Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2150 PALOMAR AIRPORT RD; ; FPC2016-0005; Permit
PERMIT REPORT C('City of Carlsbad Print Date: 12/16/2021 Job Address: 2150 PALOMAR AIRPORT RD, CARLSBAD, CA 92011-4406 Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers Parcel #: 7602218206 Track #: Valuation: $226,107.00 Lot #: Occupancy Group: Project #: #of Dwelling Units: Plan #: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check #: Plan Check #: Project Title: Description: RELOCATION OF 43 HEADS -SPRINKLER TI TI -COMM CREDIAUTO: 4939 SF SHELL TO OFFICE TI Permit No: FPC2016-0005 Status: Closed - Finaled Applied: 11/14/2016 Issued: Finaled Close Out: 02/03/2021 Inspector: Final Inspection: CoApplicant: BRIAN SULLIVAN 1975 SPANISH OAK WAY VISTA, CA 92081-7383 (760) 716-9226 FEE AMOUNT FIRE NFPA 13 or 13R System 7-100 heads $536.00 Total Fees: $536.00 Total Payments To Date: $536.00 Balance Due: $0.00 Fire Department Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov Sully Fire Protection 1975 Spanish Oak Way Vista, California C16 701490 HYDRAULIC CALCULATIONS FOR Tenant Improvement Area Premier Jet Suites Credi Auto Tenant Improvement 2150 Palomar Airport Road, Suite 209 Carlsbad, California FILENAME: 2016 Palomar TI 3rd.sdf DATE: October 31, 2016 -Design Data- OCCUPANCY CLASSIFICATION: Light Hazard DENSITY: 0.10 gpm/f12 AREA OF APPLICATION: 1,653 ft2 COVERAGE PER SPRINKLER: as noted on plan NUMBER OF SPRINKLERS FLOWING: 16 sprinklers TOTAL SPRINKLER WATER FLOW REQUIRED: 422.3 gpm TOTAL WATER REQUIRED (including hose): 522.3 gpm FLOW AND PRESSURE REQUIRED AT SOURCE: 422.3 gpm @ 83.2 psi PRESSURE AVAILABLE AT SOURCE: 93.4 psi SPRINKLER ORIFICE SIZE: as noted on plan FPC20I 6-0005 2150 Palomar Airport RD SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 1 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. 0 DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SOURCE 95.0 85.0 1400.0 93.4 522.3 83.2 Required pressure is 10.2 psi (11%) less than available pressure. AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 522.3 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 100.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 422.3 GPM NODE ANALYSIS DATA DENSITY NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE AREA REQ. ACT. (FT) (PSI) (GPM) (FT-2) (GPM/FTA2) 1 9.0 K= 5.60 11.8 19.2 147.0 0.100 0.131 2 12.4 K= 5.60 14.8 21.5 168.0 0.100 0.128 3 12.4 K= 8.00 10.6 26.0 260.0 0.100 0.100 4 12.4 K= 8.00 12.2 28.0 260.0 0.100 0.108 5 12.4 K= 5.60 13.9 20.9 168.0 0.100 0.124 6 12.4 K= 8.00 13.5 29.4 260.0 0.100 0.113 7 12.4 K= 5.60 13.3 20.5 168.0 0.100 0.122 8 12.4 K= 5.60 11.9 19.3 168.0 0.100 0.115 9 12.4 K= 8.00 17.7 33.7 260.0 0.100 0.129 10 12.4 K= 5.60 13.8 20.8 168.0 0.100 0.124 11 12.4 K= 8.00 31.1 44.6 260.0 0.100 0.172 99 12.4 K= 8.00 32.2 45.4 260.0 0.100 0.175 12 12.4 K= 5.60 13.4 20.5 168.0 0.100 0.122 13 12.4 K= 5.60 19.6 24.8 168.0 0.100 0.147 14 12.4 K= 5.60 14.3 21.2 168.0 0.100 0.126 15 12.4 K= 5.60 22.5 26.6 168.0 0.100 0.158 A 12.4 - - - - 11.8 - - - B 12.4 - - - - 11.8 - - - C 12.4 - - - - 12.9 - - - D 12.4 - - - - 15.0 - - - F 12.4 - - - - 21.0 - - - G 12.4 - - - - 31.7 - - - H 12.4 - - - - 17.8 - - - J 12.4 - - - - 20.3 - - - K 12.4 - - - - 32.8 - - - _ 0.0 - - - - 22.5 - - - BB 0.0 - - - - 22.3 - - - L 12.4 - - - - 40.2 - - - M 10.5 - - - - 50.5 - - - TOR -2.0 - - - - 64.4 - - - BOR -16.7 - - - - 71.3 - - - SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised NODE ANALYSIS DATA DENSITY NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE AREA REQ. ACT. (FT) (PSI) (GPM) (FTA2) (GPM/FT"2) UG]. -16.7 - - - - 72.4 --- BF2 -16.7 - - - - 72.5 --- BF1 -16.7 - - - - 80.5 - - - SOURCE -22.5 SOURCE 83.2 422.3 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 1 -19.2 1.080 PL 11.50 PF 1.5 1 9.0 5.6 11.8 19.2 6.7 120 FTG E PE -1.5 A 12.4 0.0 11.8 0.0 0.105 TL 13.90 PV Pipe: 3 -19.2 1.728 PL 0.50 PF 0.0 A 12.4 0.0 11.8 0.0 2.6 120 FTG ---- PE 0.0 B 12.4 0.0 11.8 0.0 0.011 TL 0.50 PV Pipe: 4 -26.0 1.080 PL 0.75 PF 1.2 3 12.4 8.0 10.6 26.0 9.1 120 FTG T PE 0.0 B 12.4 0.0 11.8 0.0 0.183 TL 6.65 PV Pipe: 5 -45.2 1.728 PL 8.75 PF 0.5 B 12.4 0.0 11.8 0.0 6.2 120 FTG ---- PE 0.0 4 12.4 8.0 12.2 28.0 0.052 TL 8.75 PV Pipe: 6 -73.2 1.728 PL 5.50 PF 0.7 4 12.4 8.0 12.2 28.0 10.0 120 FTG ---- PE 0.0 C 12.4 0.0 12.9 0.0 0.126 TL 5.50 PV Pipe: 8 -73.2 1.728 PL 4.50 PP 0.6 C 12.4 0.0 12.9 0.0 10.0 120 FTG ---- PE 0.0 6 12.4 8.0 13.5 29.4 0.126 TL 4.50 PV Pipe: 9 -102.6 1.728 PL 6.25 PF 1.5 6 12.4 8.0 13.5 29.4 14.0 120 FTG ---- PE 0.0 D 12.4 0.0 15.0 0.0 0.236 TL 6.25 PV Pipe: 11 -20.5 1080 PL 8.00 PF 1.6 7 12.4 5.6 13.3 20.5 7.2 120 FTG T PE 0.0 D 12.4 0.0 15.0 0.0 0.118 TL 13.90 PV Pipe: 12 -123.1 1.728 PL 8.25 PF 2.7 D 12.4 0.0 15.0 0.0 16.8 120 FTG ---- PE 0.0 9 12.4 8.0 17.7 33.7 0.330 TL 8.25 PV Pipe: 13 -156.7 1.728 PL 6.50 PF 3.4 9 12.4 8.0 17.7 33.7 21.4 120 FTG ---- PE 0.0 F 12.4 0.0 21.0 0.0 0.516 TL 6.50 PV Pipe: 15 -156.7 1.728 PL 7.00 PP 10.7 F 12.4 0.0 21.0 0.0 21.4 120 FTG ET PE 0.0 G 12.4 0.0 31.7 0.0 0.516 TL 20.70 PV Pipe: 16 -44.6 1.728 PL 2.50 PF 0.6 11 12.4 8.0 31.1 44.6 6.1 120 FTG T PE 0.0 G 12.4 0.0 31.7 0.0 0.051 TL 12.30 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 17 -39.8 1.080 PL 5.00 PF 4.4 12 12.4 5.6 13.4 20.5 13.9 120 FTG T PE 0.0 H 12.4 0.0 17.8 0.0 0.404 TL 10.90 PV Pipe: 18 -82.2 1.728 PL 11.50 PF 1.8 H 12.4 0.0 17.8 0.0 11.2 120 FTG ---- PE 0.0 13 12.4 5.6 19.6 24.8 0.156 TL 11.50 PV Pipe: 18A 42.4 1.728 PL 14.00 PF 0.6 H 12.4 0.0 17.8 0.0 5.8 120 FTG ---- PE 5.4 AA 0.0 0.0 22.5 0.0 0.046 TL 14.00 PV Pipe: 18A1 20.9 1.049 PL 16.00 PF 3.2 AA 0.0 0.0 22.5 0.0 7.7 120 FTG ET PE -5.4 5 12.4 5.6 13.9 20.9 0.141 TL 23.00 PV Pipe: 18B 21.5 1.728 PL 11.25 PF 0.1 AA 0.0 0.0 22.5 0.0 2.9 120 FTG ---- PE 0.0 BB 0.0 0.0 22.3 0.0 0.013 TL 11.25 PV Pipe: 18C 21.5 1.191 PL 16.00 PF 2.2 38 0.0 0.0 22.3 0.0 6.2 120 FTG ET PE -5.4 2 12.4 5.6 14.8 21.5 0.080 TL 27.10 PV Pipe: 19 -107.0 1.728 PL 2.75 PF 0.7 13 12.4 5.6 19.6 24.8 14.6 120 FTG ---- PE 0.0 J 12.4 0.0 20.3 0.0 0.255 TL 2.75 PV Pipe: 20 -42.0 1.080 PL 7.50 PF 6.0 14 12.4 5.6 14.3 21.2 14.7 120 FTG T PE 0.0 J 12.4 0.0 20.3 0.0 0.445 TL 13.40 PV Pipe: 21 -148.9 1.728 PL 4.75 PF 2.2 J 12.4 0.0 20.3 0.0 20.4 120 FTG ---- PE 0.0 15 12.4 5.6 22.5 26.6 0.470 TL 4.75 PV Pipe: 22 -175.5 1.728 PL 2.50 PF 10.3 15 12.4 5.6 22.5 26.6 24.0 120 FTG ET PE 0.0 K 12.4 0.0 32.8 0.0 0.636 TL 16.20 PV Pipe: New]. 19.3 1.080 PL 11.00 PF 1.4 12 12.4 5.6 13.4 20.5 6.8 120 FTG E PE 0.0 8 12.4 5.6 11.9 19.3 0.106 TL 13.40 PV Pipe: New2 20.8 1.191 PL 7.00 PF 0.5 14 12.4 5.6 14.3 21.2 6.0 120 FTG ---- PE 0.0 10 12.4 5.6 13.8 20.8 0.075 TL 7.00 PV Pipe: 23 -201.3 3.314 PL 15.00 PF 0.5 G 12.4 0.0 31.7 0.0 7.5 120 FTG ---- PE 0.0 99 12.4 8.0 32.2 45.4 0.034 TL 15.00 PV SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) Pipe: 23A -246.8 3.314 PL 11.00 PF 0.6 99 12.4 8.0 32.2 45.4 9.2 120 FTG ---- PE 0.0 K 12.4 0.0 32.8 0.0 0.050 TL 11.00 PV Pipe: 24 -422.2 3.314 PL 35.00 PF 7.4 K 12.4 0.0 32.8 0.0 15.7 120 FTG T PE 0.0 L 12.4 0.0 40.2 0.0 0.135 TL 54.70 PV Pipe: 25 -422.2 3.314 PL 35.00 PF 9.4 L 12.4 0.0 40.2 0.0 15.7 120 FTG 2ET PE 0.8 M 10.5 0.0 50.5 0.0 0.135 TL 69.70 PV Pipe: 26 422.2 3.314 PL 40.30 PF 8.5 TOR -2.0 0.0 64.4 0.0 15.7 120 FTG 3E PE -5.4 H 10.5 0.0 50.5 0.0 0.135 TL 62.80 PV Pipe: 27 -422.2 4.310 PL 14.66 PF 0.6 TOR -2.0 0.0 64.4 0.0 9.3 120 FTG CG PE 6.4 BOR -16.7 0.0 71.3 0.0 0.038 TL 14.66 PV Pipe: 28 422.2 4.310 PL 9.25 PF 1.1 UG1 -16.7 0.0 72.4 0.0 9.3 120 FTG 2E PE 0.0 BOR -16.7 0.0 71.3 0.0 0.038 TL 28.45 PV Pipe: 29 422.2 8.390 PL 13.00 PF 0.1 BF2 -16.7 0.0 72.5 0.0 2.5 140 FTG 3E PE 0.0 UG1 -16.7 0.0 72.4 0.0 0.001 TL 106.00 PV Pipe: 30 FIXED PRESSURE LOSS DEVICE BF1 -16.7 0.0 80.5 0.0 8.0 psi, 422.2 gpm BF2 -16.7 0.0 72.5 0.0 Pipe: 31 422.3 8.390 PL 18.59 PF 9.2 SOURCE -22.5 SRCE 83.2 (N/A) 2.5 140 FTG E2T PE -2.5 BF1 -16.7 0.0 80.5 0.0 0.001 TL 169.50 PV NOTES (HASS): Calculations were performed by the HASS 8.6 computer program in accordance with NFPA13 (2016) under license no. 50110279 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 (931) 659-9760 The system has been calculated to provide an average imbalance at each node of 0.011 gpm and a maximum imbalance at any node of 0.362 gpm. SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised - Total pressure at each node is used in balancing the system. Maximum water velocity is 24.0 ft/sec at pipe 22. Items listed in bold print on the cover sheet are automatically transferred from the calculation report. PIPE FITTINGS TABLE Pipe Table Name: KEN_CUSTOM.PIP PAGE: A MATERIAL: 40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell -------------------------------------------------------- T LngEll ChkVlv BfyVlv GatVlv AlmChk DPVlv BlHdTe R K TeeRun TeeRun 1.049 2.00 5.00 2.00 5.00 6.00 1.00 10.00 10.00 5.00 2.00 2.00 PAGE: D MATERIAL: DIRON HWC: 140 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G El]. Tee LngEll ChkVlv BfyVlv GatVlv 8.390 31.00 60.00 22.00 78.00 21.00 7.00 PAGE: W MATERIAL: DyThd HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L R B G A C Ell Tee 45 RunTee Bfly Gate Alarm Check 1.080 2.40 5.90 1.20 2.30 0.00 0.00 0.00 4.80 PAGE: Y MATERIAL: DynaFl HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D Ell Tee 45 Check BtrFly GateVl 1.191 3.20 7.90 0.00 0.00 0.00 0.00 0.00 0.00 1.728 3.90 9.80 0.00 0.00 0.00 0.00 0.00 0.00 3.314 7.50 19.70 0.00 0.00 0.00 0.00 0.00 0.00 4.310 9.60 22.70 0.00 0.00 0.00 0.00 0.00 0.00 WATER SUPPLY ANALYSIS Static: 95.00 psi Resid: 85.00 psi Flow: 1400.0 gpm 100. 0 G 80.0 A U G E 60.0 R E S S U R 40.0 E p S 20.0 -14.7 FLOW (GPM) Note: (1) Dashed Lines indicate extrapolated values from Test Results (2) On Site pressures are based on hose stream deduction at the source SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 8 DATE: 10/31/2016 C:\HASS FILES\PALOMAR TI 3RD.SDF JOB TITLE: Premier Jet Suites TI - Revised WATER SUPPLY CURVE I 0 \\\\\\\ I \\\\\\\ \\\\\\\ 88+ \\\\\\ I * <-85.0 psi @ 1400 gpm I X Flow Test Point 80+ 72+ P 64+ R I E I S I 5 56+ U I R I E I 48+ ( I P I S I I 40+ ) I 32+ 24+ 16+ LEGEND I X = Required Water Supply I 83.20 psi @ 522.3 gpm 8+ I 0 = Available Water Supply 93.39 psi @ 522.3 gpm I, -----+------+--------+--------+---------+-----------+ 400 600 800 1000 1200 1400 1600 1800 2000 FLOW (GPM) Sketch to show connectivity only, no scale, no dimensions uly 13, 2005 02:00 PM Palomar Airport Building#1 Page: 2 GENERAL RESULTS Total Water Including Hose Additional Allowances Discharge from Sprinklers Source Hose Demand Average Imbalance Maximum Imbalance Maximum Velocity @ Pipe: 102 Maximum Fr. Loss © Pipe: 102 Average Density Remote Area was not Peaked Velocity pressures have been used for information only, and are not valid for balancing the system. 742.2 gpm 500.0 gpm 240.0 gpm 0.0 gpm 0.763 gpm 5.0 gpm 14.1 ftls 0.410 psi/ft 0.16 gpm/sq.ft Static Pressure 95.0 psi Residual Pressure • 85.0 psi Flow 1404.0 gpm Hose Allowance 0.0 gpm Available Pressure 91.9 psi Required Pressure 55.4 psi Safety Factor 39.8%, 36.6 psi Water Flowing 742.2 gpm OmniCADD Hydraulic Calculation Software v. 2.3 1-2S4 INSTALLATION OF SPRINKLER TEMS Seismic Bracing Calculations Sheet of 2. Project: Wi44R 'JL 4üi14 Contractor: Vt.LY Fi4- P1D Address: 9P AVTD T. Address: Im MI e WAY ftG' ?MMAP.. AsPJo 1-T 1V.. YMA M• '2O8 I At '2oj Telephone: 1W)- if.(, - &PM 'itOil Fax: Brace Information ii Seismic Brace Attachments Length of brace: 4'..t Structure attachment fitting or tension-only bracing system: Diameter of brace: Make: Ac&..i Model: IV OL ~eft brace: 4b of *t - -. Listed load rating 5Adjust ed load rating per 9 3 a 103: Type + o Angle of brace: 1 000 Sway brace (pipe attachment) fitting: Make: Model: 1000 _1D Least radius of gyration:* 0 O0 Listed load rating:'2cJ.Adjusted load rating per 9.3.5.10.34" L/R __________________________________________ value: Seismic Brace Assembly Detail Maximum horizontal load: 2,c0&Jc. (Provide detail on plans) ROD W/ NUT (2) Fastener Information SWAy BRACE Ci-MEN7 STEEL (AECON 28a) Orientation of connecting suace: Tvs sc NON-ThREAD SWAY BRACE FiTTING / Fastener: (FIG Bog) / / 1/2 x ST ROST W/ NUT _____ Type: l,4aO To r4i FAST CLAMP N SWAY BRACE ATTACHMENT N jJLU :no. oo BRACE AlEC Diameter: Length (in wood): Maximum load: 'zbcp L.& Brace identification no. (to be used on plans) DK Lateral brace LI Longitudinal brace - Sprinkler System Load Calculation [Ii, = W. (default is 0.5)] Diameter Type Length (if) Total (if) Weight per ft Total Weight " r(,i- f•:5jJ 4> 40 3 lb/ft j4 . ( lb _____ j.(o lb/ft lb L" O1,7ilM9 i 00 4 00 . D2.7 lb/ft 4c,11 lb lb/ft lb lb/ft lb Total weight 43.j lb F xl.15 48,.(, lb Excludes tension-only bracing systems C 2006 National Fire Protection Association NFPA 13 (p. 1 of 1) FIGURE A.9.3.5(a) Seismic Bracing Calculation Form. 2007 Edition Fire Protection Products Worldwide Contacts www.tyco-fire.com Series EC-8 - 80 K-factor Extended Coverage (Light Hazard) Pendent and Recessed Pendent Sprinklers General Description The Series EC-8 Extended Cover- age Pendent Sprinklers are decora- tive glass bulb sprinklers designed for use in light hazard occupancies. They are intended for use in automatic sprinkler systems designed in accor- dance with standard installation rules (e.g., NFPA 13) for a maximum cover- age area of 400 ft2 (37,2 m2), as com- pared to the maximum coverage area of 225 ft2 (20,6 m2) for standard cov- erage sprinklers used in light hazard occupancies. The recessed version of the EC-8, in- tended for use in areas with a finished ceiling, uses either the two-piece Style 30 or 40 Recessed Escutcheon. The Style 30 Recessed Escutcheon provides up to 1/2 inch (12,7 mm) of total adjustment from the flush pen- dent position, whereas, the Style 40 provides 3/4 inch (19,1 mm) of verti- cal adjustment from the flush pendent position. The adjustment provided by the Recessed Escutcheons reduces the accuracy to which the fixed pipe drops to the sprinklers must be cut. Corrosion resistant coatings, where applicable, are utilized to extend the life of copper alloy sprinklers beyond that which would otherwise be ob- tained when exposed to corrosive at- mospheres. Although corrosion resis- tant coated sprinklers have passed the standard corrosion tests of the ap- plicable approval agencies, the test- ing is not representative of all possible IMPORTANT Always refer to Technical Data Sheet TFP700 for the "INSTALLER WARNING" that provides cau- tions with respect to handling and installation of sprinkler sys- tems and components. Improp- er handling and installation can permanently damage a sprin- kler system or its components and cause the sprinkler to fail to operate in a fire situation or cause it to operate prematurely. Page 1 of 6 corrosive atmospheres. Consequent- ly, it is recommended that the end user be consulted with respect to the suitability of these corrosion resistant coatings for any given corrosive envi- ronment. The effects of ambient tem- perature, concentration of chemicals, and gas/chemical velocity, should be considered, as a minimum, along with the corrosive nature of the chemical to which the sprinklers will be exposed. I'I.)IL.I The Series EC-8 Extended Coverage Sprinklers described herein must be installed and maintained in compli- ance with this document, as well as with the applicable standards of the National Fire Protection Association, in addition to the standards of any oth- er authorities having jurisdiction. Fail- ure to do so may impair the perfor- mance of these devices. The owner is responsible for main- taining their fire protection system and devices in proper operating con- dition. Contact the installing contrac- tor or product manufacturer with any questions. Sprinkler Identification Number (SIN) TY4232 - Pendent, 8.0K TY4232 is a re-designation for C4232 Technical Data Approvals UL and C-UL Listed. FM Approved NYC Approved. (Refer to Table A for complete approv- al information including corrosion re- sistant status. The Approvals apply to the service conditions indicated in the Design Criteria section.) Maximum Working Pressure 175 psi (12,1 bar) DECEMBER 2014 Pipe Thread Connection 3/4 inch NPT Discharge Coefficients K=8.0 gpm/psi112 (115,2 1pm/bar1l2) Temperature Ratings 135°F (57°C) and 155°F (68°C) Finish Sprinkler: Refer to Table A Recessed Escutcheon: Natural Brass, Signal White, Chrome Plated Physical Characteristics Frame ............................Bronze Button............................Bronze Sealing Assembly ...........Beryllium Nickel w/TEFLON Bulb .....................Glass (3 mm dia.) Compression Screw ................Bronze Deflector...........................Brass TFP223 1FP223 Page 2 of 6 Components: 3/4' ESCUTCHEON PLATE 1 - Frame NPT** SEATING SURFACE 2 - Button 3 - Sealing Assembly 4 - Bulb 5 - Compression 2 2-1/8" Screw 3 (54,0 mm) 6 - Deflector * (12,7 mm) I I II * Temperature rating is 4NOMINAL 1-7 /16" indicated on Deflector. MAKE-IN (36,5 mm) ** Pipe thread connections per ISO 7-1 can be provided 6* on special request. FIGURE 1 SERIES EC-8 (TY4232) EXTENDED COVERAGE PENDENT SPRINKLER SPRINKLER FINISH (See Note 4) HAZARD TYPE TEMP. BULB LIQUID NATURAL I CHROME I POLYESTER* BRASS f PLATED Light Pendent 135°F (57°C) Orange 1,2,3,5 155°F (68°C) Red Refer to Table B for UL and C-UL Rec. Pendent 135°F (57°C) Orange Sensitivity Rating and wl Style 30 Esc. 1,2,3,5 155°F (68°C) Red Refer to Table C for FM Sensitivity Rating Rec. Pendent 135°F (57°C) Orange 1,2,5 155°F (68°C) Red w/Style 40 Esc. NOTES: Listed by Underwriters Laboratories, Inc. (UL). Listed by Underwriters Laboratories, Inc. for use in Canada (C-UL). Approved by Factory Mutual Research Corporation (FM). Where Polyester Coated Sprinklers are noted to be UL and C-UL Usted, the sprinklers are UL and C-UL Listed as Corrosion Resistant Sprinklers. Approved by the City of New York under MEA 113-04-E. *Frame and Deflector only. TABLE A LABORATORY LISTINGS AND APPROVALS (Refer to the Design Criteria Section) Operation The glass bulb contains a fluid that ex- pands when exposed to heat. When the rated temperature is reached, the fluid expands sufficiently to shatter the glass bulb, allowing the sprinkler to activate and flow water. Design Criteria The Series EC-8 Extended Cover- age Pendent Sprinklers must only be installed in accordance with the ap- plicable UL and C-UL Listing or FM Approval requirements as indicated below. Only the Style 30 or 40 Re- cessed Escutcheon is to be used for recessed installation, as applicable (Ref. Table A, B, and C). UL and C-UL Listing Requirements The Series EC-8 Sprinklers may be used for the coverage areas shown in Table D, based on maintaining the minimum specified flow rate as a function of coverage area and hazard group for all of the sprin- klers in the design area. With respect to heat sensitivity, the Series EC-8 Sprinklers can be used with unobstructed construction consisting of flat, smooth ceilings (including bar joists) with a maxi- mum pitch of one in six as defined and permitted by NFPA 13. The minimum allowable spacing between the Series EC-8 Sprin- klers, to prevent cold soldering, is 8 ft. (2,4 m). The Series EC-8 Sprinklers are to be installed in accordance with all other requirements of NFPA 13 for extended coverage pendent sprinklers. FM Approval Requirements The Series EC-8 Extended Coverage Sprinklers are to be installed in ac- cordance with the applicable Factory Mutual Loss Prevention Data Sheet. Information provided in the FM Loss Prevention Data Sheet relate to, but are not limited to, hydraulic design, ceiling slope and obstructions, mini- mum and maximum allowable spac- ing, and deflector-to-ceiling distance. TFP223 Page 3 of 6 Area Style 135°F (57°C) 155°F (68°C) 16x16 Pendent OR QR 16 x 16 Style 30 Recessed OR OR 16 x 16 Style 40 Recessed OR OR 18x18 - Pendent OR OR 18 x 18 Style 30 Recessed OR SR 18 x 18 Style 40 Recessed QR SR 20 x 20 Pendent OR SR 20 x 20 Style 30 Recessed OR SR 20 x 20 Style 40 Recessed SR SR OR: Quick Response SR: Standard Response TABLE B SENSITIVITY RATING FOR UL AND C-UL LISTING OF SERIES EC-8 SPRINKLERS Area Style 135°F (57°C) 155°F (68°C) 16x16 Pendent OR OR 16x16 Style 30 Recessed OR N/A 16 x 16 Style 40 Recessed N/A N/A 18x18 Pendent OR OR 18 x 18 Style 30 Recessed OR N/A 18 x 18 Style 40 Recessed N/A N/A 20 x 20 Pendent OR OR 20 x 20 Style 30 Recessed OR N/A 20 x 20 Style 40 Recessed N/A N/A OR: Quick Response SR: Standard Response N/A: Not Applicable TABLE C SENSITIVITY RATING FOR FM APPROVAL OF SERIES EC-8 SPRINKLERS I Description I Area GPM I PSI I I TY4232 (K=8.0) Pendent 16x16 I 26 10.6 18 x 18 I i I 17.0 I 20x20 40 25.0 1 ft = 0.3048 m 1 ft2 = 0.093 m2 1 gpm = 3.785 1pm 1 psi = 0.06895 bar 1 gpm/ft2 = 40.74 mm/mm TABLE D FLOW CRITERIA FOR UL AND C-UL LISTING OF SERIES EC-8 SPRINKLERS Installation The Series EC-8 Sprinklers must be installed in accordance with this section. General Instructions Do not install any bulb type sprinkler if the bulb is cracked or there is a loss of liquid from the bulb. With the sprin- kler held horizontally, a small air bub- ble should be present. The diameter of the air bubble is approximately 1/16 inch (1,6 mm). A leak tight 3/4 inch NPT sprinkler joint should be obtained with a torque of 10 to 20 ft.-lbs. (13,4 to 26,8 Nm). Higher levels of torque may distort the sprinkler inlet with consequent leak- age or impairment of the sprinkler. Do not attempt to compensate for in- sufficient adjustment of an escutch- eon plate by under-or over-tightening the sprinkler. Re-adjust the position of the sprinkler fitting to suit. Step 1. The sprinkler must be in- stalled with the deflector parallel to the mounting surface. Pendent sprin- klers must be installed in the pendent position. Step 2. After installing the Style 30 or 40 mounting plate (or other escutch- eon, as applicable) over the sprinkler pipe threads, and with pipe thread sealant applied to the pipe threads, hand tighten the sprinkler into the sprinkler fitting. Step 3. Wrench tighten pendent sprin- klers using only the W-Type 3 (End A) Sprinkler Wrench. Wrench tighten the recessed pendent sprinklers using only the W-Type 23 Sprinkler Wrench. The wrench recess of the applicable sprinkler wrench (Ref. Figures 4 and 5) is to be applied to the sprinkler wrench flats (Ref. Figure 1). TFP223 Page 4 of 6 Care and Maintenance The Series EC-8 Sprinklers must be maintained and serviced in accor- dance with this section. Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, permission to shut down the affected fire protection systems must be obtained from the proper au- thorities and all personnel who may be affected by this action must be notified. Sprinklers that are found to be leaking or exhibiting visible signs of corrosion must be replaced. Automatic sprinklers must never be painted, plated, coated, or other- wise altered after leaving the factory. Modified sprinklers must be replaced. Sprinklers that have been exposed to corrosive products of combustion, but have not operated, should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush. Care must be exercised to avoid dam- age to the sprinklers before, during, and after installation. Sprinklers dam- aged by dropping, striking, wrench twist/slippage, or the like, must be replaced. Also, replace any sprinkler that has a cracked bulb or that has lost liquid from its bulb. (Ref. Installa- tion Section.) Frequent visual inspections are rec- ommended to be initially performed for corrosion resistant coated sprin- klers, after the installation has been completed, to verify the integrity of the "FITTING SIDE" TOWARDS SPRINKLER FITTING /\ WRENCH RECESS / (END "A") FIGURE 4 W-TYPE 3 SPRINKLER WRENCH WRENCH RECESS - 0 Lii ( FIGURE 5 W-TYPE 23 RECESSED SPRINKLER WRENCH corrosion resistant coating. Thereaf- ter, annual inspections per NFPA 25 should suffice; however, instead of in- specting from the floor level, a random sampling of close-up visual inspec- tions should be made, so as to better determine the exact sprinkler condi- tion and the long term integrity of the corrosion resistant coating, as it may be affected by the corrosive condi- tions present. The owner is responsible for the in- spection, testing, and maintenance of their fire protection system and de- vices in compliance with this docu- ment, as well as with the applicable standards of the National Fire Pro- tection Association (e.g., NFPA 25), in addition to the standards of any oth- er authorities having jurisdiction. The installing contractor or sprinkler man- ufacturer should be contacted relative to any questions. It is recommended that automatic sprinkler systems be inspected, test- ed, and maintained by a qualified In- spection Service in accordance with local requirements and/or national codes. - 2-7/8" DIA. - - 7/16±1/8" (73,0 mm) 1/2" (12,7 mm) (11,1±3,2 mm) 2-1/4" DIA. 1/4" (6,4 mm) I FACE OF (57,2 mm) SPRINKLER FITTING (3,2 mm) MOUNTING / MOUNTING SURFACE / PLATE CLOSURE 1-5/16" (33,3 mm) 1-1/16" (27,0 mm) FIGURE 2 SERIES EC-8 RECESSED PENDENT SPRINKLER ASSEMBLY WITH TWO-PIECE 1/2 INCH TOTAL ADJUSTMENT STYLE 30 RECESSED ESCUTCHEON - 2-7/8" DIA. - 9/16±1/4" (73,0 mm) 3/4"(19,1 mm) (14,3±6,4 mm) 2-1/4° DIA. 1/4"(6,4 mm) — FACE OF (57,2 mm) -1 1/8" FITTING SPRINKLER L, (3,2 mm) UN t / MOUNTING j SURFACE _ CLOSURE 6"(33,m) 13/16"(20,6 mm) FIGURE 3 SERIES EC-8 RECESSED PENDENT SPRINKLER ASSEMBLY WITH TWO-PIECE 3/4 INCH TOTAL ADJUSTMENT STYLE 40 RECESSED ESCUTCHEON 1FP223 Page 5 of 6 Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com. Ordering Procedure Contact your local distributor for avail- ability. When placing an order, indi- cate the full product name and Part Number (P/N). Sprinkler Assemblies with NPT Thread Connections Specify: Series EC-8 (TY4232), K=8.0, Extended Coverage (Light Hazard) Pendent Sprinkler, (specify) tem- perature rating, (specify) finish, P/N (specify): 135-F (57-C) Natural Brass.............PSN 50-801-1-135 Signal White (RAL9003) Polyester ................PSN 50-801-4-135 Chrome Plated............PSN 50-801-9-135 155°F (68°C) Natural Brass.............PSN 50-801-1-155 Signal White (RAL9003) Polyester ................PSN 50-801-4-155 Chrome Plated............PSN 50-801-9-155 Recessed Escutcheon Specify: Style (30 or 40) Recessed Es- cutcheon with (specify) finish, P/N (specify*) *Refer to Technical Data Sheet TFP770 Sprinkler Wrench Specify: W-Type 3 Sprinkler Wrench, P/N 56-895-1-001 Specify: W-Type 23 Recessed Sprin- kler Wrench, P/N 56-000-6-838 TFP223 Page 6 of 6 GLOBAL HEADQUARTERS 11400 Pennbrook Parkway, Lansdale, PA 194461 Telephone +1-215-362-0700 Copyright © 2014 Tyco Fire Products, LP. All rights reserved. tqco TEFLON is trademark of The DuPont Corporation Fire Protection Products Fire Protection Products Worldwide I Contacts J www.tyco-fire.com Series TY-FRB, 5.6 K-factor Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description The TYCO Series TY-FRB, 5.6 K-factor, Upright (1Y313) and Pendent (1Y323) Sprinklers described in this data sheet are quick response, standard coverage, decorative 3 mm glass bulb-type spray sprinklers designed for use in light or ordinary hazard, commercial occupan- cies such as banks, hotels, and shop- ping malls. The recessed version of the Series TY- FRB Pendent Sprinkler, where applica- ble, is intended for use in areas with a finished ceiling. This recessed pendent sprinkler uses one of the following: A two-piece Style 15 Recessed Escutcheon with recessed adjust- ment up to 5/8 inch (15,9 mm) from the flush pendent position. A two-piece Style 20 Recessed Escutcheon with recessed adjust- ment up to 1/2 inch (12,7 mm) from the flush pendent position. The adjustment provided by the Recessed Escutcheon reduces the accuracy to which the fixed pipe drops to the sprinklers must be cut. Intermediate level versions of Series TY-FRB Sprinklers are described in Technical Data Sheet TFP357. Sprin- kler guards and shields are described in Technical Data Sheet TFP780. IMPORTANT Always refer to Technical Data Sheet TFP 700 for the "INSTALLER WARNING" that provides cautions with respect to handling and instal- lation of sprinkler systems and com- ponents. Improper handling and installation can permanently dam- age a sprinkler system or its compo- nents and cause the sprinkler to fall to operate in a fire situation or cause it to operate prematurely. Page 1 of 4 Lo TICE The TYCO Series TY-FRB Sprinklers described herein must be installed and maintained in compliance with this doc- ument, as well as with the applicable standards of the National Fire Protec- tion Association, in addition to the stan- dards of any other authorities having jurisdiction. Failure to do so may impair the performance of these devices. The owner is responsible for maintain- ing their fire protection system and devices in proper operating condition. The installing contractor or sprinkler manufacturer should be contacted with any questions. Sprinkler Identification Number (SIN) TY313 .......Upright 5.6K, 1/2 NPT 1Y323 ......Pendent 5.6K, 1/2 NPT Technical Data Approvals UL and C-UL Listed FM, LPCB, and VdS Approved CE Certified Sprinklers with Polyester Finish are UL and C-UL Listed as Corrosion-Resis- tant Sprinklers. Maximum Working Pressure 175 psi (12.1 bar) 250 psi (17.2 bar)* *The maximum working pressure of 250 psi (17.2 bar) only applies to the listing by Un- derwriters Laboratories, Inc. (UL). Discharge Coefficient K=5.6 GPM/psi112 (80,6 LPM/bar112) FEBRUARY 2014 Temperature Rating 1350 F (57°C) 155°F (68°C) 175°F (79°C) 200°F (93°C) 286°F (141°C) Finishes Sprinkler: Refer to Table A Recessed Escutcheon: White Coated, Chrome Plated, or Brass Plated Physical Characteristics Frame ...................Bronze Button..............Brass/Copper Sealing Assembly.........Stainless Steel w/TEFLON Bulb ......................Glass Compression Screw........Bronze Deflector.................Bronze TFPI72 TFPI72 Page 2 of 4 Components: * Temperature rating is ** Pipe thread connections per ISO 7-1 1 - Frame 4 - Bulb indicated on Deflector. can be provided on special request. 2 - Button 5 - Compression STYLE 15 or 20 3 - Sealing Screw ESCUTCHEON PLATE 1/2' 7/16 (11,1 mm) RECESSED Assembly 6 - Deflector* DEFLECTOR * SEATING SURFACE NPT** NOMINAL MAKE-IN ESCUTCHEON * 6 _______ 1 7/16' ______ ________ : NOMINAL 2 (11,1 mm) (50,8 mm) 2' MAKE-IN _____ (50,8 mm) (34 '9 13 ________ wF Fl 1/2 NPT** DEFLECTOR * i...- 2-7/8' (73,0 mm) DIA. CROSS SECTION UPRIGHT PENDENT RECESSED PENDENT FIGURE 1 SERIES TY-FRB UPRIGHT (TY313) AND PENDENT (7Y323) SPRINKLERS 5.6 K-FACTOR, 1/2 INCH NPT, QUICK RESPONSE / RENCH RECESS (USE ONLY FIGURE 2 W-TYPE 6 SPRINKLER WRENCH WRENCH RECESS PUSH WRENCH IN TO ENSURE ENGAGEMENT WITH SPRINKLER WRENCHING AREA FIGURE 3 W-TYPE 7 RECESSED SPRINKLER WRENCH Operation The glass bulb contains a fluid which expands when exposed to heat. When the rated temperature is reached, the fluid expands sufficiently to shatter the glass bulb, allowing the sprinkler to activate and water to flow. Design Criteria The TYCO Series TY-FRB, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers are intended for fire protec- tion systems designed in accordance with the standard installation rules rec- ognized by the applicable Listing or Approval agency (such as, UL Listing is based on the requirements of NFPA 13, and FM Approval is based on the requirements of FM's Loss Prevention Data Sheets). Only the Style 15 or Style 20 Recessed Escutcheon is to be used for recessed pendent installations. Installation The TYCO Series TY-FRB, 5.6 K-factor, Upright (TY313) and Pendent (TY323) Sprinklers must be installed in accor- dance with this section. General Instructions Do not install any bulb-type sprinkler if the bulb is cracked or there is a loss of liquid from the bulb. With the sprin- kler held horizontally, a small air bub- ble should be present. The diameter of the air bubble is approximately 1/16 inch (1,6 mm) for the 135°F (57°C) and 3/32 inch (2,4 mm) for the 286°F (141°C) temperature ratings. A leak-tight 1/2 inch NPT sprinkler joint should be obtained by applying a min- imum to maximum torque of 7 to 14 ft.-lbs. (9,5 to 19,0 Nm). Higher levels of torque can distort the sprinkler Inlet with consequent leakage or impairment of the sprinkler. Do not attempt to compensate for insufficient adjustment in the Escutch- eon Plate by under- or over-tightening the sprinkler. Re-adjust the position of the sprinkler fitting to suit. Upright and Pendent Sprinklers The Series TY-FRB Upright and Pen- dent Sprinklers must be installed in accordance with the following instructions. Step 1. Install Pendent sprinklers in the pendent position. Install upright sprin- klers in the upright position. Step 2. With pipe-thread sealant applied to the pipe threads, hand- tighten the sprinkler into the sprinkler fitting. TFPI72 Page 3 of 4 Step 3. Tighten the sprinkler into the sprinkler fitting using only the W-Type 6 Sprinkler Wrench (Figure 2). With ref- erence to Figure 1, apply the W-Type 6 Sprinkler Wrench to the wrench flats. Torque sprinklers 7 to 14 ft-lbs. (9,5 to 19,0 Nm). Recessed Pendent Sprinklers The Series TY-FRB Recessed Pendent Sprinklers must be installed in accor- dance with the following instructions. Step A. After installing the Style 15 or Style 20 Mounting Plate over the sprin- kler threads, and with pipe-thread sealant applied to the pipe threads, hand-tighten the sprinkler into the sprinkler fitting. Step B. Tighten the sprinkler into the sprinkler fitting using only the W-Type 7 Recessed Sprinkler Wrench (Figure 3). With reference to Figure 1, apply the W-Type 7 Recessed Sprinkler Wrench to the sprinkler wrench flats. Torque sprinklers 7 to 14 ft.-lbs. (9,5 to 19,0 Nm). Step C. After ceiling installation and fin- ishing, slide on the Style 15 or Style 20 Closure over the Series TY-FRB Sprin- kler and push the Closure over the Mounting Plate until its flange comes in contact with the ceiling. Care and Maintenance The TYCO Series TY-FRB, 5.6 K-factor, Upright (1Y313) and Pendent (1Y323) Sprinklers must be maintained and ser- viced in accordance with this section. Before closing a fire protection system main control valve for maintenance work on the fire protection system that it controls, obtain permission to shut down the affected fire protection systems from the proper authorities and notify all personnel who may be affected by this action. Absence of the outer piece of an escutcheon, which is used to cover a clearance hole, can delay sprinkler operation in a fire situation. The owner must assure that the sprin- klers are not used for hanging any objects and that the sprinklers are only cleaned by means of gently dusting with a feather duster; otherwise, non- operation in the event of a fire or inad- vertent operation may result. Sprinklers which are found to be leak- ing or exhibiting visible signs of corro- sion must be replaced. Automatic sprinklers must never be painted, plated, coated, or other- wise altered after leaving the factory. Modified sprinklers must be replaced. Sprinklers that have been exposed to corrosive products of combustion, but have not operated, should be replaced if they cannot be completely cleaned by wiping the sprinkler with a cloth or by brushing it with a soft bristle brush. Care must be exercised to avoid dam- age to the sprinklers before, during, and after installation. Sprinklers damaged by dropping, striking, wrench twist/ slippage, or the like, must be replaced. Also, replace any sprinkler that has a cracked bulb or that has lost liquid from its bulb. (Ref. Installation Section.) The owner is responsible for the inspection, testing, and maintenance of their fire protection system and devices in compliance with this document, as well as with the applicable standards of the National Fire Protection Associa- tion (e.g., NFPA 25), in addition to the standards of any other authorities hav- ing jurisdiction. Contact the installing contractor or sprinkler manufacturer regarding any questions. Automatic sprinkler systems are rec- ommended to be inspected, tested, and maintained by a qualified Inspec- tion Service in accordance with local requirements and/or national codes. 2-7/8 DIA. (73,0 mm) 2-1/4' DIA. FACE OF (57,2 mm) SPRINKLER FITTING 5/8"(15,9 mm) \ ____ ___________ __________ FLUSH 3/8±5/16 (9,5±7,9 mm) l/8°J I I'- MOUNTING SURFACE ______ _______ (3,2 mm) CLOSURE SERIES MOUNTING 1-3/8' (34,9 mm) TY-FRB PLATE 3/4" (19,1 mm) FIGURE 4 SERIES TY-FRB RECESSED PENDENT SPRINKLER ASSEMBLY (TY323) WITH TWO PIECE 5/8 INCH TOTAL ADJUSTMENT STYLE 15 RECESSED ESCUTCHEON 2-7/8' DIA. (73,0 mm) FACE OF SPRINKLER - 2-1/4° DIA. FITTING (57,2 mm) 1/2'(12,7 mm) (7,9±6,4 mm) ______ I b FLUSH ___ MOUNTING / 1/8' J SURFACE/ \ (3,2 mm) CLOSURE SERIES MOUNTING 1-3/8'(34,9 mm) TYFRB PLATE 7/8' (22,2 mm) FIGURE 5 SERIES 77-FRB RECESSED PENDENT SPRINKLER ASSEMBLY (TY323) WITH TWO PIECE 1/2 INCH TOTAL ADJUSTMENT STYLE 20 RECESSED ESCUTCHEON TFPI72 Page 4 of 4 P/N* 77-XXX-X-XXX SPRINKLER I TEMPERATURE FINISH RATINGS SIN 1 NATURAL BRASS I 370 I 5.6K UPRIGHT (1/2 NPT) PURE WHITE (RAL9010)' POLYESTER 371 5.6K PENDENT (1/2 NPT) TY323 4 SIGNAL WHITE (RAL9003) 175 175-F (79-C) POLYESTER Use suffix "I" for ISO 7-1 connection; 9 CHROME PLATED 200 200-F (93-C) for example, 77-370-4-175-I Eastern Hemisphere sales only TABLE A SERIES TY-FRB UPRIGHT AND PENDENT SPRINKLERS PART NUMBER SELECTION 135 135*F (57°C) 155 155°F (68°C) 286 286°F (141°C) Limited Warranty For warranty terms and conditions, visit www.tyco-fire.com. Ordering Procedure Contact your local distributor for avail- ability. When placing an order, indicate the full product name and Part Num- ber (P/N). Sprinkler Assemblies with NPT Thread Connections Specify. Series TV-FRB Uptight or Pen- dent (specify) Sprinkler, SIN (specify), K=5.6, Quick Response, (specify) tem- perature rating, (specify) finish, P/N (specify, refer to Table A). Recessed Escutcheon Specify: Style 15 Recessed Escutcheon with (specify*) finish, P/N (specify*) Specify: Style 20 Recessed Escutch- eon with (specifyl finish, P/N (specify*) * Refer to Technical Data Sheet TFP770 Sprinkler Wrench Specify: W-Type 6 Sprinkler Wrench, P/N 56-000-6-387 Specify W-Type 7 Sprinkler Wrench, P/N 56-850-4-001 GLOBAL HEADQUARTERS 1 1400 Pennbrook Parkway, Lansdale, PA 194461 Telephone +1-215-362-0700 Copyright 02014 Tco Fire Products, LP. All rights reserved. tqco TEFLON is trademark of The DuPont Corporation. Fire Protection Products