PERMIT REPORT Carlsbad
Print Date: 03/22/2022 Permit No: FPC2018-0091
Job Address: 5540 FERMI CT, CARLSBAD, CA 92008-7325 Status: Closed - Finaled
Permit Type: FIRE-Construction Commercial Work Class: Fire Sprinklers
Parcel #: 2121305100 Track #: Applied: 03/15/2018
Valuation: $179,063.50 Lot #: Issued: 03/23/2018
Occupancy Group: Project #: Finaled Close Out: 02/23/2021
#of Dwelling Units: Plan #:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check #: Inspector:
Plan Check #: Final Inspection:
Project Title:
Description: ADIDAS PHASE 2- SPRINKLER TI (36 HEADS) -REVISION #2 (47 HEADS)
Applicant: CoApplicant:
A & D FIRE SPRINKLER INC A & D FIRE SPRINKLERS INC
DEVIN KRENZ 7130 CONVOY CT
7130 CONVOY CT SAN DIEGO, CA 92111-1019
SAN DIEGO, CA 92111-1019 (858) 277-3473
(858) 277-3473
FEE AMOUNT
FIRE Expedited Plan Review Per Hour - Office Hours $132.00
FIRE Expedited Plan Review Per Hour - Office Hours $132.00
FIRE NFPA 13 or 13R System 7 - 100 heads $536.00
FIRE Reinspection (per inspection) $187.00
Total Fees: $987.00 Total Payments To Date: $987.00 Balance Due: $0.00
Fire Department Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov
FIRE SPRINKLERS INC.
Adidas Phase Two
5540Fermi Court
Carlsbad, CA 92008
FIRE SPRINKLER SUBMITTAL
HYDRAULIC CALCULATIONS
** Materials of equal design, utility, and performance may be substituted for submitted materials so as to avoid delays in
the construction schedule and shall be deemed accepted by the Purchaser.
FIRE SPRINKLERS INC.
A&D FIRE SPRINKLERS INC.
7130 CONVOY COURT
SAN DIEGO, CA 92111
858-277-3473
Job Name : ADIDAS PHASE 2
Building
Location
System
Contract
Data File : PROOF CALC FOR NEW PRESENTATION & SHOWROOM.WXF
Computer Programs by Hydratec Inc. Revision: 50.52.1
Water Supply Curve C
A&D FIRE SPRINKLERS INC. Page
ADIDAS PHASE 2 Date
City Water Supply: Demand:
Cl - Static Pressure : 126 Dl - Elevation : 5.739
C2 - Residual Pressure: 114 D2 - System Flow :471.695
C2 - Residual Flow : 2950 D2 - System Pressure :122.486
Hose ( Demand) :250
D3 - System Demand : 721.695
Safety Margin : 2.627
150
140
130
_____
p120
ID3
R 11
E10°
s90
80
u70
R6°
E5°
40
30
20
ssi_.I I
10
I I
300 600 900 1200 1500 1800 2100 2400 2700
FLOW (N " 1.85)
Computer Programs by Hydratec Inc. Revision: 50.52.1
Fittings Used Summary
A&D FIRE SPRINKLERS INC.
ADIDAS PHASE 2
-----------------------------------------------------------------------
Fitting Legend
Abbrev. Name
E NFPA 13 90' Standard Elbow
F NFPA 13 45' Elbow
L NFPA 13 Long Turn Elbow
T NFPA 13 90' Flow thru Tee
Page 2
Date
1/2 % 1 11/4 1% 2 21/2 3 31/2 4 5 6 8 10 12 14 16 18 20 24
1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61
1 1 1 1 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28
0.5 1 2 2 2 3 4 5 5 6 8 9 13 16 18 24 27 30 34 40
3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121
Unit Summary
Diameter Units
Length Units
Flow Units
Pressure Units
Inches
Feet
US Gallons per Minute
Pounds per Square Inch
Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters.
Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors
of 120 except as noted with . The fittings marked with a * show equivalent lengths values
supplied by manufacturers based on specific pipe diameters and CFactors and they require no
adjustment. All values for fittings not marked with a * will be adjusted in the calculation
for CFactors of other than 120 and diameters other than Sched 40 per NFPA.
Computer Programs by Hydratec Inc. Revision: 50.52.1
Pressure / Flow Summary - STANDARD
A&D FIRE SPRINKLERS INC. Page 3
ADIDAS PHASE 2 Date
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Rea.
1 14.25 5.6 7.01 na 14.83 0.15 48 7.0
2 13.75 7.41 na
3 13.75 8.08 na
4 13.75 8.56 na
5 13.75 8.76 na
6 13.75 10.71 na
7 13.75 12.98 na
8 13.75 14.21 na
9 13.75 15.94 na
10 13.75 34.02 na
11 12.0 43.94 na
12 12.0 48.37 na
13 12.0 55.13 na
14 12.0 59.65 na
15 12.0 62.6 na
16 12.0 64.65 na
17 12.0 65.83 na
18 12.0 66.37 na
19 12.0 66.53 na
20 13.75 66.63 na
21 13.75 95.85 na
22 12.0 97.47 na
23 12.0 97.62 na
24 12.0 98.17 na
25 12.0 99.35 na
26 12.0 101.4 na
27 12.0 105.97 na
TOR 12.0 106.7 na
BOR 1.0 112.01 na
UGI -3.0 113.77 na
UG2 -3.0 113.95 na
BF1 3.0 111.39 na
BF2 3.0 120.4 na
UG3 -3.0 123.04 na
UG4 -3.0 123.91 na
SOR 1.0 122.49 na 250.0
28 9.0 5.6 8.46 na 16.29 0.15 99 7.0
29 13.75 8.11 na
30 13.75 8.13 na
31 13.75 8.91 na
32 13.75 9.44 na
33 13.75 83.95 na
34 12.0 87.55 na
35 12.0 89.2 na
36 12.0 92.51 na
37 12.0 96.8 na
38 9.0 5.6 8.96 na 16.77 0.15 35 7.0
39 13.75 8.08 na
40 14.25 5.6 7.0 na 14.82 0.15 72 7.0
41 13.75 7.4 na
42 9.0 5.6 9.54 na 17.3 0.15 56 7.0
43 14.25 5.6 7.39 na 15.22 0.15 80 7.0
44 13.75 7.8 na
45 9.0 5.6 9.7 na 17.44 0.15 38 7.0
46 14.25 5.6 8.17 na 16.01 0.15 79 7.0
47 13.75 8.6 na
48 14.25 5.6 9.31 na 17.08 0.15 80 7.0
49 13.75 9.77 na
50 9.0 5.6 13.34 na 20.45 0.15 38 7.0
51 9.0 5.6 13.61 na 20.66 0.15 96 7.0
52 14.25 5.6 14.0 na 20.95 0.15 80 7.0
53 13.75 14.57 na
Computer Programs by Hydratec Inc. Revision: 50.52.1
Flow Summary - Standard
A&D FIRE SPRINKLERS INC. Page 4
ADIDAS PHASE 2 Date
Node Elevation K-Fact Pt Pn Flow Density Area Press
No. Actual Actual Req.
54 14.25 5.6 21.67 na 26.07 0.15 54 7.0
55 13.75 23.05 na
56 13.75 23.25 na
57 13.75 24.52 na
58 13.75 27.8 na
59 13.75 37.4 na
60 12.0 43.03 na
61 14.25 5.6 21.74 na 26.11 0.15 81 7.0
62 13.75 23.12 na
63 13.75 24.11 na
64 13.75 84.08 na
65 12.0 87.12 na
66 14.25 5.6 21.85 na 26.18 0.15 90 7.0
67 14.25 5.6 22.68 na 26.67 0.15 89 7.0
68 14.25 5.6 23.07 na 26.9 0.15 90 7.0
69 14.25 5.6 26.19 na 28.66 0.15 91 7.0
70 9.0 5.6 37.54 na 34.31 0.15 103 7.0
71 13.75 41.35 na
72 13.75 42.03 na
73 13.75 86.75 na
74 9.0 5.6 37.75 na 34.41 0.15 96 7.0
75 13.75 41.58 na
76 13.75 46.24 na
77 9.0 5.6 38.14 na 34.58 0.15 85 7.0
78 13.75 55.41 na
79 13.75 90.71 na
80 13.75 59.92 na
81 13.75 95.01 na
82 13.75 62.92 na
83 13.75 99.56 na
84 13.75 64.86 na
85 13.75 97.62 na
86 13.75 65.97 na
87 13.75 96.51 na
88 13.75 66.49 na
89 13.75 95.99 na
The maximum velocity is 29.11 and it occurs in the pipe between nodes 9 and 10
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams - 2007
A&D FIRE SPRINKLERS INC. Page 5
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. 11G.or Ftngs Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
1 14.83 1.083 E 2.336 0.500 7.010 K Factor =5.60
to 120.0 0.0 2.336 0.217
2 14.83 0.0642 0.0 2.836 0.182 Vel = 5.17
2 0.0 1.083 T 5.84 4.670 7.409
to 120.0 0.0 5.840 0.0
3 14.83 0.0640 0.0 10.510 0.673 Vel = 5.17
3 9.19 1.38 0.0 10.000 8.082
to 120.0 0.0 0.0 0.0
4 24.02 0.0480 0.0 10.000 0.480 Vel = 5.15
4 15.23 1.38 0.0 1.630 8.562
to 120.0 0.0 0.0 0.0
5 39.25 0.1190 0.0 1.630 0.194 Vel = 8.42
5 17.29 1.38 0.0 8.330 8.756
to 120.0 0.0 0.0 0.0
6 56.54 0.2341 0.0 8.330 1.950 Vel = 12.13
6 17.09 1.38 0.0 5.950 10.706
to 120.0 0.0 0.0 0.0
7 73.63 0.3815 0.0 5.950 2.270 Vel = 15.79
7 20.45 1.38 0.0 2.050 12.976
to 120.0 0.0 0.0 0.0
8 94.08 0.6005 0.0 2.050 1.231 Vel = 20.18
8 20.66 1.38 0.0 2.000 14.207
to 120.0 0.0 0.0 0.0
9 114.74 0.8670 0.0 2.000 1.734 Vel = 24.61
9 20.96 1.38 1 6.0 9.290 15.941
to 120.0 0.0 6.000 0.0
10 135.7 1.1821 0.0 15.290 18.075 Vel = 29.11
10 0.0 1.38 T 6.0 1.750 34.016
to 120.0 0.0 6.000 0.758
11 135.7 1.1822 0.0 7.750 9.162 Vel= 29.11
11 96.44 2.157 0.0 12.240 43.936
to 120.0 0.0 0.0 0.0
12 232.14 0.3626 0.0 12.240 4.438 Vel = 20.38
12 48.76 2.157 0.0 13.100 48.374
to 120.0 0.0 0.0 0.0
13 280.9 0.5160 0.0 13.100 6.760 Vel = 24.66
13 -41.84 2.157 0.0 11.790 55.134
to 120.0 0.0 0.0 0.0
14 239.06 0.3828 0.0 11.790 4.513 Vel = 20.99
14 -41.71 2.157 0.0 11.000 59.647
to 120.0 0.0 0.0 0.0
15 197.35 0.2685 0.0 11.000 2.954 Vel = 17.33
15 42.70 2.157 0.0 11.980 62.601
to 120.0 0.0 0.0 0.0
16 154.65 0.1710 0.0 11.980 2.049 Vel= 13.58
16 -40.19 2.157 0.0 12.000 64.650
to 120.0 0.0 0.0 0.0
17 114.46 0.0980 0.0 12.000 1.176 Vel = 10.05
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 6
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
17 -38.70 2.157 0.0 12.000 65.826
to 120.0 0.0 0.0 0.0
18 75.76 0.0458 0.0 12.000 0.549 Vel = 6.65
18 -37.98 2.157 0.0 12.000 66.375
to 120.0 0.0 0.0 0.0
19 37.78 0.0126 0.0 12.000 0.151 Vel = 3.32
19 0.0 1.38 T 6.0 1.750 66.526
to 120.0 0.0 6.000 -0.758
20 37.78 0.1110 0.0 7.750 0.860 Vel = 8.10
20 0.0 1.38 2T 12.0 251.210 66.628
to 120.0 0.0 12.000 0.0
21 37.78 0.1110 0.0 263.210 29.224 Vel = 8.10
21 0.0 1.38 1 6.0 1.750 95.852
to 120.0 0.0 6.000 0.758
22 37.78 0.1110 0.0 7.750 0.860 Vel = 8.10
22 0.0 2.157 0.0 12.000 97.470
to 120.0 0.0 0.0 0.0
23 37.78 0.0126 0.0 12.000 0.151 Vel = 3.32
23 37.98 2.157 0.0 12.000 97.621
to 120.0 0.0 0.0 0.0
24 75.76 0.0458 0.0 12.000 0.549 Vel = 6.65
24 38.70 2.157 0.0 12.000 98.170
to 120.0 0.0 0.0 0.0
25 114.46 0.0980 0.0 12.000 1.176 Vel = 10.05
25 40.19 2.157 0.0 11.980 99.346
to 120.0 0.0 0.0 0.0
26 154.65 0.1710 0.0 11.980 2.049 VeI= 13.58
26 42.70 2.157 T 12.307 4.740 101.395
to 120.0 0.0 12.307 0.0
27 197.35 0.2685 0.0 17.047 4.577 Vel = 17.33
27 274.35 4.26 0.0 14.930 105.972
to 120.0 0.0 0.0 0.0
TOR 471.7 0.0490 0.0 14.930 0.731 VeI= 10.62
TOR 0.0 4.26 0.0 11.000 106.703
to 120.0 0.0 0.0 4.764
BOR 471.7 0.0490 0.0 11.000 0.539 Vel = 10.62
BOR 0.0 8.39 L 22.054 4.000 112.006
to 140.0 0.0 22.054 1.732
UGI 471.7 0.0013 0.0 26.054 0.035 Vel = 2.74
UG1 0.0 7.98 2L 39.264 78.250 113.773
to 150.0 0.0 39.264 0.0
UG2 471.7 0.0015 0.0 117.514 0.179 Vel = 3.03
UG2 0.0 8.39 L 22.054 6.000 113.952
to 140.0 0.0 22.054 -2.599
BF1 471.7 0.0014 0.0 28.054 0.039 Vel = 2.74
BFI 0.0 8.249 0.0 6.000 111.392
to 120.0 0.0 0.0 9.000 * Fixed Loss = 9
BF2 471.7 0.0020 0.0 6.000 0.012 Vel = 2.83
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 7
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
BF2 0.0 8.39 L 22.054 6.000 120.404
to 140.0 0.0 22.054 2.599
UG3 471.7 0.0013 0.0 28.054 0.037 Vel = 2.74
UG3 0.0 7.98 T 52.855 450.667 123.040
to 150.0 2L 39.264 119.301 0.0
UG4 471.7 0.0015 2F 27.183 569.968 0.869 VeI= 3.03
UG4 0.0 6.09 T 46.249 8.250 123.909
to 150.0 0.0 46.249 -1.732
SOR 471.7 0.0057 0.0 54.499 0.309 Vel = 5.20
250.00 Qa = 250.00
721.70 122.486 K Factor 65.21
28 16.29 1.049 E 2.0 12.140 8.459 K Factor= 5.60
to 120.0 T 5.0 7.000 -2.057
29 16.29 0.0890 0.0 19.140 1.704 Vel = 6.05
29 7.57 1.38 0.0 0.420 8.106
to 120.0 0.0 0.0 0.0
30 23.86 0.0476 0.0 0.420 0.020 Vel = 5.12
30 14.81 1.38 0.0 6.730 8.126
to 120.0 0.0 0.0 0.0
31 38.67 0.1159 0.0 6.730 0.780 Vel = 8.29
31 17.44 1.38 0.0 2.300 8.906
to 120.0 0.0 0.0 0.0
32 56.11 0.2309 0.0 2.300 0.531 Vel = 12.04
32 16.01 1.38 T 6.0 196.930 9.437
to 120.0 0.0 6.000 0.0
33 72.12 0.3672 0.0 202.930 74.509 Vel = 15.47
33 0.0 1.38 T 6.0 1.750 83.946
to 120.0 0.0 6.000 0.758
34 72.12 0.3672 0.0 7.750 2.846 VeI= 15.47
34 64.14 2.157 0.0 12.230 87.550
to 120.0 0.0 0.0 0.0
35 136.26 0.1353 0.0 12.230 1.655 Vel = 11.96
35 54.54 2.157 0.0 13.100 89.205
to 120.0 0.0 0.0 0.0
36 190.8 0.2522 0.0 13.100 3.304 Vel = 16.75
36 41.84 2.157 0.0 11.790 92.509
to 120.0 0.0 0.0 0.0
37 232.64 0.3641 0.0 11.790 4.293 Vel = 20.43
37 41.71 2.157 T 12.307 6.260 96.802
to 120.0 0.0 12.307 0.0
27 274.35 0.4939 0.0 18.567 9.170 Vel = 24.09
0.0
274.35 105.972 K Factor = 26.65
38 16.77 1.049 E 2.0 5.480 8.963 K Factor = 5.60
to 120.0 T 5.0 7.000 -2.057
39 16.77 0.0938 0.0 12.480 1.171 Vel = 6.23
39 -9.20 1.38 0.0 5.030 8.077
to 120.0 0.0 0.0 0.0
29 7.57 0.0058 0.0 5.030 0.029 Vel = 1.62
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 8
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
0.0
7.57 8.106 K Factor = 2.66
40 14.82 1.049 E 2.0 0.500 7.000 K Factor = 5.60
to 120.0 0.0 2.000 0.217
41 14.82 0.0744 0.0 2.500 0.186 Vel = 5.50
41 0.0 1.049 T 5.0 4.670 7.403
to 120.0 0.0 5.000 0.0
30 14.82 0.0748 0.0 9.670 0.723 Vel = 5.50
0.0
14.82 8.126 K Factor = 5.20
42 17.30 1.049 E 2.0 5.800 9.540 K Factor = 5.60
to 120.0 T 5.0 7.000 -2.057
5 17.3 0.0995 0.0 12.800 1.273 Vel = 6.42
0.0
17.30 8.756 K Factor = 5.85
43 15.22 1.049 E 2.0 0.500 7.390 K Factor = 5.60
to 120.0 0.0 2.000 0.217
44 15.22 0.0784 0.0 2.500 0.196 Vel = 5.65
44 0.0 1.049 T 5.0 4.670 7.803
to 120.0 0.0 5.000 0.0
4 15.22 0.0785 0.0 9.670 0.759 Vel = 5.65
0.0
15.22 8.562 K Factor = 5.20
45 17.44 1.049 E 2.0 5.480 9.702 K Factor= 5.60
to 120.0 1 5.0 7.000 -2.057
31 17.44 0.1010 0.0 12.480 1.261 Vel = 6.47
0.0
17.44 8.906 K Factor = 5.84
39 9.20 1.38 0.0 0.550 8.077
to 120.0 0.0 0.0 0.0
3 9.2 0.0091 0.0 0.550 0.005 Vel = 1.97
0.0
9.20 8.082 K Factor = 3.24
46 16.01 1.049 E 2.0 0.500 8.171 K Factor = 5.60
to 120.0 0.0 2.000 0.217
47 16.01 0.0860 0.0 2.500 0.215 Vel = 5.94
47 0.0 1.049 T 5.0 4.670 8.603
to 120.0 0.0 5.000 0.0
32 16.01 0.0862 0.0 9.670 0.834 Vel = 5.94
0.0
16.01 9.437 KFactor = 5.21
48 17.08 1.049 E 2.0 0.500 9.307 K Factor = 5.60
to 120.0 0.0 2.000 0.217
49 17.08 0.0968 0.0 2.500 0.242 Vel = 6.34
49 0.0 1.049 T 5.0 4.670 9.766
to 120.0 0.0 5.000 0.0
6 17.08 0.0972 0.0 9.670 0.940 Vel = 6.34
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 9
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftng's Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
0.0
17.08 10.706 K Factor = 5.22
50 20.45 1.049 E 2.0 5.480 13.340 K Factor = 5.60
to 120.0 1 5.0 7.000 -2.057
7 20.45 0.1357 0.0 12.480 1.693 Vel = 7.59
0.0
20.45 12.976 K Factor = 5.68
51 20.66 1.049 E 2.0 12.190 13.612 K Factor= 5.60
to 120.0 T 5.0 7.000 -2.057
8 20.66 0.1382 0.0 19.190 2.652 Vel = 7.67
0.0
20.66 14.207 K Factor = 5.48
52 20.95 1.049 E 2.0 0.500 13.998 K Factor = 5.60
to 120.0 0.0 2.000 0.217
53 20.95 0.1416 0.0 2.500 0.354 Vel = 7.78
53 0.0 1.049 T 5.0 4.670 14.569
to 120.0 0.0 5.000 0.0
9 20.95 0.1419 0.0 9.670 1.372 Vel = 7.78
0.0
20.95 15.941 K Factor = 5.25
54 26.07 1.049 T 5.0 0.500 21.667 K Factor = 5.60
to 120.0 0.0 5.000 0.217
55 26.07 0.2124 0.0 5.500 1.168 Vel = 9.68
55 -11.36 1.38 0.0 10.000 23.052
to 120.0 0.0 0.0 0.0
56 14.71 0.0193 0.0 10.000 0.193 Vel = 3.16
56 26.18 1.38 0.0 9.960 23.245
to 120.0 0.0 0.0 0.0
57 40.89 0.1285 0.0 9.960 1.280 Vel = 8.77
57 26.89 1.38 0.0 10.000 24.525
to 120.0 0.0 0.0 0.0
58 67.78 0.3273 0.0 10.000 3.273 Vel = 14.54
58 28.66 1.38 T 6.0 9.280 27.798
to 120.0 0.0 6.000 0.0
59 96.44 0.6286 0.0 15.280 9.605 Vel = 20.69
59 0.0 1.38 T 6.0 1.750 37.403
to 120.0 0.0 6.000 0.758
60 96.44 0.6285 0.0 7.750 4.871 Vel = 20.69
60 0.0 2.157 0.0 12.670 43.032
to 120.0 0.0 0.0 0.0
11 96.44 0.0713 0.0 12.670 0.904 Vel = 8.47
0.0
96.44 43.936 K Factor = 14.55
61 26.11 1.049 T 5.0 0.500 21.735 K Factor 5.60
to 120.0 0.0 5.000 0.217
62 26.11 0.2131 0.0 5.500 1.172 Vel = 9.69
62 11.36 1.38 0.0 9.040 23.124
to 120.0 0.0 0.0 0.0
63 37.47 0.1093 0.0 9.040 0.988 Vel = 8.04
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 10
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C' or Ftng's Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
63 26.66 1.38 T 6.0 196.930 24.112
to 120.0 0.0 6.000 0.0
64 64.13 0.2955 0.0 202.930 59.964 Vel = 13.76
64 0.0 1.38 1 6.0 1.750 84.076
to 120.0 0.0 6.000 0.758
65 64.13 0.2955 0.0 7.750 2.290 Vel = 13.76
65 0.0 2.157 0.0 12.670 87.124
to 120.0 0.0 0.0 0.0
34 64.13 0.0336 0.0 12.670 0.426 Vel = 5.63
0.0
64.13 87.550 K Factor = 6.85
66 26.18 1.049 1 5.0 0.500 21.851 K Factor =5.60
to 120.0 0.0 5.000 0.217
56 26.18 0.2140 0.0 5.500 1.177 Vel = 9.72
0.0
26.18 23.245 K Factor = 5.43
67 26.67 1.049 T 5.0 0.500 22.677 K Factor = 5.60
to 120.0 0.0 5.000 0.217
63 26.67 0.2215 0.0 5.500 1.218 Vel = 9.90
0.0
26.67 24.112 K Factor = 5.43
55 11.36 1.38 0.0 6.000 23.052
to 120.0 0.0 0.0 0.0
62 11.36 0.0120 0.0 6.000 0.072 Vel = 2.44
0.0
11.36 23.124 K Factor = 2.36
68 26.90 1.049 1 5.0 0.500 23.070 K Factor = 5.60
to 120.0 0.0 5.000 0.217
57 26.9 0.2251 0.0 5.500 1.238 Vel = 9.99
0.0
26.90 24.525 K Factor = 5.43
69 28.66 1.049 T 5.0 0.500 26.190 K Factor = 5.60
to 120.0 0.0 5.000 0.217
58 28.66 0.2529 0.0 5.500 1.391 Vel = 10.64
0.0
28.66 27.798 K Factor = 5.44
70 34.31 1.049 E 2.0 9.590 37.543 K Factor = 5.60
to 120.0 T 5.0 7.000 -2.057
71 34.31 0.3532 0.0 16.590 5.860 Vel = 12.74
71 -14.35 1.38 0.0 20.000 41.346
to 120.0 0.0 0.0 0.0
72 19.96 0.0341 0.0 20.000 0.682 Vel = 4.28
72 34.58 1.38 1 6.0 198.230 42.028
to 120.0 0.0 6.000 0.0
73 54.54 0.2190 0.0 204.230 44.722 Vel = 11.70
73 0.0 1.38 T 6.0 1.750 86.750
to 120.0 0.0 6.000 0.758
35 54.54 0.2190 0.0 7.750 1.697 Vel = 11.70
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 11
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. "C" or Ftngs Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
0.0
54.54 89.205 K Factor = 5.77
74 34.41 1.049 E 2.0 9.590 37.750 K Factor = 5.60
to 120.0 1 5.0 7.000 -2.057
75 34.41 0.3550 0.0 16.590 5.890 Vel = 12.77
75 14.35 1.38 T 6.0 20.150 41.583
to 120.0 0.0 6.000 0.0
76 48.76 0.1780 0.0 26.150 4.654 Vel = 10.46
76 0.0 1.38 T 6.0 1.750 46.237
to 120.0 0.0 6.000 0.758
12 48.76 0.1779 0.0 7.750 1.379 Vel = 10.46
0.0
48.76 48.374 K Factor = 7.01
77 34.58 1.049 E 2.0 9.590 38.139 K Factor =5.60
to 120.0 T 5.0 7.000 -2.057
72 34.58 0.3584 0.0 16.590 5.946 Vel = 12.84
0.0
34.58 42.028 K Factor = 5.33
71 14.35 1.38 0.0 12.820 41.346
to 120.0 0.0 0.0 0.0
75 14.35 0.0185 0.0 12.820 0.237 Vel = 3.08
0.0
14.35 41.583 K Factor = 2.23
13 41.84 1.38 T 6.0 1.750 55.134
to 120.0 0.0 6.000 -0.758
78 41.84 0.1341 0.0 7.750 1.039 Vel = 8.97
78 0.0 1.38 2T 12.0 251.210 55.415
to 120.0 0.0 12.000 0.0
79 41.84 0.1341 0.0 263.210 35.297 Vel = 8.97
79 0.0 1.38 T 6.0 1.750 90.712
to 120.0 0.0 6.000 0.758
36 41.84 0.1341 0.0 7.750 1.039 Vel = 8.97
0.0
41.84 92.509 K Factor = 4.35
14 41.71 1.38 T 6.0 1.750 59.647
to 120.0 0.0 6.000 -0.758
80 41.71 0.1333 0.0 7.750 1.033 Vel = 8.95
80 0.0 1.38 2T 12.0 251.210 59.922
to 120.0 0.0 12.000 0.0
81 41.71 0.1333 0.0 263.210 35.088 Vel = 8.95
81 0.0 1.38 T 6.0 1.750 95.010
to 120.0 0.0 6.000 0.758
37 41.71 0.1334 0.0 7.750 1.034 Vel = 8.95
0.0
41.71 96.802 K Factor = 4.24
15 42.69 1.38 T 6.0 1.750 62.601
to 120.0 0.0 6.000 -0.758
82 42.69 0.1392 0.0 7.750 1.079 Vel = 9.16
Computer Programs by Hydratec Inc. Revision: 50.52.1
Final Calculations - Hazen-Williams
A&D FIRE SPRINKLERS INC. Page 12
ADIDAS PHASE 2 Date
Hyd. Qa Dia. Fitting Pipe Pt Pt
Ref. O.Cf,or Ftng's Pe Pv ******* Notes
Point Qt Pf/Ft Eqv. Ln. Total Pf Pn
82 0.0 1.38 21 12.0 251.210 62.922
to 120.0 0.0 12.000 0.0
83 42.69 0.1392 0.0 263.210 36.636 Vel = 9.16
83 0.0 1.38 1 6.0 1.750 99.558
to 120.0 0.0 6.000 0.758
26 42.69 0.1392 0.0 7.750 1.079 Vel = 9.16
0.0
42.69 101.395 K Factor = 4.24
16 40.19 1.38 1 6.0 1.750 64.650
to 120.0 0.0 6.000 -0.758
84 40.19 0.1245 0.0 7.750 0.965 Vel = 8.62
84 0.0 1.38 2T 12.0 251.210 64.857
to 120.0 0.0 12.000 0.0
85 40.19 0.1245 0.0 263.210 32.766 Vel = 8.62
85 0.0 1.38 1 6.0 1.750 97.623
to 120.0 0.0 6.000 0.758
25 40.19 0.1245 0.0 7.750 0.965 Vel = 8.62
0.0
40.19 99.346 K Factor = 4.03
17 38.70 1.38 1 6.0 1.750 65.826
to 120.0 0.0 6.000 -0.758
86 38.7 0.1161 0.0 7.750 0.900 Vel = 8.30
86 0.0 1.38 2T 12.0 251.210 65.968
to 120.0 0.0 12.000 0.0
87 38.7 0.1160 0.0 263.210 30.544 Vel = 8.30
87 0.0 1.38 T 6.0 1.750 96.512
to 120.0 0.0 6.000 0.758
24 38.7 0.1161 0.0 7.750 0.900 Vel = 8.30
0.0
38.70 98.170 K Factor = 3.91
18 37.98 1.38 T 6.0 1.750 66.375
to 120.0 0.0 6.000 -0.758
88 37.98 0.1121 0.0 7.750 0.869 Vel = 8.15
88 0.0 1.38 2T 12.0 251.210 66.486
to 120.0 0.0 12.000 0.0
89 37.98 0.1121 0.0 263.210 29.508 Vel = 8.15
89 0.0 1.38 1 6.0 1.750 95.994
to 120.0 0.0 6.000 0.758
23 37.98 0.1121 0.0 7.750 0.869 Vel = 8.15
0.0
37.98 97.621 K Factor= 3.84