction. Such areas are the sole responsibility of the contractor.
Geotechnical analysis of storm water infiltration was limited in scope. The long term effects of
infiltration cannot be predicted with certainty and can only be evaluated through usage and time.
However, in no respect do we guarantee or warrant the future performance of infiltration systems.
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
W.O. 686218
Page 5 of 8
This study has been provided solely for the benefit of the client and is in no way intended to benefit
or extend any right or interest to any third party. This study is not to be used on other projects or
extensions to this project except by agreement in writing with Coast Geotech, Inc.
If you have any questions regarding this report, please contact our office. Reference to our Job No.
686218 will help expedite a response to your inquiry.
Respectfully submitted,
COAST GEOTECH, INC.
Mark Burwell, C.E.G.
Engineering Geologist
Enclosures: Compaction Test Results
Grading Plan
J~~Av\11~
Vithaya mg
Geotechnical Engin
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 6 of 8
REFERENCES
1. NOTICE OF FOOTING EXCAVATION OBSERVATION, UNITS 12-13
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated January 13, 2021
2. NOTICE OF FOOTING EXCAVATION OBSERVATION, UNITS 10-11
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated December 24, 2020
3. NOTICE OF FOOTING EXCAVATION OBSERVATION, UNITS 7-9
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated December 4, 2020
4. NOTICE OF FOOTING EXCAVATION OBSERVATION, UNITS 1-6
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated October 27, 2020
5. ROUGH GRADING REPORT, UNITS 1-9
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated September 23, 2020
Coast Geotech, Inc. February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 7 of 8
6. ROUGH GRADING REPORT, UNITS 10-13
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated September 21, 2020
7. DEEPENED GARAGE FOOTINGS AND CONSTRUCTION
SEQUENCE RECOMMENDATIONS
Laguna Drive Subdivision
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotech, Inc.
Dated September 15, 2020
8. PERMEABLE PA VER DRIVEWAY
Laguna Drive Subdivision
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotechnical
Dated April 6, 2020
9. GEOTECHNICAL UPDATE REPORT
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotechnical
Dated January 23, 2020
10. RESPONSE TO REVIEW COMMENTS OF GEOTECHNICAL REPORTS
Laguna Drive Subdivision
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotechnical
Dated January 14, 2020
11. THIRD GRADING PLAN REVIEW
Proposed 13 Residential Structures
570-580 Laguna Drive
Carlsbad, CA 92008
Prepared by Coast Geotechnical
Dated December 19, 2019
Coast Geotech, Inc.
12. FOUNDATION PLAN REVIEW
Proposed 13 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotechnical
Dated December 19, 2019
February 22, 2022 (Revised from December 24, 2021)
w.o. 686218
Page 8 of 8
13. SUPPLEMENTAL RECOMMENDATIONS FOR A 3-STORY STRUCTURE
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, California
Prepared by Coast Geotechnical
Dated November 21, 2019
14. SECOND GRADING PLAN REVIEW
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, CA 92008
Prepared by Coast Geotechnical
Dated January 14, 2019
15. GRADING PLAN REVIEW
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, CA 92008
Prepared by Coast Geotechnical
Dated August 6, 2018
16. PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed 12 Residential Structures
570-580 Laguna Drive
Carlsbad, CA 92008
Prepared by Coast Geotechnical
Dated April 4, 2018
ENCLOSURES
Test#/date Retest Max Dens rest Location/Sta# Elevation Wet Density Dry density % Moisture Requirment % Compaction Pass/Fail
19 130.0 Section G 35.5 131.0 121.3 8.0 90 93 Pass
20 130.0 Section E 39.0 132.9 122.4 8.6 90 94 Pass
21-9/4/20 130.0 Section G 36.5 126.7 117.2 8.1 90 90 Pass
22 130.0 Section G 38.0 123.7 115.3 7.3 90 89 Fail
23 130.0 Section G 38.0 125.5 116.2 8.0 90 89 Fail
24-9/8/20 22.0 130.0 Section G 38.0 130.1 119.1 9.2 90 92 Pass
25 23.0 130.0 Section G 38.0 127.9 117.0 9.3 90 90 Pass
26 130.0 Section G 39.0 130.6 118.0 10.7 90 91 Pass
27 130.0 Section E 40.0 125.3 117.1 7.0 90 90 Pass
28 -9/9/20 130.0 Section G 40.0 129.1 119.0 8.5 90 92 Pass
29 130.0 Section E 41.5 128.2 117.5 9.1 90 90 Pass
30 -9/10/20 130.0 Section G 41.0 125.6 116.1 8.2 90 89 Fail
31 30.0 130.0 Section G 41.0 131.0 120.1 9.1 90 92 Pass
32 -9/11/20 130.0 Section G 42.0 128.6 118.5 8.5 90 91 Pass
33 130.0 Section E 43.0 130.8 120.8 8.3 90 93 Pass
34 -9/14/20 130.0 Section I 41.0 129.8 117.8 10.2 90 91 Pass
35 130.0 Section H 41.0 129.9 118.4 9.7 90 91 Pass
36 130.0 Section H 42.0 128.7 118.6 8.5 90 91 Pass
37 -9/17/20 130.0 Section I 43.5 125.2 115.5 8.4 90 89 Fail
38 130.0 Section D 43.5 129.0 118.2 9.1 90 91 Pass
39 -9/18/20 124.0 Section D 43.5 119.1 110.6 7.7 90 89 Fail
40 124.0 Section G 44.0 122.1 112.5 8.5 90 91 Pass
41 -9/21/20 39.0 124.0 Section D 45.5 121.4 112.7 7.7 90 91 Pass
42 124.0 Section G 45.2 127.2 116.1 9.6 90 94 Pass
43 37.0 124.0 Section I 44.0 128.8 117.7 9.4 90 95 Pass
44 -9/22/20 124.0 Section H 44.2 118.3 110.8 6.8 90 89 Fail
45 44.0 124.0 Section H 44.2 120.3 112.2 7.2 90 90 Pass
46 -9/23/20 124.0 Section I 43.9 126.9 117.1 8.4 90 94 Pass
47 -8/27/21 130.0 Sewer Main 38.0 129.4 118.6 9.1 90 91 Pass
48 130.0 Sewer Main 38.0 129.3 118.0 9.6 90 91 Pass
49 130.0 Sewer Main 40.0 132.2 122.6 7.8 90 94 Pass
50-8/30/21 130.0 Sewer Main 42.0 134.0 123.6 8.4 95 95 Pass
51 130.0 Sewer Main SG 132.0 123.9 6.5 95 95 Pass
Test#/date Retest Max Dens rest Location/Sta-Elevation Wet Density Dry density % Moisture Requirment % Compaction Pass/Fail
52 131.5 Sewer Main BG 130.0 125.6 3.5 95 96 Pass
53 131.5 Sewer Main BG 128.9 125.1 3.0 95 95 Pass
54 -9/1/21 146.0 Sewer Main AC 141.9 141.9 95 97 Pass
55 146.0 Sewer Main AC 143.5 143.5 95 98 Pass
56 -11/18/21 130.0 Water Line 42.0 136.6 124.1 10.1 95 95 Pass
57 130.0 Water Line 41.0 136.6 124.2 10.0 95 96 Pass
58 -11/23/21 131.5 Water Line BG 136.2 128.6 5.9 95 98 Pass
59 131.5 Water Line BG 134.6 126.7 6.2 95 96 Pass
60 146.0 Water Line AC 143.3 143.3 95 98 Pass
61 146.0 Water Line AC 139.2 139.2 95 95 Pass
62 146.0 Water Line AC 140.7 140.7 95 96 Pass
63 146.0 Water Line AC 138.6 138.6 95 95 Pass
64 146.0 Water Line AC 141.2 141.2 95 97 Pass
65 -12/10/21 130.0 Storm Drain 38.0 129.3 118 9.6 90 91 Pass
66 130.0 Storm Drain 40.0 131.3 120.2 9.2 90 92 Pass
67 -12/11/21 130.0 Storm Drain 42.0 133.5 123.8 7.8 95 95 Pass
68 130.0 Storm Drain 40.0 126.7 117.9 7.5 90 91 Pass
69 130.0 Storm Drain 42.5 134.4 123 9.3 95 95 Pass
70 130.0 Storm Drain SG 131.8 123.1 7.1 95 95 Pass
71 130.0 Storm Drain SG 134.1 124.5 7.7 95 96 Pass
72 131.5 Storm Drain BG 133.8 128 4.5 95 97 Pass
73 131.5 Storm Drain BG 133.3 128.5 3.7 95 98 Pass
74 -12/13/21 130.0 Water Line 41.0 126.6 118.1 7.2 90 91 Pass
75 130.0 Water Line SG 133.5 123.8 7.8 95 95 Pass
76 -12/16/21 130.0 Curb/Gutter SG 134.9 125.3 7.7 95 96 Pass
77 130.0 Curb/Gutter SG 134.9 125.7 7.3 95 97 Pass
78 130.0 Curb/Gutter SG 135.5 124.7 8.7 95 96 Pass
79 130.0 Curb/Gutter SG 131.5 123.5 6.5 95 95 Pass
80 145.3 Curb/Gutter BG 144.1 138.2 4.3 95 95 Pass
81 145.3 Curb/Gutter BG 143.7 138.6 3.7 95 95 Pass
82 145.3 Curb/Gutter BG 143.7 137.8 4.3 95 95 Pass
83 -12/20/21 130.0 Sidewalk SG 133.7 122.8 8.9 95 95 Pass
84 130.0 Sidewalk SG 131.1 122.4 7.1 95 95 Pass
Test#/date Retest Max Dens rest Location/Sta# Elevation Wet Density Dry density % Moisture Requirment % Compaction Pass/Fail
85 145.3 Sidewalk BG 143.9 137.3 4.8 95 95 Pass
86 145.3 Sidewalk BG 144.4 137.5 5.0 95 95 Pass
87 146.0 Storm Drain (AC) AC 138.5 138.5 95 95 Pass
88 146.0 Storm Drain (AC) AC 143.2 143.2 95 98 Pass
89 146.0 Side of Street AC 138.9 138.9 95 95 Pass
90 -12/21/21 146.0 Water Line (AC) AC 139.9 139.9 95 96 Pass
91 146.0 Side of Street AC 141.1 141.1 95 97 Pass