Loading...
HomeMy WebLinkAboutSDP 16-12; HARDING VETERANS HOUSING; FINAL SOILS REPORT; 2022-06-20DVBE  SBE  SDVOSB  SLBE GEOTECHNICAL MATERIALS SPECIAL INSPECTION 4373 Viewridge Avenue, Suite B San Diego, CA 92123 P: 858.292.7575 www.usa-nova.com 944 Calle Amanecer, Suite F San Clemente, CA 92673 P: 949.388.7710 Affirmed Housing Group, Inc. June 20, 2022 C/O Micah Spano NOVA Project No.: 4020055 13520 Evening Creek Drive. Suite 160 San Diego, CA 92128 Subject: As-Graded Geotechnical Report Proposed Veteran Housing 3606-3618 & 3630 Harding Street, Carlsbad, CA 92008 Grading Permit No. GR2020-0007 Dear Mr. Spano: This report presents the geotechnical observations and the results of testing performed by NOVA Services, Inc. (NOVA) during grading for the above-referenced project. The report addresses only the geologic and geotechnical considerations associated with the project’s construction. The services described herein were performed by NOVA for Affirmed Housing Group during the period October 16, 2020 to May 19, 2022. NOVA is retained by Affirmed Housing Group as Geotechnical Engineer-of-Record (GEOR) for this work. Based on the observations and testing reported herein, it is the opinion of NOVA that the geotechnical aspects of the grading are in compliance with the approved geotechnical reports and the grading plans. The site is considered geotechnically suitable for its intended purpose. BACKGROUND Location The three-story apartment building is located at 3606-3618 and 3630 Harding Street in the city of Carlsbad, California. The site is bounded by residential developments to the north and south, 5 Freeway to the east, and Harding Street to the west. Project Description The new development consists of a three-story apartment building with parking areas, driveways, underground utilities, hardscapes, and associated landscaping features. Permitted Design Documentation Geotechnical/Geologic Geotechnical reports referenced for the design of the project are: (i) Geotechnical Engineering Report, Proposed Apartments, 3606-3618 & 3630 Harding Street, Carlsbad, California, Christian Wheeler Engineering, File No. 2160237.02, June 2, 2016. (hereinafter, ‘CWE 2016’). VAON ,-, ,,, 2 As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 (ii) Update Geotechnical Engineering Report, Proposed Three-Story Apartment Building, 3606-3618 & 3630 Harding Street, Carlsbad, California, NOVA Services, Project No. 3019097, March 12, 2020. (hereinafter, ‘NOVA 2020’). Construction The permitted construction drawings are: (i) Precise Grading Plans, Kettler Leweck Engineering, change update June 5, 2020 (hereinafter, ‘KLE 2020’). (ii) Foundation Plans, Harris & Sloan, June 10, 2020 (hereinafter, ‘H&S 2020’).\ OBJECTIVES AND SCOPE OF NOVA’S SERVICES Objectives The objectives of the work reported herein were twofold, namely: (i) to observe geologic conditions encountered during grading; and (ii) to document, by testing and observation, that the earthwork/grading was completed in conformance with the requirements of the design documentation listed above. Scope In order to accomplish the above objectives, NOVA undertook the scope of services abstracted below during construction. 1. Observation and Testing. NOVA performed observation and testing as requested by the contractor during rough grade operations (removals and compaction) and post-grade operations (utility backfill, paving, and flatwork). Quality Assurance (QA) in-place density testing of soils placed as compacted fills and backfills was performed after ASTM D6938 (‘In-Place Density and Moisture by Nuclear Methods’) and ASTM D8167 (‘In-Place Density and Moisture by Non-Nuclear Methods’). Testing of asphalt concrete was performed after ASTM D2950 (‘In-Place Density of Bituminous Concrete by Nuclear Methods’). The approximate locations of the density tests conducted for this work are shown on the attached Plate. The laboratory test results are presented in Table I. The field in-place density test results are summarized in Table II. 2. Laboratory Testing. The field density testing was supported by laboratory testing of representative samples of soils utilized for fills, backfills, and pavement materials. The test results are presented in Table I. The indications of this testing are the basis for NOVA’s judgments regarding the relative compaction of the fills placed. 3. Technical Support. NOVA provided periodic technical support in response to geotechnical- related issues during construction. 3 As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 4. Reporting. NOVA provided reporting during the conduct of the work. Preparation of this report completes NOVA’s scope of services. OBSERVED SOIL AND GEOLOGIC UNITS General The adequacy of earthwork was determined in part by observation of earthwork operations by NOVA staff familiar with the requirements for earthwork in the Carlsbad area and familiar with both the specific intent and specific requirements of this project. This observation was the basis for selection by NOVA of locations for testing of density and for recovery of samples for laboratory testing. NOVA’s observations during the grading excavation operations indicate that subsurface conditions within the limits of excavation were generally consistent with those anticipated and described in the approved geotechnical report (CWE 2016). The following subsections provide detailed discussion regarding NOVA’s observations of the geologic units and geologic structure encountered during mapping. Artificial Fill (af) The improvements are built entirely on engineered artificial fill (af). The purpose of the fill is to provide a building pad of engineered soils for development of shallow foundations. Fill extends to a depth of approximately +55 feet msl. Old Paralic Deposits (Qop) Old paralic deposits were observed to consist of moist, relatively dense, silty sand. No groundwater was encountered. CONSTRUCTION SUMMARY General NOVA provided observation of earthwork operations, as requested by the contractor. The description of earthwork operations provided in the following subsections reflects observations by NOVA during its presence on-site. Construction of relevance to this report was completed during the period of October 20, 2020 to May 19, 2021. The contractor was HA Builders. The specialty earthwork subcontractor was Whillock Contracting. Utilities were installed and backfilled by Ranbar Plumbing. Pavements and pavement materials were completed Frank and Son Paving and Xpress Concrete. Hardscapes and respective subgrade and base preparation was completed by Frank and Son Paving. 4 As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 EARTHWORK Site Preparation Prior to earthwork operations, older fill, debris, topsoil, and vegetation in the areas being improved were removed and disposed of off-site. Operations The grading subcontractor utilized a variety of medium to heavy-duty equipment to perform the earthwork. Equipment included: wheel loaders scrapers, graders, backhoes, tracked excavators, rollers, and sheepsfoot compaction wheels. Manually operated reciprocating hammers and walk behind rollers were used where access to larger equipment was limited. Building Pad Grading Earthwork consisted of remedial grading to prepare a suitable building pad and may be generalized to have included the stepwise sequence of operations described below. 1. Step 1, Over Excavation. The existing engineered fill was excavated to a depth of 55 to msl and extended laterally about 5 feet outside of the building limits, where feasible. Excavated soils were staged for later replacement. 2. Step 2, Densification. A representative from NOVA approved the bottom of excavations exposed by Step 1. The bottoms of the removals were scarified, moisturized and compacted prior to placing fills. 3. Step 3, Backfill. Excavated soils were backfilled consistent to the material and placement requirements described in CWE 2016. Backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction after D1557. Utilities NOVA observed backfilling operations for several utility line trenches. Site sourced or imported characteristically sandy utility backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction using manually operated reciprocating hammers and a sheepsfoot wheel attached to a tracked excavator. Flatwork/Pavers Subgrade preparation for flatwork and pavers consisted of scarifying the upper 12 inches of existing soils, and replacing the excavated soils as new fill densified to at least 95% relative compaction. 5 As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 Right-of-Ways Utility tie-in and pavement patches within the city right-of-ways (ROW) were prepared in the general sequence of operations described below. 1. Step 1, Utility Tie-In Backfill. NOVA observed backfilling operations for several utility line trench tie-ins within the City Right-of-Ways. Characteristically site sourced or imported sandy utility backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction using manually operated reciprocating hammers and a sheepsfoot wheel attached to a tracked excavator. 2. Step 2, Subgrade Preparation. Subgrade soils were scarified about 12 inches, moisture conditioned, and compacted to at least 95% relative compaction. 3. Step 3, Base Course. An approximate 8- to 12-inch-thick layer of aggregate base was placed and densified to at least 95% of the material’s maximum density. 4. Step 4, Wearing Surface. An approximate 5- to 6-inch-thick section of the asphaltic wearing surface within Oak Avenue was placed in lifts and densified by a vibratory roller. Pavement surface asphalt patches were eventually milled about 1 to 3 inches and repaved with new hot mix asphalt concrete densified to at least 95 percent relative compaction. Foundations NOVA observed soils exposed during excavation for both isolated and continuous foundations for the support of the planned structure and for ancillary site walls with exception of property boundary walls/fences. At the time of observation, the foundation excavations were observed to be minimally dimensioned with the geotechnical recommendations and embedded into a proper bearing stratum comprised of compacted fill observed and testing by NOVA. CONCLUSIONS AND LIMITATIONS Conformance with Design Based on the observations and testing reported herein, NOVA certifies that the soil engineering and engineering geologic aspects of the grading have been completed in conformance with the requirements of the approved geotechnical reports and the grading plans (Drawing#5234A). Limitations Testing and Observation This report presents opinions, information, and data relative to the earthwork at the subject site. Representatives of NOVA conducted testing and made observations as requested during the progress of the construction to evaluate conformance with the project requirements. The testing 6 As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 by NOVA indicates that the earthwork observed conformance with the project requirements for placement and densification. Results presented herein are only representative of the samples and areas tested. As with any manufactured product, there are statistical variations in the uniformity of an earth fill and in the accuracy of the test used to measure its qualities. As compared with other manufactured products, earthwork has usually wider fluctuations in both the product and the test results. Variations in material properties are inherent in any earthwork operation and should be expected. Survey References to elevations and locations herein were based on surveyors or grade checker stakes in the field and from the project grading plans prepared by KLE 2020. NOVA did not provide construction surveying services. NOVA has no opinion regarding the accuracy of the elevations or surface geometry with respect to the approved plans. Supervision The presence of NOVA personnel during the work progress did not involve any direct supervision of the contractor or his work forces. Professional and technical advice and recommendations were periodically provided to the owner during the conduct of the work, based upon NOVA’s observations and evaluations. CLOSURE NOVA appreciates the opportunity to be of service to Affirmed Housing Group, Inc. on this most interesting project. Should you have any questions or comments, please do not hesitate to contact the undersigned at 949.388.7710. Sincerely, NOVA Services, Inc. __________ ______ Chelsea Jaeger, CEG Jesse D. Bearfield, PE Project Geologist Senior Engineer Plate 1. As Graded Geotechnical Map Table I. Laboratory Test Results and Description of Terms Table II. Summary of Field In-Place Density and Moisture Content Test Results As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 ATTACHMENT 1 PLATE 1 As-Graded Geologic and Geotechnical Conditions 3606-3618 & 3630 Harding Street Carlsbad, California Grading Permit No. GP2020-0007 65666789909192100101102103199767757.0'58.0'57.0'56.5'57.0'57.0'57.0'57.0'57.0'57.0'58.5'58.5'58.5'QopQopafaf57.0'57.0'57.0'57.0'57.0'55.0'10111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364687172737475798081828385868794959697981041051061071081101111131141151161171181191201211221231241251261271281291301311321331341351361371381391401411421431441451461471481491501511521531541551561571581591601611621631641651661671681691701711721731741751761771781791801811821831841851861871881891901911921931941951961971981992002012022032042052062072082092102112122132142152162172182192202212222232242252262272282292345678969707884889310911259.5'58.5'KEY TO SYMBOLSafQopFILLOLD PARALIC DEPOSITS, CIRCLED WHERE BURIED0020'40'APPROXIMATE LOCATION OF IN-PLACE DENSITY TESTS229APPROXIMATE ELEVATION AT EXCAVATION BOTTOMAPPROXIMATE LIMITS OF REMEDIAL GRADING4373 Viewridge Avenue, Suite BSan Diego, CA 92123P: 858.292.7575944 Calle Amanecer, Suite FSan Clemente, CA 92673P: 949.388.7710NOVA3606-3618 & 3630 HARDING STREETCARLSBAD, CALIFORNIAGEOTECHNICALMATERIALSSPECIAL INSPECTIONSBEDVBEwww.usa-nova.comPROJECT NO.:DATE:DRAWN BY:REVIEWED BY:4020055JUNE 2022DTWJDBAS-GRADEDGEOTECHNICAL MAPDRAWING TITLE:SCALE:1"=20'PLATE NO.1 OF 1SDVOSB SLBENWENS56.6'APPROXIMATE AREA OF DEEPENED EXCAVATION---w CAMELIA (PI.Bl.r SM! • ~I I ,,.., 11 I ~I I I ~I I I .~I I I gl ts I rv CJ CJ ~ • • • • • LOT 4 BLOCK B ~ • MAP NO. ;'"':? • • CJ • • • • • • • ~ ( GFF=62.70 ) • • CJ C) • • • • • • • • ~ • • • • • CJ • • ( FF=62.70) <( • • . -• • • /,¢ / As-Graded Geotechnical Report Windsor Point – Harding St, Carlsbad, CA NOVA Project No. 4020055 June 20, 2022 ATTACHMENT 2 TABLES As-Graded Geologic and Geotechnical Conditions 3606-3618 & 3630 Harding Street Carlsbad, California Grading Permit No. GP2020-0007 3606-3618 and 3630 Harding Street Carlsbad, California June 2022 NOVA Project No.4020055 Optimum Maximum Moisture Dry Density Material ID Material Description (%)(pcf) A Dark Brown Silty Sand (NOVA)130.3 9.0 B Class II Recycled Base (Moody's, Oceanside)121.2 10.8 C Class II Recycled Base (Moodys, El Corazon)119.8*10.8* D Light Brown Silty Sand 119.6 12.0 E Class II Base (Superior Ready Mix, Mission Gorge)141.0*6.0* F 3/4" Class II Base (Moodys, Oceanside)121.2*9.9* Maximum Wet Material ID Material Description Density AC-1 Type III B 3 3/4" PG 64-10 (Superior Ready Mix, Mission Rd)149.9* AC-2 Type III C2 1/2" PG 64-10 (Superior Ready Mix, Mission Rd)149.0* AC-3 Type III B2 PG 64-10 (Superior Ready Mix, North Tulip)151.0* AC-4 203 B PG64-10 (Vulcan, Carroll Canyon)149.0* AC-5 203 3C3 PG64-10 (Vulcan, Carroll Canyon)148.0* *Values provided by material supplier Test Type G Gas Line Trench MG Mass Grading SG Subgrade FG Finished Grade SD Storm Drain Trench S Sewer Line Trench W Water Line Trench FL Fire Line Trench AC Asphalt Concrete B Base Material SW Sidewalk TABLE I LABORATORY DENSITES AND TESTING TERMINOLOGY Laboratory Maximum Density (ASTM D1557) 3606-3618 and 3630 Harding Street Carlsbad, California June 2022 NOVA Project No.4020055 Test Test Approx.Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail 10/16/20 1 G Gas Line Trench (Harding Street)61.5 A 130.3 9.0 125.9 5.8 97%Pass 11/10/20 2 MG Building Pad 58.0 A 130.3 9.0 125.4 6.2 96%Pass3MGBuilding Pad 58.0 A 130.3 9.0 125.4 5.6 96%Pass4MGBuilding Pad 58.0 A 130.3 9.0 126.1 6.8 97%Pass5MGBuilding Pad 59.0 A 130.3 9.0 126.4 6.9 97%Pass6MGBuilding Pad 58.0 A 130.3 9.0 125.9 6.3 97%Pass7MGBuilding Pad 57.0 A 130.3 9.0 123.4 6.9 95%Pass8MGBuilding Pad 57.0 A 130.3 9.0 127.3 6.5 98%Pass9MGBuilding Pad 57.0 A 130.3 9.0 127.2 6.9 98%Pass10MGBuilding Pad 61.0 A 130.3 9.0 123.5 8.4 95%Pass11MGBuilding Pad 61.0 A 130.3 9.0 124.9 8.3 96%Pass12MGBuilding Pad 61.0 A 130.3 9.0 128.0 6.9 98%Pass 11/12/20 13 MG Building Pad 59.0 A 130.3 9.0 121.7 8.8 93%Pass14MGBuilding Pad 59.0 A 130.3 9.0 121.5 8.7 93%Pass15MGBuilding Pad 59.0 A 130.3 9.0 123.2 8.1 95%Pass16MGBuilding Pad 61.0 A 130.3 9.0 121.6 9.5 93%Pass17MGBuilding Pad 61.0 A 130.3 9.0 124.7 8.7 96%Pass18MGBuilding Pad 61.0 A 130.3 9.0 123.8 9.8 95%Pass19MGBuilding Pad 59.0 A 130.3 9.0 121.9 7.0 94%Pass20MGBuilding Pad 59.0 A 130.3 9.0 124.0 7.0 95%Pass21MGBuilding Pad 59.0 A 130.3 9.0 123.6 7.5 95%Pass 11/13/20 22 MG Building Pad 61.0 A 130.3 9.0 121.6 7.2 93%Pass23MGBuilding Pad 61.0 A 130.3 9.0 123.2 7.7 95%Pass24MGBuilding Pad 61.0 A 130.3 9.0 123.4 7.5 95%Pass25MGBuilding Pad 59.0 A 130.3 9.0 121.6 7.6 93%Pass26MGBuilding Pad 59.0 A 130.3 9.0 121.7 7.9 93%Pass27MGBuilding Pad 59.0 A 130.3 9.0 120.9 8.1 93%Pass28MGBuilding Pad 59.0 A 130.3 9.0 121.3 7.1 93%Pass29MGBuilding Pad 59.0 A 130.3 9.0 121.0 7.5 93%Pass 11/16/20 30 MG Building Pad 61.0 A 130.3 9.0 125.6 8.0 96%Pass31MGBuilding Pad 61.0 A 130.3 9.0 124.6 8.5 96%Pass32MGBuilding Pad 61.0 A 130.3 9.0 126.6 7.8 97%Pass33FGBuilding Pad (FG)62.0 A 130.3 9.0 126.7 6.8 97%Pass34FGBuilding Pad (FG)62.0 A 130.3 9.0 126.9 7.2 97%Pass35FGBuilding Pad (FG)62.0 A 130.3 9.0 126.5 7.7 97%Pass36FGBuilding Pad (FG)62.0 A 130.3 9.0 125.8 8.1 97%Pass37FGBuilding Pad (FG)62.0 A 130.3 9.0 125.8 8.7 97%Pass38FGBuilding Pad (FG)62.0 A 130.3 9.0 124.1 9.1 95%Pass39FGBuilding Pad (FG)62.0 A 130.3 9.0 123.8 8.5 95%Pass40FGBuilding Pad (FG)62.0 A 130.3 9.0 124.6 8.1 96%Pass41FGBuilding Pad (FG)62.0 A 130.3 9.0 123.2 8.5 95%Pass42FGBuilding Pad (FG)62.0 A 130.3 9.0 123.8 8.2 95%Pass43FGBuilding Pad (FG)62.0 A 130.3 9.0 123.4 8.6 95%Pass44MGBuilding Pad 59.0 A 130.3 9.0 123.5 8.1 95%Pass45MGBuilding Pad 59.0 A 130.3 9.0 121.6 8.2 93%Pass46MGBuilding Pad 59.0 A 130.3 9.0 123.4 8.1 95%Pass47MGBuilding Pad 59.0 A 130.3 9.0 121.2 8.4 93%Pass48MGBuilding Pad 59.0 A 130.3 9.0 121.1 8.3 93%Pass49MGBuilding Pad 61.0 A 130.3 9.0 122.2 8.0 94%Pass50MGBuilding Pad 61.0 A 130.3 9.0 121.8 8.3 93%Pass51MGBuilding Pad 61.0 A 130.3 9.0 123.6 7.9 95%Pass52FGBuilding Pad (FG)62.0 A 130.3 9.0 122.9 7.5 94%Pass53FGBuilding Pad (FG)62.0 A 130.3 9.0 124.0 8.5 95%Pass54FGBuilding Pad (FG)62.0 A 130.3 9.0 121.8 8.0 93%Pass 11/17/20 55 MG Building Pad 59.0 A 130.3 9.0 126.7 7.6 97%Pass56MGBuilding Pad 59.0 A 130.3 9.0 124.0 7.0 95%Pass57MGBuilding Pad 59.0 A 130.3 9.0 124.9 7.6 96%Pass58MGBuilding Pad 59.0 A 130.3 9.0 125.9 7.1 97%Pass 11/18/20 59 MG Building Pad 61.0 A 130.3 9.0 123.0 6.0 94%Pass60MGBuilding Pad 61.0 A 130.3 9.0 125.7 6.2 96%Pass61MGBuilding Pad 61.0 A 130.3 9.0 121.4 6.5 93%Pass62MGBuilding Pad 61.0 A 130.3 9.0 119.6 6.2 92%Pass 11/19/20 63 MG Building Pad 59.0 A 130.3 9.0 122.8 7.0 94%Pass64MGBuilding Pad 59.0 A 130.3 9.0 120.1 6.7 92%Pass65MGHardscape59.0 A 130.3 9.0 127.8 6.0 98%Pass66MGHardscape61.0 A 130.3 9.0 122.4 6.2 94%Pass67MGHardscape61.0 A 130.3 9.0 123.7 6.7 95%Pass68MGBuilding Pad 61.0 A 130.3 9.0 125.6 6.8 96%Pass69MGBuilding Pad 57.0 A 130.3 9.0 117.2 6.5 90%Pass70MGBuilding Pad 57.0 A 130.3 9.0 118.1 7.0 91%Pass Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 3606-3618 and 3630 Harding Street Carlsbad, California June 2022 NOVA Project No.4020055 Test Test Approx.Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 11/20/20 71 FG Building Pad (FG)62.0 A 130.3 9.0 120.5 7.1 92%Pass72FGBuilding Pad (FG)62.0 A 130.3 9.0 119.6 6.5 92%Pass73FGBuilding Pad (FG)62.0 A 130.3 9.0 121.6 7.2 93%Pass74FGBuilding Pad (FG)62.0 A 130.3 9.0 119.6 6.3 92%Pass75FGBuilding Pad (FG)62.0 A 130.3 9.0 117.8 6.0 90%Pass76FGBuilding Pad (FG)62.0 A 130.3 9.0 124.1 6.6 95%Pass77FGBuilding Pad (FG)62.0 A 130.3 9.0 119.6 6.8 92%Pass78MGBuilding Pad 59.0 A 130.3 9.0 120.0 6.5 92%Pass79MGBuilding Pad 59.0 A 130.3 9.0 119.2 6.3 91%Pass80MGBuilding Pad 59.0 A 130.3 9.0 120.8 6.0 93%Pass81MGBuilding Pad 59.0 A 130.3 9.0 125.9 6.1 97%Pass82MGBuilding Pad 59.0 A 130.3 9.0 120.1 7.0 92%Pass83MGBuilding Pad 59.0 A 130.3 9.0 121.8 7.0 93%Pass84MGBuilding Pad 61.0 A 130.3 9.0 121.4 7.6 93%Pass85MGBuilding Pad 61.0 A 130.3 9.0 119.8 7.5 92%Pass86MGBuilding Pad 61.0 A 130.3 9.0 122.0 7.8 94%Pass87MGBuilding Pad 59.5 A 130.3 9.0 120.7 8.0 93%Pass88MGBuilding Pad 59.5 A 130.3 9.0 119.8 7.2 92%Pass 11/23/20 89 MG Hardscape 60.0 A 130.3 9.0 121.4 6.7 93%Pass90MGHardscape60.0 A 130.3 9.0 119.0 6.8 91%Pass91MGHardscape60.0 A 130.3 9.0 119.7 7.0 92%Pass92MGHardscape60.0 A 130.3 9.0 120.2 7.1 92%Pass 11/25/20 93 FG Building Pad (FG)62.0 A 130.3 9.0 123.6 6.9 95%Pass94FGBuilding Pad (FG)62.0 A 130.3 9.0 125.5 6.6 96%Pass95FGBuilding Pad (FG)62.0 A 130.3 9.0 122.0 7.3 94%Pass 96 FG Building Pad (FG)62.0 A 130.3 9.0 121.7 7.2 93%Pass97FGBuilding Pad (FG)62.0 A 130.3 9.0 122.4 7.9 94%Pass98FGBuilding Pad (FG)62.0 A 130.3 9.0 123.1 6.6 94%Pass99MGHardscape SG A 130.3 9.0 122.5 7.4 94%Pass100MGHardscape SG A 130.3 9.0 120.0 7.7 92%Pass101MGHardscape SG A 130.3 9.0 119.2 5.2 91%Pass102MGHardscape SG A 130.3 9.0 122.6 5.3 94%Pass 103 MG Hardscape SG A 130.3 9.0 119.8 6.3 92%Pass 12/11/20 104 SD Storm Drain Trench 58.0 A 130.3 8.7 125.0 8.0 96%Pass105SDStorm Drain Trench 58.0 A 130.3 8.7 123.0 8.2 94%Pass106SDStorm Drain Trench 58.0 A 130.3 8.7 122.1 8.6 94%Pass107SDStorm Drain Trench 58.0 A 130.3 8.7 123.3 7.6 95%Pass108SDStorm Drain Trench 60.0 A 130.3 8.7 125.5 8.5 96%Pass109SDStorm Drain Trench 60.0 A 130.3 8.7 123.1 8.1 94%Pass110SDStorm Drain Trench 60.0 A 130.3 8.7 123.4 7.8 95%Pass 111 SD Storm Drain Trench 60.0 A 130.3 8.7 125.1 8.3 96%Pass112SDStorm Drain Trench 58.0 A 130.3 8.7 121.4 8.0 93%Pass 113 SD Storm Drain Trench 60.0 A 130.3 8.7 123.2 7.8 95%Pass114SDStorm Drain Trench 58.0 A 130.3 8.7 122.6 7.9 94%Pass115SDStorm Drain Trench 60.0 A 130.3 8.7 121.8 8.1 93%Pass 12/14/20 116 SD Storm Drain Trench 59.0 A 130.3 8.7 121.1 7.6 93%Pass117SDStorm Drain Trench 59.0 A 130.3 8.7 124.9 7.9 96%Pass118SDStorm Drain Trench 59.0 A 130.3 8.7 118.1 5.9 91%Pass 119 SD Storm Drain Trench 59.0 A 130.3 8.7 120.2 6.8 92%Pass 12/22/20 120 SD Storm Drain Trench 59.0 A 130.3 8.7 120.2 8.1 92%Pass121SDStorm Drain Trench 59.0 A 130.3 8.7 121.8 8.6 93%Pass 12/23/20 122 SD Storm Drain Trench 59.0 A 130.3 8.7 119.2 9.1 91%Pass123SDStorm Drain Trench 59.0 A 130.3 8.7 118.8 8.9 91%Pass 124 SD Storm Drain Trench 59.0 A 130.3 8.7 120.1 8.8 92%Pass125SDStorm Drain Trench 60.0 A 130.3 8.7 121.6 8.9 93%Pass 126 SD Storm Drain Trench 60.0 A 130.3 8.7 120.1 8.6 92%Pass127SDStorm Drain Trench 57.5 A 130.3 8.7 121.6 7.7 93%Pass 12/30/20 128 SD Storm Drain Trench 60.0 A 130.3 8.7 119.2 6.8 91%Pass129SDStorm Drain Trench 60.0 A 130.3 8.7 121.5 9.1 93%Pass130SDStorm Drain Trench 60.0 A 130.3 8.7 122.1 8.6 94%Pass131SDStorm Drain Trench 60.0 A 130.3 8.7 120.2 7.8 92%Pass 132 SD Storm Drain Trench 57.0 A 130.3 8.7 121.1 8.9 93%Pass133SDStorm Drain Trench 57.0 A 130.3 8.7 119.1 8.1 91%Pass 134 SD Storm Drain Trench 59.0 A 130.3 8.7 120.2 8.3 92%Pass135SDStorm Drain Trench 59.0 A 130.3 8.7 121.3 8.4 93%Pass 1/5/21 136 S Sewer Line Trench 57.5 A 130.3 8.7 117.2 8.0 90%Pass137SSewer Line Trench 57.5 A 130.3 8.7 118.0 8.6 91%Pass138SSewer Line Trench 60.0 A 130.3 8.7 121.3 7.0 93%Pass139SSewer Line Trench 60.0 A 130.3 8.7 119.3 7.3 92%Pass 3606-3618 and 3630 Harding Street Carlsbad, California June 2022 NOVA Project No.4020055 Test Test Approx.Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 1/8/21 140 S Sewer Line Trench 59.0 A 130.3 8.7 119.2 8.9 91%Pass141SSewer Line Trench 59.0 A 130.3 8.7 117.5 9.6 90%Pass 142 S Sewer Line Trench 62.0 A 130.3 8.7 117.4 8.3 90%Pass143SSewer Line Trench 62.0 A 130.3 8.7 120.1 8.5 92%Pass144SSewer Line Trench 61.0 A 130.3 8.7 117.3 9.6 90%Pass 1/21/21 145 W Water Line Trench 62.0 A 130.3 8.7 120.9 4.4 93%Pass146WWater Line Trench 62.0 A 130.3 8.7 118.4 6.1 91%Pass 1/27/21 147 SD Storm Drain Trench 62.0 A 130.3 8.7 120.9 6.1 93%Pass148SDStorm Drain Trench 62.0 A 130.3 8.7 118.4 10.5 91%Pass 149 SD Storm Drain Trench 59.0 A 130.3 8.7 120.4 10.3 92%Pass 2/11/21 150 W Fire Line Trench 61.0 A 130.3 8.7 117.8 9.8 90%Pass151WFire Line Trench 61.0 A 130.3 8.7 118.5 9.7 91%Pass152WFire Line Trench 66.0 A 130.3 8.7 121.3 10.6 93%Pass153WFire Line Trench 60.0 A 130.3 8.7 118.0 10.0 91%Pass 3/2/21 154 SD Storm Drain Trench 60.0 A 130.3 8.7 117.4 7.3 90%Pass155SDStorm Drain Trench 59.5 A 130.3 8.7 119.5 7.6 92%Fail 156 SD Storm Drain Trench 59.5 A 130.3 8.7 120.3 7.3 92%Fail 3/16/21 157 W Water Line Trench 60.0 A 130.3 8.7 127.1 9.6 98%Pass158WWater Line Trench 60.0 A 130.3 8.7 128.3 9.7 98%Pass159FLFire Line Trench 60.0 A 130.3 8.7 125.2 9.8 96%Pass 3/17/21 160 FL Fire Line Trench 60.0 A 130.3 8.7 128.5 9.2 99%Pass 161 FL Fire Line Trench 60.0 A 130.3 8.7 127.9 9.1 98%Pass162FLFire Line Trench 60.0 A 130.3 8.7 123.9 9.3 95%Pass163SDRetest #155 59.5 A 130.3 8.7 123.8 10.2 95%Pass164SDRetest #156 59.5 A 130.3 8.7 126.2 9.8 97%Pass165SSewer Line Trench 60.0 A 130.3 8.7 123.8 10.0 95%Pass166SSewer Line Trench 60.5 A 130.3 8.7 117.7 9.4 90%Pass167SSewer Line Trench 60.0 A 130.3 8.7 125.2 9.2 96%Pass 3/18/21 168 S Sewer Line Trench and Drain 62.0 A 130.3 8.7 122.5 6.3 94%Pass169SSewer Line Trench and Drain 61.0 A 130.3 8.7 120.7 7.2 93%Pass 3/19/21 170 S Sewer Line Trench and Drain 62.0 A 130.3 8.7 121.8 7.3 93%Pass171SSewer Line Trench and Drain 62.0 A 130.3 8.7 120.7 6.0 93%Pass172SSewer Line Trench and Drain 62.0 A 130.3 8.7 119.3 6.8 92%Pass173SSewer Line Trench and Drain 62.0 A 130.3 8.7 122.2 6.6 94%Pass174SSewer Line Trench and Drain 62.0 A 130.3 8.7 117.6 7.3 90%Pass175SSewer Line Trench and Drain 62.0 A 130.3 8.7 117.2 7.0 90%Pass176SSewer Line Trench and Drain 62.0 A 130.3 8.7 119.0 7.3 91%Pass177SSewer Line Trench and Drain 62.0 A 130.3 8.7 120.1 7.5 92%Pass 3/30/21 178 AC Harding Street AC AC-1 149.9 N/A 145.9 N/A 97%Pass179ACHarding Street AC AC-1 149.9 N/A 145.7 N/A 97%Pass180ACHarding Street AC AC-1 149.9 N/A 144.1 N/A 96%Pass181ACHarding Street AC AC-1 149.9 N/A 143.2 N/A 96%Pass182ACHarding Street AC AC-1 149.9 N/A 142.4 N/A 95%Pass183SGHarding Street SG A 130.3 8.7 128.4 5.1 99%Pass184SGHarding Street SG A 130.3 8.7 129.7 7.1 100%Pass185ACHarding Street AC AC-2 149.0 N/A 146.4 N/A 98%Pass186ACHarding Street AC AC-2 149.0 N/A 147.6 N/A 99%Pass187ACHarding Street AC AC-2 149.0 N/A 146.9 N/A 99%Pass188ACHarding Street AC AC-2 149.0 N/A 141.8 N/A 95%Pass189ACHarding Street AC AC-2 149.0 N/A 146.2 N/A 98%Pass 9/8/21 190 SG Curb and Gutter SG A 130.3 8.7 120.2 6.6 92%Pass191SGCurb and Gutter SG A 130.3 8.7 119.7 6.5 92%Pass192SGCurb and Gutter SG A 130.3 8.7 110.5 8.9 85%Pass193SGCurb and Gutter SG A 130.3 8.7 119.3 7.0 92%Pass194BCurb and Gutter Base B 121.2 10.8 113.6 11.9 94%Pass195BCurb and Gutter Base B 121.2 10.8 114.9 12.2 95%Pass196BCurb and Gutter Base B 121.2 10.8 112.3 12.3 93%Pass197BCurb and Gutter Base B 121.2 10.8 112.1 11.6 92%Pass198SWSidewalkSGA130.3 8.7 117.1 10.1 90%Pass199SWSidewalkSGA130.3 8.7 119.2 9.5 91%Pass200SWSidewalkSGA130.3 8.7 118.8 8.9 91%Pass201SWSidewalkSGA130.3 8.7 120.1 10.5 92%Pass 2/16/22 202 FG Transformer Pad FG A 130.3 8.7 122.6 5.0 94%Pass 3606-3618 and 3630 Harding Street Carlsbad, California June 2022 NOVA Project No.4020055 Test Test Approx.Soil Rel.Pass/Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.FailLaboratoryField SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 3/31/22 203 SG Sidewalk SG A 130.3 8.7 127.0 5.3 97%Pass204SGSIdewalkSGA130.3 8.7 127.2 7.2 98%Pass205BSidewalkBaseC119.8 10.8 113.9 8.4 95%Pass206BSidewalkBaseC119.8 10.8 114.1 9.1 95%Pass 4/27/22 207 G Harding Street Gas Line Trench SG D 119.6 12.0 109.0 15.0 91%Pass208GHarding Street Gas Line Trench SG D 119.6 12.0 108.5 15.0 91%Pass209GHarding Street Gas Line Trench SG D 119.6 12.0 113.5 12.8 95%Pass210GHarding Street Gas Line Trench SG D 119.6 12.0 114.3 13.2 96%Pass 4/29/22 211 B Gas Line Trench Base E 141.0 6.0 135.4 7.0 96%Pass212BGas Line Trench Base E 141.0 6.0 136.2 6.7 97%Pass213ACGas Line Trench AC AC-3 151.0 N/A 144.2 N/A 95%Pass214ACGas Line Trench AC AC-3 151.0 N/A 143.4 N/A 95%Pass 5/3/22 215 B Gas Line Trench Base F 121.2 9.9 116.8 7.5 96%Pass216BGas Line Trench Base F 121.2 9.9 114.6 11.6 95%Pass217BGas Line Trench Base F 121.2 9.9 120.2 9.1 99%Pass218ACGas Line Trench AC AC-4 149.0 N/A 145.6 N/A 98%Pass219ACGas Line Trench AC AC-4 149.0 N/A 141.3 N/A 95%Pass220ACGas Line Trench AC AC-4 149.0 N/A 142.1 N/A 95%Pass 5/19/22 221 AC Harding Street AC AC-5 148.0 N/A 140.7 N/A 95%Pass222ACHarding Street AC AC-5 148.0 N/A 140.6 N/A 95%Pass223ACHarding Street AC AC-5 148.0 N/A 144.4 N/A 98%Pass224ACHarding Street AC AC-5 148.0 N/A 140.6 N/A 95%Pass225ACHarding Street AC AC-5 148.0 N/A 140.7 N/A 95%Pass226ACHarding Street AC AC-5 148.0 N/A 142.9 N/A 97%Pass227ACHarding Street AC AC-5 148.0 N/A 141.1 N/A 95%Pass228ACHarding Street AC AC-5 148.0 N/A 141.3 N/A 95%Pass229ACHarding Street AC AC-5 148.0 N/A 141.0 N/A 95%Pass