HomeMy WebLinkAbout1999-09-01; Planning Commission; ; SDP 97-25|CDP 97-52 - KELLY CORPORATE CENTER/& the City of Carlsbad Planning Department
A REPORT TO THE PLANNING COMMISSION-- *
~~ ~~ ~~ I Application complete date: November 10, 1998
P.C. AGENDA OF: September 1, 1999 Project Planner: Don Neu
Project Engineer: Frank Jimeno
SUBJECT: SDP 97-25KDP 97-52 - KELLY CORPORATE CENTER - Request for
approval of a Mitigated Negative Declaration, Mitigation Monitoring and
Reporting Program, Site Development Plan and Coastal Development Permit to
construct four two-story multi-tenant office buildings with a total area of 250,093
square feet, with at-grade parking, on a 25.28 acre site located on the south side of
Palomar Airport Road extending from an area west of Hidden Valley Road on the
west to Aviara Parkway on the east, in the Coastal Zone and Local Facilities
Management Zone 5.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolutions No. 4601, 4602 and
4603, APPROVING a Mitigated Negative Declaration and Mitigation Monitoring and
Reporting Program, SDP 97-25 and CDP 97-52, based on the findings and subject to the
conditions contained therein.
11. INTRODUCTION
These applications propose developing 3 lots with four two-story multi-tenant office buildings
having a total area of 250,093 square feet. Individual building areas are 72,593 square feet,
50,000 square feet, 50,000 square feet, and 77,500 square feet. A total of 1,006 at-grade parking
spaces will be provided. The proposed land use is permitted by the Planned Industrial, Qualified
Development Overlay Zone (P-M-Q) for the property subject to the approval of a Site
Development Plan. The property is located within the Mello I1 Segment of the Local Coastal
Program requiring the approval of a Coastal Development Permit. The project includes
constructing right turn lanes on eastbound Palomar Airport Road at the intersections with Hidden
Valley Road and Aviara Parkway. Fifty foot landscaped setbacks will be provided along
Palomar Airport Road and Aviara Parkway as well as from Encinas Creek located along the
southern boundary of the site. Thirty-five foot landscaped setbacks will be provided along
Hidden Valley Road. The project is in compliance with all city requirements. A Mitigated
Negative Declaration is proposed containing mitigation measures for traffic/circulation,
biological resources, and noise.
111. PROJECT DESCRIPTION AND BACKGROUND
The applicant is requesting that the Planning Commission approve a Site Development Plan and
Coastal Development Permit for the Kelly Corporate Center project. The project site includes 3
lots with a total area of 25.28 acres located on the south side of Palomar Airport Road extending
I.
GENERAL PLAN
Site PI, OS, UA, RM
SDP 97-25ICDP 97-52 - ~LLY CORPORATE CENTER
September 1,1999
ZONING EXISTING LAND
P-M-Q, OS, E-A, RD- Vacant
USE
M-0
from an area west of Hidden Valley Road on the west to Aviara Parkway on the east. The
project consists of four two-story office buildings totaling 250,093 square feet. Individual
building areas are 72,593 square feet, 50,000 square feet, 50,000 square feet, and 77,500 square
feet. A total of 1,006 at-grade parking spaces will be provided. The parkmg requirements for
each building are satisfied on the lot on which the building will be located. Indoor and outdoor
employee .eating areas are proposed for each building. Outdoor eating areas will have tables,
chairs, and trash containers. The outdoor furniture will be placed on concrete patio areas
containing tree planter areas to provide shade. Fully enclosed mechanical equipment .yards are
proposed for each building thereby minimizing the amount of rooftop equipment necessary for
each building. The mechanical equipment enclosures will be 10 feet tall with score lines and be
painted the colors of the proposed office buildings.
North
As depicted on Exhibits “B” and “C”, the project contains significant landscaped building
setbacks around the perimeter of the development area. A fifty foot setback is proposed from
Palomar Airport Road, Aviara Parkway and Encinas Creek. The Palomar Airport Road setback
will include a drainage channel and retention basin in addition to landscaping. A trail is located
in the 50 foot Encinas Creek buffer south of buildings 2A, 2B and 3. Thirty-five foot landscaped
setbacks are provided from Hidden Valley Road.
T-R, PI C-T-Q, P-M LEGOLAND, Vacant
City Golf Course Site
Vehicular access is provided to the site from Hidden Valley Road and Aviara Parkway. No
access is provided from Palomar Airport Road. Right turn lanes will be constructed on
eastbound Palomar Airport Road at the intersections with Hidden Valley Road and Aviara
Parkway as identified in the traffic study prepared and accepted for the project.
The architectural design, materials and colors for all four buildings are coordinated for the
project. Building heights do not exceed 35 feet and the highest architectural feature is 37 feet
tall. Primary building surfaces are green glass, painted tilt-up concrete walls, aluminum mullions
and slate tile. Each color is for specific areas of all
buildings to continue a pattern carried through on every one of the four buildings.
Three building colors are proposed.
Grading for the project consists of 27,000 cubic yards of cut and fill for a balanced operation.
Additional grading is required for the removal and replacement of alluvial soils as well as to
surcharge the building pads. Surcharge grading totals 72,600 cubic yards. The areas requiring
surcharge grading are depicted on the “Index Map” found on Exhibit “A” of the plan set. At the
completion of grading the site elevations will remain below the elevation of adjacent Palomar
Airport Road.
The following table lists the general plan, zoning and existing land use for the site and adjacent
properties:
SDP 97-25/CDP 97-52 - IC~LLY CORPORATE CENTER
September 1, 1999
South
East
West
OS, RM, UA R-1-Q, E-A Open Space, Packing
PI P-M-Q Vacant os, PI L-c Vacant
shed
General Plan: PI (Planned Industrial), OS (Open Space), UA (Unplanned Area), RM (Medium
Density Residential), T-R (TraveliRecreation Commercial)
Zoning: P-M-Q (Planned Industrial, Qualified Development Overlay Zone), E-A (Exclusive
Agricultural), RD-M-Q (Residential Density-Multiple Zone, Qualified Development Overlay
Zone), C-T-Q (Commercial Tourist, Qualified Development Overlay Zone), R- 1 -Q (One-Family
Residential, Qualified Development Overlay Zone), L-C (Limited Control)
Site Description
The project site includes areas previously used for agriculture in addition to Encinas Creek
containing southern willow scrub and freshwater marsh vegetation. Development is proposed
primarily for areas of the site disturbed by agricultural use. The site has street frontage on
Palomar Airport Road, Hidden Valley Road and Aviara Parkway.
Applicable Regulations
The proposed project is subject to the following plans, ordinances and standards as analyzed
within the following section of this staff report:
A. Planned Industrial (PI) General Plan Land Use Designation;
B. Planned Industrial, Qualified Development Overlay Zone (P-M-Q);
C. Site Development Plan findings required by the Qualified Development Overlay Zone -
Carlsbad Municipal Code, Chapter 21.06, Section 21.06.020;
D. Comprehensive Land Use Plan for McClellan-Palomar Airport;
E. Mello I1 Segment of the Local Coastal Program, the Coastal Agricultural Overlay Zone -
Carlsbad Municipal Code, Chapter 2 1.202 and the Coastal Resource Protection Overlay
Zone - Carlsbad Municipal Code, Chapter 21.203; and
F. Growth Management Ordinance (Local Facilities Management Plan Zone 5).
IV. ANALYSIS
The recommendation of approval for this project was developed by analyzing the project’s
consistency with the applicable policies and regulations listed above. Therefore, this section will
cover the project’s compliance with each of the regulations listed above in the order in which
they are presented.
SDP 97-25/CDP 97-52 - ULLY CORPORATE CENTER
September 1,1999
GENERAL PLAN
USE, CLASSIFICATION,
GOAL, OBJECTIVE
OR PROGRAM
Development area is
designated as PI
New development
shall dedicate and
improve all public
right-of-way for
circulation facilities
needed to serve
development
Utilize noise
standards contained in
the Comprehensive
Land Use Plan for
Palomar Airport
Designate as buffers
portions of land next
to sensitive
environmental areas
A. General Plan
COMPLIANCE
PROPOSED USES & IMPROVEMENTS
Office uses proposed
Additional right of
way will be dedicated
and improved to
complete two right
turn lanes on east
bound Palomar
Airport Road at
Hidden Valley Rd &
Aviara Parkway
The project includes
mitigation measures
to achieve the
required interior noise
levels
The project includes a
50 buffer from
Encinas Creek
The General Plan designation for the proposed development area of the project site is Planned
Industrial (PI). Areas along Encinas Creek are designated as Open Space (OS). Portions of the
site south of Encinas Creek are designated as Medium Density Residential (RM) and Unplanned
Area (UA). No development is proposed in the areas designated as OS, RM and UA. The areas
designated as FUvi and UA will be changed to OS as part of a future city initiated General Plan
and Zoning Consistency Program. The project complies with all elements of the General Plan as
illustrated in the table below:
ELEMENT
Land Use
Circulation
Noise
Open Space &
Conservation
COMPLY?
Yes
Yes
Yes
Yes
B. P-M-Q Zoning Regulations
The development area of the project site is zoned Planned Industrial, Qualified Development
Overlay Zone (P-M-Q). The remaining areas of the site will not be developed and are presently
designated as Open Space (OS), Exclusive Agriculture (E-A), and Residential Density-Multiple
Zone, Qualified Development Overlay Zone (RD-M-Q). The E-A and RD-M-Q zoned areas will
be rezoned to OS as part of a future city initiated General Plan and Zoning Consistency Program.
The project complies with all requirements of the P-M Zone as demonstrated in the following
table:
h
,
SDP 97-25/CDP 97-52 - KELLY CORPORATE CENTER
September 1, 1999
Page 5
Permitted Use
P-M ZONE COMPLIANCE I STANDARD I REQUIRED I PROPOSED I
Business & Professional I Offices
Multi-tenant office use
DroDosed I Building Height
Setbacks
Parking area landscaping
35 ft.; 45 ft. for allowed pro- 32 ft. 6 in. maximum; 37 ft.
trusions for allowed protrusions
Palomar Airport Road - 50 ft. Palomar Airport Road - 50 Et.
Aviara Parkway - 50 ft. Aviara Parkway - 50 ft.
Hidden Valley Road - 35 ft. Hidden Valley Road - 35 Et.
Interior Side Yard - 10 ft. Interior Side Yard - 10 ft.
Rear Yard - 10 ft. Rear Yard - Greater than 50 ft.
10% of the required parking 19.4%, 19.7% and 20.9% of I area
Lot Coverage
Employee Eating Areas
Outdoor Equipment
I the reauired Darking area I
50% maximum
4,353 sq. ft.
6,000 sq. ft.
4,650 sq. ft.
Enclose by a concrete or
masonry wall not less than 6
ft. in height concrete walls
7.3%, 13.8% and 18%
4,956 sq. Et.
6,000 sq. ft.
4,650 sq. ft.
Mechanical equipment
enclosures built of 10 ft. tall
I Minimum Lot Area I 1 acre I 6.42 acres, 7.49 acres and I I 1 1.37 acres 1
C. Site Development Plan Findings Required by the Qualified Development Overlay
Zone
The Qualified Development Overlay Zone (Q-Overlay) which is a part of the zoning designation
for the property requires that a site development plan be approved for the proposed use prior to
the issuance of any building permit. Four findings are required by the Q-Overlay Zone. The
required findings with justification for each are contained in Planning Commission Resolution
No. 4602. This section summarizes the necessary findings and support for each.
The requested use is properly related to the site, surroundings and environmental setting as the
project design complies with the requirements of the P-M zone as demonstrated in this staff
report. All required building setbacks are provided, lot coverage is well below the maximum
permitted, and landscaping in excess of the zone requirements will be provided. Adequate
separation is provided from adjacent uses and the required 50 foot buffer from Encinas Creek has
been incorporated into the site design. The site is also adequate in shape to accommodate the use
as all other applicable code requirements have been met including the parking standard in
addition to building coverage. Five parking spaces over the required number are planned and
building coverage is less than half of the maximum permitted. Between 19.4 percent and 20.9
percent of the parking area will be landscaped while the requirement is 10 percent.
All features necessary to adjust the use to existing and permitted future uses will be provided.
Landscaping is proposed to screen the parking areas from public roadways. Adequate vehicle
circulation has been provided to accommodate truck turning movements. Access to the site will
be provided by driveways onto Hidden Valley Road and Aviara Parkway. With the addition of
SDP 97-25/CDP 97-52 - K&LY CORPORATE CENTER
September 1, 1999
Page 6
FACILITY
two eastbound right turn lanes on Palomar Airport Road at its intersections with Hidden Valley
Road and Aviara Parkway as well as participation in funding improvements to the Palomar
Airport RoadEl Camino Real intersection, the planned street system is adequate to handle all
traffic generated by the use.
IMPACTS COMPLIANCE WITH
STANDARDS
D. Comprehensive Land Use Plan for McClellan - Palomar Airport
City Administration
Librarv
The project site is located within the Airport Influence Area for McClellan - Palomar Airport.
The site is inside the 65 CNEL noise contour with an area in the northeast comer located within
the 70 CNEL noise contour. The property is approximately 3,500 feet southwest of the airport.
The building locations have been plotted relative to the noise contours by SANDAG staff. No
buildings are proposed within the 70 CNEL noise contour. The airport land use plan identifies
the use as being conditionally compatible within the 65 CNEL noise contour provided interior
noise levels are attenuated to an indoor level of 50 CNEL. The project was sent to the Airport
Manager in addition to SANDAG staff. With the application of the noise mitigation measures
proposed the project was found to be in conformance with the airport land use plan.
N/A Yes
N/A Yes
E. Mello I1 Segment of the Local Coastal Program, the Coastal Agricultural Overlay
Zone and the Coastal Resource Protection Overlay Zone
Wastewater Treatment
Capacity
Parks
Drainage
Circulation
As designed the project is consistent with the relevant policies of the Mello I1 Segment of the
Local Coastal Program, the Coastal Agricultural Overlay Zone (Zoning Ordinance Chapter
21.202) and the Coastal Resource Protection Overlay Zone (Zoning Ordinance Chapter 21.203).
The project includes the required 50 foot buffer from Encinas Creek as well as a retention basin
to control the rate of stormwater runoff from the site. The property is designated as coastal
agricultural land and has been conditioned to pay the agricultural conversion mitigation fee.
Because of the potential for least Bell’s vireos to be using habitat offsite that could be impacted
by grading noise levels a condition providing for modification of the coastal grading timeframe if
necessary is proposed. This condition will provide for the potential to grade the site during the
normal coastal grading prohibition period so as not to impact the least Bell’s vireo. Please refer
to the condition for more detail.
F. Growth Management Ordinance (LFMP Zone 5)
139 EDU Yes
$.40/sq. ft. Yes
Basin C Yes
5,002 ADT Yes
The proposed project is located withm Local Facilities Management Zone 5 in the southwest
quadrant. The impacts on public facilities created by this project and compliance with the
adopted performance standards are summarized as follows:
SDP 97-25/CDP 97-52 - ~LLY CORPORATE CENTER
September 1, 1999
Page 7
Open Space
Schools
Sewer Collection System
Water Distribution Svstem
I Fire I Station4 I Yes I
N/A Yes
Payment of non-residential Yes
school fee at bldg. permit
issuance
139 EDU Yes
139 EDU Yes
V. ENVIRONMENTAL REVIEW
The proposed project has been reviewed pursuant to the Califomia Environmental Quality Act
(CEQA). Staff prepared an initial study for the project and concluded that potentially
significant impacts could result in the areas of air quality, circulation, biological resources and
noise. The project is within the scope of the City’s Master Environmental Impact Report which
was utilized to address the project’s cumulative air quality and circulation impacts. Project
specific mitigation measures are proposed for circulation, biological resources and noise. Please
see the Environmental Impact Assessment Form - Part 11 for a detailed description of the
mitigation measures and the expanded justification for the recommendation to approve the
Mitigated Negative Declaration. In consideration of the foregoing, on August 6, 1999 the
Planning Director issued an Amended Mitigated Negative Declaration for the proposed project.
An Amended Mitigated Negative Declaration was issued as a result of comments received from
the U.S. Fish and Wildlife Service on the original Mitigated Negative Declaration. The revised
biological mitigation measures are incorporated into the Amended Mitigated Negative
Declaration which was renoticed for comment.
ATTACHMENTS:
1.
2.
3.
4.
5.
6.
7.
8.
Planning Commission Resolution No. 4601 (Mit. Neg. Dec)
Planning Commission Resolution No. 4602 (SDP)
Planning Commission Resolution No. 4603 (CDP)
Location Map
Background Data Sheet
Local Facilities Impact Assessment Form
Disclosure Statements
Full Size Exhibits “A” - “X”, dated September 1, 1999
DN:eh:mh
KELLY CORPORATE CENTER
SDP 97-251CDP 97-52
BACKGROUND DATA SHEET
CASE NO: SDP 97-251CDP 97-52
CASE NAME: Kellv Comorate Center
APPLICANT: Kellv Ranch Cornorate Center I. LLC
REQUEST AND LOCATION: Four two-stow multi-tenant office buildings with a total area
of 250.093 sauare feet on a 25.28 acre site located on the south side of Palomar Airuort Road
extendim from an area west of Hidden Vallev Road on the west to Aviara Parkwav on the east.
LEGAL DESCRIPTION: Parcels 1 & 2 of Citv of Carlsbad Boundarv Adiustment No. 494 &
Parcel 2 of Citv of Carlsbad Boundary Adjustment No. 388. excepting therefrom the portion
lying easterlv of Aviara Parkwav
APN: 212-040-35.48. 54, & 55 Acres: 25.28 Proposed No. of LotsAJnits: N/A
GENERAL PLAN AND ZONING
Land Use Designation: PI. OS, US & RM
Density Allowed: N/A
Existing Zone: P-M-0. OS. E-A, RD-M-0
Surrounding Zoning, General Plan and Land Use:
Density Proposed: N/A
Proposed Zone: N/A
Zoning
Site P-M-Q, OS, E-A, RD-M-
0
General Plan Current Land Use
PI, OS, UA, RM Vacant
North C-T-Q, P-M
South R-1-Q, E-A
East P-M-Q
T-R, PI LEGOLAND, Vacant
City Golf Course Site
OS, RM, UA Open Space & Packing
Shed
PI Vacant
West L-C os, PI Vacant
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): 139
Public Facilities Fee Agreement, dated: November 12, 1997
ENVIRONMENTAL IMPACT ASSESSMENT u Negative Declaration, issued
0 Certified Environmental Impact Report, dated
Other, Mitigated Negative Declaration issued May 27, 1999
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Kelly Corporate Center - SDP 97-2XDP 97-52
LOCAL FACILITY MANAGEMENT ZONE: 5 GENERAL PLAN: PI. os. UA. RM
ZONING: P-M-0. OS, E-A. RD-M-0
DEVELOPER’S NAME: Kelly Ranch Corporate Center I. LLC
ADDRESS: 4365 Executive Drive. Suite 850. San Diego. CA 92121-2130
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 25.28 ac.. 250,093 sa. ft.
ESTIMATED COMPLETION DATE:
PHONE NO.: J619) 550-1930 ASSESSOR’S PARCEL NO.: 212-040-35.48.54. & 55
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
City Administrative Facilities: Demand in Square Footage = N/A
Library: Demand in Square Footage = N/A
Wastewater Treatment Capacity (Calculate with J. Sewer)
Park: Demand in Acreage = $.4O/se. ft.
Drainage: Demand in CFS =
139 EDU
Identify Drainage Basin = C
(Identify master plan facilities on site plan)
Circulation: Demand in ADT = 5.002
(Identify Trip Distribution on site plan)
Fire: Served by Fire Station No. = 4
Open Space: Acreage Provided = N/A
Schools: Non-res. school fee
(Demands to be determined by staff)
Sewer: Demands in EDU 139
Identify Sub Basin =
(Identify trunk line(s) impacted on site plan)
Water: Demand in GPD = 30.580
The project is not proposing any dwelling units thereby not impacting the Growth
Management Dwelling unit allowance.
DISCLOSURE STATEMENT
Applicant's statement or disclosure of cenain ownership interests on all
applications which will require discretionary action on the part of the City
Council or any appointed Board, Commission or Committee.
The following information must be disclosed:
1. APPLICANT
List the names and addresses of all persons having a financial interest in the
application.
Kelly Ranch Corporate Center I, LLC
4365 Ex-tive Drive
Suite 850
San Diego, CA 92121
2.
3.
4.
OWNER
List the names and addresses of all persons having any ownership interest in the
property involved.
See Attached
If any person identified pursuant to (1) or (2) above is a corporation or partnership,
list the names and addresses of all individuals owning more than 10% of the shares
in the corporation or owning any partnership interest in the partnership.
Richard S. Allen
4 365 Executive Drive
Suite 850
San Dieao. CA 92191
If any person identified pursuant to (11 or (2) above is a non-profit organization or a
trust, list the names and addresses of any person serving as officer or director of
the non-profit organization or as trustee or beneficiary of the trust.
Richar d C. uv Robert Pat. Kellv
1748 Via Monserate 2770 Sunny Creek Road
Fallbrook, CA 92028 Carlsbad, CA 92008
1-
2075 Las Palmas Dr. - Carlsbad, CA 92009-1576 - (61 9) 438-11 61 - FAX ((319) 438-0894 @
I. - r- l$%
5. Have you had mor1 -\an $250 worth of business trans ed with any member of
City staff, Boards, Lmmissions, Committees and/or Council within the past twelve
(1 2) months? 0 Yes No If yes, please indicate person(s):
Person is defined as "Any individual, firm, co-partnership, joint -venture, association, social club,
fraternal organization, corporation, estate, trust, receiver, syndicate, this and any other county, city
and county, city municipality, district or other political subdivision or any other group or
combination acting as a unit." - -- . _-
NOTE: Attach additional sheets if necessary.
.. Signature of owner/date
Print or type name of owner
(See Attached Signature page)
~~
Signature of a p p I i c a n t /d at e
Print or type name of applicant
--
Disclosure Statement 10/96 Page 2 of 2
..
Proiect Owners
Richard C. Kelly
1748 Via Monserate
Fallbrook, CA 92028
Irene K. Hendricks
15830 Via de Alba
Rancho Santa Fe, CA 92067
Danica A. Kelly
1748 Via Monserate
Fallbrook, CA 92028
Donna M. Kelly (Freeman)
635 Morro Hills Road
Fallbrook, CA 92028
Richard J. Hanson
181 1 Kelly Street
Oceanside, CA 92054
Katrina L. Kelly
41 8 Caroline Court
Durham, NC 27707
Coleen L. Kelly
2955 Cape Sebastion
Cardiff, CA 92007
Richard C. Kelly and
Robert Patrick Kelly as
Trustees Under Declaration
of Trust, Dated November 25, 1985
FBO Subtrusts in the Names of
Richard C. Kelly, Robert Patrick Kelly,
and Irene K. Hendricks
Robert Pat Kelly
2770 Sunny Creek Road
Carlsbad, CA 92008
Robert Pat Kelly 81 Karen R. Robinson
Kelly, Trustees of
The Kelly Family Trust
UDT 1 0/27/82
2770 Sunny Creek Road
Carlsbad, CA 92008
Sara S. Kelly
25337 C.R.T. 5
Dolores, CO 81323
Robert P. DiFiglia
2770 Sunny Creek Road
Carlsbad, CA 92008 --
Tressa DeFiglia
926 North Spaulding #7
Los Angeles, CA 90046
Kelly Ranch Corporate Center I, LLC
4365 Executive Drive
Suite 850 .
San Diego, CA 92121
Richard S. Allen
4365 Executive Drive
Suite 850
San Diego,.CA 92121
Allen Development, Inc.
4365 Executive Drive
Suite 850
San Diego, CA 92121
DEVELOPER-OWNER:
Kelly Ranch Corporate Center I, LLC,
a Delaware limited liability company
By: Allen Development, Inc., a
California corporation, its mnmem
Richard S. Allen
President
Secretary
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on ail
applications which will require discretionary action on the part of the City
Council or any appointed Board, Commission or Committee.
The following information must be disclosed:
1.
2.
3.
4.
APPLICANT
List the names and addresses of all persons having a financial interest in the
application.-
Kelly Ranch Corporate Center I, LLC
436.5 wciiti VFJ nri VP
Suite 850
San Dieqo, CA 92121
OWNER
List the names and addresses of all persons having any ownership interest in the
property involved.
See Attached
--
~~ ~~~ ~ ~ ~~ ~~~
If any person identified pursuant to (1 ) or (2) above is a corporation or partnership,
list the names and addresses of all individuals owning more than 10% of the shares
in the,corporation or owning any partnership interest in the partnership.
Richard S. Allen
~ ~ ~~
4365 Executive Drive
Suite 850
San Dieso. CA 93121
If any person identified pursuant to (1) or (2) above is a non-profit organization or a
trust, list the names and addresses of any person serving as officer or director of
the non-profit organization or as trustee or beneficiary of the trust.
1-
Richard C. Kellv Robert Pat Kellv
1748 Via Monserate 2770 Sunny Creek Road
Fallbrook, CA 92028 Carlsbad, CA 92008
2075 Las Palrnas Dr. - Carlsbad, CA 92009-1 576 - (61 9) 438-11 61 - FAX (61 9) 438-0894 @
FaMa 3
7- 5. Have you had more3an $250 worth of business trans--+ed with any member of
City staff, Boards, C .imissions, Committees and/or Coun.~tl within the past twelve
(1 2) months? 0 Yes No If yes, please indicate person(s):
Person is defined as -Any individual, firm, co-partnership, joint venture, association, social club,
fraternal organization, corporation, estate, trust, receiver, syndicate, -this and any other county, city
and county, city municipalih/, district or other political subdivision or any other group or
combination acting as a unit." - .. - . .--
NOTE: Attach additional sheets if necessary. (See Attached Signature page)
~~ .. Signature of owner/date Signature of applicantldate
Print or type name of owner
Disclosure Statement 10196
Print or type name of applicant
-. .-
Page 2 of 2
Project Owners
Richard C. Kelly
1748 Via Monserate
Fallbrook, CA 92028
Irene K. Hendricks
15830 Via de Alba
Rancho Santa Fe, CA 92067
Danica A. Kelly
1748 Via Monserate
Fallbrook, CA 92028
Donna M. Kelly (Freeman)
635 Morro Hills Road
Fallbrook, CA 92028
Richard J. Hanson
181 1 Kelly Street
Oceanside, CA 92054
Katrina L. Kelly
41 8 Caroline Court
Durham, NC 27707
Coleen L. Kelly
2955 Cape Sebastion
Cardiff, CA 92007
Richard C. Kelly and
Robert Patrick Kelly as
Trustees Under Declaration
of Trust, Dated November 25,1985
FBO Subtrusts in the Names of
Richard C. Kelly, Robert Patrick Kelly,
and Irene K. Hendricks
Robert Pat Kelly
2770 Sunny Creek Road
Carlsbad, CA 92008
Robert Pat Kelly & Karen R. Robinson
Kelly, Trustees of
The Kelly Family Trust
UDT 10127/82
2770 Sunny Creek Road
Carlsbad, CA 92008
Sara S. Kelly
25337 C.R.T. 5
Dolores, CO 81323
Robert P. DiFiglia
2770 Sunny Creek Road
Carlsbad, CA 92008
Tressa DeFiglia
926 North Spaulding #7
Los Angeles, CA 90046
Kelly Ranch Corporate Center I, LLC
4365 Executive Drive
Suite 850
San Diego, CA 92121
Richard S. Allen
4365 Executive Drive
Suite 850
San Diego, CA 92121 '
Allen Development, Inc.
4365 Executive Drive
Suite 850
San Diego, CA 92121
..
OWNER: /3
Richard C. Kellv
Trustee Under Declaration of Trust
Dated November 25, 1985
Trustee Under Declaration of Trust
Dated November 25, 1985
DEVELOPER-OWNER: *
Kelly Ranch Corporate Center I, LLC,
a Delaware limited liability company
By: Allen Development, Inc., a
California corporation, its
managing member
Richard S. Allen
President
Secretary