HomeMy WebLinkAboutCT 16-03; BEACH VILLAGE LIFE 1 MIXED USE; GEOTECHNICAL RESPONSE; 2020-02-14RD COPY RECO
- ~~v -k 11 --?-*
Initial Date
GEOTECHNICAL RESPONSE TO
CITY OF CARLSBAD LAND DEVELOPMENT ENGINEERING
REDLINE REVIEW COMMENTS AND REVIEW OF PRECISE GRADING
AND SHORING PLANS/STRUCTURAL CALCULATIONS
INSTRUCTION CHANGE SET), BEACH VILLAGE LIFE MIXED-USE HOTEL
SPA, AND CONDOMINIUMS, 300 CHRISTIANSEN WAY
== Geotechnical Geologic• Environmental
GEOTECHNICAL RESPONSE TO
CITY OF CARLSBAD LAND DEVELOPMENT ENGINEERING
REDLINE REVIEW COMMENTS AND REVIEW OF PRECISE GRADING
AND SHORING PLANS/STRUCTURAL CALCULATIONS
(CONSTRUCTION CHANGE SET), BEACH VILLAGE LIFE MIXED-USE HOTEL
SPA, AND CONDOMINIUMS, 300 CHRISTIANSEN WAY
381 CHRISTIANSEN WAY
CARLSBAD, CALIFORNIA 92008
W.O. 6942-Al-SC FEBRUARY 14,2020
Geotechnical. Geologic. Coastal • Environmental
5741 Palmer Way • Carlsbad, California 92010 • (760) 438-3155 • FAX (760) 931-0915 • www.geosoilsinc.com
February 14, 2020 W.O. 6942-Al-SC
Beach Village Life 1, LLC
do Karnak Planning and Design
381 Christiansen Way
Carlsbad, California 92008
Attention: Mr. Robert Richardson
Subject: Geotechnical Response to City of Carlsbad Land Development Engineering
Redline Review Comments and Review of Precise Grading, and Shoring
Plans/Structural Calculations (Construction Change Set), Beach Village Life
Mixed-Use Hotel, Spa, and Condominiums, 300 Christiansen Way, Carlsbad,
San Diego County, California, Assessor's Parcel Number
(APN) 203-173-02-00, City of Carlsbad Project No.: CT 16-03
Dear Mr. Richardson:
In accordance with Mr. Bill Davidson's request and authorization, GeoSoils, Inc. (GSI) is
providing this response to the City of Carlsbad Land Development Engineering's "redline"
geotechnical report review comments that require our attention (City of Carlsbad [City],
2019a and 2019b [see the Appendix]). In addition, a summary of our review of the
construction change set of the precise grading and shoring plans (Spear and Associates,
Inc. [S&A], 2020 and Sun Structural Engineering, Inc. [SSE], 2020b), and shoring structural
calculations (SSE, 2020a) is included herewith. The services GSI performed for this study
included a review of the documents referenced in the Appendix and the preparation of this
response. Unless specifically superseded herein, the conclusions and recommendations
contained in the referenced GSI reports (see the Appendix) are still considered valid and
applicable, and should be appropriately implemented during project design and
construction. It is our understanding that the City's redline review comment pertaining to
GSI (2019a) has been resolved; and therefore, does not require a response by GSI.
RESPONSE TO CITY REVIEW COMMENTS
General
The City review comments are summarized below in italics, followed by GSI's response.
Response to City (2019a)
City Redline Comments Provided on the Cover Page and Page 27 of GSI (2018c)
The City is requesting clarification regarding the extent of geotechnical inspections (i.e.,
continuous or periodic inspections) for each construction task listed under the "Updated
Summary of Recommendations Regarding Geotechnical Observation and Testing" heading
in GSI's geotechnical update evaluation report for the project (GSI, 2018c) as well as the
GSI personnel positions responsible for these geotechnical inspections.
GSI Response
Our response is summarized in the following tabulated inspection matrix. In general, the
extent of geotechnical inspections (continuous or periodic) should conform to the
requirements in Chapter 17 of the California Building Code ([CBC], California Building
Standards Commission, 2016).
CONSTRUCTION TASK CONTINUOUS I PERIODIC GSi PERSONNEL RESPONSIBLE
INSPECTION INSPECTION FOR INSPECTION
Drilling for Shoring Soldier Piles x -- Field Engineer or Geologist
During Planned Excavations - x Field Engineer or Geologist
During Grading (Overexcavation) - x Field Technician*
During Grading X - Field Technician* (Compacted Fill Placement)
Subdrain Installation - x Field Technician*
Drilling for Cast-In-Drilled Hole x .- Field Engineer or Geologist (CIDH) Pile Foundations
Foundation/Grade Beam X Field Technician* Excavations 7
Subgrade Preparation and
Compaction X Field Technician* (Slab-On-Grade, Pavements, and -
Hardscape)
Aggregate Base Placement and
Compaction -- X Field Technician*
(Pavements)
Asphaltic Concrete Placement and X Field Technician* Compacton -
Underground Utility Trench Backfill - x Field Technician*
* - A Field Engineer/Geologist may also perform these inspections.
Beach Village Life 1, LLC W.O. 6942-Al-SC
300 Christiansen Way, Carlsbad . February 14, 2020
File:e:\wpl2\6900\6942a1.grt2 GeoSoils, Inc. Page 2
Response to City (2019b)
City Redline Comment Provided on Page 20 of GSI (2018d)
The City is requiring the numerical values for the coefficient of active earth pressure ('ce) and
the unit weight of soil (y) used in the empirical formula we provided for calculating the lateral
earth pressure acting upon the shoring lagging.
GSI Response
The requested numerical values are as follows:
K= 35H (35 pounds per square foot [psfj multiplied by the height of the retained soil [35
psflft])
y = 105 to 115 pounds per cubic foot (pcf)
These values may be used in the lagging design for the currently planned temporary
shoring.
City Redline Comment Provided on Page 21 of GSI (2018d)
The City is requesting clarification of equivalent fluid pressures recommended for temporary
and permanent shoring in the first paragraph on page 21 of GS! (2018d).
GSI Response
The first paragraph on page 21 of GSI (2018d) contained a typographical error. Thus, GSI
has corrected this paragraph below:
As recommended in Figure 3 of GSI (2015), an equivalent fluid pressure (EFP) of 35H (35
pounds per square foot [psf] multiplied by the height of the retained soils [H]) should be
used in the design of the temporary shoring. Whereas, Figure 4 of GSI (2015) recommends
an EFP of 45H (45 psf multiplied by the height of the retained soils [H]) for the design of
permanent shoring with bracing (i.e, all floors near the top, middle and bottom of the shore
excavation). The old paralic deposits and the underlying, denser Santiago Formation are
considered competent earth materials. In both the temporary and permanent cases, these
earth materials may be considered drained, if drainage is included in the shoring details.
REVIEW OF S&A (2020) AND SSE (2020a AND 2020b)
Based on our review, the construction change set of the precise grading and shoring
plans/structural calculations (S&A, 2020; SSE, 2020a; and SSE, 2020b) are in general
Beach Village Life 1, LLC W.O. 6942A1-SC
300 Christiansen Way, Carlsbad February 14, 2020
File:e:\wpl2\6900\6942a1.9rt2 GeOSoils, Inc. Page 3
accordance with the recommendations provided in the project geotechnical reports
prepared by GSI (see the Appendix). GSI should be provided with the opportunity to review
any significant revisions to SM (2020) and SSE (2020a and 2020b) that involve the project
subsurface conditions and geotechnical recommendations, should any plan/structural
calculation amendments occur following the issuance of this document.
Plates 1, 2, and 3 provide the inferred geologic conditions along the west, north, and south
shoring walls, respectively.
LIMITATIONS
The conclusions and recommendations are professional opinions. These opinions have
been derived in accordance with current standards of practice, and no warranty, either
express or implied, is given. Standards of practice are subject to change with time. GSI
assumes no responsibility or liability for work or testing performed by others, or their
inaction; or work performed when GSI is not requested to be onsite, to evaluate if our
recommendations have been properly implemented. Use of this report constitutes an
agreement and consent by the user to all the limitations outlined above, notwithstanding
any other agreements that maybe in place. In addition, this report maybe subject to review
by the controlling authorities. Thus, this report brings to completion our scope of services
for this portion of the project.
Beach Village Life 1, LLC W.O. 6942-Al-SC
300 Christiansen Way, Carlsbad February 14, 2020
File:e:\wpl2\6900\6942a1.grt2 GeoSoils, Inc. Page 4
If you have any questions or comments regarding this letter, please do not hesitate to
contact the undersigned.
Respectfully
GeoSoils, Inc.
1 a_I No. 1340 1 I Certified I MJ! EngIneerfng J (P 010910
ngineering Geologist,40
4d'ffo`ihmer--
Project Geologist
RBB/JPF/ATG/mn
VSOESSm
Ir
háei1i OF C
Geotechnical Engineer, GE2S20'
Attachment: Appendix - References
Plate 1 - Inferred Geologic Conditions at West Shoring Wall
Plate 2 - Inferred Geologic Conditions at North Shoring Wall
Plate 3 - Inferred Geologic Conditions at South Shoring Wall
Distribution: (1) Addressee (PDF via email)
(1) Sun Structural Engineering, Inc., Attn: Mr. Changhua Sun (PDF via email)
(3) Arch Studio 12, Inc., Attn: Mr. Richard Johnson (US mail and PDF via
email)
(1) Spear and Associates, Inc., Attn: Mr. Josh Ziegler (PDF via email)
Beach Village Life 1, LLC W.O. 6942-Al-SC
300 Christiansen Way, Carlsbad February 14, 2020
File:e:\wp12\6900\6942a1 .gr12 GeOSoils, Inc. Page 5
APPFNflIY
REFERENCES
California Building Standards Commission, 2016, California Building Code, California Code
of Regulations, Title 24, Part 2, Volume 2 of 2, based on the 2015 International
Building Code, 2016 California Historical Building code, Title 24, Part 8, 2016
California Existing Building Code, Title 24, Part 10, and the 2015 International
Existing Building Code.
City of Carlsbad Land Development Engineering, 2019a, Redline review comments,
GeoSoils, Inc. report entitled 'Geotechnical Update Evaluation, Planned Mixed-Use
Hotel, Spa, and Condominiums, Christiansen Way, Carlsbad, San Diego County,
California, Assessor's Parcel Number (APN) 203-173-02-00," dated August 5.
2019b, Redline review comments, GeoSoils, Inc. report entitled "Revised Cast-In-
Drilled-Hole (CIDH) Pile Recommendations, Planned Mixed-Use Hotel, Spa, and
Condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00," dated August 5.
GeoSoils, Inc., 2019a, Geotechnical review of revised shoring plans and sheet 4 of the
precise grading plans, planned mixed-use hotel, spa, and condominiums,
300 Christiansen Way, Carlsbad, San Diego County, California, Assessor's Parcel
Number (APN) 203-173-02-00, City of Carlsbad Project No.: CT 16-03, W.O. 6942-Al -
SC, dated June 26.
2019b, Geotechnical review of structural plans and calculations, planned mixed-use
hotel, spa, and condominiums, 300 Christiansen Way, Carlsbad, San Diego County,
California, Assessor's Parcel Number (APN) 203-173-02-00, City of Carlsbad Project
No.: CT 16-03, W.O. 6942-Al-SC, dated June 13.
2018a, Geotechnical review of grading and shoring plans, planned mixed-use hotel,
spa, and condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, City of Carlsbad project no.: CT 16-
03, W.O. 6942-Al -SC, dated October 11.
2018b, Geotechnical response to City of Carlsbad third-party plan check and
Engineering Department review comments, planned mixed-use hotel, spa, and
condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, City of Carlsbad Project No.: CT 16-
03, W.O. 6942-Al -SC, dated May 30.
2018c, Geotechnical update evaluation, planned mixed-use hotel, spa, and
condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, W.O. 6942-Al-SC, dated
February 15.
GeoSoils, Inc.
2018d, Revised cast-in-drilled-hole (CIDH) pile recommendations, planned
mixed-use hotel, spa, and condominiums, Christiansen Way, Carlsbad, San Diego
County, California, Assessor's Parcel Number (APN) 203-173-02-00,
W.O. 6942-Al-SC, dated February 5.
2017, Supplemental geotechnical recommendations, proposed mixed-use hotel,
spa, and condominiums, Christiansen Way, Carlsbad, San Diego County, California,
Assessor's Parcel Number (APN) 203-173-02-00, dated October 23.
2015, Preliminary geotechnical evaluation, APN 203-173-02-00, Carlsbad, San Diego
County, California, W.O. 6942-A-SC, dated September 11.
Spear and Associates, Inc., 2020, Precise grading plan for: Beach Village Life, Christiansen
Way, plan & sections, sheets 1 through 4 of 13, various scales, City of Carlsbad
project no.: 16-03, drawing no.: 508-9A, revision (delta 1) dated February 7.
Sun Structural Engineering, Inc., 2020a, Structural calculations for: Beach Village Life 1,
mixed use hotel, spa & condominiums shoring design revision, 2 pages, dated
February 10.
2020b, Shoring plans for: Beach Village Life 1 mixed use hotel, spa &
condominiums, Sheets S-i, S-2, S-3 SD1, SD2, and SD-3, various scales, plot dated
February 4.
Beach Village Life 1, LLC Appendix
File:e:\wpl2\6900\6942a1.grt2 GeoSoils, Inc. Page 2
wI
PIL PROPOSED MIXED—USE BUILDING IP/L
18-2 PROJECTED
(GSI, 2018c)
8-2 PROJECTED 8-3 PROJECTED
B-i PROJECTED j9-4 PROJECTED (GSI, 2015) (GS1, 2015) (I (UN, 20(5) KIN (GSI, 2018c)
tI
Property line
-
Qcol—
)Main Level
Main Level A
55'
711
Sub Level I
48'-lO"
DI mo Sub Level 2
39' - OH
-In _J IU Ltj
0 -
—10 - - —10
—20 - --20
—30 - --30
r.1Ut:i1:I.JIwic1 !LYU
MVAVl I.J:Lc1iiil*1i'I.J
ALL LOCATIONS ARE APPROXIMATE
This document or efile is not a part of the Construction
Documents and should not be relied upon as being an
accurate depiction of design.
GRAPHIC SCALE
10 0 5 10 20 40
II
1" = 10'
BASE PROFILE BY.8
ARCH STUDIO 12, INC
70 P/Li PROPOSED MIXED-USE BUILDING 'P/L 70
B-3 PROJECTED 18-1 PROJECTED 8-2 PROJECTED
(GSI, 2015) (GsI, 2018c) (GSI, 2015)
60 Property line ( 1 Plate steel lagging for this type of h itching
- -
Shotcrete lagging - 12' max. grade
g_ -Steel column to terminate at
Steel colum to terminate at Main Steel column to termin te at Main Level Deck B 1 7ain Level B 60
g depth underside of entry stairs - - - - - - - - - -
Qcol
r J EXISTIG GRADE ,,i- Grade cut back slope - - Existhig grade line - ______ - 183 PROJECTED - B1RoJEcTED - ______ - Property line
an
QOP - QC01
— J-46' 4111111111040M (WEA
wo Qmmmw-
Grade cutback a 37'- 8"
j;E
:: _ L!iPL
H
_____________ __
50
TD=6 Y4 Bottom of grade beam line 34'- E 3617 39, —0~ Q ID 177 0 34.67
j i
77
77777 30 30
Qop
Top of Dry, LLJ
LLj Friable Sand Layer=
ThH
HThTh 'QOP
18.08
_, ___ ___ ___ _____
H 20 20
1 TD=36 TD=31 Y2' 77 LLJ
10
L Tsa Tsa Tsa H
10
1.92-1
08
H L 308 HHHHHHH 7D=56'I
-10
!I.]:4tIJa'I.]:4R1c1 !kYU
Vt .............. I.i;LtMii*ifI'J
ALL LOCATIONS ARE APPROXIMATE
This document or efile is not a part of the Construction
Documents and should not be relied upon as being an
accurate depiction of design.
BASE PROFILE BY.,
ARCH STUDIO 12, INCR
GRAPHIC SCALE-
10 0 5 to 20 40
I I
7" = 10'
70 1 PAL PROPOSED MIXED-USE BUILDING P/L -
70
Iwo
50- Wo
Main Level A
U 55'-7"
;Ub Level 1
48
%
ubLevel 2
39' - 0"
Wei
(N
30-
LLJ
20-
9
Qco! - QUATERNARY COLLUV!UM/DISTURBED NATURAL GROUND
Qop - QUATERNARY OLD PARAUC DEPOSITS
Tsa - TERTIARY SAN 71AGO FORMATION
- APPROXIMATE LOCATION OF GEOLOGIC CONTACT,
QUERIED WHERE UNCERTAIN
V - ES17MA TED PERCHED GROUND WA TER SURFACE
- ESTIMATED REGIONAL GROUND WA TER SURFACE
- PLANNED LOCATION OF 36"0 SOLDIER PILE
- EXISTING EXTERNAL SURFACE GRADE
- APPROXIMATE AREA OF RECOMMENDED OVEREXCA VA TION
AND REPLACEMENT FILL
- In _J IL) LU
1-1/4" STL PLATE LAGGING
0- -0
--10
-20- --20
-30- --30
!a VIIii.k4RIci!A?YU
ALL LOCATIONS ARE APPROXIMATE
This document or efile is not a part of the Construction
Documents and should not be relied upon as being an
accurate depiction of design.
GRAPHIC SCALE
10 0 5 10 20 40
1" - 10'
!AY All Nill 1111~` 1t