Loading...
HomeMy WebLinkAboutMS 15-09; VALLEY STREET SUBDIVISION PARCEL 2 & 3; POST CONSTRUCTION BMP CERTIFICATION - BIOFILTRATION BASINS; 2018-11-27SPEAR & ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 475 PRODUCTION STREET SAN MARCOS, CA 92078 (760) 736-2040 • FAX (760) 736-4866 WWW.SPEARINC.NET Parcel 2 & 3 ‐ Post Construction BMP Basin Verification    Date: November 27, 2018    Subject Property Information:  Owner: Ruzam, LLC        Address: 3683 & 3687 Valley Street       City: Carlsbad, CA 92008       Assessor's Parcel Number (APN): 205‐220‐96 & 97     Grading Plan No.: 491‐7A           To Whom It May Concern:    We hereby certify that we have field verified the post construction BMP Biofiltration Basins located on  Parcel 2 & Parcel 3 and found the constructed basins to be in substantial conformance with the detail  shown on Grading Plan 491‐7A, Sheet 2.             Engineer of Work: Spear & Associates, Inc. – Josh Zeigler, P.E.         Engineer’s Signature:          Date:   11/27/18             Licensed Professional Contact information:  Phone: (760) 736‐2040       Address: 475 Production Street, San Marcos CA 92078   E‐mail:  josh@spearinc.net