HomeMy WebLinkAbout2022-08-18; Traffic and Mobility Commission; ; Avenida Encinas Coastal Rail Trail and Pedestrian ImprovementsMeeting Date: Aug. 18, 2022 To: Traffic and Mobility Commission Staff Contact: Brandon Miles, Associate Engineer brandon.miles@carsbadca.gov, 442-339-2745 Subject: Avenida Encinas Coastal Rail Trail and Pedestrian Improvements Recommended Action Support staff’s recommendation to implement the improvement plans for Segment 2 of the Avenida Encinas Coastal Rail Trail and Pedestrian Improvements, Capital Improvement Program Project No. 6004. Summary In July 2017, Caltrans awarded the City of Carlsbad an Active Transportation Program, or ATP, grant by Caltrans to construct a portion of the Coastal Rail Trail, or CRT, along Avenida Encinas between Carlsbad Boulevard and Cannon Road. Construction of this portion of the CRT has been identified as a high priority by the local and regional community. The CRT is a planned regional bikeway that includes a 44-mile regional bikeway that connects six coastal cities throughout San Diego County. On Dec. 7, 2021, with a recommendation from staff, the City Council authorized executing an agreement with NASLAND Engineering for engineering design and environmental services for the project. On April 4, 2022, the Traffic and Mobility Commission received a presentation and provided input on the preliminary design of the project. At the same meeting, the commission voted unanimously to support staff’s recommended bike lane classification, enhanced Class II bike lane, along Avenida Encinas Following the April 4, 2022, Traffic and Mobility Commission meeting, staff discovered additional comments submitted by the public relating to the project. To provide those additional comments to the Traffic and Mobility Commission, staff placed an item on the June 6, 2022, Regular Meeting Agenda for the Commission’s consideration. At the June 6, 2022, meeting, the Commission discussed the additional comments that had been received as well as comments received in person at the meeting. Following consideration of all the comments received staff were directed to return to the Traffic and Mobility Commission with the final improvement plans for Segment 2 of the Avenida Encinas Coastal Rail Trail and Pedestrian Improvements. Aug. 18, 2022 Item #1 1 Discussion Staff have received input from Traffic and Mobility Commission and the public on the preliminary design plans. Staff directed NASLAND Engineering to update the improvement plans and environmental documents for Segment 2 of the project. Segment 2 is located between Poinsettia Transit Station and Carlsbad Boulevard as shown in Exhibit 1. Improvements along the project corridor include the following features as identified in the improvement plans provided in Exhibit 2: • Striping modifications • Enhanced Class II bike lanes • Enhanced intersection treatments including curb extensions, traffic calming measures, and high visibility crosswalks at the following intersections on Avenida Encinas: o Poinsettia Lane o Portage Way o Dory Lane o Carlsbad Boulevard • Traffic calming with a road lane realignment between Poinsettia Lane and Windrose Circle that has been identified to reduce the level of service (LOS). • Enhanced midblock pedestrian crossing at San Carlos Street and Avenida Encinas As shown in the proposed improvements plans, provided in Exhibit 2, most of the roadway improvements will be implemented through roadway restriping. The roadway segment from Poinsettia Lane to Windrose Circle will be restriped from 5-vehicle lanes to 2-vehicle lanes. While traffic studies show the road lane realignment for this segment will result in a drop in Level of Service, from LOS C to LOS D, this segment will still operate at acceptable levels of service under the City’s General Plan Mobility Element. Consistent with Mobility Element 3- P.15, staff will therefore bring this item to the City Council with a recommendation to approve the road lane re-alignment. Next Steps Following the Traffic and Mobility Commission’s review, staff will finalize the construction plans for Segment 2 of the project and submit a construction allocation request to Caltrans for the ATP grant funding by Aug. 31, 2022. Thereafter, staff will bring a staff report to the City Council in late 2022 with a recommendation to approve the plans, specifications, and contract documents and authorize the City Clerk to advertise for construction bids for the project. After the bidding process is complete, the project will be brought back to the City Council with a request to award a construction contract to the lowest responsive and responsible bidder. The construction is targeted to begin in mid-2023. Exhibits 1. Project Location Map 2. Improvement Plans Aug. 18, 2022 Item #1 2 ââ ââ ââ ââ ââââ ââ ââ ââ ââ ââââââââââRD AVENIDA ENC INAS POINSETT I A PALOMAR AIRPORT CARLSBAD BL §¨¦5 §¨¦5 LNRD CANNON PRTS PLOTTED BY: Andy Chang PLOT DATE: 10/25/2021 PATH: Z:\Brandon_Miles\LocationMaps\6004_Avenida_Encinas_Coastal_Rail_Trail\6004_LocationMap_WithVicinityMap.mxd PROJECT NAME EXHIBITPROJECT NUMBER6004 1Avenida Encinas Coastal Rail Trail and Pedestrain Improvements LOCATION MAP CARLSBAD VISTA ENCINITAS OCEANSIDE SAN MARCOSPROJECTLIMITS è è PROJECTLIMITS è èPRTS - Poinsettia Regional Transit Station Legend ââ ââ ââ ââ Segment 1 - Completed Segment 2 - To be Completed by ATP and City Funds Segment 3 - To be Completed by City-Only Funds Exhibit 1 Aug. 18, 2022 Item #1 3 ” CITY OF CARLSBAD AVENIDA ENCINAS COASTAL RAIL TRAIL PROJECT AND PEDESTRIAN IMPROVEMENTS SEGMENT 2 VICINITY MAP CITY OF CARLSBAD CARLSBAD, CA CITY COUNCIL MATT HALL - MAYOR TERESA ACOSTA - COUNCIL MEMBER PRIYA BHAT-PATEL - COUNCIL MEMBER KEITH BLACKBURN - COUNCIL MEMBER PEDER NORBY - COUNCIL MEMBER SCOTT CHADWICK - CITY MANAGER Exhibit 2 Aug. 18, 2022 Item #1 4 Aug. 18, 2022Item #1 5 Aug. 18, 2022Item #1 6 Aug. 18, 2022 Item #1 7 Aug. 18, 2022 Item #1 8 Aug. 18, 2022 Item #1 9 Aug. 18, 2022 Item #1 10 Aug. 18, 2022 Item #1 11 Δ Aug. 18, 2022 Item #1 12 Aug. 18, 2022 Item #1 13 Aug. 18, 2022 Item #1 14 Aug. 18, 2022 Item #1 15 Aug. 18, 2022 Item #1 16 Δ Aug. 18, 2022 Item #1 17 Δ Aug. 18, 2022 Item #1 18 Δ Aug. 18, 2022 Item #1 19 Δ Aug. 18, 2022 Item #1 20 Δ Aug. 18, 2022 Item #1 21 Δ Aug. 18, 2022 Item #1 22 TRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSDETAIL SHEETAug. 18, 2022Item #1 23 DORY LNMARLIN LNPORTAGEWAYMERIDIANWAY 7800P57.94AVENIDA ENCINASAVENIDA ENCINASCARLSBADBLVD (NB)TRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSPONTO DRSEE BELOW LEFTMATCHLINE 21+50SEE ABOVE RIGHTMATCHLINE 21+50 MATCHLINE 34+75 SEE SHEET 22 CARLSBADBLVD (SB)SIGNING AND STRIPING PLANTrail35...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................Aug. 18, 2022Item #1 24 AVENIDA ENCINASDWYA V E N ID A E N C I N A SWINDROSE CIRTRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSSEE SHEET 23MATCHLINE 53+50MATCHLINE CSEE ABOVE RIGHT SEE SHEET 21MATCHLINE 34+75 SEE BELOW LEFTMATCHLINE 42+50SIGNING AND STRIPING PLAN35TrailTrailAug. 18, 2022Item #1 25 5558ICV/WV58.95SAN CARLOS ST AVENIDA ENCINAS 6585AD1 B 64.036586AD164.076587AD164.026588AD1 CLO 63.98 SAN LUCAS S T SHOPPIN G CENTER D W YAVENIDA EN CINAS TRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSMA T C H L I N E 5 3 + 5 0 S E E S H E E T 2 2 MATCHLINE 64+70SEE BELOW LEFTSEE ABOVE RIGHTMATCHLINE 64+70MATCHLINE 75+75SEE SHEET 24POINSETTIA L N SIGNING AND STRIPING PLAN 35 SHOPPI N G CENTE R D WY Aug. 18, 2022 Item #1 26 EMBARCADERO LN (S)AVENIDA ENCINASRAINTREE DRMACADAMIA DRAVENIDA ENCINASTRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSSEE SHEET 23MATCHLINE 75+75 MATCHLINE 87+10 SEE BELOW LEFT SEE ABOVE RIGHTMATCHLINE 87+10 SEE SHEET 25MATCHLINE 99+003025SIGNING AND STRIPING PLAN25Aug. 18, 2022Item #1 27 DWY136CSLB-13 6 54. 0 6AVENIDA ENCINASTRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSSEE SHEET 24MATCHLINE 99+00 3035EMBARCADERO LN (N )SIGNING AND STRIPING PLANAug. 18, 2022Item #1 28 GGEECATVCATVTTGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGEEEEEEEEEEEEEEE EEE E EEEEEEEEEEEEE E E EEEEEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W T T T T E E E E E EEEEEESSSCATVCATVW W W FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVTTTTTTEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTSSSSSSSSSSSSSSSSSSSSSSSSSSSSSRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWTTTTTTTTTTTTTTTTTTTTTTTTTRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSAVENIDA ENCINAS AND SAN CARLOS STREETPEDESTRIAN SIGNAL PLANAVENIDA ENCINASSAN CARLOS STREETSHOPPING CENTER DWYAug. 18, 2022Item #1 29 5558ICV/WV58.95TRAFFIC AVENIDA ENCINAS CRT IMPROVEMENTSNOT FORCONSTRUCTIONAVENIDA ENCINAS AND POINSETTIA LANETRAFFIC SIGNAL MODIFICATION PLANAVENIDA ENCINASPOINSETTIA LANEAug. 18, 2022Item #1 30 AVENIDA ENCINASCARLSBAD BLVD (SB)CARLSBAD BLVD (NB)AVENIDA ENCINASSHOPPING CENTER DWYSAN LUCAS ST658 5AD1 B64.03 6586AD164.0 7 6587AD164.02 658 8AD1 C L O 63.98TRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSDETECTOR LOOP REPLACEMENT PLANAug. 18, 2022Item #1 31 EEEE E E E GGGGGGGEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOCATVCATVCATVCATVCATVTTTTTTTTGGGGFOFOFOFOEEEEETTTTFOFOFOFOFOCATVCATVCATVG G G GGGGGGGGGGGGGGGGGG GGGGGGGGGGGGGGGGGGGGGGEEEEEEEEEEEEEEE EEE E EEEEEEEEEE E E EEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W T T T T E E E E E EEEEEESSSCATVCATVCATVCATVW W W FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVTEEEEEEEEEEEEEETTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTFOFOFOFOFOFOFOFOFOFOFOFOFOTTTTTTTTTTTTTTTTTTTTTTTTTCATVCATVCATVCATVCATVCATVCATV CATV CATV SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSRW RW RWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWW W W WTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTRW RW RW SAN LUCAS ST6585AD1 B64.036586AD164.076587AD164.026588AD1 CLO63.98 AVENIDA ENCINASSAN CARLOS STREETSHOPPINGCENTER DWYGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWEW W W W W W W W W W W W W G G G GGG G G G G G G G G FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOT T T T TTTTTT T T T T T TCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATVCATV CATVCATVCATVCATVCATVEEEEEEETTTTTTTTTTEEEEEEEEEEEEEEEEEEEEEE E E E E E E WWWWSDSDSDSDSDSDSDSDSDSD SD SD SD RW RW RW RW RW RW RW RW RW RWTTTTTTTTTT SSSSSSSSSSSSSSSSSSSSSSSSSSSSSRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRW5558ICV/WV58.95 AVENIDA ENCINASTRAFFICNOT FORCONSTRUCTIONAVENIDA ENCINAS CRT IMPROVEMENTSFIBER OPTIC COMMUNICATION PLANSEE ABOVE RIGHTMATCHLINE 67+50 MATCHLINE 67+ 5 0 SEE BELOW LE F TPOINSETTIA LANERTPROPOSEDETHERNET SWITCHTRRTTRRTTRPROPOSEDETHERNET SWITCHPROPOSEDETHERNET SWITCHPROPOSED SPLICE DIAGRAMSHOPPING CENTER DWYAug. 18, 2022Item #1 32 Avenida Encinas Coastal Rail Trail and Pedestrian Improvements Project No. 6004 Hossein Ajideh, Engineering Manager Brandon Miles, Associate Engineer Aug. 18, 2022 Recommended Action Support staff’s recommendations to approve the plans and specifications for Avenida Encinas Coastal Rail Trail and Pedestrian Improvements, Capital Improvement Program (CIP) Project No. 6004 2 Background •Coastal Rail Trail (CRT) is a regional bikeway that includes a 44-mile regional bikeway that connects six coastal cities throughout San Diego County •Project constructs 2.5 miles of enhanced bicycle and pedestrian facilities, enhanced intersection treatments for improved safety, and traffic calming with road lane realignment 3 Timeline •Nov. 15, 2021 -SANDAG, as Metropolitan Planning Organization, approved both requests for State-Only and scope change •Dec. 7, 2021 –City Council authorized executing an agreement with consultant •Dec. 24, 2021 –Caltrans approved State-Only Finding request •April 4 and June 6, 2022 –Staff presented project to T&MC •Aug. 1, 2022 –Requested funding allocation •Request for Scope Change supported by Caltrans and now is under review by California Transportation Commission (CTC) staff –Tentatively scheduled to be presented at Oct 2022 CTC meeting 4 Project •To expedite project schedule and realistically manage environmental review and ROW acquisition phases to meet ATP grant requirements, this project has been broken into: 1.Segment 1 -from Cannon Rd to Palomar Airport Rd –Completed 2.Segment 2 -from Poinsettia Coaster Station to Carlsbad Blvd –final draft 3.Segment 3 -from Palomar Airport Rd to Poinsettia Coaster Station –in design phase 5 6 Avenida Encinas Coastal Rail Trail and Pedestrian Improvements Proposed Improvement Segment 2 7 8 Avenida Encinas Carlsbad Blvd to Ponto Dr. 9 Avenida Encinas Dory Ln to Portage Way 10 Avenida Encinas Windrose Cir 11 Avenida Encinas Shopping Center to San Lucas St. 12 Avenida Encinas San Carlos St to Poinsettia Ln 13 Avenida Encinas Poinsettia Ln to Raintree Dr 14 Avenida Encinas Macadamia Dr 15 Avenida Encinas Embarcadero Ln To Poinsettia Coaster Station Next Steps •Staff will –Finalize project plans, specifications and cost estimate •Request City Council to –approve plans and specifications and authorize for bids –request City Council to award a construction contract 16 Recommended Action Support staff’s recommendations to approve the plans and specifications for Avenida Encinas Coastal Rail Trail and Pedestrian Improvements 17 Thank you!