Loading...
HomeMy WebLinkAboutSDP 02-16; COASTLINE COMMUNITY CHURCH; FINAL SOILS REPORT; 2020-12-07FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING GRADING AND WALL BACKFILL OPERATIONS COASTLINE COMMUNITY CHURCH EXPANSION 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA PREPARED FOR COASTLINE COMMUNITY CHURCH ℅ GRANT GENERAL CONTRACTORS CARLSBAD, CALIFORNIA DECEMBER 7, 2020 PROJECT NO. G1968-11-02 Project No. G1968-11-02 December 7, 2020 Coastline Community Church ℅ Grant General Contractors 5051 Avenida Encinas Carlsbad, California 92008 Attention: Mr. Jim Grant Subject: FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING GRADING AND WALL BACKFILL OPERATIONS COASTLINE COMMUNITY CHURCH EXPANSION 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA Dear Mr. Grant: In accordance with your request, we provided compaction testing and observation services during grading and wall backfill operations at the Coastline Community Church expansion project. This phase of the construction included constructing of a new ministry building, future turf area/ playground, an elevator tower, improving an existing drainage basin, installing a new basin, and driveway extension. Our testing and observation services were performed from May 21 to November 30, 2020. The scope of our services summarized in this report include: Observing remedial grading operations located in the turf and playground area including the removal of unsuitable previously placed fill and the placement of a subdrain to intercept seepage. Observing grading operations during excavation of existing fill soils within the building pad to achieve finish grade and the processing, moisture conditioning, and recompaction of the upper 1 foot of the building pad and Drive A extension. Observing the construction of a Mechanically Stabilized Earth (MSE) wall. Performing in-place dry density and moisture content tests on fill placed and compacted during the grading and wall backfill operations. Performing laboratory tests to aid in evaluating the maximum dry density/optimum moisture content and shear strength of the compacted fill. Additionally, we performed laboratory tests on samples of soil present within approximately 3 feet of finish grade within the building pad to evaluate expansion characteristics and water-soluble sulfate content. GEOCON INCORPORATED GEOTECHNICAL ■ ENVIRONMENTAL ■ MATE RI ALS O 6960 Flanders Drive ■ San Diego, California 92121-297 4 ■ Telephone 858.558.6900 ■ Fax 858.558.6159 Geocon Project No. G1968-11-02 - 2 - December 7, 2020 Preparing an As-Graded Geologic Map. Preparing this final report of grading and wall backfill. GENERAL The project site is located at 2215 Calle Barcelona within a portion of the Coastline Community Church facility in the City of Carlsbad, California (see Vicinity Map). Bighorn Grading & Engineering Incorporated located in Temecula, California performed the grading and CMU retaining wall backfill for the project. Geogrid Retaining Wall Systems Incorporated performed the construction and backfill of the MSE wall. Vicinity Map To aid in preparing this report, we reviewed the following geotechnical report and grading plans associated with the project: 1.Update Geotechnical Report, Coastline Community Church Expansion, 2215 Calle Barcelona, Carlsbad, California, prepared by Geocon Incorporated, dated October 12, 2018 (Project No. G1968-11-02). 2.Grading Plans For: Coastline Community Church – Phase 1, City Project No. SDP02-16, Carlsbad, California, prepared by Fuscoe Engineering, city approval date May 1, 2020. Geocon Project No. G1968-11-02 - 3 - December 7, 2020 References to elevations and locations presented herein were based on the surveyor’s or grade checker’s stakes in the field, surveyed bottom elevations, and/or interpolation from the referenced grading plans. Geocon Incorporated does not provide surveying services and, therefore, has no opinion regarding the accuracy of the as-graded elevations or surface geometry with respect to the approved plans or proper surface drainage. PREVIOUS GRADING AND DEVELOPMENT Initial development of the property consisted of sheet-grading the site in 1997 during overall grading operations of the surrounding development that included the church site. The initial church site grading consisted of removing surficial soil and the placement of compacted fill to achieve sheet-grade elevations. Bottom removal elevations varied from 73 feet to 92 feet MSL to expose very dense Delmar Formation prior to placement of compacted fill. The church site fill was placed under the observation and compaction testing services of Geocon Incorporated as part of the surrounding Arroyo La Costa development. Geocon then performed testing and observation services during the fine grading of the existing church facility in 2006 to achieve new finish grade elevations. Additional fill up to roughly 18 feet thick was placed at the site. An elevation of roughly 105 feet MSL was achieved in 2006 in the area of the new building pad and 94 feet to 105 feet MSL within the turf and playground area. Rough finish grade was previously established within Drive A extension in 2006. GRADING AND MSE WALLS This report pertains to the grading, MSE wall construction, and MSE and CMU wall backfill operations of the church expansion project. Grading for the new ministry building pad included removal of approximately 6 feet of previously placed fill to achieve a finish pad elevation of 99.30 feet MSL. We then observed the processing, moisture conditioning, and recompaction of the upper foot of soil within the building pad. Remedial grading was limited to the proposed turf and playground area as shown on Figure 1. This included the removal of loose and saturated previously placed fill to depths up to 11 feet to achieve a firm bottom prior to placing new compacted fill. A perforated subdrain was installed at the base of the removal on the south side of the turf area as shown on Figure 1 to intercept seepage. The subdrain consists of a 4-inch diameter schedule 40 PVC perforated pipe surrounded by 3/4-inch gravel and filter fabric. The subdrain was connected to an existing storm drain as shown on Figure 1. A 345-foot long MSE retaining wall was constructed on the south side of the new ministry building. Prior to the construction and placement of fill, a representative of Geocon Incorporated observed the footing excavation along the base of the wall. Our observations indicated that the exposed soil conditions within the footing consisted of properly compacted fill and was considered suitable for Geocon Project No. G1968-11-02 - 4 - December 7, 2020 support of the retaining wall. The exposed soil conditions were consistent with those described in the previously referenced update geotechnical report. A wall drain, consisting of a 4-inch-diameter perforated subdrain surrounded by gravel and filter fabric, was installed in conformance with the referenced grading and wall plans. The drain extends along the length of the wall backcut behind the bottom grid and outlets at various points along the wall prior to connecting to a storm drain in front of the wall. Backfill soil was then placed and compacted in layers to the design elevations shown on the referenced grading plans that included the wall plans. The geogrid reinforcement consists of Tensar geogrids as specified in the referenced retaining wall plans, cut to the minimum length shown on the plans, attached to the individual block units, and laid on the compacted backfill soil. CMU retaining walls were constructed on the north side of the building pad, the tower elevator on the south side of the turf area, and the new basin on the southeast portion of the project as shown on Figure 1. We performed wall backfill in-place density tests in general conformance with ASTM Test Method D 6938 (nuclear) with the results summarized on Table I indicating a prefix designation of “WB.” During the grading and wall backfill operations, we performed in-place density tests to evaluate the dry density and moisture content of the finish grade compacted fill. We performed in-place density tests in general conformance with ASTM Test Method D 6938 (nuclear). Table I presents the results of the in-place dry density and moisture content tests. In general, the in-place density test results indicate the finish grade soils possess a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content at the locations tested. The As-Graded Geologic Map, Figure 1, presents the approximate locations of the in-place density tests. We tested laboratory samples of material used for fill to evaluate moisture-density relationships, optimum moisture content and maximum dry density (ASTM D 1557) and shear strength (ASTM D 3080). We tested samples of material within the upper approximately 3 feet of finish grade to evaluate the expansion index (ASTM D 4829) and water-soluble sulfate content (California Test No. 417) characteristics. The laboratory test results are shown on Tables II through V. SLOPES New fill slopes constructed above retaining walls with a maximum height of approximately 30 feet were created during the current phase of grading. New and existing fill slopes should be planted, drained, and maintained to reduce erosion. Slope irrigation should be kept to a minimum to just support the vegetative cover. Surface drainage should not be allowed to flow over the top of the slope or walls. Geocon Project No. G1968-11-02 - 5 - December 7, 2020 SOIL AND GEOLOGIC CONDITIONS The soil and geologic conditions encountered during grading are similar to those described in the referenced update geotechnical report. We performed testing and observation services during the processing of finish grade soil in accordance with recommendations provided in the update geotechnical report. The As-Graded Geologic Map, Figure 1, depicts the general geologic conditions observed during grading operations. The building pad, turf and playground area, and driveway extension consists of new compacted fill (Qcf) with a maximum thickness of approximately 13 feet in thickness, overlying previously compacted fill placed in 1997 and 2006 (Qpf), overlying the Del Mar Formation (Td). In general, the fill consists of light to reddish brown, silty and clayey sand. CONCLUSIONS AND RECOMMENDATIONS 1.0 General 1.1 Based on our observations and test results, we opine that the grading and wall backfill operations to which this report pertains has been performed in conformance with the recommendations of the previously referenced update geotechnical report prepared by Geocon Incorporated, dated October 12, 2018, the geotechnical requirements of the referenced grading plans, and the requirements of the City of Carlsbad. 1.2 We did not observe soil or geologic conditions during pad grading that would preclude the continued development of the property as planned. Based on laboratory test results and field observations, we opine the fill observed and tested as part of the grading for this project was generally compacted to a dry density of at least 90 percent of the laboratory maximum dry density near to slightly above optimum moisture content. 1.3 The conclusions and recommendations presented in the referenced report remain valid for use in constructing the proposed project. We understand the project was designed using the 2016 California Building Code (CBC). We should be contacted if design recommendations using the 2019 CBC are necessary. 1.4 Trench excavations within the fill should generally be possible with moderate to heavy effort using conventional heavy-duty equipment. 2.0 Finish Pad Grade Soil Conditions 2.1 Observations and laboratory test results indicate that the prevailing soil conditions within the upper approximately 3 feet of finish grade of the building pad is considered to be “very low” (expansion index [EI] of 0 to 20) as defined by the 2016 California Building Code Geocon Project No. G1968-11-02 - 6 - December 7, 2020 (CBC) Section 1803.5.3. Table 2.1 presents soil classifications based on the expansion index. Results of the EI laboratory tests are presented in Table II. TABLE 2.1 EXPANSIVE SOIL CLASSIFICATION BASED ON EXPANSION INDEX Expansion Index (EI) ASTM D 4829 Expansive Soil Classification 2016 CBC Expansion Classification 0 – 20 Very Low Non-Expansive 21 – 50 Low Expansive 51 – 90 Medium 91 – 130 High Greater Than 130 Very High 2.2 We performed laboratory tests on samples of the finish-grade materials to evaluate the percentage of water-soluble sulfate content. Table III presents results of the laboratory water-soluble sulfate content tests. The test results indicate the on-site materials at the locations tested possess a “S0” sulfate exposure to concrete structures as defined by 2016 CBC Section 1904 and ACI 318-14 Chapter 19. The presence of water-soluble sulfates is not a visually discernible characteristic; therefore, other soil samples from the site could yield different concentrations. Additionally, over time landscaping activities (i.e., addition of fertilizers and other soil nutrients) may affect the concentration. 2.3 Geocon Incorporated does not practice in the field of corrosion engineering. Therefore, further evaluation by a corrosion engineer may be performed if improvements susceptible to corrosion are planned. 3.0 Site Drainage and Moisture Protection 3.1 Adequate site drainage is critical to reduce the potential for differential soil movement, erosion and subsurface seepage. Under no circumstances should water be allowed to pond adjacent to footings. The site should be graded and maintained such that surface drainage is directed away from structures in accordance with 2016 CBC 1804.3 or other applicable standards. In addition, surface drainage should be directed away from the top of slopes into swales or other controlled drainage devices. Roof and pavement drainage should be directed into conduits that carry runoff away from the proposed structure. 3.2 Underground utilities should be leak free. Utility and irrigation lines should be checked periodically for leaks, and detected leaks should be repaired promptly. Detrimental soil movement could occur if water is allowed to infiltrate the soil for prolonged periods of time. Geocon Project No. G1968-11-02 - 7 - December 7, 2020 3.3 Landscaping planters adjacent to paved areas are not recommended due to the potential for surface or irrigation water to infiltrate the pavement's subgrade and base course. Area drains to collect excess irrigation water and transmit it to drainage structures or impervious above- grade planter boxes can be used. In addition, where landscaping is planned adjacent to the pavement, construction of a cutoff wall along the edge of the pavement that extends at least 6 inches below the bottom of the base material should be considered. LIMITATIONS The conclusions and recommendations contained herein apply only to our work with respect to development and represent conditions on the date of our final observation. Any subsequent improvement should be done in conjunction with our observation and testing services. As used herein, the term “observation” implies only that we observed the progress of the work with which we agreed to be involved. Our services did not include the evaluation or identification of the potential presence of hazardous materials. Our conclusions and opinions as to whether the work essentially complies with the job specifications are based on our observations, experience and test results. Subsurface conditions, and the accuracy of tests used to measure such conditions, can vary greatly at any time. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and location. We will accept no responsibility for any subsequent changes made to the site by others, by the uncontrolled action of water, or by the failure of others to properly repair damages caused by the uncontrolled action of water. The findings and recommendations of this report may be invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and should not be relied upon after a period of three years. Should you have any questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience. Very truly yours, GEOCON INCORPORATED John Hoobs CEG 1524 Shawn Foy Weedon GE 2714 JH:SFW:dmc (e-mail) Addressee )lUL NEW MI NI S T R Y BUILDI N G 100.0 0 F F 99.30 P A D TURF A R E A (FUTU R E PLAYG R O U N D ) CALL E B A R C E L O N A 14 15 16 17 18 19 20 21 22 SZ-23 24 25 26 27 28 29 30 31 32 33 34 FG-35 FG-36 FG-37 38 40FG-41 SZ-42 SZ-43 SZ-44 SZ-45 SZ-46 SZ-47 SZ-48 SZ-49 SZ-50 SZ-51 SZ-52 SZ-53 SZ-54 SZ-55 SZ-56 SZ-57 SZ-58 SZ-59 SZ-60 SZ-61 SZ-62 SZ-63 SZ-64 SZ-65 SZ-66 SZ-67 SZ-67A SZ-68 SZ-69 SZ-70 SZ-70A SZ-71 SZ-71A SZ-72 SZ-73 SZ-74 SZ-75 SZ-76 SZ-77 SZ-78 SZ-78ASZ-79 SZ-79A SZ-80 SZ-81 SZ-82 SZ-83 SZ-84 SZ-84A SZ-85 SZ-86 SZ-87 SZ-88 SZ-89SZ-90 1 2 3 4 5 FG-6 FG-7 FG-8 FG-9 SZ-10 SZ-11 12 13 89 89 89 89 89 90 92 93 93.5 89 91 98 94 97 92 92 9993 93 94 94 95 97 95 EXISTING HEEL DRAIN LIMITS OF GRADING DRIVE "A" DRAIN OUTLET Qpf LIMITS OF GRADING Qpf Qpf Qcf/ Qcf/ Qcf/ 4" HEEL DRAIN SOLID PIPE DRAIN CONNECTED TO STORM DRAIN PIPE SZ-91 SZ-92 SZ-93 LIMITS OF GRADING 94 94A 95 96 WB-1 WB-2 WB-3 WB-4 WB-5 WB-6 WB-7 WB-8 WB-9 WB-10 WB-11 WB-12 WB-13 WB-14 WB-15 WB-16 WB-17 WB-18 WB-19 WB-20 WB-21 WB-22 WB-23 WB-24 WB-25 WB-26 WB-27 WB-28 WB-29 WB-30 WB-31 WB-32 WB-33 WB-34 WB-35 WB-36 WB-37 WB-38 WB-39 WB-40 WB-41WB-42 WB-43 WB-44WB-45 WB-46 WB-47 WB-48 WB-49 WB-50 WB-51 WB-52 WB-53 WB-54 WB-55 WB-56 WB-57 WB-58WB-59 WB-60 WB-61 WB-62 6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121 - 2974 PHONE 858 558-6900 - FAX 858 558-6159 SHEET OF PROJECT NO. SCALE DATE FIGURE Plotted:12/07/2020 8:09AM | By:ALVIN LADRILLONO | File Location:Y:\PROJECTS\G1968-11-02 (Coastline Community Church)\SHEETS\G1968-11-02 Geo Map.dwg GEOTECHNICAL ENVIRONMENTAL MATERIALS 1" = AS - GRADED GEOLOGIC MAP COASTLINE COMMUNITY CHURCH - NEW MINISTRY BUILDING 2215 CALLE BARCELONA CARLSBAD, CALIFORNIA 30' 12 - 07 - 2020 G1968 - 11 - 02 1 1 1 96 89 ........COMPACTED FILL ........PREVIOUS COMPACTED FILL (Dotted Where Buried) ........APPROX. BOTTOM ELEVATION OF REMOVAL (In Feet) ........APPROX. LOCATION OF DENSITY TEST FG...Finish Grade SZ...Slope Zone ........APPROX. LOCATION OF MSE WALL DENSITY TEST ........AREA OF REMEDIAL GRADING GEOCON LEGEND Qcf Qpf WB-62 <:,,, ~ I ~~~~ ~ es.1/\ .,..,,. X \. \ / .. , s..\\\ // \ y ... ' .. \ ... // \ _,..13 4 • ••• • • . . :••· . •• • • • • '-~ 'v ~'<.,~ 3.5 93.4 X X =;\) :~~~~ ~---\ \ \''\ I I I ~=--- 116.7 X 135.7 X 91.4 91. X /'X ' /"----k ~1/"=:taff~~~;,_===:c~=#~JI I ~~da~~..,,.. -'\' ?t ·-~,0 ,-, 134.4 X l ,J 133.4 X 40004 A 1971699.48 6252861.48 1 5 5 134.80 X I I I I I ;:: C,,103.4 R X ¼ ,g,w '" s-~s~:i_G/r..._,...\'1-\i,'o/. IJ:-:,6 \\)\V 1,\Cl . 104.4 X 1 131.7 X /POLE /" 131.6 xr 131.4 X I~ ~ "~ 131.6 X 131.5 ¾--........._ X ~ ---..........._ ------- 13 ' ' \..__j GRAPHIC SCALE o~~· "'1iii.1s!""·""'liiiii3~0~•-.;;41ii5iii'iiiiii6~0~·---~90~·;._iiiiiiiiiiii,.dj,120· SCALE 1"=30' (on 36x24) 13 CJ • • GEOCON I NCORPORATED ■ ■ TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. 1 05/21/20 Drive A Extension 129 4 0 121.8 11.0 112.6 12.7 92 90 2 05/21/20 Drive A Extension 130 4 0 121.8 11.0 110.7 13.2 91 90 3 05/21/20 Drive A Extension 131 3 0 121.4 12.0 113.0 13.8 93 90 4 05/21/20 Drive A Extension 132 4 0 121.8 11.0 109.9 11.7 90 90 5 05/21/20 Drive A Extension 131 4 0 121.8 11.0 110.7 12.3 91 90 FG 6 05/21/20 Drive A Extension 130 4 0 121.8 11.0 112.7 13.9 93 90 FG 7 05/21/20 Drive A Extension 132 3 0 121.4 12.0 111.5 14.1 92 90 FG 8 05/22/20 Drive A Extension 132 4 0 121.8 11.0 114.3 14.7 94 90 FG 9 05/22/20 Drive A Extension 132 4 0 121.8 11.0 110.4 11.1 91 90 SZ 10 05/22/20 Drive A Extension 130 3 0 121.4 12.0 113.9 11.4 94 90 SZ 11 05/22/20 Drive A Extension 131 3 0 121.4 12.0 114.1 12.9 94 90 12 05/26/20 Drive A Extension 133 4 0 121.8 11.0 111.4 13.0 91 90 13 05/26/20 Drive A Extension 133 4 0 121.8 11.0 110.6 12.2 91 90 14 06/26/20 Drain Pipe (playground)90 3 0 121.4 12.0 111.4 13.0 92 90 15 06/29/20 Playground 92 3 0 121.4 12.0 110.2 12.8 91 90 16 06/30/20 Playground 93 3 0 121.4 12.0 110.5 13.1 91 90 17 06/30/20 Playground 94 3 0 121.4 12.0 111.1 13.0 92 90 18 07/01/20 Playground 93 3 0 121.4 12.0 110.7 13.6 91 90 19 07/01/20 Playground 94 3 0 121.4 12.0 110.0 13.3 91 90 20 07/02/20 Playground 91 2 0 116.0 14.7 108.8 14.7 94 90 21 07/06/20 Playground 96 4 0 121.8 11.0 109.9 11.8 90 90 22 07/06/20 Playground 95 3 0 121.4 12.0 111.2 12.9 92 90 SZ 23 07/07/20 Playground 98 4 0 121.8 11.0 110.0 11.1 90 90 24 07/07/20 Playground 96 4 0 121.8 11.0 112.1 11.3 92 90 25 07/09/20 Playground 99 4 0 121.8 11.0 111.7 11.8 92 90 26 07/09/20 Playground 97 5 0 125.8 10.5 114.9 10.7 91 90 27 07/09/20 Playground 96 5 0 125.8 10.5 113.1 11.8 90 90 28 07/09/20 Playground 100 2 0 116.0 14.7 109.0 15.8 94 90 29 07/14/20 Playground 99 4 0 121.8 11.0 115.0 11.0 94 90 Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) 30 07/14/20 Playground 98 4 0 121.8 11.0 111.6 11.3 92 90 31 07/14/20 Playground 101 4 0 121.8 11.0 110.2 12.6 90 90 32 07/14/20 E of Bldg Pad 98 4 0 121.8 11.0 111.7 11.1 92 90 33 07/16/20 E of Bldg Pad 97 2 0 116.0 14.7 104.6 18.3 90 90 34 07/16/20 SE Corner of Bldg Pad 98 2 0 116.0 14.7 105.0 18.1 91 90 FG 35 07/16/20 Bldg Pad 99 5 0 125.8 10.5 114.4 11.7 91 90 FG 36 07/16/20 Bldg Pad 99 5 0 125.8 10.5 113.7 12.8 90 90 FG 37 07/16/20 E of Bldg Pad 99 2 0 116.0 14.7 104.8 18.4 90 90 38 08/06/20 Upper level observation deck 111 2 0 116.0 14.7 104.5 14.0 90 90 39 R 08/07/20 Lower level elevator building 100 1 0 126.8 10.1 111.4 17.1 88 90 40 08/07/20 Lower level elevator building 100 2 0 116.0 14.7 106.5 14.6 92 90 FG 41 08/07/20 Lower level elevator building 102 4 0 121.8 11.0 114.0 12.3 94 90 SZ 42 08/10/20 Slope S. of MSE wall 110 2 0 116.0 14.7 104.4 16.5 90 90 SZ 43 08/10/20 Slope S. of MSE wall 105 2 0 116.0 14.7 106.2 15.8 92 90 SZ 44 08/10/20 Slope S. of MSE wall 108 2 0 116.0 14.7 108.2 14.8 93 90 SZ 45 08/10/20 Slope S. of MSE wall 110 2 0 116.0 14.7 105.5 15.8 91 90 SZ 46 08/12/20 Slope S. of MSE wall 107 2 0 116.0 14.7 104.7 16.3 90 90 SZ 47 08/12/20 Slope S. of MSE wall 106 2 0 116.0 14.7 107.3 16.8 93 90 SZ 48 08/12/20 Slope S. of MSE wall 111 2 0 116.0 14.7 105.6 15.7 91 90 SZ 49 08/12/20 Slope S. of MSE wall 112 2 0 116.0 14.7 106.2 16.6 92 90 SZ 50 08/12/20 Slope S. of MSE wall 107 2 0 116.0 14.7 105.2 15.3 91 90 SZ 51 08/12/20 Slope S. of MSE wall 110 2 0 116.0 14.7 105.5 16.4 91 90 SZ 52 08/13/20 Slope S. of MSE wall 112 2 0 116.0 14.7 107.5 14.5 93 90 SZ 53 08/13/20 Slope S. of MSE wall 111 2 0 116.0 14.7 104.5 15.0 90 90 SZ 54 08/13/20 Slope S. of MSE wall 112 2 0 116.0 14.7 106.6 16.0 92 90 SZ 55 08/14/20 Slope S. of MSE wall 110 2 0 116.0 14.7 107.0 14.8 92 90 SZ 56 08/14/20 Slope S. of MSE wall 113 4 0 121.8 11.0 110.0 11.4 90 90 TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) SZ 57 08/14/20 Slope S. of MSE wall 114 2 0 116.0 14.7 106.4 15.2 92 90 SZ 58 08/17/20 Slope S. of MSE wall 115 2 0 116.0 14.7 104.7 15.6 90 90 SZ 59 08/17/20 Slope S. of MSE wall 114 4 0 121.8 11.0 111.3 11.3 91 90 SZ 60 08/17/20 Slope S. of MSE wall 117 2 0 116.0 14.7 104.1 16.8 90 90 SZ 61 08/18/20 Slope S. of MSE wall 120 2 0 116.0 14.7 104.3 13.7 90 90 SZ 62 08/18/20 Slope S. of MSE wall 114 2 0 116.0 14.7 106.2 14.6 92 90 SZ 63 08/18/20 Slope S. of MSE wall 117 4 0 121.8 11.0 112.1 13.4 92 90 SZ 64 08/19/20 Slope S. of MSE wall 117 2 0 116.0 14.7 106.0 16.4 91 90 SZ 65 08/19/20 Slope S. of MSE wall 120 2 0 116.0 14.7 107.2 15.6 92 90 SF 66 08/20/20 Slope S. of MSE wall 111 4 0 121.8 11.0 114.4 11.3 94 90 SF 67 08/20/20 Slope S. of MSE wall 117 2 0 116.0 14.7 97.3 12.4 84 90 SZ 67 A 08/31/20 Slope S. of MSE wall 117 2 0 116.0 14.7 105.2 15.1 91 90 SF 68 08/20/20 Slope S. of MSE wall 114 2 0 116.0 14.7 107.9 13.6 93 90 SZ 69 08/20/20 Slope S. of MSE wall 123 4 0 121.8 11.0 112.1 11.5 92 90 SZ 70 08/20/20 Slope S. of MSE wall 121 2 0 116.0 14.7 104.8 9.4 90 90 SZ 70 A 08/21/20 Slope S. of MSE wall 121 2 0 116.0 14.7 105.5 14.8 91 90 SZ 71 08/21/20 Slope S. of MSE wall 122 4 0 121.8 11.0 105.7 11.5 87 90 SZ 71 A 08/21/20 Slope S. of MSE wall 122 4 0 121.8 11.0 110.3 11.2 91 90 SZ 72 08/21/20 Slope S. of MSE wall 123 2 0 116.0 14.7 106.9 15.0 92 90 SF 73 08/24/20 Slope S. of MSE wall 119 4 0 121.8 11.0 111.2 11.1 91 90 SF 74 08/24/20 Slope S. of MSE wall 123 2 0 116.0 14.7 106.4 14.7 92 90 SZ 75 08/24/20 Slope S. of MSE wall 121 4 0 121.8 11.0 110.8 12.1 91 90 SF 76 08/25/20 Slope S. of MSE wall 114 4 0 121.8 11.0 109.9 11.5 90 90 SF 77 08/25/20 Slope S. of MSE wall 122 2 0 116.0 14.7 106.5 14.9 92 90 SZ 78 08/25/20 Slope S. of MSE wall 125 2 0 116.0 14.7 97.3 11.3 84 90 SZ 78 A 08/25/20 Slope S. of MSE wall 125 2 0 116.0 14.7 104.2 15.1 90 90 SZ 79 08/26/20 Slope S. of MSE wall 124 2 0 116.0 14.7 103.6 11.3 89 90 TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) SZ 79 A 08/26/20 Slope S. of MSE wall 124 2 0 116.0 14.7 105.8 15.2 91 90 SZ 80 08/26/20 Slope S. of MSE wall 122 4 0 121.8 11.0 109.4 12.5 90 90 SF 81 08/26/20 Slope S. of MSE wall 112 4 0 121.8 11.0 117.9 11.7 97 90 SF 82 08/26/20 Slope S. of MSE wall 119 4 0 121.8 11.0 114.0 11.7 94 90 SF 83 08/26/20 Slope S. of MSE wall 128 4 0 121.8 11.0 102.5 9.8 84 90 SZ 83 A 08/31/20 Slope S. of MSE wall 128 4 0 121.8 11.0 110.3 12.3 91 90 SF 84 08/26/20 Slope S. of MSE wall 124 4 0 121.8 11.0 102.1 5.6 84 90 SZ 84 A 08/31/20 Slope S. of MSE wall 124 4 0 121.8 11.0 109.2 11.3 90 90 SZ 85 08/27/20 Slope S. of MSE wall 120 4 0 121.8 11.0 109.7 12.5 90 90 SZ 86 08/27/20 Slope S. of MSE wall 116 4 0 121.8 11.0 109.2 13.3 90 90 SZ 87 08/27/20 Slope S. of MSE wall 118 4 0 121.8 11.0 112.4 15.2 92 90 SZ 88 08/27/20 Slope S. of MSE wall 121 4 0 121.8 11.0 109.2 12.7 90 90 SZ 89 08/27/20 Slope S. of MSE wall 116 2 0 116.0 14.7 108.2 15.1 93 90 SZ 90 08/27/20 Slope S. of MSE wall 120 2 0 116.0 14.7 107.8 17.5 93 90 SZ 91 09/23/20 Slope N. edge of site 94 4 0 121.8 11.0 110.5 12.5 91 90 SZ 92 09/23/20 Slope N. edge of site 96 4 0 121.8 11.0 112.7 14.1 93 90 SZ 93 10/12/20 Slope N. edge of site 97 4 0 121.8 11.0 110.9 12.5 91 90 SZ 94 10/13/20 Slope N. edge of site 96 2 0 116.0 14.7 100.0 11.8 86 90 SZ 94 A 10/13/20 Slope N. edge of site 96 2 0 116.0 14.7 104.9 15.0 90 90 SZ 95 10/14/20 Slope N. edge of site 95 2 0 116.0 14.7 105.1 16.3 91 90 SZ 96 10/14/20 Slope N. edge of site 95 2 0 116.0 14.7 105.3 15.5 91 90 TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. WB 1 07/29/20 MSE Wall 4+20 100 2 0 116.0 14.7 105.3 15.2 91 90 WB 2 07/29/20 MSE Wall 3+30 100 2 0 116.0 14.7 102.2 17.3 88 90 WB 2 A 07/29/20 MSE Wall 3+30 100 2 0 116.0 14.7 104.7 16.1 90 90 WB 3 07/29/20 MSE Wall 2+30 100 2 0 116.0 14.7 105.8 15.6 91 90 WB 4 07/29/20 MSE Wall 1+50 100 2 0 116.0 14.7 106.8 16.0 92 90 WB 5 07/30/20 MSE Wall 4+65 102 2 0 116.0 14.7 104.8 16.1 90 90 WB 6 07/31/20 MSE Wall 2+75 102 2 0 116.0 14.7 106.6 15.3 92 90 WB 7 07/31/20 MSE Wall 2+00 102 2 0 116.0 14.7 107.3 15.2 93 90 WB 8 07/31/20 MSE Wall 1+25 102 2 0 116.0 14.7 104.9 15.9 90 90 WB 9 08/03/20 MSE Wall 3+75 103 2 0 116.0 14.7 104.5 14.9 90 90 WB 10 08/03/20 MSE Wall 3+00 103 3 0 121.4 12.0 109.1 12.7 90 90 WB 11 08/03/20 MSE Wall 2+50 103 2 0 116.0 14.7 106.5 15.3 92 90 WB 12 08/03/20 MSE Wall 1+75 103 2 0 116.0 14.7 105.9 16.2 91 90 WB 13 08/04/20 MSE Wall 4+10 106 2 0 116.0 14.7 108.3 15.3 93 90 WB 14 08/04/20 MSE Wall 3+50 106 2 0 116.0 14.7 107.3 14.5 93 90 WB 15 08/04/20 MSE Wall 2+40 106 2 0 116.0 14.7 106.5 15.5 92 90 WB 16 08/05/20 MSE Wall 3+90 107 2 0 116.0 14.7 105.0 14.4 91 90 WB 17 08/05/20 MSE Wall 3+40 107 2 0 116.0 14.7 105.7 15.7 91 90 WB 18 08/06/20 MSE Wall 1+30 107 2 0 116.0 14.7 104.0 15.7 90 90 WB 19 08/06/20 MSE Wall 2+40 104 2 0 116.0 14.7 105.9 14.5 91 90 WB 20 08/07/20 MSE Wall 4+00 109 2 0 116.0 14.7 107.3 15.9 93 90 WB 21 08/07/20 MSE Wall 3+10 105 2 0 116.0 14.7 104.3 16.2 90 90 WB 22 08/07/20 MSE Wall 2+45 109 2 0 116.0 14.7 105.4 15.0 91 90 WB 23 09/23/20 North Retaining Wall 94 2 0 116.0 14.7 106.8 14.8 92 90 WB 24 09/23/20 North Retaining Wall 94 2 0 116.0 14.7 105.3 15.0 91 90 WB 25 09/23/20 North Retaining Wall 95 2 0 116.0 14.7 104.1 16.2 90 90 WB 26 09/23/20 North Retaining Wall 95 2 0 116.0 14.7 105.6 14.9 91 90 WB 27 09/24/20 North Retaining Wall 96 2 0 116.0 14.7 106.4 14.5 92 90 WB 28 09/24/20 North Retaining Wall 96 2 0 116.0 14.7 106.9 15.1 92 90 Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) WB 29 09/24/20 North Retaining Wall 97 2 0 116.0 14.7 110.4 11.3 95 90 WB 30 09/24/20 North Retaining Wall 97 2 0 116.0 14.7 106.7 15.9 92 90 WB 31 09/25/20 North Retaining Wall 98 2 0 116.0 14.7 104.8 15.3 90 90 WB 32 09/25/20 North Retaining Wall 99 2 0 116.0 14.7 105.8 14.2 91 90 WB 33 09/25/20 North Retaining Wall 99 2 0 116.0 14.7 105.3 14.3 91 90 WB 34 09/25/20 North Retaining Wall 99 2 0 116.0 14.7 106.2 13.9 92 90 WB 35 11/04/20 Basin 112 2 0 116.0 14.7 107.0 15.1 92 90 WB 36 11/04/20 Basin (in-place)114 2 0 116.0 14.7 107.7 14.8 93 90 WB 37 11/04/20 Basin (in-place)112 2 0 116.0 14.7 106.0 14.9 91 90 WB 38 11/04/20 Basin 112 2 0 116.0 14.7 107.3 14.6 93 90 WB 39 11/05/20 Basin 112 2 0 116.0 14.7 105.8 15.1 91 90 WB 40 11/05/20 Basin 114 4 0 121.8 11.0 115.1 11.7 94 90 WB 41 11/05/20 Basin 115 4 0 121.8 11.0 110.9 11.1 91 90 WB 42 11/06/20 Upper basin 116 2 0 116.0 14.7 106.3 14.6 92 90 WB 43 11/06/20 Upper basin 111 4 0 121.8 11.0 114.6 10.5 94 90 WB 44 11/06/20 Upper basin 113 4 0 121.8 11.0 111.4 12.2 91 90 WB 45 11/06/20 Upper basin 114 4 0 121.8 11.0 110.2 12.6 90 90 WB 46 11/06/20 Upper basin 116 4 0 121.8 11.0 112.6 11.3 92 90 WB 47 11/06/20 SZ Upper basin 117 4 0 121.8 11.0 113.1 11.9 93 90 WB 48 11/16/20 MSE Wall W. of Elevator Tower 112 4 0 121.8 11.0 110.2 11.3 90 90 WB 49 11/16/20 MSE Wall W. of Elevator Tower 114 4 0 121.8 11.0 112.8 14.0 93 90 WB 50 11/17/20 MSE Wall W. of Elevator Tower 116 4 0 121.8 11.0 118.9 13.6 98 90 WB 51 11/17/20 MSE Wall W. of Elevator Tower 118 4 0 121.8 11.0 118.3 11.1 97 90 WB 52 11/17/20 MSE Wall W. of Elevator Tower 119 4 0 121.8 11.0 118.2 11.4 97 90 WB 53 11/23/20 MSE Wall W. of Elevator Tower 110 4 0 121.8 11.0 110.3 11.2 91 90 WB 54 11/23/20 MSE Wall W. of Elevator Tower 111 4 0 121.8 11.0 111.0 12.0 91 90 WB 55 11/23/20 MSE Wall W. of Elevator Tower 112 4 0 121.8 11.0 112.3 11.8 92 90 TABLE 1 SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Coastline Community Church G1968-11-02 Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) Test No. Date (MM/D D/YY) Location Elev. or Depth (feet) Required Relative Compaction (%) WB 56 11/23/20 MSE Wall W. of Elevator Tower 113 4 0 121.8 11.0 112.8 12.3 93 90 WB 57 11/24/20 MSE Wall W. of Elevator Tower 114 4 0 121.8 11.0 110.9 11.2 91 90 WB 58 11/24/20 MSE Wall W. of Elevator Tower 115 4 0 121.8 11.0 111.5 11.0 92 90 WB 59 11/24/20 MSE Wall W. of Elevator Tower 116 4 0 121.8 11.0 110.5 11.6 91 90 WB 60 11/25/20 MSE Wall W. of Elevator Tower 117 4 0 121.8 11.0 111.2 10.1 91 90 WB 61 11/25/20 MSE Wall S. of Elevator Tower 114 4 0 121.8 11.0 110.4 11.2 91 90 WB 62 11/25/20 MSE Wall S. of Elevator Tower 117 4 0 121.8 11.0 111.7 11.8 92 90 WB 63 11/30/20 Basin (in-place)116 2 0 116.0 14.7 106.1 12.8 91 90 WB 64 11/30/20 Basin (in-place)116 2 0 116.0 14.7 106.4 13.4 92 90 WB 65 11/30/20 MSE Wall E. of Elevator 114 4 0 121.8 11.0 111.6 11.3 92 90 WB 66 11/30/20 MSE Wall E. of Elevator 117 4 0 121.8 11.0 110.5 11.9 91 90 TABLE 1 EXPLANATION OF CODED TERMS AC Asphalt Concrete IT Irrigation Trench SG Subgrade AD Area Drain JT Joint Trench SL Sewer Lateral B Base M Moisture Test SM Sewer Main CG Curb/Gutter MG Minor Grading SR Slope Repair DW Driveway MSE Mechanically Stabilized Earth Wall ST Slope Test ET Electrical Trench PT Plumbing Trench SW Sidewalk ETB Exploratory Trench RG Regrade SZ Slope Zone FB Footing Backfill RWL Reclaimed Water Lateral UT Utility Trench FG Finish Grade RWM Reclaimed Water Main WB Wall Backfill FS Fire Service SBT Subdrain Trench WL Water Lateral GT Gas Trench SD Storm Drain WM Water Main A, B, C, … R Corresponds to the curve numbers presented in the summary of the laboratory maximum dry density and optimum moisture content test results. The field representative selected the curve no. based on the laboratory test results and field observations. >¾" ROCK - ROCK CORRECTION The laboratory maximum dry density and optimum moisture content can be adjusted for in-place soil that possesses rock larger than ¾ inch. The curve no. is adjusted for the percentage of ¾ inch rock in accordance with ASTM D 4718 or Woodward Clyde guidelines. TEST NO. PREFIX TEST NO. RE. Retest of previous density test failure following additional moisture conditioning or recompaction Fill in area of density test was removed during construction operations ELEVATION OR DEPTH Corresponds to the elevation or the depth, in feet, of the in-place density/moisture content test. The value has been rounded to the nearest whole foot. CURVE NO. Geocon Project No. G1968-11-02 December 7, 2020 TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557 Curve No. Description Maximum Dry Density (pcf) Optimum Moisture Content (% dry weight) 1 Dark brown, Clayey, fine to medium SAND 126.8 10.1 2 Yellowish brown, Silty, fine to medium SAND 116.0 14.7 3 Light olive brown, Sandy SILT 121.4 12.0 4 Light yellowish brown, Silty, fine to medium SAND 121.8 11.0 5 Reddish brown, Silty, fine to medium SAND 125.8 10.5 TABLE III SUMMARY OF LABORATORY DIRECT SHEAR TEST RESULTS ASTM D 3080 Sample No. Dry Density (pcf) Moisture Content (%)Unit Peak [Ultimate1] Cohesion (psf) Angle of Peak [Ultimate1] Shear Resistance (degrees) Initial Final 2 112.9 10.8 16.4 400 [400] 30 [29] 1 Ultimate at end of test at 0.2-inch deflection. TABLE IV SUMMARY OF LABORATORY EXPANSION INDEX TEST RESULTS ASTM D 4829 Sample No. Moisture Content (%) Dry Density (pcf) Expansion Index 2016 CBC Expansion Classification ASTM Soil Expansion Classification Before Test After Test EI-1 8.8 15.1 114.8 12 Non- Expansive Very Low TABLE V SUMMARY OF WATER-SOLUBLE SULFATE LABORATORY TEST RESULTS CALIFORNIA TEST NO. 417 Sample No. Water Soluble Sulfate (%) ACI 318 Sulfate Exposure EI-1 0.019 S0