HomeMy WebLinkAbout1896 RUTHERFORD RD; ; AS150367; Permit10/27/21,10:21 AM AS150367 Permit Data
City of Carlsbad
Sprinkler Permit
1896 RUTHERFORD
Job Address:
RD
Permit Type: SPRINK
Parcel No: 2121203000
Lot #: 0
Permit No: AS150367
Status: ISSUED
Applied 12/22/2015
Approved: 12/22/2015
Reference No.: Issued: 12/22/2015
PC #: Inspector:
Project Title: SPY OPTICS TI FOR SPY OPTICS
Applicant: Owner:
P D G CARLSBAD 46 LTD
1825 GILLESPIE WAY #102
EL CAJON CA
Fees ($) Add'I Fees ($) Total ($) Balance ($)
213 0 213 0
1/1
0
CARLSBAD FIRE DEPARTMENT
Fire Prevention Division
1635 Faraday Avenue - Carlsbad, CA 92008
760.602.4665
WATER AVAILABILITY FORM
SECTION A: TO BE COMPLETED BY CUSTOMER
PROJECT NAME: Spy Optics SR#:
(Assigned upon plan submittal)
PROJECT ADDRESS: 1896 Rutherford Rd CITY: Carlsbad
PHONE: (760) 310-6122 (Epic Fire Protection, Inc.) FAX NUMBER: (760) 798-0556
Largest Building (ft.2): 38,000 Sprinkled? YES Construction Type:
SECTION B: TO BE COMPLETED BY LOCAL WATER COMPANY. CUSTOMER TO PROVIDE RESULTS TO CFD.
Water Purveyor: City of Carlsbad
Location of test (reference map required): INorth end of Rutherford Rd. (H20366)
TEST INFORMATION IS VALID FOR 6 MONTHS FROM DATE PERFORMED
Flow Test Results
Static pressure: 125 PSI Hydrant Number (if applicable): H20366
Elevation of test: 261 Feet Date/Time of Test':
Pitot Tube Reading: PSI Corresponding Flow: GPM
Total Flow: 4,650 GPM Residual Pressure 103 PSI
At peak demand , this water system is capable of providing a fire flow discharge @ 20 psi of no _le more
than8,000GPM,butexceedsmaximumvelocitiesof15fps.Themaximumflowavailableat15fpsis4,650gpm.
'Test to be performed as close as possible to the time the most conservative flows and pressures are expected.
Note: If the water availability information was obtained in a manner other than a flow test (i.e. computer
modeling), fill out the information above as applicable and check here:
Name: JenniferR.Mael,P.E. Eng. Lic. No. (if applicable): C69606
Signature:
Title/Org "_jectManager Date: 10/2/2015
PIrz'-2f -
-.
\¼..J
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative.
Alidefects shall be corrected and system left in service before contractor's personnel finally leave the job.
A certificate shall be fl!ied out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and
contractor. It is understood the owner's representative's signature In no way prejudices any claim against contractor for faulty material, poor
workmanship, or failure to comply with approving authority's requirements or local ordinances.
Property name1 . Date
Property address I Va ç1E1Zç t) cAEYR5040 4 ______
Address C - Plans •
Installation conforms to accepted plans : : Yes E No
Equipment used Is approved Yes E No
If no, explain deviations
Has person in charge of fire equipnent been instructed as Yes E No
to location of control valves and care and maintenance
of this new equipment?
If no, explain?
Instructions Have copies of the following been left on the premises? Yes E No
System components instructions Yes No
Care and maintenance instructions Yes E No 0
NFPA25 S Yes No
Location of
system Supplies buildings
Year of Orifice Temperature
Make Model manufacture size Quantity rating
___ __ ____
Sprinklers kP& €c-t4- Zô _______
I C( 15 CS 0
Pipe and Type of pipe
fittings Type of fittings dLLt9
Maximum time to operate
Alarm Alarm device through test connection
valve or Type Make . Model Minutes Seconds
Indicator F. ____________ 0 4!T2
Dry valve
Make Model Serial no Make [ Model ___iialno.
- pipe • Time to - Time water Alarm
'' operating
test
through test
connection1
—\A1r
pressuFa'—.
Air
pressure air pressure
reached
test outlet1
operated
properly.
______
Minutes J Seconds psi psi Minutes Seconds Yes No
Without
With
UReexpIai
Operation E Pneumatic E Electric E Hydraulics
iQQupervised ED Yes No Detecting media supervised No
Does valve rate from the manual trip, remote, or both Yes E No control stations?
Deluge and
preaction
valves
Is there an accessible facil "k,~ach It
for testing?
Circuit
-f—no, explain
Does each circui rate Does each circuit operate Maximum time to
Make Model supervisi ss alarm? valve release? operate release
No Minutes Seconds
Pressure
Locatlo
oor
ake and
model
Setting Static pressure Resirpasure
(flowIng)
Flow rate
___________________ _________
Inlet (psi) Outlet (psi) Inlet (psi) Outlet (psi) F4Qwgpm)
Test
Hydrostatic: Hydrostatic tests shall be made at not lessthan 200 psi (13.6 bar) for 2 hours or 50 psI (3.4 bar)
above static pressure in excess of 150 psi (10.2 bar) for 2 hours. Differential dry-pipe valve clappers shall be left
open during the test to prevent damabe. All aboveground piping leakage shall be stopped.
description Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1½ pi (0.1 bar)
in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1½psi (0.1 bar) In 24 hours.
All piping hydrostatically tested at psi ( bar) for 2 hours Dry piping pneumatically tested Yes No Equipment operates properly . Yes E No
If no, state reason
Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silicate or derivatives
of sodium silicate, brine, or other corrosive chemicals were not used for testing systems or stopping leaks?
Yes No
Tests
Drain
test
Reading of gauge located near water
supply test connection:110—psi (_bar)
Residual pressure with valve in test
connection open wide: psi (._._. bar)
Underground mains and lead in connections to system risers flushed before connection made
to sprinkler piping / Verified by copy of the U Form No. 85B Yes No Other Explain flushed by installer of underground •
sprinkler piping E Yes E No
If powder-driven fasteners are used in concrete, has F7 Yes No representative sample testing be satisfactorily If no, explain
completed?
B sting
[!ga
I Eskets
Number used Locations Nrremov
Wing Yes No
.. If yes.
Do you certify as the sprink tractor that welding procedures ply 0 Yes El No with the requirements of at least J?
Welding Do you certify that the lding was mod by welders fled In ED Yes E No
compliance with the requlrem of at least AWS B2..1 ?
Do you c that the welding was carried out in compliance with a documented ED Yes D No:
control procedure to ensure that all discs are retrieved, that openings
1n piping are smooth, that slag and other welding residue are removed, and that
the internal diameters of piping are not penetrated? • •
Cutouts
(discs)
Do you certify that you have a control feature to ensure that Yes E No all cutouts (discs) are retrieved?
* - Hydraulic Nameplate provided If no, explain
data
nameplate Yes E No
Date left in service with all control valves open
emarks 'Z2.t - I
Name of sprinkler contractor
Signatures For property owner (signed)
sprinkler
Additional explanations nd notes
Tests witnessed by
Title Date
Title Date
'a -