HomeMy WebLinkAbout1998-04-01; Planning Commission; ; CDP 98-07 - VISTA/CARLSBAD INTERCEPTOR SEWER REPLACEMENT REACHES VC5B - VC9'me City of CARLSBAD Planning Department
A REPORT TO THE PLANNING COMMISSION
Coastal Development Permit
Item No. [Z
P.C. AGENDA OF: April 1, 1998
Application complete date: February 10, 1998
Project Planner: Jeff Gibson
Project Engineer: Kelly Weaver
SUBJECT: CDP 98-07 - VISTA/CARLSBAD INTERCEPTOR SEWER REPLACE-
MENT REACHES VC5B - VC9 - Request for approval of a Negative
Declaration and Coastal Development Permit to allow for the replacement of the
Vista/Carlsbad interceptor gravity sewer pipeline along Jefferson Street between
Las Flores Drive and Oak Avenue, a portion of which is in the Coastal
Commission Appeal area, and the realignment of the gravity sewer pipeline along
Carlsbad Village Drive to be realigned in Oak Avenue between Jefferson Street
and the railroad right-of-way, within Local Facilities Management Zone 1.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 4258
APPROVING the Negative Declaration issued by the Planning Director and ADOPT Planning
Commission Resolution No. 4259 APPROVING Coastal Development Permit CDP 98-07,
based upon the findings and subject to the conditions contained therein.
II.INTRODUCTION
Pursuant to Section 21.201.030 of the Carlsbad Municipal Code, the replacement and
realignment of the portion of the Carlsbad/Vista Interceptor Sewer, Reaches VC5B - VC9, within
the Mello II Segment of the City's Local Coastal Program (LCP) along Jefferson Street between
Las Flores Drive and Laguna Drive requires the processing and approval of a Coastal
Development Permit (CDP). The CDP application was reviewed for consistency with LCP
policies and implementation. There are no unresolved issues. The staffs recommendation for
approval, with conditions, is supported by the analysis as follows.
III. PROJECT DESCRIPTION AND BACKGROUND
The proposed, three-part project consists of: (1) the replacement of an existing sewer line under
the pavement in the right-of-way of Jefferson Street; (2) the abandonment of a sewer line under
Carlsbad Village Drive (CVD); and, (3) the realignment and construction of the CVD portion of
the sewer under the pavement in the right-of-way of Oak Avenue. The project would replace an
existing and deteriorating sewer facility. All trenching and other miscellaneous construction
work would take place within either the existing paved street or the disturbed portion of the
railroad right-of-way directly west of Oak Avenue. The sewer pipes would be up-sized from
CDP 98-07 - VISTA/CARLSBAD INTERCEPTOR SEWER
REPLACEMENT REACHES VC5B - VC9
April 1, 1998
Page 2
27-inch to 36-inch and 36-inch to 42-inch to return the existing over-capacity sewer pipeline
system to normal flow depths.
IV. ANALYSIS
The proposed project is a maintenance and repair effort for the long-term upkeep of the sewer
system. Since a portion of the project (within Jefferson Street between Las Flores Drive and
Laguna Drive) is in the Mello II Segment of the Local Coastal Program, a Coastal Development
Permit is required. The portion of the project located within the City's Redevelopment Area is
exempted from the requirements of a Redevelopment Permit and a Coastal Development Permit
by the Carlsbad Village Redevelopment Master Plan and Design Manual, which serves as the
implementation ordinance for this portion of the Coastal Zone. The project fullfills a public
utility infrastructure need in support of demand generated by existing and proposed land uses
established by the Land Use Element and is, therefore, consistent with the General Plan. It was
included in the approved Planning Commission Determination of General Plan Consistency for
the 1996-1997 Capital Improvement Plan Buildout (PCD/GP96-01).
Review of Required Coastal Findings
1. Conformance with the Certified Local Coastal Program and all applicable policies.
A portion of the project is located in the Mello II Local Coastal Program Segment.
The project proposes the repair and replacement of an existing sewer pipeline system
within an existing public street. The LCP Land Use Plan designates the subject site for
transportation and public utility uses.
2. Conformance with public access policies of Chapter 3 of the Coastal Act.
The replacement of the underground pipeline would not permanently impact traffic
circulation and patterns. However, short-term pipeline construction impacts would
temporarily change local traffic patterns in the area. Local ordinance requires that all
construction operations located within the public right-of-way must have a Traffic
Control Plan approved by the City's Engineering Department Traffic Division before
construction commences. The approved Traffic Control Plan would incorporate the
necessary traffic safety control measures such as signs, lane and construction barricades,
designation of work zones, and phasing to ensure that traffic and pedestrian safety and
emergency access is maintained. In addition, when a street or portions of a street are
closed due to paving or construction, substantial advanced notification is given to
businesses and residents living in the area so they can plan accordingly and do not block
construction access by parking vehicles in the street. Some of the construction (Portions
of Jefferson Street and all of Oak Avenue) would take place in areas where the street
system is comprised of a rectangular grid system. The grid layout of the streets would
help to minimize traffic congestion and restricted access by allowing more convenient
alternative routes around the streets being impacted by the project's construction.
CDP 98-07 - VISTA/CARLoBAD INTERCEPTOR SEWER
REPLACEMENT REACHES VC5B - VC9
April 1, 1998
Page 3
3. Coastal Overlay Zone.
The planned construction would take place within an existing public street, therefore,
project construction will not impact coastal resources such as coastal bluffs, steep slopes,
or native coastal vegetation.
V. ENVIRONMENTAL REVIEW
The Initial Study prepared in conjunction with this project determined that the environmental
effects which are peculiar to the project are not considered significant effects. The project would
replace an existing and deteriorating sewer facility and all trenching and other miscellaneous
construction work would take place within either the existing paved street or the disturbed
portion of the railroad right-of-way. In consideration of the foregoing, on February 13, 1998, the
Planning Director issued a Negative Declaration for the proposed project. No comments were
received. Please see the Environmental Assessment Form for an expanded justification for the
recommendation to approve the Negative Declaration.
ATTACHMENTS;
1. Planning Commission Resolution No. 4258
2. Planning Commission Resolution No. 4259
3. Location Map
JG:nm:mh
VISTA/CARLSBAD INTERCEPTER
SEWER REPLACEMENT
REACHES VC5B - VC9
CDP 98-07