Loading...
HomeMy WebLinkAboutPD 2018-0027; GEE RESIDENCE; FINAL SOILS REPORT; 2022-08-16 EDG Project No. 226750-4 Date: August 16, 2022 To: Hacienda Development Solutions LLC Attn: Sergio Vazquez 106 5th Avenue Chula Vista, California 91910 Re: Proposed Drainage and Stormwater Improvements, to be Located at 3800 Alder Avenue, Carlsbad, California. Subject: Compaction and Construction Observation Report – Rough Grading for the Construction of New Fill Slopes, Detention Basins, and Drainage Systems. Ref: 1. “Limited Geotechnical Investigation and Recommendations for the Additions and Remodel to the Residence Located at 3800 Alder Avenue, Carlsbad, California,” dated July 22, 2014, prepared by Engineering Design group. 2. Grading Plan, Drawing No. 520-3A, prepared by Engineering Design Group. 3. Updated Geotechnical Recommendations, dated October 2, 2020, prepared by Engineering Design Group. INTRODUCTION In accordance with your request and authorization we have provided limited earthwork observation and compaction testing services during the construction of fill slopes at detention basins, and backfilling of trenches associated with drainage systems, at the above referenced site. The results of our limited quality control and compaction testing operations are summarized below. GRADING OPERATIONS Grading observed and tested for this project consisted of creating a new fill slope at Detention Basin 1A, limited reestablishment of fill slope at Detention Basin 1B, and backfilling of trench excavations for drainage lines. Rough grading at the subject site was conducted during May 2022. ENGINEERING DESIGN GROUP www.designgroupca.com 2121 Montiel Road, San Marcos, CA 92069 760.839.7302 EDG Project No. 226750-4 In areas of new fill slopes at Detention Basin 1A, existing weathered and fill materials were removed, keyways were extended into competent material at the toe of the proposed slope. Keyways were excavated to a depth of 4 feet below adjacent grade and canted into the slope. Keyway subgrade was scarified to a depth of 12 inches, moisture conditioned and fill soils recompacted. As part of the creation of fill slopes, competent material was benched, soils placed and recompacted utilizing earth moving equipment. As part of construction of Detention Basin 1B, a portion of the existing slope was removed to allow access for equipment. As part of a localized reestablishment, a keyway was extended into competent material to a depth of 2 feet below adjacent grade, competent material was benched, soils placed and recompacted utilizing earth moving equipment. Onsite soil materials were utilized as graded fill. Prior to re-compaction, soils were generally cleaned of vegetative and other debris and cobbles greater than 6 inches and moisture conditioned. Onsite soil consisted of Light grey to brown, silty sands/sandy silts to sandy clays. Based upon observation, onsite soils possess a low to medium potential for expansion. Soil was moisture conditioned with a fire hose and placed and re-compacted utilizing a Bobcat, mini excavator, and mechanized whacker. FIELD AND LABORATORY TESTING Limited field density tests were performed in accordance with D2922 (Nuclear Gauge Method). Our test results indicate that, in the locations tested, soils have been compacted to at least 90% relative compaction, as determined by ASTM D1557, (Procedure A). The reported test results are representative of the soil conditions at the locations tested. Our observation and field density testing methods are in accordance with normally accepted procedures. The accuracy of the relative compaction values is subject to the precision limitations of the ASTM test methods. The accuracy of the maximum dry density determination (ASTM D1557) is discussed in the Annual Book of ASTM Standards, Section 4, Volume 04.08, entitled, Soil and Rock; Building Stones. Variations of relative compaction values should be expected, laterally and vertically, from actual test locations. TESTING SUMMARY In general, it is our opinion, based on the placement procedure and the test data collected, the fill soils tested, at the locations tested, were compacted to a minimum of 90% relative EDG Project No. 226750-4 compaction (based on ASTM D1557, Procedure A). If you have any questions regarding this report, or if we can be of further service, please do not hesitate to contact us. We hope the report provides you with the necessary information to continue with the development of the project. Sincerely, ENGINEERING DESIGN GROUP Erin Rist Steven B. Norris California RCE# 65122 California GE# 2590 Attachments: 1) Table 1 & 2: “Laboratory and Field Test Results” 2) Figure 1: “Approximate Location of Compaction Tests” EDG Project No. 226750-4 LABORATORY AND FIELD TEST RESULTS TABLE NO. 1 Laboratory Test Results SOIL TYPE (#) SOIL TYPE MAXIMUM DENSITY (PCF) OPTIMUM MOISTURE (%) U.S.C.S. CLASSIFICATION 1 Moderate Brown, Sandy Clay/Clayey Sand 122.4 12.5 SM - SC TABLE NO. 2 Field Test Results TEST NO. DATE ELEVATION (FT) SOIL TYPE (#) DRY DENSITY (PCF) FIELD MOISTURE (%) RELATIVE COMPACTION (%) COMMENT 1 5/10/2022 273 1 112.0 13.3 92 2 5/10/2022 273 1 105.4 12.5 84 RETEST 3 3 5/10/2022 273 1 112.1 12.6 92 4 5/12/2022 275 1 116.2 11.2 95 5 5/12/2022 275 1 110.0 11.3 90 6 5/12/2022 275 1 110.2 13.8 90 7 5/12/2022 272 1 120.6 12.4 99 8 5/13/2022 277 1 113.0 13.1 92 9 5/13/2022 277 1 115.8 11.6 95 10 5/13/2022 277 1 112.5 11.3 92 11 5/17/2022 279 1 107.9 9.4 88 RETEST 12 12 5/17/2022 279 1 117.4 8.6 96 13 5/17/2022 279 1 111.0 10.8 91 14 5/17/2022 274 1 111.8 11.1 91 15 5/19/2022 281 1 118.1 9.7 97 16 5/19/2022 281 1 119.0 9.3 97 TEST NO. DATE ELEVATION (FT) SOIL TYPE (#) DRY DENSITY (PCF) FIELD MOISTURE (%) RELATIVE COMPACTION (%) COMMENT 17 5/19/2022 276 1 110.6 8.5 90 18 5/25/2022 284 1 112.4 11.7 92 19 5/25/2022 284 1 116.8 11.7 95 20 5/25/2022 278 1 118.0 9.0 96 21 5/25/2022 278 1 113.2 9.4 93 FIGURE 1 Approximate Location of Compaction Test Project: Hacienda Development Solutions Address: 3800 Alder Avenue, Carlsbad, California EDG Project No:226750-4 ●1 ●3 ●2 ●4 ●5 ●6 ●8 Not to Scale ●9 ●10 ●11 ●12 ●13 ●15 ●16 ●18 ●19 ●7●14 ●17●20 ●21 Wall Not a Part Previously Done Grading-Not Part of Earthwork Observation/Inspection Per This Report Basin 1A Basin 1B ENGINEERING DESIGN GROUP www.designgroupca.com 8° DRAINAGE fJ,SfJ,I ROCK ~IKJ,itl_f!;!)~ . -..,-81,CKIIH)-~~ -=s--.:.~~)=-.i,vt- ~ .. PAR ..,.. 1«11[: S££ D£TAIL 2/ 11-/IS SHEET FOR HfADWAl.l AT OOTTOII OF BROW txrCH (£) ~-=--"'""- FF=29•.JS P.. p 2121 Montiel Road, San Marcos, CA 92069 760.839.7302 \ . \ \ \ \ \ ,¾ ~ 0 t ~~:,:111,~:z'__r,;~""'-:r~~lli.t.'.l~l;r \J~:. ~i\_;,, : -li:Ql~!bi..:~::!i~~~t!,.e.~.ea~;, ~ 1f,,, ~ ~---~