HomeMy WebLinkAbout1998-06-17; Planning Commission; ; CT 93-09A|HDP 93-09A|CDP 97-54 - OCEAN BLUFF.
The City of CARLSBAD Planning Department A REPORT TO THE PLANNING COMMISSION
P.C. AGENDA OF: June 17,1998
Application complete date: January 12, 1998
Project Planner: Anne Hysong
Project Engineer: Mike Shirey
SUBJECT: CT 93-09(AYHDP 93-O9(AVCDP 97-54 - OCEAN BLUFF - Request for
approval of a tentative map revision, hillside development permit amendment and
coastal development permit for minor grading changes, a sewer line realignment,
the subdivision of the former affordable housing lot into four single family lots,
and the partial improvement and grading of Poinsettia Lane to its full width right-
of-way between Aviara Parkway and Black Rail Road in the Zone 20 Specific
Plan and Local Facilities Management Zone.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution Nos. 43 18,43 19, and
based on findings and subject to the conditions contained therein.
4320 RECOMMENDING APPROVAL of CT 93-09(A), HDP 93-09(A), and CDP 97-54
11. INTRODUCTION
The applicant is requesting approval of a revised tentative subdivision map, hillside development
permit amendment, and a new coastal development permit to allow minor grade changes, delete
an affordable housing lot and add four single family lots, add Poinsettia Lane Reach I1 to the
required off-site improvements, and incorporate building placement and architecture as required
by the approved Hillside Development Permit. As designed and conditioned, the proposed
project is in compliance with the General Plan, Zone 20 Specific Plan, Mello I1 Local Coastal
Program (LCP), the Subdivision Ordinance, and relevant Zoning Ordinance regulations.
111. PROJECT DESCRIPTION AND BACKGROUND
The Ocean Bluff project is located within the boundaries of Area C of the Zone 20 Specific Plan
and Mello I1 LCP segment. The 31.2 acre site is designated RLM by the General Plan allowing
low medium residential density and zoned R- 1-7500-4 allowing single family development. A
tentative map, hillside development permit, and site development plan were approved on April 2,
1996 for a standard 92 lot single family subdivision, one multiple family lot with a 16 unit
affordable housing apartment project, one 3 acre open space lot, and the off-site grading and
improvement of half width right-of way of Poinsettia Lane Reach I between Aviara Parkway and
Street A. The approved tentative map will expire on April 2, 1999. The proposed project
P
CT 93-09(A)/HDP 93-09(. L,/CDP 97-54 - OCEAN BLUFF
June 17,1998
Page 2
consists of a tentative map revision, hillside development permit amendment, and coastal
development permit to allow:
grading of off-site Poinsettia Lane Reach 1 to the full width right-of-way between
Aviara Parkway and Street A (previously approved at 60’ width);
0
0 grading of off-site Poinsettia Lane Reach I1 between Street A and Black Rail Road to
full width right-of-way;
0 changes to pad grades to accommodate a sewer realignment to the north resulting
from the final design of Black Rail Road (now shown on the revised map);
0 the subdivision of the former affordable housing site into 4 single family lots;
0 building placement and architectural design of single family units on each single
family lot; and
0 mitigation through the purchase of credits in an off-site habitat mitigation bank or off-
site revegetation for disturbance to .35 acres of coastal sage scrub habitat and .45
acres of southern maritime chaparral resulting from the proposed Poinsettia Lane
Reach I1 improvements.
The proposed Poinsettia Lane Reach I off-site improvement would result in the dedication and
grading of the full width right-of-way for this road segment and construction of the center two
lanes, one on each side of a raised unimproved median. The revised design is consistent with the
improvements funded by the recently formed Bridge and Thoroughfare District (B&TD) No. 2
and would enable the developer to take full advantage of the reimbursement program allowed
under the B&TD. The City and the developer have also agreed to extend the developer’s
obligation for the construction of Poinsettia Lane to Black Rail Road (Reach 11). This segment
will also be improved to full width grading, two travel lanes and an unimproved raised median.
Reach I1 is also reimbursable under B&TD No.2. Economies of scale can be utilized to construct
Reach I1 of Poinsettia Lane with the Ocean Bluff project, since Ocean Bluff already is obligated
to construct Reach I to gain access to their site. This will ultimately decrease the total
construction cost of this segment of Poinsettia Lane.
Proposed grading revisions to the approved tentative subdivision map consist of the lowering and
raising of pad grades abutting Black Rail Road and at the intersection of Poinsettia Lane and
Black Rail Road consistent with the final design of Black Rail Road approved as part of the
Cobblestone subdivision to the north. The changes in road and pad grades are within 5’ of the
approved grades. The new design eliminates the 2:l slopes on the single family lots thereby
increasing usable rear yards and redirects the sewer line serving the northeastern portion of the
site to Black Rail Road where it will connect to the Cobblestone sewer line.
The proposed revised tentative map would subdivide the former affordable housing lot into 4
single family lots thereby increasing the total number of lots from 94 (92 single family lots, one
multiple family lot, and one open space lot) to 97 (96 single family residential lots and one open
space lot). This action is consistent with the Ocean Bluff tentative map condition of approval
requiring that should the project’s inclusionary housing obligation be satisfied off-site, the
h
CT 93-09(A)/HDP 93-09(A)/CDP 97-54 - OCEAN BLUFF
June 17,1998
developer must process a tentative map revision to subdivide the multiple family lot (Lot 93) into
not more than 4 standard single family lots. On December 2, 1997, the City Council approved
the applicant’s request to purchase credits off-site in the Villa Loma affordable housing project in
lieu of constructing the 16 unit affordable apartment project approved on Lot 93.
To ensure consistency with the Hillside Ordinance architectural design standards and Specific
Plan architectural standards, the approved p,roject was conditioned to require Planning Director
approval of a hillside development permit amendment for building placement and architecture
prior to building permit issuance. The tentative map revisions discussed above also require
approval of a hillside development pennit amendment; therefore, building placement and
architecture are before the Planning Commission as part of the amendment. The project is also
subject to the R-1 One Family zoning regulations requiring yard setbacks and restricting building
height and coverage. Therefore, the proposed building placement and architecture have been
reviewed for consistency with the R-1 zone standards as well as the Hillside Development
Ordinance and Zone 20 Specific Plan architectural standards. Three architectural styles (Spanish,
Monterey, and Craftsman) are proposed for each of three one and two story floor plans. The
proposed single family units range in size from 2,320 square feet to 3,334 square, and all have
two car garages with an optional third car tandem garage.
The project is subject to the following land use plans, policies, programs and zoning regulations:
A. General Plan
B. Zone 20 Specific Plan (SP 203)
C. Mello I1 Local Coastal Program segment
D. Carlsbad Municipal Code, Title 21 (Zoning Ordinance) including:
1.
2
Chapter 2 1.95 - Hillside Development Regulations;
Chapters 21.201 and 21.203 - Coastal Development Procedures and Coastal
Resource Protection Overlay Zone.
E. Carlsbad Municipal Code Title 20 (Subdivisions)
F. Growth Management
IV. ANALYSIS
The recommendation of approval for this project was developed by analyzing the project’s
consistency with the applicable policies and regulations listed above. The following analysis
section discusses compliance with each of these regulations/policies utilizing both text and
tables.
CT 93-09(A)/HDP 93-09,' .)/CDP 97-54 - OCEAN BLUFF
June 17,1998
A. General Plan
The proposed project revisions including the full width right-of-way of Poinsettia Lane
Reach I and addition of Poinsettia Lane Reach 11, four additional single family lots, and
building placement and architecture are consistent with the applicable policies and
programs of the General Plan. Particularly relevant to these proposed revisions are the
Land Use, Circulation, Open Space and Conservation, and Noise Elements of the General
Plan.
Element
Land Use
Open Space
Circulation
Noise
Use Classification, Goal,
Objective, or Program
RLM (0-4 Dwelling
Units/Acre)
~ GCP (3.2 Dwelling
Units/Acre)
Adequate provision of
public facilities in
accordance with Growth
Management performance
standards
Protect rare, threatened or
endangered species
Minimize impact from new
development on hillsides
Require new development
to construct all roadways
necessary to serve proposed
development prior to or
concurrent with need.
60 dBA CNEL is the
exterior noise level and 45
dBA CNEL is the interior
noise level to which all
residential units shall be
mitigated.
Proposed UsesAmprovements
Single Family -
3.2 Dwelling Units/ Acre
The project is conditioned to
construct/install all public facilities to
serve the subdivision including
Poinsettia Lane and Black Rail Road;
public facilities are adequate in Zone
20 to satisfy the demand.
Impacts to .35 acres of Coastal Sage
Scrub habitat and .45 acres of
southern Maritime Chaparral to be
mitigated in an off-site habitat
mitigation bank or through
revegetation.
Architecture is in scale with terraced
building pads and visually compatible
with natural landscape.
Project is conditioned to complete all
street improvements prior to
occupancy of any unit.
Future projects along off-site
Poinsettia Lane Reaches I and I1 must
comply with noise standards.
Compliance
Yes
Yes
Yes
Yes
Yes
Yes
DESIGN CRITERIA
50% of ridge line units shall be
single story around 50% of
footprint
Variety of roof, wall, and
accent materialskolors
CT 93-09(A)/HDP 93-09(A)/CDP 97-54 - OCEAN BLUFF
June 17,1998
COMPLIANCE
50% of these units are single story units
Three exterior color schemes for wall, trim, and accent which
will blend into the natural hillside landscape
Page 5
B. Zone 20 Specific Plan
The Zone 20 Specific Plan requires project compliance with all applicable land use plans,
policies, and ordinances. The following discussion describes the proposed project’s
conformance with the relevant Specific Plan regulations which include land use, zoning.
development standards, Mello I1 LCP regulations, and open space preservation.
Land Use
The project is located within Area C of the Specific Plan. Properties within this area are
designated for Residential Low-Medium (RLM) density development allowing 0 - 4
dwelling units per acre by the General Plan with a Growth Control Point (GCP) of 3.2
dwelling units per acre.. Although the proposed map revision would increase the total
number of residential lots from 93 to 96, the total number of units would decrease from
108 to 96 due to the deletion of the 16 unit affordable project. The revised density of 3.2
dwelling units per acre is consistent with the GCP.
On April 2, 1996, the Ocean Bluff property was rezoned R-1-7500-Q concurrent with
tentative map approval. A site development plan for the affordable housing project was
approved thereby satisfling the Qualified Overlay “Q” designation. The revised project
includes building placement, floor plans, and architectural elevations which must be
consistent with the R-1 zone development standards and Zone 20 architectural standards.
As shown on the following table, the project meets or exceeds the R-1 zone standards:
REGULATION
Lot Size
Building Height
Setbacks
(Lots 92 - 96)
Lot Coverage
Garage
STANDARD
Minimum - 7,500 Square Feet
Maximum - 30 Feet
(Minimums)
Front Yard: 20 Feet
Side Yard: 10% Lot Width
Rear Yard:
Maximum - 40%
2 Car - 20 Feet X 20 Feet
2 X Side Yard
8,085 - 8,972 Square Feet
Front Yard: 20 Feet - 40 Feet
Side Yard: 6 Feet Minimum
Rear Yard: 12 Feet - 104 Feet
2 Car Garage with optional tandem
I < 40%
1 third car garage
The proposed building placement and architecture are consistent with the Zone 20
architectural standards as specified in the following table:
CT 93-09(A)/HDP 93-09(~)/CDP 97-54 - OCEAN BLUFF
June 17,1998
I DESIGN CRITERIA COMPLIANCE
Variety of one and two story Three floor plans: one single story and two two-story
units
Variety of architectural Spanish, Monterey, and Craftsman architecture with stone,
features wood and wrought iron trim, and Spanish and shake roof tile in
variety of colors; shutters, french doors
Variety of roof heights and Combination of one and two story roof elements with hip and
masses gable roofs
Window/door enhancement Recessed, arched, and paned windows on all elevations
Variety of garage designs, Two car garages (tandem third car garage) - combination of
facades and orientations two car and separate single car garage doors
Articulated building forms Recessed entries, doors, windows, balconies and porches;
multiple building planes on fronthear elevations; multi-level
roofs; one and two story exterior elements
Page 6
C. Mello I1 LCP
The project received approval of a Local Coastal Permit from the California Coastal
Commission in July 1996. Coastal Commission staff have found that proposed revisions
to the tentative map and Poinsettia Lane Reach I are minor design changes requiring no
further review by the Commission. They have also determined that the addition of the
Poinsettia Lane Reach I1 roadway segment and single family dwelling placement and
architecture must be considered by the City under a new coastal development permit.
There are no specific LCP regulations for building placement or architecture beyond
those required by the R-1 zone, and as shown above, the proposed project complies with
R- 1 development standards.
Mello I1 LCP regulations relevant to the Poinsettia Lane Reach I1 roadway segment
restrict grading during the rainy season and require the provision of drainage facilities
and erosion and sediment control in accordance with the City’s Master Drainage Plan.
The project is conditioned to restrict grading during the rainy season, and drainage
facilities would be provided in accordance with the City’s Master Drainage Plan.
Issuance of the required grading permit and improvement plans will ensure that all
erosion control, sediment control, and drainage facilities are utilized or constructed in
accordance with City standards.
D1. Hillside Development Regulations
Although the pad grades are being lowered and raised within the eastern portion of the
subdivision to accommodate the final design of Black Rail Road and to enable the sewer
line serving the northeastern area of the site to achieve gravity flow through connection
with sewer facilities to the north, changes are within 5’ of the previously approved
grades. The previously approved hillside grading design has been retained; therefore, the
project substantially conforms with the approved hillside grading design. The proposed
Poinsettia Lane Reach I1 road segment does not require hillside review in that the
underlying topography is relatively flat (less that 15% slope).
STANDARD
Sufficient setback from
adjoining downhill slope
Dominant roof and hillside
slope are parallel
Exterior materials/colors
which are consistent with the
natural landscape
CT 93-09(A)/HDP 93-09(~)/CDP 97-54 - OCEAN BLUFF
June 17,1998
Page 7
PROPOSED
Minimum 15’
Dominant roof and hillside slopes
are parallel and one and two story
roof lines are provided along
ridgelines
Exterior materials include cement
tile roofs, stucco with wood and
stone trim and earth tone colors
HDP 93-09 was conditioned to require Planning Commission approval of an amendment
to the Hillside Development permit to ensure that future architecture is consistent with
the Hillside Development Ordinance architectural standards as shown on the following
table:
REGULATION
View preservation and
enhancement
Hillside architecture
D2. Coastal Development and Resource Protection Overlay Regulations
See discussion under Item C. Mello I1 LCP above.
E. Tentative Map Revisions
In accordance with Section 20.12.120 of the Carlsbad Municipal Code, revised tentative
maps may be processed upon findings that the proposed subdivision map generally
conforms to the street and lot configuration shown on the approved tentative map,
involves one contiguous area, contains all required information, and is filed within 18
months of the approved tentative map. The proposed revised tentative map conforms to
these requirements since it generally conforms to the original subdivision design,
includes one contiguous area consisting of the entire original subdivision, contains all of
the required information which must be included on tentative maps filed pursuant to
CMC Chapter 20.12, and was filed within 18 months after the approval of the original
tentative map.
F. Growth Management
The impacts on facilities resulting from the proposed revisions would be the same or less
than the impacts previously reported for the approved subdivision. The total dwelling
units are reduced from 108 to 96. This reduction is the result of the deletion of the 16
unit affordable housing project on Lot 93.
V. ENVIRONMENTAL REVIEW
The project is located within the boundaries of the Zone 20 Specific Plan (SP 203) which covers
the 640 acre Zone 20 planning area. The direct, indirect, and cumulative environmental impacts
from the future development of Zone 20 have been analyzed in the Final Program Environmental
CT 93-09(A)/HDP 93-09ti+)/CDP 97-54 - OCEAN BLUFF
June 17,1998
Page 8
Impact Report (PEIR 90-03). In accordance with the Zone 20 PEIR requirements, additional
project level studies were conducted and analyzed for the approved Ocean Bluff project and a
Notice of Prior Environmental Compliance was issued on September 27, 1995. The approved
subdivision was conditioned to mitigate 3.98 acres of habitat impacted by the Poinsettia Lane
Reach I and Street A alignments, and this mitigation has been completed through the approval of
a 4d permit and purchase of credits in the Highland Mitigation Bank.
The Zone 20 PEIR identified biological impacts to coastal sage scrub and southern maritime
chaparral within the proposed Poinsettia Lane Reach I1 alignment. In accordance with the Zone
20 PEIR requirements, an additional project level biological analysis was performed for the
Poinsettia Lane Reach I1 off-site improvement. The analysis identified specific mitigation
necessary to reduce biological impacts identified by the Zone 20 PEIR. Proposed mitigation for
disturbance to .35 acres of coastal sage scrub habitat and .45 acres of southern maritime
chaparral consists of the purchase of credits in an off-site habitat mitigation bank andor
revegetation at an off-site location within Zone 20 upon approval by the City of Carlsbad, United
States Fish and Wildlife Service, and California Department of Fish and Game. Impacts beyond
what was analyzed in the final PEIR would not result from implementation of the revised project;
therefore, this project qualifies as subsequent development to both the Zone 20 PEIR and City’s
MEIR as identified in Section 21083.3 of the California Environmental Quality Act. The
Planning Director issued a Notice of Prior Environmental Compliance on May 8,1998.
ATTACHMENTS:
1.
2.
3.
4.
5.
6.
7.
8.
9.
Planning Commission Resolution No. 43 18
Planning Commission Resolution No. 43 19
Planning Commission Resolution No. 4320
Location Map
Notice of Prior Environmental Compliance dated May 8, 1998
Environmental Impact Assessment Form, Part 11, dated March 9, 1998
Background Data Sheet
Disclosure Statement
Planning Commission Resolution No. 3869 - 10. Planning Commission Resolution No. 3871
1 1. Reduced Exhibits
12. Exhibits “A” - “Z ” dated June 17, 1998
AH:kc
-mi- L- P. E
- City of Carlsbad
DISCLOSURE STATEMENT
Applicant’s seakmmt or diirolomas of Ccrtrin owwnhip interests on dl applications which will require discretionary action on the put of the
City Council or any appointed Boirrd, Commission or Comminrs.
1. APPLICANT (Not the applicant’s agent1
hid. the FOmE’&J&Q& lruki of the applicant and the nrtw of the legal ewirersliip
(!.e, partnershi daunts in common, non-rmfit. cnmontion. LE).
-- Catellus kesidential Group, Ifre.
California Corporation
Catellus Residential Group, Inc.
5 Park Plaza, Suite #400, Irvine, CA 92614
Ligt ihs nmas aid rddrssus Of && perc.0ns having a fhmoiol inmost in the nppllcatlcn
-
2. OWNER (Not tho oWnar’a agcnt)
PKIVide tht
ownership (i.e putnmhip. mmu in emrnon. aan-pofit, capontion, a): Lgw name of tbe property owner urd the nature of the Iqa!
Catellus kesidential Group, Inc.
!I Park PI aza,Suite #400, Irvine, CA 9261 4
Lict tbc nmos and rddrcw of & pcrsons hirig my ownership interest in the
~nvolvtd.
Catellus Residential Group, Inc.
5 Park PI aza, Suite #400, Irvine, CA 92614 .. . --- - ...--
2075 La Pslmmr Or, - Carlsbad, CA 8200rb1576 e (760) 438-1 167 - PAX (790) 438-0894 @
; CORPORATIOPJ OR PARTNERSEIF limy person iden=ir^lcd purrurn! to (1) or (2) hve is a corpomtioa or pmorshiF:, ik -h name
td sddrcssc8 of && U~diridudr ownhg mom than 10% of the sham in the :xixvacon cv
g.m!ag MY p~aaship -st in the partnership. LF NO bDlt’DI:ALS ONX hIOKE THAN it% OF T).IE SHARES, PLMSE INDICATE NON-APPLICABLE (MA) IY THE SPACE
BELOW.
CaLPERS in the only entity that owns more than 10% of the Parent
Corporation (Catellus Development Lorporationj stocK.
DeveloDment Corporation owns 100% ot Catellus Residential Group, I nc
1 NOX*PROFIT ORGANIZATION OR 7Xl;ST
If my pron hhtifi~~ pvc~prt to (1) or 7) om\e is a non-profrt organizot;on or ia DJSL list $0
name3 and adh~ss of person mvmg aa officer m director ofrke noa-pmfk cxgh7iration
Or s mstee of brneflthry drhe mot.
5. ffbvc you had mor0 than =SO worth of busmess msaCCdd uith any member of City staff. Bou4 Commissions, Cnmrnht dor Qunci! within the put rwelvr (1 5) months?
Yes !g Nc If yar, please indiwe ptrocn(t):
__
SOTE: Amch adddfdorA1 sham if necessary.
I senify thr! OH rhc above infomation is mc and
Sputum af o w’diate Signature of applicanr/datr
Print or type ilmc of owner Print or rypt name of app1fuz.r &&i&.&
Catellus Residential Group, Inc. &t
Brian J. Milich, Vice President
Oirclosuro Sra:cmenr 1 OB6 Paw 2 of 2
TENTATIVE MAP CT 93-09A
HDP 97- ICDP 97.
A STREET .
CI I) *-e r
HILLSIDE DEVELOPMENT PERMIT/ COASTAL DEVELOPMENT PERMIT
OCEAN BLUFF
City Of Carlsbad, California
MP LOT DRAINAQE TYP UTERAL LOCATIONS . -
W?r( .I.,
---- EASEMENT NOTES
PUBLIC UTILITIES AND DISTRICTS
GENFRAL NCITFS
OWNERWSUBMVIDER
HILLSIDE DEVELOPMENT PERMIT/ COASTAL DEVELOPMFNT PERMIT 1
OCEAN BLUFF
City Of Cnrlshnd. Califorriia
I
r! .
HUNSAKER Sa ASSOCIATES I - ,D,-:., :&
v I ,i
IIUNSALER & ASSOCIATES
IAN OIICO. IMC.
1 3 BR DEN 2BA
! I
2320 SF
.m
OCEAN BLUFF
OPTION 145 S.F. P
CARL S B A D, CALI P 0 R N I A
CATELLUS RESIDENTIAL GROUP
1
.
PLAN 1 IMOFI" m OCEAN BLUFF
C ARLS B AD. CALIF 0 R N I A
CATELLUS RESIDENTIAL GROUP
2
1A FIUlNT SPANISH
REAR
n w u/ L JI 1
RlGHT
t
1 1 1 1
LEFT
PLAN 1 ELEVATIONS .m OCEAN BLUFF
CAR LS B AD, CALIF0 R N I A
CATELLUS RESIDENTIAL GROUP
1
1B
MONTEREY 1c
CRAFlSMAN
PLAN 1 ELEVATIONS .m OCEAN BLUFF
CARL S B AD. C A L I F 0 R N I A
CATELLUS RESIDENTIAL GROUP
I OPTDECK li I
1 I
SECOND FLOOR FIRST FLOOR
2 4BRDONUS 3BA 3057 SF
FC OCEAN BLUFF
CAR L S B A D, CA LIP OR NIA
CATELLUS RESIDENTIAL GROUP
OPTION 223 S.F.
t
.
PLAN 2 w3oFpLAN *m OCEAN BLUFF
CARLS B AD, CA LIFORN 1 A
CATELLUS RESIDENTIAL GROUP
,
2B FwaJT MONTERN
€L
n
ii I + 1
RIGHT
1 1 I I I J
REAR LEFT
PLAN 2 ELEVATIONS .m OCEAN BLUFF
C ARLS B AD, C ALIFORN 1 A
CATELLUS RESIDENTIAL GROUP
I
2A “ISH
PLAN 2 ELEVATIONS .- OCEAN BLUFF
C A R L S B AD. CALIF 0 R N I A
CATELLUS RESIDENTIAL GROUP
2c CRAFSMAN
P
SECOND FLOOR
3 3 BR/DEN/L.OFT 3 BA 3334 S.F.
OCEAN BLUFF
CARL S B A D. C A LIFO R N I A
CATELLUS RESIDENTIAL GROUP
OPTION 137 S.F.
II a ID
PLAN 3 FKlOFPLAN m OCEAN BLUFF
C AR L S B AD, CALI FORN I A
CATELLUS RESIDENTIAL GROUP
10
XFmNT
CR A FlsM AN
REAR
n m
RIGHT
LEFT
PLAN 3 ELEVATIONS .m OCEAN BLUFF
CARL S B A D. CALIFORNIA
CATELLUS RESIDENTIAL GROUP
3A
SPANISH
PLAN 3 ELEVATIONS *m OCEAN BLUFF
C A R L S B A D. C A L IF0 R N I A
CATELLUS RESIDENTIAL GROUP - w4s IlJM
3B MONTEREY
.
12
1