HomeMy WebLinkAboutMS 15-09; VALLEY STREET SUBDIVISION PARCEL 2 & 3; POST CONSTRUCTION BMP CERTIFICATION - BIOFILTRATION BASINS; 2018-11-27SPEAR & ASSOCIATES, INC.
CIVIL ENGINEERING AND LAND SURVEYING
475 PRODUCTION STREET
SAN MARCOS, CA 92078
(760) 736-2040 • FAX (760) 736-4866
WWW.SPEARINC.NET
Parcel 2 & 3 ‐ Post Construction BMP Basin Verification
Date: November 27, 2018
Subject Property Information:
Owner: Ruzam, LLC
Address: 3683 & 3687 Valley Street
City: Carlsbad, CA 92008
Assessor's Parcel Number (APN): 205‐220‐96 & 97
Grading Plan No.: 491‐7A
To Whom It May Concern:
We hereby certify that we have field verified the post construction BMP Biofiltration Basins located on
Parcel 2 & Parcel 3 and found the constructed basins to be in substantial conformance with the detail
shown on Grading Plan 491‐7A, Sheet 2.
Engineer of Work: Spear & Associates, Inc. – Josh Zeigler, P.E.
Engineer’s Signature: Date: 11/27/18
Licensed Professional Contact information:
Phone: (760) 736‐2040
Address: 475 Production Street, San Marcos CA 92078
E‐mail: josh@spearinc.net