Loading...
HomeMy WebLinkAbout2525 EL CAMINO REAL; 105; FPC2017-0174; Permit(ityof PERMIT REPORT Carlsbad Print Date: 12/13/2021 Permit No: FPC2017-0174 Job Address: 2525 EL CAMINO REAL, # 105, CARLSBAD, CA 92008-1206 Status: Closed - Finaled Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 1563020900 Track #: Applied: 06/22/2017 Valuation: $646,960.18 Lot U: Issued: 07/10/2017 Occupancy Group: Project U: Finaled Close Out: 02/01/2021 #of Dwelling Units: Plan U: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check U: Inspector: Plan Check U: Final Inspection: Project Title: Description: CHEESECAKE FACTORY -SPRINKLER TI >100 HEADS (140) FPContractor: RCM FIRE PROTECTION INC 350 ENTERPRISE PL TRACY, CA 95304-1610 (209) 833-8228 FEE AMOUNT FIRE NFPA 13 or 13R System> 100 heads $634.00 Total Fees: $634.00 Total Payments To Date: $634.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov GI-iEESlCAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 HYDRAULIC DESIGN INFORMATION SHEET Job Name: CHEESECAKE FACTORY Location: 2525 EL CAMINO REAL CARLSBAD Drawing Date: 6/21/17 Contractor: RCM FIRE PROTECTION 350 ENTERPRISE PL TRPCY,CA 95304 Lansdale, PA 19446 Designer: AARON J Calculated By: SprinkCAD www.sprinkcad.com 451 N. Cannon Ave. Lansdale, PA 19446 Construction: CONCRETE BEAM Reviewing Authorities:CARLSBAD FD SYSTEM DESIGN Remote Area Number: 1 Telephone:209 833-8228 Occupancy:OH1 KITCHEN Code:NFPA 13 Hazard:OH1 System Type:WET Area of Sprinkler Oper. 1500 sq ftl Sprinkler or Nozzle Density (gpm/sq ft) 0.150 I Make: TYCO Area per Sprinkler 130.0 sq ftl Model: TY3231 Hose Allowance Inside 0 gpm I K-Factor: 4.34 Hose Allowance Outside 250 gpm I Temperature Rating: 155 CALCULATION SUMMARY 22 Flowing Outlets gpm Required: 719.2 psi Required: 51.4 @ Source WATER SUPPLY Water Flow Test I Pump Data I Date of Test I Rated Capacity 0 gpm I Static Pressure 99.0 psi I Rated Pressure 0.0 psi I Residual Pres 77.0 psi Elevation 0 I At a Flow of 4080 gpm Make: I Elevation 0" I Model: I Location: Source of Information: SYSTEM VOLUME 536 Gallons Notes: THE 4.34 K FACTOR IS EQUILVALENT K FOR FLEX DROPS CA 92008 \CT/ FPC20I7-0174 2525 EL CAMINO REAL UNITIO5 LIC V??ACY S qREEscARE FACTORY Drawing Date:6/21/17 6/21/17 8:19 HYDRAULIC CALCULATION DETAILS HYDRAULIC FLOW LOSS QTY DESCRIPTION LENGTH C ID gpm psi TOTALS Hydr Ref W Required at Hyd Area 1 469 49.8 psi Total Loss for TO SYSTEM 0.0 psi 1 8" Grvd Butterfly Valve CSC "A" 12' 120 8.071 469 0.0 2 8" Grvd 90 Ell #510 36' 120 8.071 469 0.1 1 8" Grvd Check Valve Tyco CV-1FR CHART LOSS 469 0.2 1 Pipe 8" 10x21 Allied Domestic 5' 120 8.249 469 0.0 Total Loss for THRU RISER 0.3 psi 6 8" MJ 90 Ell DI 108' 120 8.071 469 0.2 1 Pipe 8" DIx18 Cl 52 800' 140 8.720 469 0.9 1 8" MJ Tee DI 35' 120 8.071 469 0.1 1 Pipe 8" DIx18 Cl 52 100' 140 8.720 469 0.1 1 8" Flngd Pr Rd Valve Tyco PRV-1 G 0' 0 8.071 469 0.0 1 Pipe 8" DIx18 Cl 52 20' 140 8.720 469 0.0 1 8" Flngd Gate Valve CSC "721U" P 4' 120 8.071 469 0.0 Fixed Flow Flow Loss 250 gpm Hydr Ref Ri Required at Source 719 51.4 psi Water Source 99.0 psi static, 77.0 psi residual @ 4080 gpm 719 gpm 98.1 psi SAFETY PRESSURE 46.7 psi Available Pressure of 98.1 psi Exceeds Required Pressure of 51.4 psi This is a safety margin of 46.7 psi or 48 % of Supply Maximum Water Velocity is 19.8 fps CREESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Page 3 FITTING NAME TABLE ABBREV. NAME C Coupling E 90' Standard Elbow F 45' Elbow S Straight Flow Thru Tee T 90' Flow Thru Tee V Valve LEGEND HYD REF Hydraulic reference. Refer to accompanying flow diagram. - K FACTOR Flow factor for open head or path where Flow (gpm) = K x -\/P Qa Flow added or subtracted Qt Total flow DIA Actual internal diameter of pipe C Hazen Williams pipe roughness factor Pf/ft Friction loss per foot of pipe PIPE Length of pipe FTNG'S Number of fittings. See table above. TOTAL Total length (PIPE + FTNG'S) Pt Total pressure (psi) at fitting Pe Pressure due to change in elevation where Pe = 0.433 x change in elevation Pf Friction loss (psi) to fitting where Pf = 1 x 4.52 x (Q/C)"1.85 / ID'4.87 Pv Velocity pressure (psi) where Pv = 0.001123 x Q"2/ID"4 Pn Normal pressure (psi), where Pn = Pt - Pv NOTES: - Pressures are balanced to 0.01 psi. Pressures are listed to 0.1 psi. Addition may vary by 0.1 psi due to accumulation of round off. - Calculations conform to NFPA 13. - Velocity Pressures are not considered in these Calculations CHEESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Page 4 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/(PSI')) (PSI) (GPM) (GPM) (GPM/SQ.FT) 1 13.83 20.6 15 9.00 4.34 21.8 20.2 19.5 0.16 2 13.83 21.6 2S 9.00 4.34 22.3 20.5 19.5 0.16 3 13.83 20.9 3S 9.00 4.34 22.1 20.4 19.5 0.16 4 13.83 20.9 4S 9.00 4.34 22.1 20.4 19.5 0.16 5 13.83 25.0 5S 9.00 4.34 26.0 22.1 19.5 0.17 6 13.83 23.8 6S 9.00 4.34 24.9 21.6 19.5 0.17 7 13.83 23.8 7S 9.00 4.34 24.9 21.6 19.5 0.17 8 13.83 25.2 8S 9.00 4.34 26.2 22.2 19.5 0.17 9 13.83 27.1 9S 9.00 4.34 28.0 23.0 19.5 0.18 10 13.83 29.3 lOS 9.00 4.34 29.7 23.6 19.5 0.18 11 13.83 30.1 uS 9.00 4.34 30.4 23.9 19.5 0.18 12 13.83 19.8 12S 9.00 4.34 21.0 19.9 19.5 0.15 13 13.83 20.2 13S 9.00 4.34 21.4 20.1 19.5 0.15 14 13.83 21.8 14S 9.00 4.34 22.6 20.6 19.5 0.16 15 13.83 22.3 15S 9.00 4.34 23.4 21.0 19.5 0.16 16 13.83 28.7 16S 9.00 4.34 29.6 23.6 19.5 0.18 17 13.83 19.3 17S 9.00 4.34 20.6 19.7 19.5 0.15 18 13.83 19.7 18S 9.00 4.34 20.9 19.8 19.5 0.15 19 13.83 18.9 19S 9.00 4.34 20.2 19.5 19.5 0.15 20 13.83 21.1 20S 9.00 4.34 22.2 20.5 19.5 0.16 21 13.83 23.0 21S 9.00 4.34 24.1 21.3 19.5 0.16 22 13.83 29.0 22S 9.00 4.34 29.3 23.5 19.5 0.18 30 13.83 26.3 31 13.83 22.4 32 13.83 32.2 33 13.83 26.1 34 13.83 24.7 35 13.83 29.7 36 13.83 23.6 CHEESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Page 5 NODE ELEVATION SPRINKLER PRESSURE ACTUAL MINIMUM ACTUAL NUMBER K-FACTOR FLOW FLOW DENSITY (FT) (GPM/(PSI)) (PSI) (GPM) (GPM) (GPM/SQ.FT) 37 13.83 21.0 38 13.83 23.9 39 13.83 22.0 40 13.83 20.8 41 13.83 20.5 Al 13.83 33.4 A2 13.83 33.6 A3 13.83 33.7 A4 13.83 34.2 A5 13.83 35.0 A6 13.83 49.6 W 13.83 49.8 Max velocity of 19.78 occurs in the pipe from A5 TO 22 Nodes with fl5! indicate a node at the top of a sprig or bottom of drop pendent. The node without an "S" is on the branch. CHEESECAKE FACTORY Drawing Date: 6121117 6/21/17 8:19 Tyco Fire Products Page 6 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 1 FROM HYDRAULIC REFERENCE 19 TO W (PRIMARY PATH) 19.50 1.049 1E 4.83 20.2 20.2 K = 4.34 19S C=120 2.00 -2.1 0.0 19.50 0.124 6.83 0.8 20.2 Vel = 7.31 1.049 iT 7.39 18.9 18.9 EqK = 4.48 19 C=120 5.00 0.0 0.0 19.50 0.124 12.39 1.5 18.9 Vel = 7.31 19.68 1.380 2.89 20.5 20.5 41 C=120 0.00 0.0 0.0 See PATH 2 39.18 0.119 2.89 0.3 20.5 Vel = 8.49 19.85 1.380 4.55 20.8 20.8 40 C=120 0.00 0.0 0.0 See PATH 3 59.03 0.253 4.55 1.2 20.8 Vel = 12.79 20.46 1.380 4.38 22.0 22.0 39 C=120 0.00 0.0 0.0 See PATH 9 79.49 0.440 4.38 1.9 22.0 Vel = 17.22 21.29 1.610 15.77 23.9 23.9 38 C=120 0.00 0.0 0.0 See PATH 11 100.77 0.322 15.77 5.1 23.9 Vel = 16.04 23.51 1.610 iT 4.68 29.0 29.0 EqK = 4.37 22 C=120 8.00 0.0 0.0 124.28 0.474 12.68 6.0 29.0 Vel = 19.78 344.90 3.260 iT 61.88 35.0 35.0 AS C=120 20.16 0.0 0.0 See PATH 4 469.18 0.178 82.04 14.6 35.0 Vel = 18.21 8.249 iF 70.61 49.6 49.6 A6 C=120 10.01 0.0 0.0 469.18 0.002 80.62 0.2 49.6 Vel = 2.84 W 469.18 49.8 K = 66.50 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) CHEESEpAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 7 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn 23.51 1.049 iT 4.83 29.3 29.3 K = 4.34 22S C=120 5.00 -2.1 0.0 23.51 0.176 9.83 1.7 29.3 Vel = 8.81 22 23.51 29.0 K = 4.37 PATH 2 FROM HYDRAULIC REFERENCE 17 TO 41 19.68 1.049 1E 4.83 20.6 20.6 K = 4.34 17S C=120 2.00 -2.1 0.0 19.68 0.126 6.83 0.9 20.6 Vel = 7.38 1.049 1E 7.04 19.3 19.3 EqK = 4.48 17 C=120 2.00 0.0 0.0 19.68 0.126 9.04 1.1 19.3 Vel = 7.38 41 19.68 20.5 K = 4.35 PATH 3 FROM HYDRAULIC REFERENCE 18 TO 40 19.85 1.049 1E 4.83 20.9 20.9 K = 4.34 18S C=120 2.00 -2.1 0.0 19.85 0.128 6.83 0.9 20.9 Vel = 7.44 1.049 iT 3.81 19.7 19.7 EqK = 4.47 18 C=120 5.00 0.0 0.0 19.85 0.128 8.81 1.1 19.7 Vel = 7.44 40 19.85 20.8 K = 4.35 PATH 4 FROM HYDRAULIC REFERENCE 12 TO A5 19.91 1.049 1E 4.83 21.0 21.0 K = 4.34 12S C=120 2.00 -2.1 0.0 19.91 0.129 6.83 0.9 21.0 Vel = 7.46 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) CI-IEESEçAKE FACTORY Drawing Date: 6121117 6/21/17 8:19 Tyco Fire Products Page 8 HYD. Qa DIA. FITTING PIPE Pt Pt REF "0" TYPES FTNG'S Fe Pv NOTES POINT Qt Pf/ft TOTAL Pf Pn PATH 4 FROM HYDRAULIC REFERENCE 12 TO A5 CONTINUED 1.049 1E 6.70 19.8 19.8 EqK = 4.47 12 0=120 2.00 0.0 0.0 19.91 0.129 8.70 1.1 19.8 Vel = 7.46 20.08 1.380 6.94 21.0 21.0 37 C=120 0.00 0.0 0.0 See PATH 5 39.99 0.123 6.94 0.9 21.0 Vel = 8.66 20.61 1.380 6.84 21.8 21.8 EqK = 4.41 14 0=120 0.00 0.0 0.0 60.60 0.266 6.84 1.8 21.8 Vel = 13.13 21.01 1.380 13.20 23.6 23.6 36 0=120 0.00 0.0 0.0 See PATH 10 81.61 0.461 13.20 6.1 23.6 Vel = 17.68 23.60 1.610 iT 4.78 29.7 29.7 35 0=120 8.00 0.0 0.0 See PATH 17 105.20 0.348 12.78 4.5 29.7 Vel = 16.74 239.69 3.260 8.06 34.2 34.2 A4 C=120 0.00 0.0 0.0 See PATH 6 344.90 0.101 8.06 0.8 34.2 Vel = 13.39 AS 344.90 35.0 K = 58.31 20.61 1.049 iT 4.83 22.6 22.6 K = 4.34 14S 0=120 5.00 -2.1 0.0 20.61 0.138 9.83 1.3 22.6 Vel = 7.73 14 20.61 21.8 K = 4.41 PATH 5 FROM HYDRAULIC REFERENCE 13 TO 37 20.08 1.049 1E 4.83 21.4 21.4 K = 4.34 13S 0=120 2.00 -2.1 0.0 20.08 0.131 6.83 0.9 21.4 Vel = 7.53 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) C,HEESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 9 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv NOTES POINT Qt Pf/ft TOTAL Pf Pn PATH 5 FROM HYDRAULIC REFERENCE 13 TO 37 CONTINUED 1.049 iT 0.73 20.2 20.2 EqK = 4.47 13 0=120 5.00 0.0 0.0 20.08 0.131 5.73 0.8 20.2 Vel = 7.53 37 20.08 21.0 K = 4.39 PATH 6 FROM HYDRAULIC REFERENCE 1 TO A4 20.24 1.049 1E 4.83 21.8 21.8 K = 4.34 is 0=120 2.00 -2.1 0.0 20.24 0.133 6.83 0.9 21.8 Vel = 7.59 1.049 7.66 20.6 20.6 EqK = 4.46 1 0=120 0.00 0.0 0.0 20.24 0.133 7.66 1.0 20.6 Vel = 7.59 20.51 1.380 6.07 21.6 21.6 EqK = 4.42 2 0=120 0.00 0.0 0.0 40.76 0.128 6.07 0.8 21.6 Vel = 8.83 40.76 1.380 8.65 22.4 22.4 31 C=120 0.00 0.0 0.0 See PATH 7 AND 8 81.52 0.461 8.65 4.0 22.4 Vel = 17.66 22.12 1.610 iT 12.88 26.3 26.3 30 C=120 8.00 0.0 0.0 See PATH 14 103.64 0.339 20.88 7.1 26.3 Vel = 16.49 3.260 16.84 33.4 33.4 Al 0=120 0.00 0.0 0.0 103.64 0.011 16.84 0.2 33.4 Vel = 4.02 65.50 3.260 4.70 33.6 33.6 A2 0=120 0.00 0.0 0.0 See PATH 12 169.14 0.027 4.70 0.1 33.6 Vel = 6.57 70.55 3.260 8.53 33.7 33.7 A3 C=120 0.00 0.0 0.0 See PATH 16 239.69 0.051 8.53 0.4 33.7 Vel = 9.30 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) CjIEESECAI<E FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 10 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv NOTES kkkk POINT Qt Pf/ft TOTAL Pf Pn A4 239.69 34.2 K = 41.00 20.51 1.049 iT 4.83 22.3 22.3 K = 4.34 2S C=120 5.00 -2.1 0.0 20.51 0.136 9.83 1.3 22.3 Vel = 7.69 2 20.51 21.6 K = 4.42 PATH 7 FROM HYDRAULIC REFERENCE 4 TO 31 20.38 1.049 1E 4.83 22.1 22.1 K = 4.34 4S C=120 2.00 -2.1 0.0 20.38 0.135 6.83 0.9 22.1 Vel = 7.64 1.049 iT 6.04 20.9 20.9 EqK = 4.46 4 C=120 5.00 0.0 0.0 20.38 0.135 11.04 1.5 20.9 Vel = 7.64 31 20.38 22.4 K = 4.31 PATH 8 FROM HYDRAULIC REFERENCE 3 TO 31 20.38 1.049 1E 4.83 22.1 22.1 K = 4.34 3S C=120 2.00 -2.1 0.0 20.38 0.135 6.83 0.9 22.1 Vel = 7.64 1.049 iT 5.96 20.9 20.9 EqK = 4.46 3 C=120 5.00 0.0 0.0 20.38 0.135 10.96 1.5 20.9 Vel = 7.64 31 20.38 22.4 K = 4.31 PATH 9 FROM HYDRAULIC REFERENCE 20 TO 39 20.46 1.049 1E 4.83 22.2 22.2 K = 4.34 20S C=120 2.00 -2.1 0.0 20.46 0.136 6.83 0.9 22.2 Vel = 7.67 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) çREESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 11 HYD. Qa DIA. FITTING PIPE Pt Pt REF "C" TYPES FTNG'S Pe Pv NOTES POINT Qt Pf/ft TOTAL Pf Pn PATH 9 FROM HYDRAULIC REFERENCE 20 TO 39 CONTINUED 1.049 iT 1.80 21.1 21.1 EqK = 4.46 20 C=120 5.00 0.0 0.0 20.46 0.136 6.80 0.9 21.1 Vel = 7.67 39 20.46 22.0 K = 4.36 PATH 10 FROM HYDRAULIC REFERENCE 15 TO 36 21.01 1.049 1E 4.83 23.4 23.4 K = 4.34 15S C=120 2.00 -2.1 0.0 21.01 0.143 6.83 1.0 23.4 Vel = 7.88 1.049 iT 4.20 22.3 22.3 EqK = 4.45 15 C=120 5.00 0.0 0.0 21.01 0.143 9.20 1.3 22.3 Vel = 7.88 36 21.01 23.6 K = 4.32 PATH 11 FROM HYDRAULIC REFERENCE 21 TO 38 21.29 1.049 1E 4.83 24.1 24.1 K = 4.34 21S C=120 2.00 -2.1 0.0 21.29 0.146 6.83 1.0 24.1 Vel = 7.98 1.049 iT 1.47 23.0 23.0 EqK = 4.44 21 C=120 5.00 0.0 0.0 21.29 0.146 6.47 0.9 23.0 Vel = 7.98 38 21.29 23.9 K = 4.35 PATH 12 FROM HYDRAULIC REFERENCE 6 TO A2 21.64 1.049 1E 4.83 24.9 24.9 K = 4.34 6S C=120 2.00 -2.1 0.0 21.64 0.151 6.83 1.0 24.9 Vel = 8.11 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) çl-IEESE,CAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 12 HYD. Qa DIA. FITTING PIPE Pt Pt REF VIC11TYPES FTNG!S Pe Pv NOTES ******* POINT Qt Pf/ft TOTAL Pf Pn PATH 12 FROM HYDRAULIC REFERENCE 6 TO A2 CONTINUED 1.049 1E 3.79 23.8 23.8 EqK = 4.44 6 C=120 2.00 0.0 0.0 21.64 0.151 5.79 0.9 23.8 Vel = 8.11 21.65 1.380 10.24 24.7 24.7 34 C=120 0.00 0.0 0.0 See PATH 13 43.29 0.143 10.24 1.5 24.7 Vel = 9.38 22.21 1.380 19.67 26.1 26.1 33 C=120 0.00 0.0 0.0 See PATH 15 65.50 0.307 19.67 6.0 26.1 Vel = 14.19 1.610 iT 1.87 32.2 32.2 32 C=120 8.00 0.0 0.0 65.50 0.145 9.87 1.4 32.2 Vel = 10.42 A2 65.50 33.6 K = 11.30 PATH 13 FROM HYDRAULIC REFERENCE 7 TO 34 21.65 1.049 1E 4.83 24.9 24.9 K = 4.34 7S C=120 2.00 -2.1 0.0 21.65 0.151 6.83 1.0 24.9 Vel = 8.12 1.049 iT 0.68 23.8 23.8 EqK = 4.44 7 C=120 5.00 0.0 0.0 21.65 0.151 5.68 0.9 23.8 Vel = 8.12 34 21.65 24.7 K = 4.36 PATH 14 FROM HYDRAULIC REFERENCE 5 TO 30 22.12 1.049 1E 4.83 26.0 26.0 K = 4.34 5S C=120 2.00 -2.1 0.0 22.12 0.157 6.83 1.1 26.0 Vel = 8.29 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) CHEESECAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 13 HYD. Qa DIA. FITTING PIPE Pt Pt REF UC!I TYPES FTNG'S Fe Pv NOTES ******* POINT Qt Pt/ft TOTAL Pt Pn PATH 14 FROM HYDRAULIC REFERENCE 5 TO 30 CONTINUED 1.049 iT 3.87 25.0 25.0 EqK = 4.43 5 C=120 5.00 0.0 0.0 22.12 0.157 8.87 1.4 25.0 Vel = 8.29 30 22.12 26.3 K = 4.31 PATH 15 FROM HYDRAULIC REFERENCE 8 TO 33 22.21 1.049 1E 4.83 26.2 26.2 K = 4.34 8S C=120 2.00 -2.1 0.0 22.21 0.158 6.83 1.1 26.2 Vel = 8.33 1.049 iT 1.12 25.2 25.2 EqK = 4.43 8 C=120 5.00 0.0 0.0 22.21 0.158 6.12 1.0 25.2 Vel = 8.33 33 22.21 26.1 K = 4.34 PATH 16 FROM HYDRAULIC REFERENCE 9 TO A3 22.98 1.049 1E 4.83 28.0 28.0 K = 4.34 9S C=120 2.00 -2.1 0.0 22.98 0.168 6.83 1.1 28.0 Vel = 8.61 1.049 1E 11.27 27.1 27.1 EqK = 4.42 9 C=120 2.00 0.0 0.0 22.98 0.168 13.27 2.2 27.1 Vel = 8.61 23.64 1.380 4.60 29.3 29.3 EqK = 4.37 10 C=120 0.00 0.0 0.0 46.62 0.164 4.60 0.8 29.3 Vel = 10.10 23.93 1.380 iT 4.39 30.1 30.1 EqK = 4.36 ii C=120 6.00 0.0 0.0 70.55 0.352 10.39 3.7 30.1 Vel = 15.28 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) CVEESEAKE FACTORY Drawing Date:6/21/17 6/21/17 8:19 Tyco Fire Products Page 14 HYD. Qa DIA. FITTING PIPE Pt Pt REF licitTYPES FTNG'S Pe Pv NOTES POINT Qt Pf/ft TOTAL Pf Pn A3 70.55 33.7 K = 12.15 23.64 1.049 IT 4.83 29.7 29.7 K = 4.34 lOS C=120 5.00 -2.1 0.0 23.64 0.177 9.83 1.7 29.7 Vel = 8.86 10 23.64 29.3 K = 4.37 23.93 1.049 IT 4.83 30.4 30.4 K = 4.34 uS C=120 5.00 -2.1 0.0 23.93 0.181 9.83 1.8 30.4 Vel = 8.97 11 23.93 30.1 K = 4.36 PATH 17 FROM HYDRAULIC REFERENCE 16 TO 35 23.60 1.049 1E 4.83 29.6 29.6 K = 4.34 16S C=120 2.00 -2.1 0.0 23.60 0.177 6.83 1.2 29.6 Vel = 8.85 1.049 IT 0.94 28.7 28.7 EqK = 4.41 16 C=120 5.00 0.0 0.0 23.60 0.177 5.94 1.0 28.7 Vel = 8.85 35 23.60 29.7 K = 4.33 UNITS - DIAMETER (INCH) LENGTH (FOOT) FLOW (GPM) PRESSURE (PSI) Job CHEESECAKE FACTORY 2525 EL CAMINO REAL CARLSBAD Remote Area: I Water Static Pres: 99.0 psi Resid. Pres: 77.0 psi Flow: 4080 gpm Date: Loc: Required Pressure: 51.4 psi Sys Flow: 469 gpm Sys+Hose: 719 gpm Safety Pres: 46.7 psi Hd Ely Pres: -2.1 psi Hose Allowance In: ogpm Out: 250 gpm 20 80 60 250 gpm hose 40 20 150 225 300 375 450 525 600 675 7 Flow (gpm)