Loading...
HomeMy WebLinkAbout2716 MORNING GLORY LN; ; CBR2020-3400; PermitBuilding Permit Finaled Residential Permit Print Date: 09/07/2022 Job Address: 2716 MORNING GLORY LN, CARLSBAD, CA 92008-1035 Permit Type: BLDG-Residential Work Class: Alteration Parcel#: 1561203300 Track#: Valuation: $48,007.51 Lot#: Occupancy Group: Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: Sprinkled: Project Title: Description: 962 SF INTERIOR REMODEL AT 1ST FLOOR// 163 SF DECK ADDITION Property Owner: JON PEMBROKE KELLY TRUST 2777 JEFFERSON ST, # 100 CARLSBAD, CA 92008 FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL Total Fees: $832.56 Total Payments To Date: $832.56 {_ City of Carlsbad Permit No: CBR2020-3400 Status: Closed -Fina led Applied: 12/29/2020 Issued: 06/01/2021 Finaled Close Out: 08/26/2022 Final Inspection: 08/26/2022 INSPECTOR: Dreibelbis, Peter Kersch, Tim Renfro, Chris Alvarado, Tony Burnette, Paul Balance Due: AMOUNT $399.60 $279.72 $41.00 $42.00 $62.00 $2.00 $6.24 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 Plan CheckCf)R,2,('\20::: WJ;.) £s~. Value L\2)1CCf3: PC Deposit _______ _ Oate \1-29-:Z.O .;,oAddress . .:i'16 MORNING GLORY LN CARLSBAD CA Suite: APN: 156-120-33 ·----- CT/Project #: ________________ Lot #:. ____ Year Bullt: _1_9_7_5 ______ _ Fire Sprinklers: QvEs@NO Air Conditionlns:O YES® NO Electrical Panel Upgrade: OvEs® NO BRIEF DESCRIPTION Of WORK! REMODEL OF EXISTING FIRST FLOOR LIVING SPACE <KITCHEN-PANTRY-POWDER} 962 S.F. EXTENTION OF EXISTING SECOND FLOOR COVERED PATIO -163 S.F. [ii Addltlon/New: _____ Llving SF, ___ Deck SF, ___ Patio SF, 163 Garage SF __ Is this to create an Accessory Dwelling Unit? 0 Y 0 N New Fireplace? 0 Y ® N , If yes how many? __ Iii Remodel:._,9...,6...,,2 ___ SF of affected area Is the area a conversion or change of use ? Ov 0 N □ Pool/Spa: ____ SF Additional Gas or Electrical Features? __________ _ osolar: ___ KW, ___ Modules, Mounted:ORoof OGround, Tilt:OvO N, RMA: Ov ON, Batterv:Ov ON, Panel Upgrade: Ov ON D Reroof: --------------------------------□ Plumbing/Mechanical/Electrical D Only: Other: This permit Is to be Issued In the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the owner or contractor. The person listed as the Applicant below wlll be the main point of contact throughout the permit process. PROPERTY OWNER APPLICANT 0 PROPERTY OWNERS AUTHORIZED AGENT APPLICANT 0 Name: JON PEMBROKE KELL~ Name:. _________________ _ Address:2716 MORNING GLORY LANE Address: ________________ _ City: CARLSBAD State: CA Zip: 92008 City: _________ State: __ Zip: ___ _ Phone: {858) 342-9777 Phone: ________________ _ Email: paola@benzonidesin.com Email: _________________ _ DESIGN PROFESSIONAL APPLICANT iJ CONTRACTOR OF RECORD APPLICANT 0 Name: PAOLA BONAClNA BENZONI Address:371 GLENCREST DRIVE ,--;--..~ ~ Name: t ~ ~~OU Address:GL= City: SOLANA BEACH State: CA Zip:_92_0_75 __ CityP'1 (&'Y)tJ State: QAt Zip: f'.}]Qj q Pho; S\8 -6]0-ili&o Phone: (858) 822-9697 Email: paola@benzonidesin.com Architect State License: BUILDING DESIGNER Email: aaz:se:E,TO~ I e..J:Eamt::M ~ CQl'J State license/class:<l:> Bus. Ucense: lo6:>1 iQ 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-,602-2719 Fax: 760-602-85511 REV,_08/20 IDENTIFY WHO WILL PERFORM THI: WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW: (OPTION A}: LI CENSED CONTRACTOR DECLARATION; I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Sect/Qn 7000) of Division 3 of the Business and Professions Code, and my license Is in full force and effect. I also affirm under penalty of perjury one of the following declarations: 0 I ha>1e and will maintain a certificate of consent to self-Insure for workers• compensation provided by Section 3700 of the labor Code. for the performance of the work which this permit is Issued. Policy No. ______________________________________ _ 0 I ha11e and WIii maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit Is Issued. My workers' com~at~surance carrier and policy number are: Insurance Company Name: et:A~ :;--,=@b~ ~ Polley No. ~ · tJS:50 Expiration oaw(Q'5. ~ 2 . 0 Certificate of Exemption: I certify that In the performance of the work for which this permil 1s issued, I shall not employ any person in any manner so 11s to become subject 10 die workers' compensation laws of California. WARNING: Failure to secure worl<en compensation coverage ls unlawful and shall subject an employer to crln)inal perutlties and d11il fines up to $100,000.00, in addition the to the cost of compensation, dam11aes as provided for In Section 3706 of the labor Code, Interest and attorney's fees. CONSTRUCTION LENDING AGENCY, tF ANV: , herebv affirm that there is a construction lending <1genr.y for the per lormance of the work this permit Is issued (Sec. 3097 (i) Civil Code). lender's Name: ____________________ ~ender'$ Address: ___________________ _ CONTRACTORPRINT:~ BU~ SIGN: ~ DATE: os/25/202..J (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not Intended or offered for sale (Sec. '7044, Business and Professions Code: The Contractor's License law does not apply to an owner of property who builds or improves thereon, and who does such work himsett or through hrs own employees, provided that such improvements are not intended or ottered for s-ate. II, however, the bundlng or 11npr0l/ement Is sold Within one year of completion, the owner-builder wlll have the burden of proving that he did not build or improve for the purpose ofsale). 0 I, as owner of the property, am excluslvely contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's llcense law does not apply toan owner of property who builds or Improves thernon, and contracts for such projects with contractor(s) litensed ounuant to lhe Contractor's license lawl. 0 I am exempt under Business and Professions Code Division 3, Chapter !l, Artfcle 3 for this reason: O•owner Builder acknowledaement and verification form• has been filled out, signed and attached to this applicatfon. 0 Owners "Aulhorlzed Agent Form" has been filled out, signed and attached to this applk:atlo n giving tire agent authority to obtain the permit on the ow11er's beha/j. By my signature below I acknowledge that, except for my personal residence io which I must have resided for at least one year prior to completion of th" Improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-bulhjer if it has not been constructed In Its entirety by licensed contractors. I understand that a cop,y of the applicable low, Section 7044 of the Business and Professions Code, Is available upon request when this application Is submitted or at the following Web site: http://www.leginjo.cu.gov/calaw.html. OWNER PRINT: _________ _ SIGN: __________ DATE: ______ _ APPLICANT CERTIFICAl'ION: SIGNATURE REQUIRED AT TTiE TIME Of SUBMITTAL By my signature below, I certify that: I am the property owner or State of Cal/forn7a Licensed Contractor or authorized to act on the property owner or conuactors behalf. I cert(fy that I hove read the qpp/Tcatfon and srate thot the above Information is conect and that the informar,011<1: the plans is accurate. I agree to comply with all City ordinances and State laws relating to build'fng consrrucr1on. I hereby authorize representative of the City of Carlsbad to_ enter upon'.the obove mentioned property for Inspection purposes. I ALSO AGREE TO SAVE; INDEMNIFY AND KEEP HARMLESS THE QTY OF CARLSBAD AGAINST ALL LIABIU11ES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID OTY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit ls required for excovotlons over S'0' deep and demolition or construction of structures over 3 stvr/es In height. APPLICANT PRINT: PAOLA BONACINA BENZONI SIG 12/20/2020 • I I I '· 163S Faraday Ave Carlsbad, CA 92008 2 REV. 08120 (city of Carlsbad OWNERS AUTHORIZED AGENT FORM B-62 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov OWNER'S AUTHORIZED AGENT FORM Only a property owner, contractor or their authorized agent may submit plans and applications for building permits. To authorize a third-party agent to sign for a building permit, the owner's third party agent must bring this signed form, which Identifies the agent and the owner who s/he is representing, and for what jobs s/he moy obtain permits. The form must be completed in Its entirety to be accepted by the City for each separate permit applicot/an. Note: The following Owner's Authorized Agent form Is required to be completed by the property owner only when designating an agent to apply far o construction permit an his/her behalf. AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF Excluding the Property Owner Acknowledgement, the execution of which I understand ts my personal responsibility, I hereby authorize the following person(s} to act as my agent(s) to apply for, sign, and file the documents necessarv to obtain an Owner-Builder Permit for my project. 1,, ) ,,.. .-1 'I', 1-,,~ n,, ""° ~'7{DCJEL Or 1_,C:: 1, I rc;.Ht:,-,1 ""'t '-V "-",j ~ Scope of construction Project (or Description of Work): cxra:,tl OJ,J O-f: ( e:) ~ D ~ Col)f:12a:> ?Af!O Project Location or Address: 21 l io M.DR.JJ l IJ{-r Gr<-ceJ.j Lb,I , ChJZ,LS,.BAD, (A. Name of Authorized Agent: 'fAOLA OOl/A. C../ /Jb 1:tb2D.U he1 No. (f>ss )~ 2.1. 9 b '\'f Address of Authorized Agent: 3J I §:LE"N, C.eJ::::=s,T :pg.. 'S?l-6.,-.». 'fi;ACtt, CA '-ti:bfS J declare under penalty of perjury that I am the property owner for the address listed above and I personalty filled out the above information and certify Its accuracy. Jon Pembroke Kelly, MD, FAAOS WORKF('q_CE ORTHOPAEDICS 2777 JEFff"' )N STREET, SUITE 100 CARLSB· · CALWORNIA 92008 [2 I1b PERMIT INSPECTION HISTORY for (CBR2020-3400) Permit Type: BLDG-Residential Work Class: Alteration Status: Closed -Finaled Application Date: 12/29/2020 Owner: TRUST JON PEMBROKE KELLY TRUST Issue Date: 06/01 /2021 Subdivision: PARCEL MAP NO 00004 Expiration Date: 05/16/2022 IVR Number: 30729 Address: 2716 MORNING GLORY LN CARLSBAD, CA 92008-1035 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Wednesday, September 7, 2022 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Status COMMENTS GFCI protected receptacles in all kitchen countertop areas required. Call for final inspection when completed. Passed No No No No No Page 4 of 4 PERMIT INSPECTION HISTORY for (CBR2020-3400) Permit Type: BLDG-Residential Work Class: Alteration Application Date: 12/29/2020 Owner: TRUST JON PEMBROKE KELLY TRUST Issue Date: 06/01/2021 Subdivision: PARCEL MAP NO 00004 Address: 2716 MORNING GLORY LN CARLSBAD, CA 92008-1035 Status: Scheduled Date 11/15/2021 05/17/2022 08/15/2022 08/26/2022 Closed -Finaled Expiration Date: 05/16/2022 IVR Number: 30729 Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Status Checklist Item COMMENTS BLDG-Building Deficiency Shear nail rear kitchen wall. Ok to wrap BLDG-15 Roof/ReRoof (Patio) 170633-2021 Passed Chris Renfro Checklist Item COMMENTS BLDG-Building Deficiency 11/15/2021 BLDG-84 Rough Combo(14,24,34,44) 170750-2021 Passed Tony Alvarado Checklist Item BLDG-34 Rough Electrical COMMENTS November 15, 2021: 1. No rough frame combination Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. On-site field welding inspected by third-party deputy inspector, obtain field weld third-party special inspector report for city records-approved. 4. Structural support beam, located in family kitchen area, revised structural detail and specifications per structural engineering, obtain and filed in city documents folder. 05/17/2022 BLDG-91 Complaints Inspection 182924-2022 Partial Pass Chris Renfro Checklist Item COMMENTS BLDG-Building Deficiency 08/15/2022 BLDG-Final Inspection Checklist Item 189180-2022 COMMENTS Failed Chris Renfro BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final GFCI protected receptacles in all kitchen countertop areas required. Call for final inspection when completed. 08/26/2022 BLDG-Final Inspection 190082-2022 Passed Peter Dreibelbis Wednesday, September 7, 2022 Reinspection Inspection Passed Yes Complete Passed Yes Complete Passed Yes Reinspection Incomplete Passed Yes Reinspection Incomplete Passed No No No No No Complete Page 3 of 4 PERMIT INSPECTION HISTORY for (CBR2020-3400) Permit Type: BLDG-Residential Work Class: Alteration Application Date: 12/29/2020 Owner: TRUST JON PEMBROKE KELLY TRUST Issue Date: 06/01/2021 Subdivision: PARCEL MAP NO 00004 Address: 2716 MORNING GLORY LN CARLSBAD, CA 92008-1035 Status: Scheduled Date 10/27/2021 11/12/2021 Closed -Finaled Expiration Date: 05/16/2022 IVR Number: 30729 Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Status 10/27/2021 11/12/2021 BLDG-84 Rough Combo(14,24,34,44) 169370-2021 Cancelled Tony Alvarado Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS October 25, 2021: 1. No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. October 25, 2021: 1. No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. October 25, 2021: 1. No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. October 25, 2021: 1 . No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. BLDG-11 169471-2021 Cancelled Tim Kersch Foundation/Ftg/Piers (Rebar) Checklist Item COMMENTS BLDG-Building Deficiency BLDG-13 Shear 170740-2021 Panels/HD (ok to wrap) Checklist Item COMMENTS BLDG-Building Deficiency BLDG-14 Frame/Steel/Bolting/We lding (Decks) 170634-2021 Passed Chris Renfro Partial Pass Chris Renfro Wednesday, September 7, 2022 Reinspection Inspection Reinspection Incomplete Passed Yes Yes Yes Yes Reinspectlon Incomplete Passed Yes Complete Passed Yes Relnspection Incomplete Page 2 of 4 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for (CBR2020-3400) Permit Type: BLDG-Residential Work Class: Alteration Application Date: 12/29/2020 Owner: TRUST JON PEMBROKE KELLY TRUST Issue Date: 06/01/2021 Subdivision: PARCEL MAP NO 00004 Address: 2716 MORNING GLORY LN CARLSBAD, CA 92008-1035 Status: Scheduled Date 06/15/2021 07/15/2021 10/12/2021 10/25/2021 Closed -Finaled Actual Inspection Type Start Date 06/15/2021 BLDG-SW-Pre-Con Checklist Item Expiration Date: 05/16/2022 IVR Number: 30729 Inspection No. Inspection Primary Inspector 159648-2021 COMMENTS Status Passed Paul Burnette BLDG-Building Deficiency 07/15/2021 BLDG-11 Foundation/Fig/Piers (Rebar) Checklist Item 161979-2021 Partial Pass Paul Burnette COMMENTS BLDG-Building Deficiency BLDG-66 Grout Checklist Item 161978-2021 COMMENTS Cancelled Paul Burnette BLDG-Building Deficiency 10/12/2021 BLDG-11 168278-2021 Partial Pass Tim Kersch Foundation/Fig/Piers (Rebar) Checklist Item BLDG-Building Deficiency COMMENTS 10/25/2021 BLDG-17 Interior Lath/Drywall 169369-2021 Cancelled Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS October 25, 2021: 1. No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. BLDG-21 Underground/Underflo or Plumbing 169256-2021 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS October 25, 2021: 1. No rough frame combination and drywall Inspection Deficiencies. 2. Rough frame combination, electrical, plumbing, mechanical, scope of work - approved. 3. Drywall/gypsum board method of attachment schedule -approved. Wednesday, September 7, 2022 Reinspection Inspection Complete Passed Yes Re inspection Incomplete Passed Yes Reinspection Incomplete Passed No Reinspection Incomplete Passed Yes Relnspection Incomplete Passed Yes Complete Passed Yes Page 1 of 4 DATE: 03/18/2021 JURISDICTION: CARSLBAD PLAN CHECK#.: CBR2020-3400 ✓• EsG1I SET: II PROJECT ADDRESS: 2716 MORNING GLORY LANE PROJECT NAME: SFD REMODEL FOR KELLY 0 APPLICANT 0 JURIS. IZ] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. 0 The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 0 The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. 0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. 0 The applicant's copy of the check list has been sent to: PAOLA BENZONI iZ] EsGil staff did not advise the applicant that the plan check has been completed. 0 EsGil staff did advise the applicant that the plan check has been completed. Person contacted: PAOLA Telephone#: 858 822 9697 Date contacted: (by: ) Email: PAOLA@BENZONIDESIN.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 03/11/2021 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 DATE: 01/18/2021 JURISDICTION: CARSLBAD PLAN CHECK#.: CBR2020-3400 ✓• EsG1I A SAFEbuilt Company SET: I PROJECT ADDRESS: 2716 MORNING GLORY LANE PROJECT NAME: SFD REMODEL FOR KELLY □ APPLICANT □ JURIS. D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. C8J The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. C8J The applicant's copy of the check list has been sent to: PAOLA BENZONI D EsGil staff did not advise the applicant that the plan check has been completed. C8J EsGil staff did advise the applicant that the plan check has been completed. Person contacted: PAOLA Telephone#: 858 822 9697 Date contacted: (by: ) Email: PAOLA@BENZONIDESIN.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 12/31/2020 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 CARSLBAD CBR2020-3400 01/18/2021 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK#.: CBR2020-3400 JURISDICTION: CARSLBAD PROJECT ADDRESS: 2716 MORNING GLORY LANE FLOOR AREA: REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 01/18/2021 FOREWORD (PLEASE READ): STORIES: HEIGHT: DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/31/2020 PLAN REVIEWER: Bert Domingo This plan review is limited to the technical requirements contained in the California Residential Code, California Building Code, California Plumbing Code, California Mechanical Code, California I Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2019 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2019 CRC, 2019 CBC, 2019 CPC, 2019 CMC and 2019 CEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2019 California Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. CARSLBAD CBR2020-3400 01/18/2021 PLANS 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad , CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning , Engineering and Fire Departments. 2. Bring IY::KJ. corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. 2. A reminder that due to Covid-19, the City will not permit counter corrections. Please make sure all the items are satisfied; otherwise, another round of corrections will be necessary. 3. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). 4. Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). FIRE PROTECTION 5. Show locations of permanently wired smoke alarms with battery backup, per Section R314: a) b) c) d) Inside each bedroom. Outside each separate sleeping area in the immediate vicinity of the bedrooms. On each story, including basements. Such smoke alarm locations shall comply with the following: i) They shall be not less th an 3' from the door opening of a bathroom. ii) They shall be at least 20' from a cooking appliance. iii) They shall be at least 3' from supply registers of heating/cooling systems. iv) They shall be at least 3' from the tip of the blade of a ceiling- mounted fan. CARSLBAD CBR2020-3400 01/18/2021 • NOTE: When more than one smoke alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the unit. 6. In dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), show the locations of permanently wired carbon monoxide alarms with battery backup, per Section R315: a) Outside each separate sleeping area in the immediate vicinity of the bedrooms. b) On each story, including basements. c) Where a fuel-burning appliance is installed in a bedroom or its attached bathroom. a carbon monoxide alarm shall be installed within the bedroom. • NOTE: When more than one carbon monoxide alarm is required to be installed, the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the unit. GARAGE AND CARPORTS 7. Effective July 1, 2019, new or replacement garages shall have battery back-up installed for any garage door openers. SB969. 8. The garage shall be separated from the residence and its attic area by not less than ½" gypsum board applied to the garage side (at walls). Garages beneath habitable rooms shall be separated by not less than 5/8" Type X gypsum board. Section R302.6. Please patch the wall that is new. 9. Show a self-closing and self-latching door or an automatic-closing and latching door; either 1-3/8" solid core or a listed 20-minute assembly, for openings between garage and dwelling. Section R302.5.1. PLUMBING 10. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. CARSLBAD CBR2020-3400 01/18/2021 RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along with additions/alterations that increase the building's conditioned area, volume or size. CGC Section 301 .1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. 11 . Indoor water use. Show compliance with the following table, per CGC Section 4.303.1. FIXTURE FLOW RA TES FIXTURE TYPE MAXIMUM FLOW RA TE Water closets 1.28 gallons/flush Urinals (wall-mounted) 0.125 gallon/flush Urinals (others) 0.5 gallon/flush Showerheads 1 .8 gpm @ 80 psi Lavatory faucets 1.2 gpm @ 60 psi1 Kitchen faucets 1.8 gpm@60 psi Metering faucets 0.20 gallons per cycle 1. Lavatory faucets shall not have a flow rate less than 0.8 gpm at 20 psi. 12. Note on the plans that when a shower is provided with multiple shower heads, the sum of flow to all the heads shall not exceed 1.8 gpm @ 80 psi, or the shower shall be designed so that only one head is on at a time. CGC Section 4.303.1.3.2. 13. Recycling. Note on the plans that a minimum of 65% of construction waste is to be recycled. CGC Section 4.408.1. 14. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan, per CGC Section 4.408.2. 15. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC Section 4.410.1. CARSLBAD CBR2020-3400 01/18/2021 16. Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC Section 4.504.2. 17. Interior moisture control. Note on the plans that concrete slabs will be provided with a capillary break. CGC Section 4.505.2.1. 18. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods listed in CGC Section 4.505.3. 19. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. 20. Heating and air-conditioning system design. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: (Support documentation required at application submittal) 4.507.2. a) Establish heat loss and heat gain values according to ANSI/ACCA Manual J-2016, ASHRAE handbooks or other equivalent methods. b) Size duct systems according to ANSI/ACCA 1 Manual D -2016, ASHRAE handbooks or other equivalent methods. c) Select heating and cooling equipment according to ANSI/ACCA 3 Manual S -2014 or other equivalent methods. Exception: Use of alternate design temperatures necessary to ensure the systems function are acceptable 21 . Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. a) Complete a Residential Occupancies Application Checklist that includes the minimum criteria. It is available at: https://www.hcd.ca.gov/building- standards/calgreen/cal-green-forms.shtml CARSLBAD CBR2020-3400 01/18/2021 ENERGY CONSERVATION 22. Include on the Title Sheet of the plans the following statement: "Compliance with the documentation requirements of the 2019 Energy Efficiency Standards is necessary for this project. Registered , signed, and dated copies of the appropriate CF1 R, CF2R, and CF3R forms shall be made available at necessary intervals for Building Inspector review. Final completed forms will be available for the building owner." 23. All domestic hot water piping to have the following minimum insulation installed: ½" pipe (1/2" insulation);¾" pipe (1" insulation); 1" to 1-½" pipe (1-½" insulation). CPC 609.11 & ES 150.00) a) Additionally, the ½" hot water pipe to the kitchen sink, and the cold-water pipe within 5' of the water heater both require 1" minimum insulation. ES 150.00) Residential ventilation requirements: ES 150.0(o)/ASHRAE 62.2 24. Kitchens require exhaust fans with a minimum 100 cfm ducted to the exterior. Detail compliance by including a complying exhaust fan or a ducted range hood to the exterior. 25. Bathrooms require exhaust fans (minimum 50 cfm) to be ducted to the exterior. A bathroom is defined "as a room with a bathtub, shower, or spa or some similar source of moisture". MISCELLANEOUS 26. Please submit calculations for the guardrail. 27. Please identify the recommended structural headers and beams on the framing plans. 28. May need a pad foundation for the floor beam along line C. 29. Please show existing foundation along line C. CARSLBAD CBR2020-3400 01/18/2021 ]To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes □ No □ The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Error! Reference source not found. at EsGil. Thank you. CARSLBAD CBR2020-3400 01/18/2021 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARSLBAD PREPARED BY: Bert Domingo PLAN CHECK#.: CBR2020-3400 DATE: 01/18/2021 BUILDING ADDRESS: 2716 MORNING GLORY LANE BUILDING OCCUPANCY: R 3 BUILDING I AREA I Valuation Reg. PORTION ( Sq. Ft.) Multiplier Mod. CITY ESTIMATE Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance 1997 UBC Building Permit Fee ..,. I hi '•I. 1997 UBC Plan Check Fee ...- VALUE Type of Review: 0 Complete Review D Structural Only D Repetitive Fee ,.. Repeats □ Other □ Ho...-iy EaGil Fee Comments : In addition to the above fee, an additional fee of$ $ /hr.) for the CalGreen review. ($} 48,007 48,007 $260.061 is due ( hour@ Sheet 1 of 1 ( City of Carlsbad PURPOt:_ CLIMATE ACTION PLAN CONSISTENCY CHECKLIST 8-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) oramance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be 1ecessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. I NOTE: The following type of permits are not required to fill out this form ❖ Patio ❖ Decks ❖ PME (w/o panel upgrade) ❖ Pool A If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. " Details on CAP ordinance requirements are available on the city's website. -" A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. Project Name/BuT1ci'1ng Permit No.: Applicant Name/Co.: Applicant Aaares&. Contact Phone: Applr:llon lnfcnnllllut _____________ BP No. ~W-~0 156-·120-33 PAOLA BONACINA BENZONI -BENZONI DESIGN 371 GLENCREST DRIVE SOLANA BEACH. CA 92075 (858) 822 9697 Contact Email: paola@benzonidesign.com Contact information of person completing this checklist (if different than above): Name: Comoany name/address: Applicant Signature: _ 8-50 Contact Phone: Contact Email: Date: 12/20/2020 Page 1 of6 Revised 06/18 f .. City of Carlsbad Climate Action Plan Consistency Checklist Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, attach Building Permit Valuation worksheet. Building Permit Valuation (BPV) from worksheet$ 46.740.08 Conllruction Type ~ Residential □ New construction Kl Additions and alterations: / <: IXI BPV < $60,000 '----□ BPV =!: $60,000 □ Electrical service panel upgrade only □ BPV =!: $200,000 D Nonresidential □ New construction □ Alterations: □ BPV =!: $200,000 or additions=!: 1,000 souare feet 0 BPV~$1,000,000 D ~ 2,000 sq. ft. new roof addition Checkllstbnl Complete Sac:tion(s) Nalll: A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use --......... NIA NIA ) All residential additions and alterations 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages only *Multi-family dwellings only where interior finishes are removed 1A, 4A* 18, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 18, 28, 38, 48 and 5 I 18,5 18,28,5 Building alterations of~ 75% existing gross floor area 28,5 1 B also applies if BPV ~ $200,000 Check the appopiaB boa, explai1 al rd~ flld a:eptiorl iams, aid provide stptilQ cabdalions and dlmnentatian as neoessay. 1. Energy Efficiency Please refer to Gar1sbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the Galifomia Green Building Standards Code (CALGreen) for more information when completing this section. A. D Residential addition or alteration ~ $60,000 building pennit valuation. □ NIA ________ _ See CMC section 18.30.190. D Exception: Horne energy score ~ 7 (attach certification) Year Built Single-family Requirements Multi.family Requirements □ Before 1978 Select one: C Duct sealing C Altic insulation []Cool roof □ Altic insulation □ 1978 and later Select one: □ Lighting package ti water heating Package □ Between 1978 and 1991 Select one: □Duct sealino l:IAttic insulation □Cool roof D 1992 and later Select one: □Lighting package □water heating package B. D Nonresidential* new construction or alterations ~ $200,000 building pennit valuation, or additions ~ 1,000 square feet 0 NIA Updated 8/ 15/20 I 9 2