Loading...
HomeMy WebLinkAboutSDP 2019-0009; 2051 PALOMAR AIRPORT ROAD; WATER QUALITY BMP FINAL CERTIFICATION; 2021-04-30TAIT RISING TO THE CHALLE"'!GE April 30, 2021 City of Carlsbad p:71 4/560 /8200 www.tait.com Civil Engineer's Water Quality/BMP Final Certification Reference Project: SDP 2019-0009 2051 Palomar Airport Road Carlsbad, CA Tait Job No.: SP8415 701 N. Parkcenter Drive, Santa Ar Pursuant to the Municipal Permit, TAIT has inspected and verified that the structural BMPs including the LID, source control, hydromodification, and treatment control BMPs have been installed and are operating in compliance with the approved Storm Water Quality Management Plan (SWQMP Plan and Report). Tait performed a site visit to confirm the installation of all BMP's for the Palomar Airport Road project. This inspection included: the Bioclean MWS Units (treatment control BMPs); the Bioclean filters and the FloGuard catch basin inserts (LID BMPs); the installation of the ADS Detention Pipe Systems (hydromodification and treatment control- BMPs ); and the construction/installation of the stencils, trash enclosure and drain inlets (source control BMPs). Upon field verification of the above referenced items, it is our professional opinion that the BMP's have been installed and are operating per the approved Storm Water Quality Management Plan (SWQMP Plan and Report) . • VeryTru.·l.yYour.s~.7:. • AIT &ASSJ5JA-T . . . •. ·· C ~,,? //d/;; . p Jacob Vandervis P.E. 46301 Vice President