Loading...
HomeMy WebLinkAbout2201 LEVANTE ST; ; CBR2021-1191; PermitPERMIT REPORT Residential Permit Print Date: 07/12/2022 Job Address: 2201 LEVANTE ST, CARLSBAD, CA 92009-8014 Permit Type: BLDG-Residential Work Class: Addition Parcel#: 2162405301 Track#: Valuation: $42,036.00 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Plan Check#: Project Title: Description: GIDLEY: 248 SF FAMILY ROOM ADDITION Property Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R FEE STRONG MOTION -RESIDENTIAL (SMIP) 2201 LEV ANTE ST CARLSBAD, CA 92009 581473 -GREEN BUILDING STATE STANDARDS FEE BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) SFD & DUPLEXES BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) SWPPP INSPECTION FEE TIER 1-Medium BLDG BUILDING PLAN CHECK FEE (BLDG) SWPPP PLAN REVIEW FEE TIER 1 -Medium Total Fees: $2,049.30 Total Payments To Date: $2,049.30 {city of Carlsbad Permit No: CBR2021-1191 Status: Closed -Finaled Applied: 04/26/2021 Issued: 11/02/2021 Fina led Close Out: 06/09/2022 Inspector: Final Inspection: Balance Due: TAlva 06/09/2022 AMOUNT $5.46 $2.00 $194.00 $1,162.00 $98.00 $271.00 $252.84 $64.00 $0.00 Please take NOTICE that approval of your project includes the "lmposition11 of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. lf you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ... (__ City of Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan Check 03J?.;;h;2 /. J j q f Est. Value ,'ffel;:J, 63r;. Qt5 PC Deposit Date l/· ;::J?, -o? / Job Addres• :2?C? ( L.£VAN7C-~ r. Suite: ____ ,APN: .;2./4:,-.Z.40-5"3 CT/Project #: _________________ ,Lot#: ;2.l 8 Year Built: ________ _ Fire Sprinklers: QYES®No Air Conditioning:3YES Q NO Electrical Panel Upgrade: QYEs® NO BRIEF DESCRIPTION OF WORK: ~tP0,111, APP/71 t::)N ~ Addition/New: .2..tf &l Living SF, ____ Deck SF, ____ Patio SF,. ____ Garage SF __ _ Is this to create an Accessory Dwelling Unit? 0 Y (81:N New Fireplace? 0 Y S°N, if yes how many? __ □Remodel: SF of affected area Is the area a conversion or change of use? OY ON 0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ___________ _ □solar: KW, ___ Modules, Mounted:ORoof OGround, Tilt: 0 YON, RMA: Ov ON, Battery:OY ON, Panel Upgrade: OY ON D Reroof: ·--------------------------------□ Plumbing/Mechanical/Electrical 0 Only: Other: This permit is to be issued in the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the owner or contractor. The person listed as the Applicant below will be the main point of contact throughout the permit process. PROPERTY OWNER APPLICANT O PROPERTY OWNERS AUTHORIZED AGENT APPLICANT 0 Name: ppA/ ,6/PUY Name:. _________________ _ Address: .Z:,20/ Ml/AA/~ J;7. Address: ________________ _ City-4f(-@..t.p State: .:=A Zip: ,,2.d?t2"f City: State:. ___ Zip:. ____ _ Phone: /,/'f-/3'J/-;£/ ')Cf Phone: ______________ _ Email:. _________________ Email: __________________ _ DESIGN PROFESSIONAL APPLICANT ~ Name: £D .:'"/Ul<autf Address: 2/.z.£ /U'ITr-' T. City:,€,fAI t,1&~P State: CA Zip: 9.2/// Phone: 61"/ -77,P-'17&;, Email, £,~(VgW(!SAN, AA· Ct1);11 Architect State License: _.N,Cl[,;~£:N'.~=koc::.. _____ _ CONTRACTOR OF RECORD APPLICANT 0 Name:. __________________ _ Address:. _________________ _ City: State:. ___ Zip:. _____ _ Phone:. __________________ _ Email:. __________________ _ State License/class:. ______ Bus. License: ___ _ 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov REV. 08/20 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHEOC: NUMIER: _____ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STAT£ LICENSED CONTRACTOR OR A PROPERTY OWNER. If THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR UfflR IS REQ\IIRED PEIIMIT ISSUANCE. (OPTION Al: LICENSED CONTRACTOR DECLARATION: lherebyofflrmunderpenaltyofperjurythotlamlicensedunderprovisionso/Chapter9(commendngwlths«tion7000)o/DlvlsionJ oftheBusinessondProfessionsCode,andmylicenselslnfullforceandeffect. lalsoafflrmunderpenaltyo{perjuryantofthe following declarations/CHOOSE ONE}: r'if have and will maintaa, • Cfflifiute of eof\Wnt to self ·insure tor work en' co,npmHUon p<OWjed by Sfflion 3700 of the Labot Gode. forfftt_~~•I ~'.~_:,;£: ~ which thts ~rmtt l'1 ~. POticyNo, ,-, :!L,' -OR- f11 how! •nd will mamtain ......,,,, wm....,..,.,.., •• n,qulNd by.Section 3700of the L>borC<>do, forthe.,..-ol the_fot_tliisi,Mllltls ~----r•ncecam.,andpollcynuml,er""';'-CompanyName:-,--,----------------PollcyNo. _____________ ;._ _______ Elcpjladon ____________ _ ~~tc of £xemptton: I tffidy that In the performance of the work for whidl this pemut ts lssutd, t shaff not employ any~ VJ any manner so ntobecome 1ubject to the worti:ers' compemation LlW1 of Cafifomia. WARNING: Fdu,e to SkUfW 1iWUrh,s (Clfflplftlltla I :owtap k ........ Hid shill tu:11ject.u. :tfflplap9fl to ------up10$100,000.00,ln-lhttolllemstof _____ ,,_,.,, ... __ .,.,_~··· lntenst ...i-..,,,, - CONSTRUCTION LENDING AGENcy, IF ANY: I hHebv affirm that there Is • co1htmctlon _,........,, 1or the l)Orfotmanat ol the wm< this pmnit ls -(Sic. 3097 (I! CW Cod,~ l.endel"sName; ________________ L«lldefs-.S: ________________ _ '""""CTOR "'""'"'"°'' ,,.,,,,..,,, .... ,..,,,. ""Z .., __ ""'""""""""' the information on the plans is accurate. I agree tocomply with alt City es and State laws relating to building constroctlon. NAME (PRINT}: MieoJ() L. Q1M f':M{\SIGNATURE·' DATE: /0-15' Note: 11 the p,non """"'UCJW 1, an a~ .ttentfor the contrac:tor ptOVtcle: • iudwM'futioft on COMnKtor ltfflerheacl (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractcr's License Law for the following reason: Q I, as owner ot,,,.. .,,_rty o, my emi,loyets-,...,.., thelr10I• compen<atk)n, will doth•-"•n<lthelilnldlttis not lnllMlded..--far ,.(Sec. ?044, 8usirle$l: and Professk>ns Code: The Cootf'actof's l..a,ise law does not appty to an owner of property who buuds or i~ thereon~ and who dots tucll worl< hunsetf c, through his own employees, provid<d that such improv,menu are not tntencfeo or offered far sale. If,-•'"" buildincc,imp""""""' witNn one y.., of co,npletloll, the own<r-bullder ,.;g how!'"" -en of provlnl lhat he did not build or improv, far the,.._ of salt). -OR• a I, as owner ol ttw, .,,_rty, am ~ <ontr1K'tinll -ll<omed conuactors IO c:on.tructthe proj«t (Sec. 7044, -and l'l of lo hl-llt,e ··• Conmtctor'• U""1se law does no! •Polv to an .-ol p<-who builds cw Imp,-, !her"°"-and <OIi-fot SU<b p<ojom -w.lli>d'"(,)_.... purnunt to the Contractor's utense law~ -OR-Of am exempt under Business ,nd Profeutoru Code DMsion 3. Chtpter9, Artide l fOf this ft!asoo: AND, 0 f-OAM 8-61 ""Owner WktH' Adutow~ W YwitfatJon:Form" is required for any permit is~ ta a propttty ~~ By my ,lgnature below I aclmowledge that, e,cept fur my pmO!fal i<,,ld«•oo In wl>l<h I must hm, r•-far at least one yu, poo, to ""'11)1etlon of tile ;m,,«>vem<nlS 00\leted by this penn,t, I r.moot l,pfly ..ti • st-that I haw bui~ •• an .,_,builder~ ll has oot bffn ccnstructed III It, ontir,ty by licensed ''""' attoo. J understand !hot ocopyo/ theapplfcoble law, Stttloll 11>4'1 of /he lluslllfflond l'rl>f tsslolls COM, fs°"'"obltUflOtl l'l'(jlleSf w/tffl thisapp/l<a!loll rs submitted or ot the foll-ing Web site: hllp:l lwww.htgln{o.co.govlcalaw.htmJ. OWNER CfHTIFICATION: lcertifythatlhavereodthe applicationandstate Information on the plans Is accurate, I agree tac amply with all City construct/on. N;._;-lf the penon slcnf"I' •-I, •• authorilecl apnt fotthe p,$pefty ownor 1635 r•raday Ave C.rhb><t CA 92008 Ph: 160'602•2719 fa: 7 2 thellbave'lnfarmatlanis<Ol'l"eCtondthat the / ·· andStatelaw:stelatlngtobufldingi REV.07!21 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Closed -Finaled Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item BLDG-Building Deficiency BLDG-Structural Final BLDG-Structural Final Tuesday, July 12, 2022 COMMENTS May 5, 2021 :(PENDING-individual flaUvaulted roof ceiling joist-bay ventilation requirement-not completed. 1. Final inspection Pending Two Items: a) roof venting system required for vaulted-flat roof, ceiling roof rafters-at individual new ceiling joisUrafter areas-venting failed. b) informed both contractor and owner offset space between twin home exterior common party wall -required detail from Engineered/designer to verify as built site condition. As-built site common party exterior party wall condition deviates from Architectural a Approved plans. c) informed general contractor Micah, regarding finish exterior means and methods of infilling gap/void between adjacent common 2x framed wall of twin home, exterior party wall opening requiring architect of record or an engineer detail of as-built site conditions. Partial pass new room addition, scope of work for new addition per plans - approved Pending new windows to be replaced with new tempered windows, due to window sill plate height less than 24 inches off interior finish floor surface level. April 29, 2022:· 1. Addition not ready, required tempered glass located at all window sill areas. Passed No Yes No Page 8 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency May 5, 2021 :(PENDING-individual flaUvaulted roof ceiling joist-bay ventilation requirement-not completed. No BLDG-Structural Final BLDG-Structural Final 06/0912022 0610912022 BLDG-Final Inspection Tuesday, July 12, 2022 1. Final inspection Pending Two Items: a) roof venting system required for vaulted-flat roof, ceiling roof rafters-at individual new ceiling joisUrafler areas-venting failed. b) informed both contractor and owner offset space between twin home exterior common party wall -required detail from Engineered/designer to verify as built site condition. As-built site common party exterior party wall condition deviates from Architectural a Approved plans. c) informed general contractor Micah, regarding finish exterior means and methods of infilling gap/void between adjacent common 2x framed wall of twin home, exterior party wall opening requiring architect of record or an engineer detail of as-built site conditions. Partial pass new room addition, scope of work for new addition per plans - approved Pending new windows to be replaced with new tempered windows, due to window sill plate height less than 24 inches off interior finish floor sur1ace level. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. 184474-2022 Passed Peter Dreibelbis Yes No Complete Page 7 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency May 5, 2021:(PENDING-individual flat/vaulted roof ceiling joist-bay ventilation requirement-not completed. No BLDG-Structural Final BLDG-Structural Final 06/02/2022 06/02/2022 BLDG-Final Inspection Tuesday, July 12, 2022 1. Final inspection Pending Two Items: a) roof venting system required for vaulted-flat roof, ceiling roof rafters-at individual new ceiling joist/rafter areas-venting failed. b) informed both contractor and owner offset space between twin home exterior common party wall -required detail from Engineered/designer to verify as built site condition. As-built site common party exterior party wall condition deviates from Architectural a Approved plans. c) informed general contractor Micah, regarding finish exterior means and methods of infilling gap/void between adjacent common 2x framed wan of twin home, exterior party wall opening requiring architect of record or an engineer detail of as-built site conditions. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. Partial pass new room addition, scope of work for new addition per plans - approved Pending new windows to be replaced with new tempered windows, due to window sill plate height less than 24 inches off interior finish floor surface level. 184039-2022 Cancelled Tony Alvarado No Yes Reinspection Incomplete Page 6 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLOG-Building Deficiency May 5, 2021:(PENDING-individual flaVvaulted roof ceiling joist-bay ventilation requirement-n_ot completed. No BLDG-Structural Final BLDG-Structural Final 06/01/2022 06/01/2022 BLDG-Final Inspection Tuesday, July 12, 2022 1. Final inspection Pending Two Items: a) roof venting system required for vaulted-flat roof, ceiling roof rafters-at individual new ceiling joisUrafter areas-venting failed. b) informed both contractor and owner offset space between twin home exterior common party wall -required detail from Engineered/designer to verify as built site condition. As-built site common party exterior party wall condition deviates from Architectural a Approved plans. c) informed general contractor Micah, regarding finish exterior means and methods of infilling gap/void between adjacent common 2x framed wall of twin home, exterior party wall opening requiring architect of record or an engineer detail of as-built site conditions. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. Partial pass new room addition, scope of work for new addition per plans - approved Pending new windows to be replaced with new tempered windows, due to window sill plate height less than 24 inches off interior finish floor surface level. 183887-2022 Cancelled Tony Alvarado No Yes Reinspectlon Incomplete Page 5 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency April 29, 2022:: No 0510412022 05/05/2022 BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final 05/04/2022 BLDG-Final Inspection Checklist Item BLDG-Structural Final BLDG-Structural Final 05/05/2022 BLDG-Final Inspection Tuesday, July 12, 2022 1. Addition not ready, required tempered glass located at all window sill areas. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. 181848-2022 COMMENTS Partial Pass Tony Alvarado Partial pass new room addition, scope of work for new addition per plans - approved Pending new windows to be replaced with new tempered windows, due to window sill plate height less than 24 inches off interior finish floor surface level. April 29, 2022:: 1. Addition not ready, required tempered glass located at all window sill areas. 182101-2022 Failed Tony Alvarado No No No No Reinspection Incomplete Passed Yes No Reinspection Incomplete Page 4 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04/26/2021 Issue Date: 11/02/2021 Expiration Date: 10/26/2022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency February 16, 2021 :(PENDING). Yes Tuesday, July 12, 2022 BLDG-18 Exterior Lath/Drywall Checklist Item 1. Insulation-approved. 2. Exterior stucco wire lath and moisture barrier-approved. 3. Pending Two Items: a) roof venting system required for flat roof, ceiling roof rafters-at individual new ceiling joisUrafter areas-failed. b) informed both contractor employee last Friday, February 11, 2022, and contractor Micah on February 16, 2022. c) informed general contractor Micah, regarding tempered glass requirements at all glazing locations, when new window sill height is lower than 18 inches high, from top window sill height to finish floor level. 181676-2022 Passed Tony Alvarado COMMENTS BLDG-Building Deficiency February 16, 2021:(PENDING). BLDG-Final Inspection 1. Insulation-approved. 2. Exterior stucco wire lath and moisture barrier-approved. 3. Pending Two Items: a) roof venting system required for flat roof, ceiling roof rafters-at individual new ceiling joist/rafter areas-failed. b) informed both contractor employee last Friday, February 11, 2022, and contractor Micah on February 16, 2022. c) informed general contractor Micah, regarding tempered glass requirements at all glazing locations, when new window sill height is lower than 18 inches high, from top window sill height to finish floor level. 181678-2022 Failed Tony Alvarado Complete Passed Yes Reinspection Incomplete Page 3 of 8 PERMIT INSPECTION HISTORY for (CBR2021-1191) Permit Type: BLDG-Residential Work Class: Addition Status: Scheduled Date Closed -Finaled Actual Inspection Type Start Date Checklist Item Application Date: 04126/2021 Issue Date: 11/0212021 Expiration Date: 10/2612022 IVR Number: 32995 Inspection No. COMMENTS Inspection Status Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Subdivision: LA COSTA SOUTH #3 Address: 2201 LEVANTE ST CARLSBAD, CA 92009-8014 Primary Inspector Reinspection Inspection Passed BLDG-Building Deficiency February 16, 2021:(PENDING). Yes BLDG-18 Exterior Lath/Drywall Checklist Item 1. Insulation-approved. 2. Exterior stucco wire lath and moisture barrier-approved. 3. Pending Two Items: a) roof venting system required for flat roof, ceiling roof rafters-at individual new ceiling joisUrafter areas-failed. b) informed both contractor employee last Friday, February 11, 2022, and contractor Micah on February 16, 2022. c) informed general contractor Micah, regarding tempered glass requirements at all glazing locations, when new window sill height is lower than 18 inches high, from top window sill height to finish floor level. 176820-2022 Partial Pass Tony Alvarado COMMENTS BLDG-Building Deficiency February 16, 2021:(PENDING). 1 . Insulation-approved. 04/2912022 04/29/2022 BLOG-16 Insulation Tuesday, July 12, 2022 2. Exterior stucco wire lath and moisture barrier-approved. 3. Pending Two Items: a) roof venting system required for flat roof, ceiling roof rafters-at individual new ceiling joisUrafter areas-failed. b) informed both contractor employee last Friday, February 11, 2022, and contractor Micah on February 16, 2022. c) informed general contractor Micah, regarding tempered glass requirements at all glazing locations, when new window sill height is lower than 18 inches high, from top window sill height to finish floor level. 181677-2022 Passed Tony Alvarado Reinspection Incomplete Passed Yes Complete Page 2 of 8 Building Permit Inspection History Finaled (cityof Carlsbad PERMIT INSPECTION HISTORY for {CBR2021-1191) Permit Type: BLDG-Residential Application Date: 04/26/2021 Owner: CO-OWNERS GIDLEY DON E AND BARRETT JENNIFER R Work Class: Addition Issue Date: 11/02/2021 Subdivision: LA COSTA SOUTH #3 Status: Closed -Finaled Expiration Date: 10/26/2022 Address: 2201 LEVANTE ST IVR Number: 32995 CARLSBAD, CA 92009-8014 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection Date Start Date Status 0111912022 01119/2022 BLDG-11 174823-2022 Passed Tony Alvarado Complete Foundation/Ftg/Piers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Foundation steel reinforcement rebar Yes approved per structural engineers plans and details. 02111/2022 02111/2022 BLDG-13 Shear 176603-2022 Passed Tony Alvarado Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Exterior shear panels schedule and hold Yes downs per engineer plans and details-approved. BLDG-15 Roof/ReRoof 176604-2022 Passed Tony Alvarado Complete (Patio) BLDG-84 Rough 176439-2022 Passed Tony Alvarado Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 0211612022 0211612022 BLDG-16 Insulation 176821-2022 Partial Pass Tony Alvarado Re inspection Incomplete Tuesday, July 12, 2022 Page 1 of8 DATE: 09/18/2021 JURISDICTION: CARLSBAD PLAN CHECK#.: CBR2021-1191 ✓• EsG1I SET II PROJECT ADDRESS: 2201 LEVANTE STREET PROJECT NAME: SFD ADDITION FOR GIDLEY APPROVED □ APPLICANT □ JURIS. [8J The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's BUILDING codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ED SIEFKEN [8J EsGil staff did not advise the applicant that the plan check has been completed. D EsGil staff did advise the applicant that the plan check has been completed. Person contacted: ED Telephone#: 619 778 9750 Date contacted: (by: ) Email: ESIEFKEN@SAN.RR.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 09/10/2021 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 ✓• EsG1I DATE: 05/12/2021 JURISDICTION: CARLSBAD PLAN CHECK#.: CBR2021-1191 PROJECT ADDRESS: 2201 LEVANTE STREET PROJECT NAME: SFD ADDITION FOR GIDLEY SETI □ APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 1:8] The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. 1:8] The applicant's copy of the check list has been sent to: ED SIEFKEN D EsGil staff did not advise the applicant that the plan check has been completed. 1:8] EsGil staff did advise the applicant that the plan check has been completed. Person contacted: ED Telephone#: 619 778 9750 Date contacted: (by: ) Email: ESIEFKEN@SAN.RR.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 04/27/2021 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 CARLSBAD CBR2021-1191 05/12/2021 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK#.: CBR2021-1191 JURISDICTION: CARLSBAD PROJECT ADDRESS: 2201 LEVANTE STREET FLOOR AREA: REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 05/12/2021 FOREWORD (PLEASE READ): STORIES: HEIGHT: DATE PLANS RECEIVED BY ESGIL CORPORATION: 04/27/2021 PLAN REVIEWER: Bert Domingo This plan review is limited to the technical requirements contained in the California Residential Code, California Building Code, California Plumbing Code, California Mechanical Code, California I Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2019 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2019 CRC, 2019 CBC, 2019 CPC, 2019 CMG and 2019 CEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2019 California Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. CARLSBAD CBR2021-1191 05/12/2021 PLANS 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. 2. A reminder that due to Covid-19, the City will not permit counter corrections. Please make sure all the items are satisfied; otherwise, another round of corrections will be necessary. 3. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). 4. Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). FIRE PROTECTION 5. Please indicate on the plans whether the existing residence has a fire sprinkler system installed. If so, then provide a note stating that any additions/alterations will be provided with an automatic residential fire sprinkler system. Section R313.2. CARLSBAD CBR2021-1191 05/12/2021 6. In existing buildings, when alterations, repairs or additions requiring a permit occur tof-W~B-sleeping rooms-are added), the dwelling unit shall be provided with smoke alarms located as required for new dwellings; the smoke alarms shall be interconnected and hard wired. Exception: Smoke alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R314.2.2. Please show on the floor plans to include the second floor. 7. When alterations, repairs or additions are proposed for dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), the dwelling unit shall be provided with carbon monoxide alarms located as required for new dwellings; the carbon monoxide alarms shall be interconnected and hard wired. Exception: Carbon monoxide alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R315.2. Please show on the floor plan to include the 2nd floor. ROOFS/DECKS/BALCONIES 8. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required vent is located no more than 3' below the ridge) and remaining vents located at the lower third of the of the attic space. Show on the plans the area required and area provided. Section R806.2. a) When using a radiant barrier, California energy design affects the attic ventilation area requirement: If using the Prescriptive method for energy compliance, then the attic vent area must be at the 1/150 area: If using the Performance method, either the 150 or 300 areas may be used, as documented on the energy forms. Section RA4.2.1. CARLSBAD CBR2021-1191 05/12/2021 9. Enclosed rafter spaces do not require venting if the following specific insulation design is used, per Sections R806.5/EM3.9.6: • If the insulation is air-permeable and it is installed directly below the roof sheathing with rigid board or sheet insulation with a minimum R-5 value installed above the roof sheathing. (or) • If the insulation is air-impermeable and it is in direct contact with the underside of the roof sheathing. (or) • If two layers of insulation are installed below the roof sheathing: An air- impermeable layer in direct contact with the underside of the roof sheathing and an additional layer of air permeable insulation installed directly under the air- impermeable insulation. ♦ In climate zones 3-15, air permeable insulation installed as part of one of the previous insulation assemblies in unvented attics must comply with section R806.5.5.2 10. Where eave vents are installed, insulation shall not block the free flow of air. A minimum of 1" of air space shall be provided between the insulation and the roof sheathing. To accommodate the thickness of insulation plus the required 1" clearance, member sizes may have to be increased for rafter-ceiling joists. Section R806.3. 11. Note on the plans: "Attic ventilation openings shall be covered with corrosion-resistant metal mesh with 1/16" minimum to¼" maximum openings. Section R806.1. STRUCTURAL 12. You have chosen to use the conventional construction bracing provisions outlined in the CRC. Provide documentation to show that the plans comply with the Braced Wall provisions of Section R602.10. Include the following: a) A checklist to show that the building is not "irregular," as defined in Section R301.2.2.6. b) Documentation to show there are sufficient Braced Wall Lines in the building, per Section R602.10.1. c) Documentation to show there are sufficient Braced Wall Panels in each Braced Wall Line, per Section 602.10.1.1. Be sure to include all length factor adjustments from Section 602.10. d) If the above items cannot be provided or if the building does not satisfy the conventional bracing provisions, then provide design calculations from a licensed Engineer or Architect to show compliance. CARLSBAD CBR2021-1191 05/12/2021 PLUMBING 13. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along with additions/alterations that increase the building's conditioned area, volume or size. CGC Section 301.1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. 14. Storm water drainage/retention during construction. Note on the plans: Projects which disturb less than one acre of soil shall manage storm water drainage during construction by one of the following: A. Retention basins. B. Where storm water is conveyed to a public drainage system, water shall be filtered by use of a barrier system, wattle or other approved method. CGC Section 4.106.2. 15. Grading and paving. Note on the plans that site grading or drainage system will manage all surface water flows to keep water from entering buildings (swales, water collection, French drains, etc.). CGC Section 4.106.3. Exception: Additions not altering the drainage path. 16. Indoor water use. Show compliance with the following table, per CGC Section 4.303.1. FIXTURE FLOW RATES FIXTURE TYPE MAXIMUM FLOW RA TE Water closets 1.28 gallons/flush Urinals (wall-mounted) 0.125 gallon/flush Urinals (others) 0.5 gallon/flush Showerheads 1.8 gpm @ 80 psi Lavatory faucets 1.2 gpm @ 60 psi1 Kitchen faucets 1.8 gpm @60 psi CARLSBAD CBR2021-1191 05/12/2021 !Metering faucets 0.20 gallons per cycle 1. Lavatory faucets shall not have a flow rate less than 0.8 gpm at 20 psi. 17. Note on the plans that when a shower is provided with multiple shower heads, the sum of flow to all the heads shall not exceed 1.8 gpm @ 80 psi, or the shower shall be designed so that only one head is on at a time. CGC Section 4.303.1.3.2. 18. Note on the plans that landscape irrigation water use shall have weather or soil-based controllers. CGC Section 4.304.1. 19. Recycling. Note on the plans that a minimum of 65% of construction waste is to be recycled. CGC Section 4.408.1. 20. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan, per CGC Section 4.408.2. 21. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC Section 4.410.1. 22. Interior moisture control. Note on the plans that concrete slabs will be provided with a capillary break. CGC Section 4.505.2.1. 23. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods listed in CGC Section 4.505.3. 24. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. 25. Heating and air-conditioning system design. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: (Support documentation required at application submittal) 4.507.2. a) Establish heat loss and heat gain values according to ANSI/ACCA Manual J-2016, ASHRAE handbooks or other equivalent methods. b) Size duct systems according to ANSI/ACCA 1 Manual D -2016, ASHRAE handbooks or other equivalent methods. c) Select heating and cooling equipment according to ANSI/ACCA 3 Manual S-2014 or other equivalent methods. CARLSBAD CBR2021-1191 05/12/2021 Exception: Use of alternate design temperatures necessary to ensure the systems function are acceptable 26. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. a) Complete a Residential Occupancies Application Checklist that includes the minimum criteria. It is available at: https://www.hcd.ca.gov/building- standards/calgreen/cal-qreen-forms.shtml ENERGY CONSERVATION 27. A complete energy plan check will be performed after completed and/or the corrected energy design (CF1 R) has been provided. The design sheets must be signed by the document author and /or responsible designer. 28. Prior to the initial plan submittal, the energy design was required to be registered with the appropriate HERS provider data registry. Prior to the next plan review, please register the energy design and resubmit plans with completed forms (registration number). 29. Include on the Title Sheet of the plans the following statement: "Compliance with the documentation requirements of the 2019 Energy Efficiency Standards is necessary for this project. Registered, signed, and dated copies of the appropriate CF1 R, CF2R, and CF3R forms shall be made available at necessary intervals for Building Inspector review. Final completed forms will be available for the building owner." 30. All domestic hot water piping to have the following minimum insulation installed: ½" pipe (1/2" insulation);¾" pipe (1" insulation); 1" to 1-½" pipe (1-½" insulation). CPC 609.11 & ES 150.0U) Additionally, the ½" hot water pipe to the kitchen sink, and the cold-water pipe within 5' of the water heater both require 1" minimum insulation. ES 150.OU) MISCELLANEOUS 31. Please submit calculations for the beam between the new addition and the existing. 32. Please show how the solarium floor would be drained. CARLSBAD CBR2021-1191 05/12/2021 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes □ No □ The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bert Domingo at EsGil. Thank you. a) • CA!RLSBAD CBR2021-1191 05/12/2021 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PREPARED BY: Bert Domingo PLAN CHECK#.: CBR2021-1191 DATE: 05/12/2021 BUILDING ADDRESS: 2201 LEVANTE STREET BUILDING OCCUPANCY: R 3 BULDING AREA Valuation Reg. PORTION ( Sq. Ft.) Multiplier Mod. CTYVALUE Air Conditioring Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance 1997 USC Buildin Pormit F•e 0 "' ! 1997 UBC Plan Check fee Type of Review: I;;" Complete Review r Repetitive Fee "' 1 .,..I Repeats r Other r Hourly EsGilFee VALUE r Structural Only Comments: In addition to the above fee, an additional fee of$ $ /hr.) for the CalGreen review. ($) 42,036 42,036 $235.107 is due ( hour@ Sheet 1 of 1 {__ City of Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool JJ If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. ;J Details on CAP ordinance requirements are available on the city's website. ;J A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. Project Name/Building PermitNo. /..rPUY APPlr/oAI BP No.: Property Address/APN: Applicant Name/Co.: Applicant Address: 71.2.t 1-/YATT .>T. Contact Phone: Contact Email: ££/,,EFl<XN@>"l'f./lf'. /(R. 4:>/11 Contact information of person completing this checklist (if different than above): Name: Company name/address: Applicant Signature~L ~ 8-50 Contact Phone: Contact Email: Date: 4 -.,.Z:S-~/ \.J ~ l2Q.A._ (9 0 h : ~ Page 1 of 6 Revised 06/18 City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet: $ ~ Ot2, 00 eonmlllllon~. 1 CompleteSadlon(•) 1 Noles: 8" Residential □ New construction ,,81 Additions and alterations: l!il BPV < $60,000 □ BPV "$60,000 □ Electrical service panel upgrade only □ BPV "$200,000 0 Nonresidential □ New construction □ Alterations: □ BPV" $200,000 or additions 2: 1,000 square feet □ BPV "$1,000,000 □ " 2,000 sq. ft. new roof addition A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use N/A N/A All residential additions and alterations 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages only 'Multi-family dwellings only where interior finishes are removed 1A, 4A' 18, 4A' and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 18, 28, 38, 48 and 5 18, 5 18,28,5 Building alterations of" 75% existing gross floor area 28, 5 1 B also applies if BPV" $200,000 ~ltelll .•. ·• < . .. .. ·-·••·. .• > •. . . . . . • . . · . Cl\el:klbJ~boa,exp!aii,aJnol ""8cll!lle ari:1 ~ ilellls. 1111<1 p!ll'1id&9UPl)Oltitt caloolations aoo doctimentatioo as necessary. 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMG) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CAL Green) for more information when oompleting this section. A. D Residential addition or alteration ~ $60,000 building permit valuation. 0 N/A ________ _ See CMC section 18.30.190. D Exception: Home energy soore" 7 (attach certification) Year Built Single-family Requirements Multi-family Requirements □ Before 1978 Select one: □ Duct sealino □ Attic insulation □ Co~ roof □ Attic insulation □ 1978 and later Select one: □ L~hting package □ Water heating Package □ Between 1978 and 1991 Select one: □Duct sealino □Attic insulation □Cool roof D 1992 and later Select one: □Lighting package □Water heating package B. O Nonresidential' new construction or alterations 2: $200,000 building permit valuation, or additions ~ 1,000 square feet 0 N/A Updated 8/15/20 I 9 2 City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CALGreen Appendix A5, Division A5.2 -Energy Efficiency. A5.203.1. 1 Choose one: □ . 1 Outdoor lighting □ .2 Warehouse dock seal doors □ .3 Restaurant service water heating (comply with Cal~omia Energy Code section 140.5, as amended) D N/A _________ _ □ .4 Daylight design PAfs □.S Exhaust air heat recovery AS.203.1.2.1 Choose one as applicable: 095 Energy budget 0.90 Energy budget □ N/A AS.211.1" □ On-site renewable energy □NIA AS.211.3" □ Green power (if offered by local utility provider, 50% minimum renewable sources) □ N/A AS.212.1 □ Elevators and escalators □ N/A AS.213.1 □ Steel framing □ N/A • lndudes hotels/motels and high-rise residential buildings "For alterations~ $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMG 18.30.130 instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building penm~ applications submitted after 1/1120). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic requirement (28 below) instead. 2) If project includes installation of an elecbic heat pump water heater pursuant to CMC 18.30.150(8) (high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc' sheets if necessary) Total System Size: kWdc = (CFAx.572) I 1,000 + (1.15 x#d.u.) 'Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception D D D D kWdc 8. 0 Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof area by 1'2,000 square feet. Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hoteUmotel buildings. Choose one of the following methods: □ Gross Floor Area (GFA) Method GFA: 011 < 10,000s.f. Enter: 5 kWdc Min. System Size: 0 If~ 1 O,OOOs.f. calculate: 15 kWdc x (GFN10,000) •• kWdc .. Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method Updated 8/15/2019 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:* .. ______ x .80= Min. system size: _____ kWdc •••Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A D Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170when completing this section. D For systems serving individual dwelling units choose one: D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Exception: D For systems serving multiple dwelling units, install a central water-heating system with all of the following: D Gas or propane water heating system D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) D Solar water heating system that is either: D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recovery □Exception: B. D Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. D Water heating system derives at least 40% of its energy from one of the following (attach documentation): D Solar-thermal D Photovoltaics D Recovered energy □Water heating system is (choose one): D Heat pump water heater D Electric resistance water heater( s) □Solar water heating system with .40 solar savings fraction D Exception: Updated 8/15120 I 9 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. Electric Vehicle Charging A D Residential New construction and major alterations* Please refer to Carlsbad Ordinance CMC section 18.21.140 when com One and two-family residential dwelling or townhouse with attached garage: D One EVSE Ready parking space required D Exception : D Multi family residential· -D Exception · Total Parking Spaces EVSESoaces Proposed Capable I Readv I Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number) EVSE Installed= Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces -EVSE Installed (EVSE other may be "Capable," "Ready" or "Installed.") Installed I Total I 'Major alterations are: (1) for one and two-family dwellings and townhouses ~th attached garages, alterations have a building permtt valuation 2 $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more ~thou! attached garages), alteraUons have a building permit valuation 2 $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (includes hotels/motels) D Exception · Total Parking Spaces EVSE Spaces Proposed Caoable I Readv T Installed I Total I I I Calculation· Refer to the table below· Total Number of Parkino Soaces nrovided Number of =uired EV S00ces Number of reouired EVSE Installed Soaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 fl 201 and over 1 O oercent of total 50 oercent of Re□uired EV Soaces Updated 8/15/2019 5 City of Carlsbad Climate Action Plan Consistency Checklist 5. D Transportation Demand Management (TDM): Nonresidential ONLY An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determine whether or nor your penmit requires a TDM plan. ~ TDM is applicable to your penmit, staff will contact the applicant to develop a site-specific TDM plan based on the penmit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Office ( all )2 20 Restaurant 11 Retail, 8 Industrial 4 Manufacturing 4 Warehousin 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 10thEdilion 13 11 4.5 3.5 3 1 2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to calculate employee ADT , Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf = 8,334 sf 3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my penmit require a TDM plan and understand that an approved TDM plan is a condition of penmit issuance. Applicant Signature:$ ,A,.~ Date: ,f-.2.1-.Z / Person other than Applicant to be contacted for TOM compliance (if applicable): Name(Printed): __________________ _ Phone Number: _____ _ Email Address: __________________ _ Updated 8/15/20 I 9 6