A REPORT TO THE PLANNING COMMISSION
Item No.
P.C. AGENDA OF: September 16, 1998
Application complete date: July 8, 1998
Project Planner: Jeff Gibson
Project Engineer: Steve Jantz
SUBJECT: SDP 98-06/CDP 98-33 - HOEHN MOTORS MERCEDES BENZ - Request for
a Negative Declaration, Site Development Plan, and Coastal Development Permit
to develop a 49,573 square foot commercial automobile dealership on a vacant
and previously graded 5.84 acre site (two lots) located on the west side of Car
Country Drive between Cannon Road and Paseo del Norte, within Local Facilities
Management Zone 3.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 4369
RECOMMENDING APPROVAL of a Negative Declaration, and Planning Commission
Resolutions No. 4370, and 4371, RECOMMENDING APPROVAL of SDP 98-06 and CDP
98-33 based upon the findings and subject to the conditions contained therein.
II. INTRODUCTION
The proposed project is for the development of an approximately 49,500 square foot commercial
automobile dealership on a vacant and previously graded 5.84 acre site (two lots) located on Car
Country Drive within the Coastal Zone. The proposed project will consist of automobile sales,
display, inventory storage, and service. The project requires a Site Development Plan and a
Coastal Development Permit. Due to City Council Urgency Ordinance NS-24, which was
recently extended for commercially designated property in this area, the project must be
reviewed by the Planning Commission and approved by the City Council. The project complies
with City standards, is consistent with the Car County Specific Plan, and all the necessary
findings can be made for the approvals being requested. In conclusion, staff believes that the
project has addressed all issues and, therefore, warrants approval.
III. PROJECT DESCRIPTION AND BACKGROUND
The project site consists of two vacant and pre-graded commercially designated lots that total
approximately 5.8 acres in size. The site has been graded relatively level and all frontage
improvements, including landscaping, sidewalk, curb, and gutter have been provided along Car
Country Drive. The project site does not contain surface water or native habitat and is located
adjacent to existing commercial automobile dealerships directly north, south, and west of the
site. The site is zoned C-2 and is within the Car Country Specific Plan and the Coastal Zone.
SDP 98-06/CDP 98-33 - hv/iiHN MOTORS MERCEDES BENZ
September 16, 1998
Page 2
The proposed project has an architectural style generally described as Spanish motif with clay
barrel tile roofs and slump block and stucco building walls. The project consists of the following
features:
A. A two-story and 26,224 square foot main display and sales building;
B. A 1,993 square foot service drive-up building;
C. 21,356 square feet of automobile repair and detail bays;
D. 3 driveways leading to Car Country Drive; and
E. 472 total parking spaces for customers, employees, sales inventory, and repair.
IV. ANALYSIS
The project is subject to the following regulations and requirements:
A. Carlsbad General Plan Regional Commercial (R) designation;
B. City Council Urgency Ordinance NS-24;
C. Car Country Specific Plan (SP 19);
D. Mello II Segment of the Carlsbad Local Coastal Program regulations; and
E. Growth Management regulations.
The recommendation for approval for this project was developed by analyzing the project's
consistency with the applicable regulations and policies. The project's compliance with each of
the above regulations is discussed in detail in the sections below.
A. General Plan
The General Plan designation of this property is Regional Commercial (R). The R designation
allows regional commercial centers that provide shopping goods, general merchandise,
automobile sales and service, apparel, furniture, and home furnishings. The proposed land use
consists of automobile sales and service targeted for a regional market, therefore, the use is
consistent with the R General Plan designation. The project complies with the applicable
elements of the General Plan as illustrated in Table A below.
SDP 98-06/CDP 98-33 -
September 16, 1998
Page 3
MOTORS MERCEDES BENZ
Table A - GENERAL PLAN COMPLIANCE
ELEMENT USE, CLASSIFICATION, GOAL
OBJECTIVE OR PROGRAM
PROPOSED USES &
IMPROVEMENTS
COMPLY?
Land Use Regional Commercial designation Automobile sales and
service
Yes
Housing Potential housing linkage fee
pending further study
Project has been
conditioned to pay linkage
fee pending fee adoption
Yes
Public Safety Requires pedestrian, fire, structural,
geotechnical, and flood safety
The lot is graded to
engineering standards and
all public sidewalks,
curbs, gutters, fire
hydrants, street lights, and
drainage and sewer
facilities have been
provided to service the
two lots. All buildings
must meet Fire Code and
UBC standards prior to
issuance of a building
permit
Yes
Circulation Requires provisions of adequate
roadways and intersections and safe
access to the project site
All public streets and
intersections in the project
area have been constructed
and the three project
driveways leading to Car
Country Drive meet
separation and sight
distance standards
Yes
B. City Council Urgency Ordinance NS-24
The urgency ordinance was recently extended by City Council and it applies to commercial
projects located in a specified area around the Carlsbad Ranch/Lego Specific Plan. This project
is within the boundaries of the urgency ordinance. Therefore, the project must be forwarded on
to City Council for final approval where the Planning Commission would have otherwise been
the final decision-maker. The necessary reports and resolutions have all been written to reflect
this requirement and the Planning Commission will make a recommendation to the City Council.
C. Car Country Specific Plan - SP 19
The project is located on Lots No. 8 and 9 within the Car Country Specific Plan which requires
the processing of a Site Development Plan for the development of automobile dealerships. The
SDP 98-06/CDP 98-33 -
September 16, 1998
Page 4
MOTORS MERCEDES BENZ
Site Development Plan meets or exceeds all applicable requirements of Specific Plan 19 as
demonstrated in Table B below:
Table B: Specific Plan 19
STANDARD
Land Use
*Parking:
Sales
Service
Customer/employee
Building Height
Building Coverage
Architecture and Materials
Employee Eating Areas
Fencing
Loading Areas
Driveway Locations
Roof Equipment
Outdoor Lighting
Building Setbacks:
Front
Side Yard
REQUIRED
Retail sales, leasing, renting,
and servicing of new and used
automobiles and other motor
vehicles
1 space per 400 sf - 71 spaces
4 spaces per 1st 3 bays, 2
spaces per each remaining bay -
100 spaces
Satisfaction of PD- (72
proposed employees)
30 feet /two-story
25%
Spanish motif with tile roof,
stucco & slump block walls
2,924 sf
Must be compatible with
building and 7-9 foot in height
Not allowed in front or side
yard setbacks
Locations approved with SP
Roof mounted equipment must
be screened from view of
adjacent properties and public
streets
Metallic Quartz Vapor/ 100 foot
candles/90% angle/20 ft. pole
height
25 feet minimum
1 0 foot minimum
PROPOSED
Retail sales, leasing,
renting, and servicing of
new and used automobiles
288 spaces
101 spaces
83 spaces
30 feet and two-story
18%
Spanish motif with tile
roof, stucco & slump
block walls
2,926 sf
8 foot high masonry
perimeter screen wall
painted to match building
walls
All loading areas located
outside of setbacks
Driveways in approved
locations
Roof equipment located
behind roof parapet in
mechanical equipment
wells
Project's final lighting
plan conditioned to
comply with SP standards
110 feet
55 feet
*A reciprocal parking and access agreement had been required to be recorded to legally ensure
that all parking requirements generated by the proposed dealership will be satisfied.
SDP 98-06/CDP 98-33 - HwEHN MOTORS MERCEDES BENZ
September 16, 1998
PageS
£. Mello II Segment of the Carlsbad Local Coastal Program
The project is located in the Coastal Zone and is subject to the policy requirements of the Mello
II Segment. The project is not located near a coastal bluff, shoreline, stream, lagoon or the
ocean, and will not impact public access to any coastal resources. The project site is already
graded, contains no native habitat, and the project will not impact agricultural resources or
operations in the area. Even though the site has been rough graded, the minor proposed cut
amount of 6,350 cubic yards and the fill amount of 5,800 cubic yards to prepare the site for
construction will require the issuance of a building permit. The site is not located in any coastal
viewshed area and will not negatively impact coastal view resources. The project must comply
with the City's Storm Water Management Ordinance and meet all standards of the City's
NPDES Permit to reduce urban pollutant runoff from the site. Therefore, the project is in
compliance with the Mello II Segment policies and will not negatively impact the resources of
the Coastal Zone.
F. Growth Management
The proposed project is located within Local Facilities Management Zone 3 in the northwest
quadrant of the City. The impacts on public facilities created by the project, and its compliance
with the adopted performance standards, are summarized in Table D below.
Table D : GROWTH MANAGEMENT COMPLIANCE
STANDARD
City Administration
Library
Waste Water Treatment
Parks
Drainage
Circulation
Fire
Open Space
Schools
Sewer Collection System
Water
IMPACTS
N/A
N/A
Encinas
N/A
Basin B
1,949ADT
Station No. 5
N/A
N/A
27EDU
19,410GPD
COMPLIANCE
N/A
N/A
Yes
Yes
Yes
Yes
Yes
N/A
N/A
Yes
Yes
V.ENVIRONMENTAL REVIEW
The initial study (EIA-Part II) prepared in conjunction with this project determined that the
project would not have a significant impact on the environment. The project is considered an
infill type of development that is consistent with the General Plan and zoning. The project falls
within the scope of the City's MEIR for the City of Carlsbad General Plan update (EIR 93-01)
SDP 98-06/CDP 98-33 - h^EHN MOTORS MERCEDES BENZ
September 16, 1998
Page 6
certified in September, 1994, in which a Statement of Overriding Considerations was adopted for
cumulative impacts to air quality and traffic. An ADT of 1,949 would be generated by the
proposed project. This ADT is consistent with the generation rate analyzed for the site in the
MEIR. All feasible mitigation measures identified by the MEIR which are appropriate to this
project have been incorporated into the site design. No additional mitigation measures in the
form of roadway improvements are necessary. The project site has also been disturbed by
authorized grading. The surrounding properties are developed with dealerships and commercial
land uses and all the support utilities and service infrastructure has been constructed. Please see
the Environmental Assessment Form-Part II for a detailed description of the justification to
recommend approval of the Negative Declaration. In consideration of the foregoing, on July 17,
1998 the Planning Director issued a Negative Declaration for the proposed project. The
environmental document was noticed in the newspaper and no public comments were received
during the 30 day public review and comment period.
ATTACHMENTS:
1. Planning Commission Resolution No. 4369 (Negative Declaration)
2. Planning Commission Resolution No. 4370 (SDP 98-06)
3. Planning Commission Resolution No. 4371 (CDP 98-33)
4. Location Map
5. Background Data Sheet
6. Local Facilities Impact Assessment Form
7. Disclosure Statement
8. Reduced Exhibits
9. Full Size Exhibits "A" - "J" dated September 16,1998
JG:mh
HOEHN MOTORS
MERCEDES BENZ
SDP 98-06/CDP 98-33
BACKGROUND DATA SHEET
CASE NO: SDP 98-06/CDP 98-33
CASE NAME: Hoehn Motors Mercedes Benz
APPLICANT: Hoehn Group
REQUEST AND LOCATION: A 49.500 sq. ft. automobile dealership on the west side of Car
Country Drive
LEGAL DESCRIPTION: Lot 8 and Lot 9 of Carlsbad Tract No. 87-3. in the City of Carlsbad,
County of San Diego. State of California, according to map thereof No. 12242. filed in the office
of County Recorder of San Diego County, dated October 28,1988.
APN: 211-080-08 & 9 Acres: 5.8 Proposed No. of Lots/Units: 49.500 sa. ft
GENERAL PLAN AND ZONING
Land Use Designation: Regional Commercial
Density Allowed: N/A Density Proposed: N/A
Existing Zone: C-2-0 Proposed Zone: N/A
Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning
Requirements)
Zoning Land Use
Site C-2-Q R/Vacant
North C-2-Q R/Dealership
South C-2-Q R/Dealership
East OS OS/Agricultural
West C-2-Q R/Dealership
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (Sewer Capacity): 27
Public Facilities Fee Agreement, dated: February 11.1998
ENVIRONMENTAL IMPACT ASSESSMENT
Negative Declaration, issued July 17. 1998
Certified Environmental Impact Report, dated N/A
Other, N/A
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Hohen Motors Mercedes Benz - SDP 98-06/CDP 98-33
LOCAL FACILITY MANAGEMENT ZONE: 3 GENERAL PLAN: Regional Com.
ZONING: C-2-O
DEVELOPER'S NAME: Hohen Group
ADDRESS: PO Box 789. Carlsbad. CA 92008
PHONE NO.: 760 438-4454 ASSESSOR'S PARCEL NO.: 211-080-08 & 09
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 49.573 SO. FT.
ESTIMATED COMPLETION DATE: N/A
A. City Administrative Facilities: Demand in Square Footage = N/A
B. Library: Demand in Square Footage = N/A
C. Wastewater Treatment Capacity (Calculate with J. Sewer) N/A
D. Park: Demand in Acreage = N/A
E. Drainage: Demand in CFS = N/A
Identify Drainage Basin = B
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADT= 1.949
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No. = 5
H. Open Space: Acreage Provided = N/A
I. Schools: N/A
(Demands to be determined by staff)
J. Sewer: Demands in EDU = 27
Identify Sub Basin = B
(Identify trunk line(s) impacted on site plan)
K. Water: Demand in GPD= 19.410
City of Carlsbad
Planning Department
DISCLOSURE STATEMENT
APPLICANTS STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS WHICH WILL REGUIR6
DISCRETIONARY ACTION ON THE PART OF THE CfTY COUNCIL OR ANY APPOINTED BOARD. COMMISSION OR COMMOTES.
{Please Print)
The -following information must be disclosed:
1. Applicant
List the names and addresses of all persons having a financial interest in the application.
R. A. Hoehn ____ SSfift Pagpn Dpi Nnrt-P Carl sharl
T.W. Hoehn III 545 A Paseo Del Norte, Carlsbad
3.
4.
List the names and addresses of all persons having any ownership interest in the property involved.
R.A. Hoehn 5566 Paseo Del Norte, Carlsbad
T.W. Hoehn III 5454 Paseo Del Norte. Carlsbad
If any person identified pursuant to (1) or (2) above is a corporation or partnership, list the names anc
addresses of all individuals owning more than 10% of the shares in the corporation or owning any partnership
interest in the partnership.
Same as above .
If any person identified pursuant to (1) or (2) above is a non-profit organization or a trust, list the names anc
addresses of any person serving as officer or director of the non-profit organization or as trustee or beneficiar.
of the trust.
N/A
FRM00013 8/90
2O75 Las Palmas Drive • Carlsbad. California 92OO9--4859 • (619) 438-1161
Disclosure Statement
•'Over)
Page 2
Have you had more than S250 worth of business transacted with any member of City staff. Bcarcs
Commissions, Committees and Council within the past twelve months?
Yes No x If yes, please indicate person(s)
Parson n defined aa: 'Any individual, firm. copartnership, joint venture. association, social club, fraternal organization, corporation, estate trust.
receiver, syndicate, this and any other county, city and county, city municipality, diitnct or other political subdivision, or any other grouo or
combination acting as a unit*
(NOTE: Attach additional pages as necessary.)
Signature of Owner/date Signature of applicant/date
T. W. Hoehn III
Print or type name of owner Print or type name of applicant
FRM00013 8/90
• t*c*< IPMM • ••-*' u. • 9f-f n* tor* IMO*) j !
e
) SITEPUVN
VICINITY MAP
GENERAL NOTES
KEYNOTES
(I) fl
LEGEND
ED
CD
DATA
»*< c-t-a
ScuT C—^^P—-^
Vtt.««A. OCC
M* I'. *-l
K HWM MM* o
HOEHN
MERCEDES BENZ
SITE PLAN
A1
e sEcai.r...-SECOND FLOOR PLAN
B_LO_Ul^^_^AJLJUJ_LnjU_l.^JLa ;..jl/J J^UlXJUlJ.JLJUUlJ.JLJLn J .l.jj
'tp-—**=>• --^—Wi"°J "J """J "i
0 D iJ LI 1 LI fJ [J L] [
®FIRST
'""'•'
FIRST FLOOR PLAN
FLOOR AREA
HOEHN
MERCEDES BENZ
MAIN BUILDINGS SERVICE DRIVE-UPFLOOR PLANS
A2.1
SSSS
£
•aa-
I j
e SERVICE BUILDING
-'. i
D
.Kl,
LI
e
J j 1
'],
-I
3ETAIL BAYS
r •]n IT n.
w-r
n.P
______>
J
1
HOEHN
MERCEDES BENZ
SERVICE BUILDING& DETAIL BAYS
A2.2
n n
cumocrn*
**r KTUOMI mp. O
MMNBUJLMNQ
CLAYMMT1U
DODDDnDQDDD
QQDDQDQQQ.QG.
SERVICE BUILMNQ
DDDDDD DDDDD D
D DDDDDD D Q 0 D D D
--- • • "/ - - j. - " • •- . j. - -- -• • '
d
D ° 0 DDDDDD
D DDDDDD
V
ROOF PLANinr-r-r
DdDDDDDD G
HOEHN
MERCEDES BENZ
ROOF PLAN
A2.3
EAST ELEVATIONwr-r-o-
WEST ELEVATION
(MalBayt)
SOUTH ELEVATIONt/tr-r-cr
(S«vlo<B4*lng)
HOEHN
MERCEDES BENZ
t MIL-IP DOOM mr.
EAST ELEVATION - Service Building
WEST ELEVATION - Service Buildingirtr-rr
p'
sr
ICMLKU.-4PDOOM r
EAST ELEVATION • Detail Bayswr-r-r WEST ELEVATION - Detail Bays
HOEHN
MERCEDES BENZ
SERVICE BUILDING& DETAIL BAYS
EXTERIOR ELEVATIONS
A3.2