July 27, 2021
City of Carlsbad Land Development Engineering
1635 Faraday Avenue
Carlsbad, CA 92008
SUBJECT: Buena Vista Reservoir Site, Carlsbad
Certification for Permanent Post Construction BMP
As the professional in responsible charge for the design of the above project, I certify that I have inspected
all constructed permanent post construction treatment control BMP’s required per the City of Carlsbad
BMP Design Manual and Construction Permit No. GR2019-0040; and that said BMP’s have been
constructed in compliance with the approved plans and all applicable specifications, permits, ordinances
and Order No. R9-2007-0001 of the San Diego Regional Water Quality Control Board.
I understand that this BMP certification statement does not constitute an operation and maintenance
verification.
Sincerely,
Nick Psyhogios, P.E.
Principal
8450 Miramar Place, San Diego, CA 92121
Ph: 858‐458‐9900
Fax: 858‐458‐9904
May 13, 2021
Buena Vista Reservoir Park
BVLD Job #1030047
BMP Certification Submittal
-Photo of Bottom of Basin Grade
-Photo of Catch Basin
-Photo of Drain (Outlet) Pipe Connection to Catch Basin
-Photo of Drain (Outlet) Pipe Invert to Basin Riser Pipe
-Photo of 1st Layer of 12" Gavel
-Photo of 2nd layer of 3" #8 Gravel
-Photo of 3rd layer of 3" Washed Sand
-Photo of 4th layer of 12" Biosoil
-Photo of completed Basin with stakes
-Basin BMP As Built
-Material Receipts
-Photos of Completed Basin - fully planted and mulched.
-Photo of Signage at Basin.
BrightView
Landscape Development
1711J98 7rP2
2121
+h66.0JO
2122
+h"'990
2119
[~:: +{µ'm
67.069
T-1~ 2097
2106
1711 8-T-
+I G
G +16"'872
210! G
I~ 21,fJ
16"'/UI
2140
+h"'m
954
169.llJ
CIWA
G 2159
2077
+h66.097
166.917 ~
2057
~417,f f:59.12 T-IO"Fff
1/~007
T-lo"Pftl.
+ + 2058 +1 G
2157
166.977
T-6"1ft:1
2110 [~"'~ 2146
+h"'946
1711215
7rP2
21JO
= 1711474 10PFflC
2024 1711554
10PFflC
2025 1711662 7rP2
2026 1711868
10PFflC
+h66."9
2046 17115/U 7rP2
+fifo78 G
2045 17115J5 10PFflC
2075
+h66.059
2151
+h"'962
2147 2111 166. +h66.""
G 21Jt
+h"'965
21J6
+h"'957 ~2155 67.144
2114
166.l"r\
21J5
+h65.960
T-6')ftf
21/U 167.DJ
T-6')ftf
2070 +166.6/U
2071 G
2072 +166.491
+h66.6JO G
2027
~6
20J2 1711718 TrJP2
WEIGHMASTER c-ERTIFICATE ..,.3
THIS IS TO CERTIFY that the following descnbed commodity was weighed, measured, or counted by a weighmaster, whose signature is on this certificate, who is a recognized authority of accuracy, as prescribed by Chapter
7 (commencing with Section 12700) of Division 5 of the California Business and Professions Code, administered by the Division of Measurement Standards of the California Department of food and Agriculture.
DEPUTY:
MEASURED FOR:
DELIVERED BY:
DRIVER SIGNATURE:
VEHICLE UC. NO.
'•·•d MEASURED AT:
l
2,
'r: •> i..:
WEIGH MASTER:
AGRI SERVICE, INC.
3720 Oceanic Way #204 • Oceanside, CA 92056 • 760.295.6255 • FAX 760.295.6262
l.
I I
DATE:
COMMODITY:
AMOUNT:
INVOICE NO. P.0.NO.
TRAILER LIC. NO. ', oACCOUNT
El Corazon Compost Facility
3210 Oceanside Blvd., Oceanside, CA 92056
LIABILITY RELEASE
oc.o.□.$
CHECK NO.
No. 75184
YARDSL.C.
CASHo cco
All deliveries are made at buyer's risk. Although all efforts will be made to accommodate the buyer's request, driver discretion will be used in determining the safety of unloading at Job site.
The undersigned agrees to accept responsibility for any property damage including but not limited to: -lrngat1on pipes or drains -Cracked concrete -Asphalt damage -Fencing
This agreement is in effect for all loads requested by buyer and delivered by AGRI Service, Inc.
RECEIVED BY: SIGNATURE: DATE:
CALIFORNIA 800.522.0282
l CALIFORNIA 800.734.3053
ZONA 855.522.0282
VI( EST TICK# 1 " ..., 8"
== OAST DEiIVERYTICKE;
'=--SANO & GRAVEL
~ ___ u_o_TE_®w __ w_w_.w_cs_g_.c_o_m _________ Date:------
b#: P.O.#:
Id To:
l> Location:
3:VER: Truck#: Plant:
( f -' -, I
:erence #: Arrival Time: \l. I \ ' ~
l
)SS Wt: Time Departed:
·eWt: Total Time:
Wt: I f L I Time Allowed: ' ~l J
flmodity: -' Excess Time:
er Notes: Reason For Standby:
ies shall be made where customer designates. Customer lzerby assumes responsibility for damage inside curb
•erty line. Any and all claims for shortag and/or quality of product delivered will not be allowed unless made
of delivery
\ I \ \ l
I ' \
Consignor/Consignee Printed Name Consignor/Consignee Signature
..
~ --' ~ 'iil;.--:..:,.,,,_
--.-
Construction Management and Inspection
1635 Faraday Avenue Carlsbad, CA 92008 760-602-2780 760-438-4178 fax tcbmp@carlsbadca.gov
www.carlsbadca.gov
February 25, 2020
MEMORANDUM
TO: Property Owners/Developers/Contractors
All Active Construction Sites in the City of Carlsbad
FROM: Shawnetta Grandberry, QSD, Senior Construction Inspector,
Construction Management and Inspections
RE: BMP Verification of Installation Required Prior to Occupancy
On May 8, 2013, the California Regional Water Quality Control Board (RWQCB) issued a municipal storm water
permit Order No. R9-2013-0001 (Municipal Permit) to the City of Carlsbad (City). The Municipal Permit
requires the City to use its land use and planning authority to implement a program to control and reduce the
discharge of pollutants in storm water from development projects.
In addition, on February 16, 2016, new storm water standards were adopted for both private and public
development projects. The BMP Design Manual includes storm water guidelines for all development projects.
Priority Development Projects require city-approved Storm Water Quality Improvement Plans, drainage studies,
and construction plans that include hydromodification, low impact development (LID), and treatment control best
management practices (BMPs).
Pursuant to the Municipal Permit, the City must require and confirm that prior to occupancy and/or intended use
of any portion of the project, that structural BMPs including LID, source control, and treatment controls are
inspected and verified by the Engineer of Work (EOW). The EOW must verify that the BMPs are constructed
and operating in compliance with the applicable requirements. This verification includes:
• Inspection and photographs of the installation of permanent BMPs must be completed at each phase of
construction. Photos of the structures are required prior to construction, during, and at final installation;
• Prior to occupancy all permanent BMPs must be constructed per the requirements of approved plans and
functionality must be verified in writing by the EOW. The verification letter must include the EOW
stamp;
• When informational signage is required for permanent BMPs, please review the approved plans and
permits for specific requirements. The signs must be designed, approved, and installed prior to
occupancy;
• The developer is responsible for ensuring the permanent BMPS are not removed or modified by the new
homeowner of HOA until the project has been finalized and found to be in full conformance with the
approved plans and specifications; and
• At the completion of the project, an addendum to the As-Builts, and/or Storm Water Quality Management
Plan (SWQMP) may be required to address any changes that occurred during construction.
C cityof
Carlsbad
These requirements apply to all priority development projects subject to the BMP Design Manual standards,
including phased development projects. Verification of BMP installation and functionality can ONLY be
certified by a California registered civil engineer or other EOW. Operation and maintenance of BMP facilities is
an eight-stage process:
Item Description Time Frame
1
Determine structural BMP ownership, party
responsible for permanent O&M, and
maintenance funding.
Prior to first submittal of a project application –
include draft framework in preliminary SWQMP.
2 Identify expected maintenance actions. First submittal of a project application – identify in
SWQMP.
3
Document structural BMP locations and signage
on drawings.
During final design, complete structural BMP
tables on construction drawings using city template
title sheets.
4
Develop detailed O&M Section (in SWQMP). During final design, subject to approval by the City
Engineer, and prior to issuance of construction,
grading, building, or other applicable permits.
5
Execute Permanent Storm Water Quality BMP
Maintenance Agreement (legal agreement to be
recorded against the property).
Required by the City Engineer, prior to the
issuance of construction, grading, building or other
applicable permits.
6
Ensure the permanent BMPs are not removed or
modified by the new homeowner or HOA.
The Developer must provide the homeowner
and/or HOA with educational information and
conduct regular inspections of post-construction
BMPs until project completion and the City finds
the project to be in full conformance with the
approved plans and specifications.
7
Project revisions may trigger an amendment to
the approved SWQMP to reflect constructed
structural BMPs with as-built plans.
Required by City Engineer, upon completion of
construction of structural BMPs.
8
Maintain the facilities in perpetuity and keep
records for self-inspection and verification
requirements.
The responsible party must submit annual
verification of maintenance records to the City
upon request.
Project proponents are required to comply with all storm water regulations and implement BMPs to the maximum
extent practicable. It is the City’s goal to obtain your compliance with the applicable regulations and requirements.
Please contact your Project Engineer or Inspector to review the specific project requirements. Thank you in
advance for your cooperation and compliance efforts.